Breck Polley
- Listed as
- architect, engineer
- Firm
- Huntman
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Sep 2026
30 permits since 2000 (architect on 29 permits, engineer on 1 permit): 21 completed, 6 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 300 Clay St | alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb toDetails
alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to | $875,345 | |
| Jul 14, 2026 | In progress issued Aug 2026 | 1 Maritime Pz | Gci, Inc | removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of theDetails
removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the | $165,418 |
| Jun 24, 2026 | In progress issued Jun 2026 | 150 California St | Matrix Hg Inc | replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.Details
replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse. | $198,000 |
| Jun 1, 2026 | In progress issued Jul 2026 | 101 California St | Skyline Construction | floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.Details
floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns. | $38,000 |
| Apr 8, 2026 | In progress issued Apr 2026 | 300 Clay St | Matrix Hg Inc | 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.Details
26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. | $90,000 |
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lightingDetails
9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting | $342,500 |
| Feb 6, 2026 | Completed final sign-off Sep 2026 | 150 California St | Mayco Commercial Construction Inc | 17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.Details
17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms. | $450,000 |
| Feb 3, 2026 | Completed final sign-off Mar 2026 | 3565 California St | Skyline Construction | revision to pa # 2025-0903-4422: corrected cover sheet only- reduced scope of work. no longer requires deferred life safety/fire alarm submittal.Details
revision to pa # 2025-0903-4422: corrected cover sheet only- reduced scope of work. no longer requires deferred life safety/fire alarm submittal. | |
| Oct 1, 2025 | Completed final sign-off Jun 2026 | 150 California St | Mayco Commercial Construction Inc | 6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lightingDetails
6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting | $199,018 |
| Sep 3, 2025 | Completed final sign-off Mar 2026 | 3565 California St | Skyline Construction | interior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep.Details
interior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep. | $484,422 |
| Jun 16, 2025 | Completed final sign-off Jan 2026 | 300 Clay St | Matrix Hg Inc | add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant.Details
add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant. | $36,789 |
| Feb 13, 2025 | In progress issued Feb 2025 | 300 Clay St | Matrix Hg Inc | fire sequence change. revision to pa#2024-0724-7142Details
fire sequence change. revision to pa#2024-0724-7142 | $50,000 |
| Jan 28, 2025 | Completed final sign-off Nov 2025 | 3565 California St | Skyline Construction | demo only of non structural partitions, ceilings, millwork, finishes and mep. no build-back. ti and remodel of building facades under separate permits. no occupancy at completion of permitDetails
demo only of non structural partitions, ceilings, millwork, finishes and mep. no build-back. ti and remodel of building facades under separate permits. no occupancy at completion of permit | $18,195 |
| Dec 17, 2024 | Completed final sign-off Oct 2025 | 1 Maritime Pz | Bcci Construction Company | 19th floor. partial demolition of non structural partitons, ceiling, finishes, and mep. new construction of demising partitions. new finishes, ceiling, and mech in common areas. upgrn existing restrooms to bring to compliance with sfbc chapter 11b. electrical deferred.Details
19th floor. partial demolition of non structural partitons, ceiling, finishes, and mep. new construction of demising partitions. new finishes, ceiling, and mech in common areas. upgrn existing restrooms to bring to compliance with sfbc chapter 11b. electrical deferred. | $1,066,991 |
| Dec 12, 2024 | Completed final sign-off Apr 2025 | 1 Maritime Pz | Gci, Inc | 24/f: barrier removal only, including selective demo of restroom finishes and accessories construction of non structural partitons wall finishes, restroom accessories and hevy drinking fountain to bring restrooms up to full compliance with sfbc chapter 11bDetails
24/f: barrier removal only, including selective demo of restroom finishes and accessories construction of non structural partitons wall finishes, restroom accessories and hevy drinking fountain to bring restrooms up to full compliance with sfbc chapter 11b | $25,000 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl.Details
rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl. | $19,272 |
