Permit GraphShortlistSan Francisco building permits since 2000

Breck Polley

License
C34828
Look the license up with the state
Listed as
architect, engineer
Firm
Huntman
Based in
San Francisco
On San Francisco permits
Jul 2020 to Sep 2026

30 permits since 2000 (architect on 29 permits, engineer on 1 permit): 21 completed, 6 in progress, 3 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 2, 2026In progress
filed Sep 2026, not yet issued
300 Clay Stalteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to
Details
Permit
202609027552
Status
filed
Filed
Sep 2, 2026
Declared cost
$875,345
Address
300 Clay St

alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to

Open the permit page

$875,345
Jul 14, 2026In progress
issued Aug 2026
1 Maritime PzGci, Incremoval of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the
Details
Permit
202607144956
Status
issued
Filed
Jul 14, 2026
Permit issued
Aug 11, 2026
Declared cost
$165,418
Address
1 Maritime Pz

removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the

Open the permit page

$165,418
Jun 24, 2026In progress
issued Jun 2026
150 California StMatrix Hg Increplace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.
Details
Permit
202606243787
Status
issued
Filed
Jun 24, 2026
Permit issued
Jun 24, 2026
Declared cost
$198,000
Address
150 California St

replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.

Open the permit page

$198,000
Jun 1, 2026In progress
issued Jul 2026
101 California StSkyline Constructionfloors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.
Details
Permit
202606012221
Status
issued
Filed
Jun 1, 2026
Permit issued
Jul 8, 2026
Declared cost
$38,000
Address
101 California St

floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.

Open the permit page

$38,000
Apr 8, 2026In progress
issued Apr 2026
300 Clay StMatrix Hg Inc26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.
Details
Permit
202604089072
Status
issued
Filed
Apr 8, 2026
Permit issued
Apr 21, 2026
Declared cost
$90,000
Address
300 Clay St

26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.

Open the permit page

$90,000
Feb 17, 2026Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting
Details
Permit
202602175990
Status
complete
Filed
Feb 17, 2026
Permit issued
Feb 19, 2026
Final sign-off
Jun 26, 2026
Declared cost
$342,500
Address
150 California St

9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework including relocated and some new lighting

Open the permit page

$342,500
Feb 6, 2026Completed
final sign-off Sep 2026
150 California StMayco Commercial Construction Inc17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.
Details
Permit
202602065382
Status
complete
Filed
Feb 6, 2026
Permit issued
Feb 19, 2026
Final sign-off
Sep 3, 2026
Declared cost
$450,000
Address
150 California St

17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.

Open the permit page

$450,000
Feb 3, 2026Completed
final sign-off Mar 2026
3565 California StSkyline Constructionrevision to pa # 2025-0903-4422: corrected cover sheet only- reduced scope of work. no longer requires deferred life safety/fire alarm submittal.
Details
Permit
202602035085
Status
complete
Filed
Feb 3, 2026
Permit issued
Feb 11, 2026
Final sign-off
Mar 30, 2026
Address
3565 California St

revision to pa # 2025-0903-4422: corrected cover sheet only- reduced scope of work. no longer requires deferred life safety/fire alarm submittal.

Open the permit page

Oct 1, 2025Completed
final sign-off Jun 2026
150 California StMayco Commercial Construction Inc6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting
Details
Permit
202510016451
Status
complete
Filed
Oct 1, 2025
Permit issued
Oct 14, 2025
Final sign-off
Jun 26, 2026
Declared cost
$199,018
Address
150 California St

6/fl- ti of (e) suite 650 to include interior non structural demo , non structural partitions, doors, frames, hardware, sidelights, finishes and millwork, ceiling and lighting

Open the permit page

$199,018
Sep 3, 2025Completed
final sign-off Mar 2026
3565 California StSkyline Constructioninterior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep.
Details
Permit
202509034422
Status
complete
Filed
Sep 3, 2025
Permit issued
Oct 2, 2025
Final sign-off
Mar 30, 2026
Declared cost
$484,422
Address
3565 California St

interior tenant improvement of a new branch bank including new non structural partitions, doors, glazing, finishes, millwork and mep.

