Permit GraphShortlistSan Francisco building permits since 2000

Charles Bloszies

License
C015414
Look the license up with the state
Listed as
architect, engineer
Firm
Cba
Based in
San Francisco
On San Francisco permits
Feb 2005 to Dec 2025

50 permits since 2000 (architect on 47 permits, engineer on 3 permits): 36 completed, 3 in progress, 5 never finaled, 6 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 22, 2025In progress
filed Dec 2025, not yet issued
120 Kearny Stinstall new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy.
Details
Permit
202512222455
Status
filed
Filed
Dec 22, 2025
Declared cost
$1,000,000
Address
120 Kearny St

install new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy.

Open the permit page

$1,000,000
Jun 6, 2025In progress
filed Jun 2025, not yet issued
50 Post Stcore & shell renovation of an open-air retail facility. selective demolition of (e) bldg elements,enclosure of open-air atrium w/ (n) curtain walls, (n) facades on post st. & sutter st.(n) stairs & elevators, infrastructure for (n) commercial cooking facilities,(n) mechanical & smoke control systems
Details
Permit
202505065861
Status
filed
Filed
Jun 6, 2025
Declared cost
$40,000,000
Address
50 Post St

core & shell renovation of an open-air retail facility. selective demolition of (e) bldg elements,enclosure of open-air atrium w/ (n) curtain walls, (n) facades on post st. & sutter st.(n) stairs & elevators, infrastructure for (n) commercial cooking facilities,(n) mechanical & smoke control systems

Open the permit page

$40,000,000
Aug 16, 2023In progress
issued Nov 2023
360 Spear Stinstall 11 additional lift assisted bike racks. ref pa# 201812279204. e-bikes are not permitted to charge in bike room.
Details
Permit
202308164548
Status
issued
Filed
Aug 16, 2023
Permit issued
Nov 21, 2023
Address
360 Spear St

install 11 additional lift assisted bike racks. ref pa# 201812279204. e-bikes are not permitted to charge in bike room.

Open the permit page

Dec 5, 2022Never finaled
filed Dec 2022, never issued
462 Bryant Staddition to (e) brick masonry structure at 460 bryant st that includes a main 3-story bldg, 1-story annex (462 bryant st) & basement common to both portions. removal of 1-story annex & construct a 7-story structure in it place. both structures function as 1 building with a common entrance.
Details
Permit
202212057694
Status
filed
Filed
Dec 5, 2022
Declared cost
$25,000,000
Address
462 Bryant St

addition to (e) brick masonry structure at 460 bryant st that includes a main 3-story bldg, 1-story annex (462 bryant st) & basement common to both portions. removal of 1-story annex & construct a 7-story structure in it place. both structures function as 1 building with a common entrance.

Open the permit page

$25,000,000
May 23, 2022Completed
final sign-off Nov 2022
1275 Sacramento StTruebeck Constructionremoval of non-structural partitions to combine 3 existing rooms into 1 new room. removal and replacement of existing finishes, fixtures and millwork. mep deferred
Details
Permit
202205234789
Status
complete
Filed
May 23, 2022
Permit issued
Jul 12, 2022
Final sign-off
Nov 4, 2022
Declared cost
$300,000
Address
1275 Sacramento St

removal of non-structural partitions to combine 3 existing rooms into 1 new room. removal and replacement of existing finishes, fixtures and millwork. mep deferred

Open the permit page

$300,000
Aug 6, 2021Completed
final sign-off Nov 2022
360 Spear StRossi Builders Inc.replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wall
Details
Permit
202108065944
Status
complete
Filed
Aug 6, 2021
Permit issued
Aug 23, 2021
Final sign-off
Nov 23, 2022
Declared cost
$65,000
Address
360 Spear St

replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wall

Open the permit page

$65,000
Feb 16, 2021Completed
final sign-off Nov 2022
1 Kearny StCentric Construction Incwork includes (n) exhaust ductwork & equipment serving greast duct system. exterior modification are limited to (n) louvers in (e) wall at 2nd flr of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit.
Details
Permit
202102164724
Status
complete
Filed
Feb 16, 2021
Permit issued
Dec 17, 2021
Final sign-off
Nov 7, 2022
Declared cost
$259,700
Address
1 Kearny St

work includes (n) exhaust ductwork & equipment serving greast duct system. exterior modification are limited to (n) louvers in (e) wall at 2nd flr of recess in annex facade on geary st. all electrical & plumbing work will be design-build by the general contractor under a separate permit.