| Sep 24, 2024 | Completed final sign-off Jul 2025 | 1 Maritime Pz | Gci, Inc | 26th flr.minor office ti.(n)freestanding office enclosure, new millwork and sink. voluntary upgrade of non accessible(e)multi occupancy restroom & locker facility designed for use of men only to a fully accessible single occupancy facility including demo, new partitions,doors,ceilings, finishes &mepDetails
26th flr.minor office ti.(n)freestanding office enclosure, new millwork and sink. voluntary upgrade of non accessible(e)multi occupancy restroom & locker facility designed for use of men only to a fully accessible single occupancy facility including demo, new partitions,doors,ceilings, finishes &mep | $159,840 |
| Aug 19, 2024 | Completed final sign-off Mar 2025 | 1 Maritime Pz | Gci, Inc | interior tenant improvement on occupied multi tenant floor. scope includes selective demo of non structural partitions, interior glazing, ceilings, light fixtures, millwork finishes. fuild back non structural paritions, doos, interior glazing, ceilings, light fixtures, millwork, finishes. mep defer.Details
interior tenant improvement on occupied multi tenant floor. scope includes selective demo of non structural partitions, interior glazing, ceilings, light fixtures, millwork finishes. fuild back non structural paritions, doos, interior glazing, ceilings, light fixtures, millwork, finishes. mep defer. | $200,220 |
| Aug 2, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | 18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type)Details
18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type) | $4,483,300 |
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 101 California St | Skyline Construction | 17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mepDetails
17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep | $4,483,300 |
| Apr 22, 2024 | Completed final sign-off Aug 2024 | 1 Maritime Pz | Hathaway Dinwiddie Co. | revision to approved permit 2023-1211-2251;; minor revisions to mechanicl and plumbing systems simplified structural upgardsDetails
revision to approved permit 2023-1211-2251;; minor revisions to mechanicl and plumbing systems simplified structural upgards | |
| Jan 25, 2024 | Completed final sign-off Aug 2025 | 1 Maritime Pz | Bcci Construction Company | 17th and 18th floors- floor demo of 17th and 18th floor with tenant improvements to core restrooms and elevator lobbies. no exterior work.Details
17th and 18th floors- floor demo of 17th and 18th floor with tenant improvements to core restrooms and elevator lobbies. no exterior work. | $686,200 |
| Dec 11, 2023 | Completed final sign-off Sep 2024 | 1 Maritime Pz | Hathaway Dinwiddie Co. | ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above).Details
ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above). | $518,000 |
| Jul 14, 2023 | Completed final sign-off Jul 2024 | 300 Clay St | Hathaway Dinwiddie Co. | ste #15: interior non-structural demolition and minor improvement (paint and temp lighting) to prep unoccupied tenant suite for marketing.Details
ste #15: interior non-structural demolition and minor improvement (paint and temp lighting) to prep unoccupied tenant suite for marketing. | $30,000 |
| Nov 21, 2022 | Never finaled filed Nov 2022, never issued | 300 Toni Stone Cg | proj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, and all geder toilet rooms. no exterior work, no ooc change.Details
proj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, and all geder toilet rooms. no exterior work, no ooc change. | $31,000,000 | |
| Oct 27, 2022 | Never finaled filed Oct 2022, never issued | 300 Toni Stone Cg | proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries,Details
proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries, | $22,000,000 | |
| Jan 11, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Gci, Inc | 16/f: demo of non-structural partitions, doors, glazing, millwork, finishes & mehcnaical, plumbing. ab-017 compliant. maher n/a. remain vacant. sprinkler permit: 202111293246Details
16/f: demo of non-structural partitions, doors, glazing, millwork, finishes & mehcnaical, plumbing. ab-017 compliant. maher n/a. remain vacant. sprinkler permit: 202111293246 | $123,850 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 255 California St | Principal Builders Inc. | suite 1150: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep @003k%@aacfbDetails
suite 1150: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep @003k%@aacfb | $625,000 |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 255 California St | Principal Builders Inc. | suite 1200: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep permits.Details
suite 1200: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep permits. | $625,000 |
| Jul 20, 2020 | Never finaled issued Aug 2021, no final | 33 New Montgomery St | Peacock Construction | installation of iron fence/gate of loading dock, side of building.Details
installation of iron fence/gate of loading dock, side of building. | $10,000 |