Open the permit page

$484,422
Jun 16, 2025Completed
final sign-off Jan 2026
300 Clay StMatrix Hg Incadd (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant.
Details
Permit
202506168732
Status
complete
Filed
Jun 16, 2025
Permit issued
Jun 16, 2025
Final sign-off
Jan 7, 2026
Declared cost
$36,789
Address
300 Clay St

add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant.

Open the permit page

$36,789
Feb 13, 2025In progress
issued Feb 2025
300 Clay StMatrix Hg Incfire sequence change. revision to pa#2024-0724-7142
Details
Permit
202502130235
Status
issued
Filed
Feb 13, 2025
Permit issued
Feb 28, 2025
Declared cost
$50,000
Address
300 Clay St

fire sequence change. revision to pa#2024-0724-7142

Open the permit page

$50,000
Jan 28, 2025Completed
final sign-off Nov 2025
3565 California StSkyline Constructiondemo only of non structural partitions, ceilings, millwork, finishes and mep. no build-back. ti and remodel of building facades under separate permits. no occupancy at completion of permit
Details
Permit
202501289176
Status
complete
Filed
Jan 28, 2025
Permit issued
Apr 22, 2025
Final sign-off
Nov 19, 2025
Declared cost
$18,195
Address
3565 California St

demo only of non structural partitions, ceilings, millwork, finishes and mep. no build-back. ti and remodel of building facades under separate permits. no occupancy at completion of permit

Open the permit page

$18,195
Dec 17, 2024Completed
final sign-off Oct 2025
1 Maritime PzBcci Construction Company19th floor. partial demolition of non structural partitons, ceiling, finishes, and mep. new construction of demising partitions. new finishes, ceiling, and mech in common areas. upgrn existing restrooms to bring to compliance with sfbc chapter 11b. electrical deferred.
Details
Permit
202412176941
Status
complete
Filed
Dec 17, 2024
Permit issued
Jan 7, 2025
Final sign-off
Oct 7, 2025
Declared cost
$1,066,991
Address
1 Maritime Pz

19th floor. partial demolition of non structural partitons, ceiling, finishes, and mep. new construction of demising partitions. new finishes, ceiling, and mech in common areas. upgrn existing restrooms to bring to compliance with sfbc chapter 11b. electrical deferred.

Open the permit page

$1,066,991
Dec 12, 2024Completed
final sign-off Apr 2025
1 Maritime PzGci, Inc24/f: barrier removal only, including selective demo of restroom finishes and accessories construction of non structural partitons wall finishes, restroom accessories and hevy drinking fountain to bring restrooms up to full compliance with sfbc chapter 11b
Details
Permit
202412126650
Status
complete
Filed
Dec 12, 2024
Permit issued
Jan 2, 2025
Final sign-off
Apr 2, 2025
Declared cost
$25,000
Address
1 Maritime Pz

24/f: barrier removal only, including selective demo of restroom finishes and accessories construction of non structural partitons wall finishes, restroom accessories and hevy drinking fountain to bring restrooms up to full compliance with sfbc chapter 11b

Open the permit page

$25,000
Oct 25, 2024Completed
final sign-off Mar 2025
101 California StSkyline Constructionrev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl.
Details
Permit
202410253712
Status
complete
Filed
Oct 25, 2024
Permit issued
Nov 8, 2024
Final sign-off
Mar 7, 2025
Declared cost
$19,272
Address
101 California St

rev to pa# 2024-0802-7822: (3) new private office (formely open office space) and conversion of (2) flex rooms to private offices (assembly to business) plus mehanical lighting and electric. 18th fl.