Open the permit page

$259,700
Dec 3, 2020Completed
final sign-off May 2021
360 Spear StRossi Builders Inc.4th fl: modifications to base building mechanical system at tenant space.
Details
Permit
202012030192
Status
complete
Filed
Dec 3, 2020
Permit issued
Jan 11, 2021
Final sign-off
May 11, 2021
Declared cost
$175,000
Address
360 Spear St

4th fl: modifications to base building mechanical system at tenant space.

Open the permit page

$175,000
Oct 29, 2020Completed
final sign-off Nov 2021
360 Spear StRossi Builders Inc.permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use greater than 25000gsf. additional restrm/bathrm work w/ lockers & bicycle parking features. maher n/a
Details
Permit
202010297723
Status
complete
Filed
Oct 29, 2020
Permit issued
Sep 10, 2021
Final sign-off
Nov 15, 2021
Address
360 Spear St

permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use greater than 25000gsf. additional restrm/bathrm work w/ lockers & bicycle parking features. maher n/a

Open the permit page

Oct 22, 2020Completed
final sign-off Nov 2021
360 Spear StRossi Builders Inc.4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior work
Details
Permit
202010227200
Status
complete
Filed
Oct 22, 2020
Permit issued
Dec 18, 2020
Final sign-off
Nov 15, 2021
Declared cost
$75,000
Address
360 Spear St

4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior work

Open the permit page

$75,000
Sep 15, 2020Completed
final sign-off Nov 2021
360 Spear StRossi Builders Inc.revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t.i under separate permit. no work proposed in space occupied by internet exchange use on 2nd flr.
Details
Permit
202009154216
Status
complete
Filed
Sep 15, 2020
Permit issued
Feb 1, 2021
Final sign-off
Nov 15, 2021
Declared cost
$750,000
Address
360 Spear St

revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t.i under separate permit. no work proposed in space occupied by internet exchange use on 2nd flr.

Open the permit page

$750,000
Aug 27, 2020Completed
final sign-off Mar 2022
99 Missouri StOliver & Company Inc.two structures combined into single retail building. reconstruct portions of exterior facade, install new windows and entrances, site work in rear parking lot and sidewalk landscaping, new partitions, ceilings, finishes. utility upgrades. separate permit filed for first floor slab on grade.
Details
Permit
202008272734
Status
complete
Filed
Aug 27, 2020
Permit issued
Mar 24, 2021
Final sign-off
Mar 1, 2022
Declared cost
$4,000,000
Address
99 Missouri St

two structures combined into single retail building. reconstruct portions of exterior facade, install new windows and entrances, site work in rear parking lot and sidewalk landscaping, new partitions, ceilings, finishes. utility upgrades. separate permit filed for first floor slab on grade.

Open the permit page

$4,000,000
May 6, 2020Never finaled
filed May 2020, never issued
554 Fillmore Stconver vacant church bldg to residential use comprised of group housing & dwelling units. install (n) flr & internal construction within (e) envelope. partial seismically strengthen (e) umb structure. include (e) bell tower. minor change to exterior to provide light & air to units.(n)mep, fire -
Details
Permit
202005067322
Status
filed
Filed
May 6, 2020
Declared cost
$8,000,000
Address
554 Fillmore St

conver vacant church bldg to residential use comprised of group housing & dwelling units. install (n) flr & internal construction within (e) envelope. partial seismically strengthen (e) umb structure. include (e) bell tower. minor change to exterior to provide light & air to units.(n)mep, fire -

Open the permit page

$8,000,000
Mar 13, 2020Completed
final sign-off May 2021
360 Spear Stadministrative permit for pa #201812279204 & 201906264490, to confirm that 360 spear st is a "full sprinklered building" as defined by the san francisco building code, no work is proposed.
Details
Permit
202003137046
Status
complete
Filed
Mar 13, 2020
Permit issued
Jun 18, 2020
Final sign-off
May 11, 2021
Address
360 Spear St

administrative permit for pa #201812279204 & 201906264490, to confirm that 360 spear st is a "full sprinklered building" as defined by the san francisco building code, no work is proposed.