Open the permit page

$19,272
Sep 24, 2024Completed
final sign-off Jul 2025
1 Maritime PzGci, Inc26th flr.minor office ti.(n)freestanding office enclosure, new millwork and sink. voluntary upgrade of non accessible(e)multi occupancy restroom & locker facility designed for use of men only to a fully accessible single occupancy facility including demo, new partitions,doors,ceilings, finishes &mep
Details
Permit
202409241456
Status
complete
Filed
Sep 24, 2024
Permit issued
Oct 7, 2024
Final sign-off
Jul 1, 2025
Declared cost
$159,840
Address
1 Maritime Pz

26th flr.minor office ti.(n)freestanding office enclosure, new millwork and sink. voluntary upgrade of non accessible(e)multi occupancy restroom & locker facility designed for use of men only to a fully accessible single occupancy facility including demo, new partitions,doors,ceilings, finishes &mep

Open the permit page

$159,840
Aug 19, 2024Completed
final sign-off Mar 2025
1 Maritime PzGci, Incinterior tenant improvement on occupied multi tenant floor. scope includes selective demo of non structural partitions, interior glazing, ceilings, light fixtures, millwork finishes. fuild back non structural paritions, doos, interior glazing, ceilings, light fixtures, millwork, finishes. mep defer.
Details
Permit
202408198922
Status
complete
Filed
Aug 19, 2024
Permit issued
Sep 12, 2024
Final sign-off
Mar 10, 2025
Declared cost
$200,220
Address
1 Maritime Pz

interior tenant improvement on occupied multi tenant floor. scope includes selective demo of non structural partitions, interior glazing, ceilings, light fixtures, millwork finishes. fuild back non structural paritions, doos, interior glazing, ceilings, light fixtures, millwork, finishes. mep defer.

Open the permit page

$200,220
Aug 2, 2024Completed
final sign-off Mar 2025
101 California StSkyline Construction18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type)
Details
Permit
202408027822
Status
complete
Filed
Aug 2, 2024
Permit issued
Aug 29, 2024
Final sign-off
Mar 7, 2025
Declared cost
$4,483,300
Address
101 California St

18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type)

Open the permit page

$4,483,300
Jul 26, 2024Completed
final sign-off Mar 2025
101 California StSkyline Construction17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep
Details
Permit
202407267324
Status
complete
Filed
Jul 26, 2024
Permit issued
Aug 29, 2024
Final sign-off
Mar 7, 2025
Declared cost
$4,483,300
Address
101 California St

17/fl- full office ti to include (n) non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep

Open the permit page

$4,483,300
Apr 22, 2024Completed
final sign-off Aug 2024
1 Maritime PzHathaway Dinwiddie Co.revision to approved permit 2023-1211-2251;; minor revisions to mechanicl and plumbing systems simplified structural upgards
Details
Permit
202404220427
Status
complete
Filed
Apr 22, 2024
Permit issued
Jun 11, 2024
Final sign-off
Aug 29, 2024
Address
1 Maritime Pz

revision to approved permit 2023-1211-2251;; minor revisions to mechanicl and plumbing systems simplified structural upgards

Open the permit page

Jan 25, 2024Completed
final sign-off Aug 2025
1 Maritime PzBcci Construction Company17th and 18th floors- floor demo of 17th and 18th floor with tenant improvements to core restrooms and elevator lobbies. no exterior work.
Details
Permit
202401254620
Status
complete
Filed
Jan 25, 2024
Permit issued
May 7, 2024
Final sign-off
Aug 11, 2025
Declared cost
$686,200
Address
1 Maritime Pz

17th and 18th floors- floor demo of 17th and 18th floor with tenant improvements to core restrooms and elevator lobbies. no exterior work.

Open the permit page

$686,200
Dec 11, 2023Completed
final sign-off Sep 2024
1 Maritime PzHathaway Dinwiddie Co.ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above).
Details
Permit
202312112251
Status
complete
Filed
Dec 11, 2023
Permit issued
Jan 19, 2024
Final sign-off
Sep 27, 2024
Declared cost
$518,000
Address
1 Maritime Pz

ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above).