Open the permit page

Dec 23, 2019Completed
final sign-off May 2021
888 Post StSkyline Capital Builders Llcchange of use from retail/office/storage to office storage homeless shelter & navigation center for homeless youth w/ training & other office use. seismic strenthening per asce 41-13 & tenant improvements associated, utility upgrade, 1st fl for donation & job training,
Details
Permit
201912230310
Status
complete
Filed
Dec 23, 2019
Permit issued
Apr 14, 2020
Final sign-off
May 5, 2021
Declared cost
$9,499,595
Address
888 Post St

change of use from retail/office/storage to office storage homeless shelter & navigation center for homeless youth w/ training & other office use. seismic strenthening per asce 41-13 & tenant improvements associated, utility upgrade, 1st fl for donation & job training,

Open the permit page

$9,499,595
Oct 16, 2019Completed
final sign-off Oct 2022
1275 Sacramento StTruebeck Constructiontwo story horizontal addition to non-historic school bldg. interior renovation of classsroom on two flrs, new roof level restroom.
Details
Permit
201910164604
Status
complete
Filed
Oct 16, 2019
Permit issued
Apr 27, 2021
Final sign-off
Oct 31, 2022
Declared cost
$10,000,000
Address
1275 Sacramento St

two story horizontal addition to non-historic school bldg. interior renovation of classsroom on two flrs, new roof level restroom.

Open the permit page

$10,000,000
Aug 16, 2019Completed
final sign-off Jan 2021
969 Folsom StBlackline Constructionrevision to 201903286495 new concrete floor. no exterior work under this permit
Details
Permit
201908169061
Status
complete
Filed
Aug 16, 2019
Permit issued
Aug 23, 2019
Final sign-off
Jan 28, 2021
Address
969 Folsom St

revision to 201903286495 new concrete floor. no exterior work under this permit

Open the permit page

Aug 7, 2019Completed
final sign-off Dec 2020
360 Spear StRossi Builders Inc.hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils.
Details
Permit
201908078128
Status
complete
Filed
Aug 7, 2019
Permit issued
Aug 7, 2019
Final sign-off
Dec 7, 2020
Declared cost
$575,000
Address
360 Spear St

hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils.

Open the permit page

$575,000
Jul 24, 2019Completed
final sign-off Nov 2021
360 Spear StRossi Builders Inc.base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n) partitions in prep of vacant space
Details
Permit
201907246806
Status
complete
Filed
Jul 24, 2019
Permit issued
Aug 12, 2019
Final sign-off
Nov 15, 2021
Declared cost
$500,000
Address
360 Spear St

base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n) partitions in prep of vacant space

Open the permit page

$500,000
Apr 19, 2019Expired or cancelled
cancelled Jan 2026
906 BroadwayOccidental Expressadministrative permit to memorialize planning commission motion no. 20405, authorizes change of use from church to instructional services & community facility. no construction & building remains vacant. this administrative permit will be identified on all future permits.
Details
Permit
201904198541
Status
cancelled
Filed
Apr 19, 2019
Address
906 Broadway

administrative permit to memorialize planning commission motion no. 20405, authorizes change of use from church to instructional services & community facility. no construction & building remains vacant. this administrative permit will be identified on all future permits.

Open the permit page

Mar 28, 2019Completed
final sign-off Jan 2021
969 Folsom StBlackline Constructionbase bld it - new raised flr, new restrooms and a new kitchenette, minor structural alterations including replace some (e) roof girdles and columns. new code complaint exit doors at both folsom and shipley facades no other exterior work
Details
Permit
201903286495
Status
complete
Filed
Mar 28, 2019
Permit issued
Jul 25, 2019
Final sign-off
Jan 28, 2021
Declared cost
$350,000
Address
969 Folsom St

base bld it - new raised flr, new restrooms and a new kitchenette, minor structural alterations including replace some (e) roof girdles and columns. new code complaint exit doors at both folsom and shipley facades no other exterior work

Open the permit page

$350,000
Dec 27, 2018Completed
final sign-off Aug 2020
360 Spear StRossi Builders Inc.replace existing storefront entrance and garage doors in approx 35% of the ground floor openings along spear street. install new canopy meeting sf planning code section 136.1(c)(2)(c).
Details
Permit
201812279189
Status
complete
Filed
Dec 27, 2018
Permit issued
Apr 15, 2019
Final sign-off
Aug 26, 2020
Declared cost
$500,000
Address
360 Spear St

replace existing storefront entrance and garage doors in approx 35% of the ground floor openings along spear street. install new canopy meeting sf planning code section 136.1(c)(2)(c).