Open the permit page

$518,000
Jul 14, 2023Completed
final sign-off Jul 2024
300 Clay StHathaway Dinwiddie Co.ste #15: interior non-structural demolition and minor improvement (paint and temp lighting) to prep unoccupied tenant suite for marketing.
Details
Permit
202307142226
Status
complete
Filed
Jul 14, 2023
Permit issued
Jul 21, 2023
Final sign-off
Jul 25, 2024
Declared cost
$30,000
Address
300 Clay St

ste #15: interior non-structural demolition and minor improvement (paint and temp lighting) to prep unoccupied tenant suite for marketing.

Open the permit page

$30,000
Nov 21, 2022Never finaled
filed Nov 2022, never issued
300 Toni Stone Cgproj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, and all geder toilet rooms. no exterior work, no ooc change.
Details
Permit
202211216982
Status
approved
Filed
Nov 21, 2022
Declared cost
$31,000,000
Address
300 Toni Stone Cg

proj-22-0514 mayor ed 17-02: mission rock bldg g - ti of 6 full flrs (6-11) in an (e) 13 story bldg. scope includes new interior construction of open work space, enclosed offices, meeting rooms, employee pantries, and all geder toilet rooms. no exterior work, no ooc change.

Open the permit page

$31,000,000
Oct 27, 2022Never finaled
filed Oct 2022, never issued
300 Toni Stone Cgproj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries,
Details
Permit
202210275305
Status
approved
Filed
Oct 27, 2022
Declared cost
$22,000,000
Address
300 Toni Stone Cg

proj-22-0511, mayor ed-17-02: ti of 1 partial and 4 full floors in an exiting 13-story bldg. selective demo of structural slab for new interconnecting stair & new interior construction to include work open space, enclosed offices, meeting rooms, employee pantries,

Open the permit page

$22,000,000
Jan 11, 2022Completed
final sign-off Feb 2023
140 New Montgomery StGci, Inc16/f: demo of non-structural partitions, doors, glazing, millwork, finishes & mehcnaical, plumbing. ab-017 compliant. maher n/a. remain vacant. sprinkler permit: 202111293246
Details
Permit
202201115759
Status
complete
Filed
Jan 11, 2022
Permit issued
Jan 14, 2022
Final sign-off
Feb 10, 2023
Declared cost
$123,850
Address
140 New Montgomery St

16/f: demo of non-structural partitions, doors, glazing, millwork, finishes & mehcnaical, plumbing. ab-017 compliant. maher n/a. remain vacant. sprinkler permit: 202111293246

Open the permit page

$123,850
Aug 9, 2021Completed
final sign-off Jun 2022
255 California StPrincipal Builders Inc.suite 1150: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep @003k%@aacfb
Details
Permit
202108096066
Status
complete
Filed
Aug 9, 2021
Permit issued
Sep 3, 2021
Final sign-off
Jun 10, 2022
Declared cost
$625,000
Address
255 California St

suite 1150: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep @003k%@aacfb

Open the permit page

$625,000
Aug 9, 2021Completed
final sign-off Jun 2022
255 California StPrincipal Builders Inc.suite 1200: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep permits.
Details
Permit
202108096065
Status
complete
Filed
Aug 9, 2021
Permit issued
Sep 3, 2021
Final sign-off
Jun 10, 2022
Declared cost
$625,000
Address
255 California St

suite 1200: non-structural demo. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep permits.

Open the permit page

$625,000
Jul 20, 2020Never finaled
issued Aug 2021, no final
33 New Montgomery StPeacock Constructioninstallation of iron fence/gate of loading dock, side of building.
Details
Permit
202007200484
Status
issued
Filed
Jul 20, 2020
Permit issued
Aug 20, 2021
Declared cost
$10,000
Address
33 New Montgomery St

installation of iron fence/gate of loading dock, side of building.

Open the permit page

$10,000