Open the permit page

$500,000
Dec 12, 2018Completed
final sign-off May 2020
360 Spear StRossi Builders Inc., Fisher Development Inccut new window openings in the existing perimeter shearwalls and strengthening the piers and spandrels around these openings by installation of carbon fiber wrap.
Details
Permit
201812128090
Status
complete
Filed
Dec 12, 2018
Permit issued
Feb 5, 2019
Final sign-off
May 18, 2020
Declared cost
$500,000
Address
360 Spear St

cut new window openings in the existing perimeter shearwalls and strengthening the piers and spandrels around these openings by installation of carbon fiber wrap.

Open the permit page

$500,000
Dec 12, 2018Completed
final sign-off Aug 2019
360 Spear StFisher Development Increplacement of metal panels in e window frames with safety glass to match adjacent glass panels in color and overall appearance.
Details
Permit
201812128082
Status
complete
Filed
Dec 12, 2018
Permit issued
Feb 5, 2019
Final sign-off
Aug 5, 2019
Declared cost
$250,000
Address
360 Spear St

replacement of metal panels in e window frames with safety glass to match adjacent glass panels in color and overall appearance.

Open the permit page

$250,000
Dec 5, 2018Never finaled
issued Dec 2018, no final
969 Folsom StModern Construction Incdemolition of mezzanine floor and non structural partition walls. soft demo only. no structural work. n/a for maher
Details
Permit
201812057525
Status
issued
Filed
Dec 5, 2018
Permit issued
Dec 5, 2018
Declared cost
$10,000
Address
969 Folsom St

demolition of mezzanine floor and non structural partition walls. soft demo only. no structural work. n/a for maher

Open the permit page

$10,000
Oct 23, 2018Completed
final sign-off Apr 2019
360 Spear StFisher Development Incselective non structural demo on floors 1-4. removal of (e) non operational mep systems, partitions, fixtures & finishes, no exterior demo is proposed maher na
Details
Permit
201810233916
Status
complete
Filed
Oct 23, 2018
Permit issued
Nov 5, 2018
Final sign-off
Apr 24, 2019
Declared cost
$5,000
Address
360 Spear St

selective non structural demo on floors 1-4. removal of (e) non operational mep systems, partitions, fixtures & finishes, no exterior demo is proposed maher na

Open the permit page

$5,000
May 4, 2018Never finaled
filed May 2018, never issued
1130 Post Stconstruction to improve life safety of garage by replacing auto ramps to reduce slope & improve turning raidus seismic strengthening & new utilities. work under this permit is core & structural. mep work will be design/build under another permit. maher n/a.
Details
Permit
201805048272
Status
filed
Filed
May 4, 2018
Declared cost
$5,000,000
Address
1130 Post St

construction to improve life safety of garage by replacing auto ramps to reduce slope & improve turning raidus seismic strengthening & new utilities. work under this permit is core & structural. mep work will be design/build under another permit. maher n/a.

Open the permit page

$5,000,000
Mar 2, 2018Completed
final sign-off Jul 2018
218 Stockton StFisher Development Incnew locker rooms & storage in the basement
Details
Permit
201803022723
Status
complete
Filed
Mar 2, 2018
Permit issued
Apr 16, 2018
Final sign-off
Jul 30, 2018
Declared cost
$125,000
Address
218 Stockton St

new locker rooms & storage in the basement

Open the permit page

$125,000
Feb 6, 2018Expired or cancelled
cancelled Jan 2026
1 Kearny Stno construction work review of (e) bld conditions to conformance to 2016 ca bld code disabled access req's. public access to bld lobbies, elevators & bathrooms. bld was remodeled & hoorizontal extension in 2006 ref 200607136416
Details
Permit
201802060586
Status
cancelled
Filed
Feb 6, 2018
Address
1 Kearny St

no construction work review of (e) bld conditions to conformance to 2016 ca bld code disabled access req's. public access to bld lobbies, elevators & bathrooms. bld was remodeled & hoorizontal extension in 2006 ref 200607136416

Open the permit page

Feb 10, 2017Completed
final sign-off Jul 2017
153 Kearny StC C I Commercial Construction & Improvscope of work consists of restroom improvements on the 2nd, 5th and 6th floor of 153 kearny. improvements include new vanities, accessories and finishes
Details
Permit
201702109191
Status
complete
Filed
Feb 10, 2017
Permit issued
Feb 15, 2017
Final sign-off
Jul 12, 2017
Declared cost
$8,000
Address
153 Kearny St

scope of work consists of restroom improvements on the 2nd, 5th and 6th floor of 153 kearny. improvements include new vanities, accessories and finishes

Open the permit page

$8,000
Feb 10, 2017Completed
final sign-off Jul 2017
153 Kearny StC C I Commercial Construction & Improvrevision to previously approved interior improvements application in the entry lobby of 153 kearny st pa 2016-0815-5034. work under this revisions consists of voluntary fire rating uprgades to the existing lobby walls, doors, and mezzanine floor.
Details
Permit
201702109196
Status
complete
Filed
Feb 10, 2017
Permit issued
Feb 15, 2017
Final sign-off
Jul 12, 2017
Declared cost
$10,000
Address
153 Kearny St

revision to previously approved interior improvements application in the entry lobby of 153 kearny st pa 2016-0815-5034. work under this revisions consists of voluntary fire rating uprgades to the existing lobby walls, doors, and mezzanine floor.

Open the permit page

$10,000
Nov 7, 2016Expired or cancelled
cancelled Feb 2020
744 Harrison Stto document change of use on lot comprising 744 harrison st, the existing building on one lot will be converted from retail on 1st floor and warehouse on 2nd to office use on both floors, the existing adjoining lot is vacant and serves as parking for existing uses as well as proposed office use.
Details
Permit
201611072141
Status
cancelled
Filed
Nov 7, 2016
Address
744 Harrison St

to document change of use on lot comprising 744 harrison st, the existing building on one lot will be converted from retail on 1st floor and warehouse on 2nd to office use on both floors, the existing adjoining lot is vacant and serves as parking for existing uses as well as proposed office use.

Open the permit page

Jun 8, 2016Completed
final sign-off Nov 2017
856 Market StSouth Bay Constructionproposed work is a revision to base building renovation project,appn. 201512084521, revisions include alterations of structural framing details & a revision,revised location for a new electrical service that was approved under the base permit.no other work is proposed, maher n/a
Details
Permit
201606089412
Status
complete
Filed
Jun 8, 2016
Permit issued
Jul 20, 2016
Final sign-off
Nov 8, 2017
Declared cost
$123,000
Address
856 Market St

proposed work is a revision to base building renovation project,appn. 201512084521, revisions include alterations of structural framing details & a revision,revised location for a new electrical service that was approved under the base permit.no other work is proposed, maher n/a

Open the permit page

$123,000
Aug 21, 2013Completed
final sign-off Sep 2013
1269 Lombard StPalisade Builders Increvision to appl #2012.0723.5535 - approval of local equivalency to document that door at rear of property, will swing over property line per agreed easement, this permit fo rdocumentation only, no construction work.
Details
Permit
201308214851
Status
complete
Filed
Aug 21, 2013
Permit issued
Aug 21, 2013
Final sign-off
Sep 17, 2013
Address
1269 Lombard St

revision to appl #2012.0723.5535 - approval of local equivalency to document that door at rear of property, will swing over property line per agreed easement, this permit fo rdocumentation only, no construction work.

Open the permit page

Aug 8, 2013Completed
final sign-off Jan 2015
460 Bryant Stin-fill of an (e) floor opening & removal of stairs connecting the basement & ground floor spaces. the construction of a new opening & stairs within the same space. no exterior work.
Details
Permit
201308083878
Status
complete
Filed
Aug 8, 2013
Permit issued
Sep 23, 2013
Final sign-off
Jan 7, 2015
Declared cost
$150,000
Address
460 Bryant St

in-fill of an (e) floor opening & removal of stairs connecting the basement & ground floor spaces. the construction of a new opening & stairs within the same space. no exterior work.

Open the permit page

$150,000
Aug 18, 2011Completed
final sign-off Feb 2012
1840 Washington StJames E Roberts-Obayashi Corporationrevision to apl #201002045949: additoinal fireproofing details
Details
Permit
201108182713
Status
complete
Filed
Aug 18, 2011
Permit issued
Aug 18, 2011
Final sign-off
Feb 27, 2012
Address
1840 Washington St

revision to apl #201002045949: additoinal fireproofing details

Open the permit page

Feb 26, 2008Completed
final sign-off Jun 2008
690 Market Stfor documentation request only per building inspectors request. revise scope of work from 200308051235s2. to include 88 units for final completion and defer competion and defer 13 units having each a separate cfc, correct door swings at units per inspector's requirements.
Details
Permit
200802265577
Status
complete
Filed
Feb 26, 2008
Permit issued
Feb 26, 2008
Final sign-off
Jun 27, 2008
Declared cost
$20,000
Address
690 Market St

for documentation request only per building inspectors request. revise scope of work from 200308051235s2. to include 88 units for final completion and defer competion and defer 13 units having each a separate cfc, correct door swings at units per inspector's requirements.

Open the permit page

$20,000
Feb 20, 2008Never finaled
issued Feb 2008, no final
690 Market Stconstruct new 1 hr rated demising wall at ground floor. commercial space ti under seperate permit
Details
Permit
200802205148
Status
issued
Filed
Feb 20, 2008
Permit issued
Feb 20, 2008
Declared cost
$25,000
Address
690 Market St

construct new 1 hr rated demising wall at ground floor. commercial space ti under seperate permit

Open the permit page

$25,000
Jan 30, 2008Completed
final sign-off Jun 2008
942 Market Stti on ground floor to construct a new demising wall to separate two comercial spaces. mep under separate permit. accessibility to be provide with t.i. per sfbc ab-017.
Details
Permit
200801303581
Status
complete
Filed
Jan 30, 2008
Permit issued
Jan 30, 2008
Final sign-off
Jun 12, 2008
Declared cost
$11,000
Address
942 Market St

ti on ground floor to construct a new demising wall to separate two comercial spaces. mep under separate permit. accessibility to be provide with t.i. per sfbc ab-017.

Open the permit page

$11,000
Nov 28, 2007Completed
final sign-off Sep 2009
690 Market Stminor revision to pa# 200707207350 unit #2302 change in kitchen island design, remove non-rated hallway door and revise door style at library/ media room.
Details
Permit
200711289139
Status
complete
Filed
Nov 28, 2007
Permit issued
Nov 29, 2007
Final sign-off
Sep 17, 2009
Declared cost
$10,000
Address
690 Market St

minor revision to pa# 200707207350 unit #2302 change in kitchen island design, remove non-rated hallway door and revise door style at library/ media room.

Open the permit page

$10,000
Jul 20, 2007Expired or cancelled
expired Sep 2009
690 Market Stremove interior wall to merge two dwelling units on 22nd floor into single unit
Details
Permit
200707207350
Status
expired
Filed
Jul 20, 2007
Permit issued
Aug 10, 2007
Declared cost
$27,000
Address
690 Market St

remove interior wall to merge two dwelling units on 22nd floor into single unit

Open the permit page

$27,000
Jul 18, 2007Completed
final sign-off Dec 2007
942 Market Strevision to approved pa# 2003/0805/1236 s1 to change facade facing market st and mason facade. per planning dept comments. new canopy over louvers and glass doors.
Details
Permit
200707187087
Status
complete
Filed
Jul 18, 2007
Permit issued
Aug 10, 2007
Final sign-off
Dec 3, 2007
Declared cost
$21,000
Address
942 Market St

revision to approved pa# 2003/0805/1236 s1 to change facade facing market st and mason facade. per planning dept comments. new canopy over louvers and glass doors.

Open the permit page

$21,000
Jun 7, 2007Completed
final sign-off Mar 2010
690 Market St2 new communicating openings on basement level and mezzanine to adjacent property at 660 market street (for work related to pa# 200704138769)
Details
Permit
200706073321
Status
complete
Filed
Jun 7, 2007
Permit issued
Sep 28, 2007
Final sign-off
Mar 12, 2010
Declared cost
$97,300
Address
690 Market St

2 new communicating openings on basement level and mezzanine to adjacent property at 660 market street (for work related to pa# 200704138769)

Open the permit page

$97,300
Apr 5, 2007Completed
final sign-off Jun 2008
88 Kearny Stadd 10 car lifts at basement level. new 1-hr rated partitions to seperate car lifts fire protection under seperate permit.
Details
Permit
200704058140
Status
complete
Filed
Apr 5, 2007
Permit issued
Aug 7, 2007
Final sign-off
Jun 27, 2008
Declared cost
$430,000
Address
88 Kearny St

add 10 car lifts at basement level. new 1-hr rated partitions to seperate car lifts fire protection under seperate permit.

Open the permit page

$430,000
Mar 28, 2007Expired or cancelled
expired Jun 2008
690 Market Strevision to mechanical & electrical systems approved under appl#200308051235 to comply with owner requirements & final smoke control report.
Details
Permit
200703287535
Status
expired
Filed
Mar 28, 2007
Permit issued
Jan 3, 2008
Declared cost
$20,000
Address
690 Market St

revision to mechanical & electrical systems approved under appl#200308051235 to comply with owner requirements & final smoke control report.

Open the permit page

$20,000
Jul 13, 2006Completed
final sign-off Mar 2011
1 Kearny Stassembly occup is not allowed in this bldg.proposed(e)as apprv only complies w/ "b" occp.any future res. "r"or assembly"a"occup would req both exit stairs to discharge directly to public way.new ten story horiz addition to(e)12 story historical bldg.(e)3 story bldg was demolish under 200705252255.
Details
Permit
200607136416
Status
complete
Filed
Jul 13, 2006
Permit issued
Feb 26, 2008
Final sign-off
Mar 1, 2011
Declared cost
$10,000,000
Address
1 Kearny St

assembly occup is not allowed in this bldg.proposed(e)as apprv only complies w/ "b" occp.any future res. "r"or assembly"a"occup would req both exit stairs to discharge directly to public way.new ten story horiz addition to(e)12 story historical bldg.(e)3 story bldg was demolish under 200705252255.

Open the permit page

$10,000,000
Mar 2, 2006Completed
final sign-off Oct 2006
658 Market Stinterior tenant improvement of 1st floor space new architectural & structural improvements. m.e.p under seperate permit.
Details
Permit
200603025863
Status
complete
Filed
Mar 2, 2006
Permit issued
Apr 18, 2006
Final sign-off
Oct 13, 2006
Declared cost
$820,000
Address
658 Market St

interior tenant improvement of 1st floor space new architectural & structural improvements. m.e.p under seperate permit.

Open the permit page

$820,000
Dec 29, 2005Completed
final sign-off Mar 2010
660 Market Stnew parking on lower level. communicating opening between 690/660 market st.
Details
Permit
200512291252
Status
complete
Filed
Dec 29, 2005
Permit issued
Apr 11, 2008
Final sign-off
Mar 12, 2010
Declared cost
$820,000
Address
660 Market St

new parking on lower level. communicating opening between 690/660 market st.

Open the permit page

$820,000
Oct 4, 2005Expired or cancelled
cancelled Sep 2007
1700 Franklin Stpartial demolition of exterior facade brace & repair franklin st facade.disabled access to be submitted with new construction.demo & shoring only.
Details
Permit
200510044674
Status
cancelled
Filed
Oct 4, 2005
Declared cost
$175,000
Address
1700 Franklin St

partial demolition of exterior facade brace & repair franklin st facade.disabled access to be submitted with new construction.demo & shoring only.

Open the permit page

$175,000
Feb 11, 2005Completed
final sign-off Oct 2005
633 Battery StDpr Construction Incoti-1, 4th floor, el, me, sp.
Details
Permit
200502115315
Status
complete
Filed
Feb 11, 2005
Permit issued
Feb 28, 2005
Final sign-off
Oct 17, 2005
Declared cost
$105,000
Address
633 Battery St

oti-1, 4th floor, el, me, sp.

Open the permit page

$105,000