Sarah Louie-Roitman
- Listed as
- architect, authorized agent-others
- Firm
- Alan Zee Sarah-Louie Arch
- Based in
- Oakland
- On San Francisco permits
- Mar 2003 to Jun 2024
42 permits since 2000 (architect on 39 permits, authorized agent-others on 4 permits): 31 completed, 5 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 21, 2024 | Completed final sign-off Nov 2025 | 3020 Kirkham St | Chang Chao Ming Constr | project proposes an infill of an (e) 1st stroy courtyard/lightwell @ the interior of the property (not visible from street). interior kitchen & bathroom remodels. (n) bathroom & interior stairs. (n) finishes & fixtures throughout the area of work. mep & lighting under separate permitDetails
project proposes an infill of an (e) 1st stroy courtyard/lightwell @ the interior of the property (not visible from street). interior kitchen & bathroom remodels. (n) bathroom & interior stairs. (n) finishes & fixtures throughout the area of work. mep & lighting under separate permit | $290,000 |
| May 16, 2024 | Completed final sign-off Jul 2025 | 579 34th Av | Chang Chao Ming Constr | interior kitchen and bathroom remodels. new bathroom, interior stair, and flat roof infill at main level (not visible from the street). new finishes and fixtures throughout area of work. mechanical, electrical, lighting and plumbing shall be part of a separate permit as needed.Details
interior kitchen and bathroom remodels. new bathroom, interior stair, and flat roof infill at main level (not visible from the street). new finishes and fixtures throughout area of work. mechanical, electrical, lighting and plumbing shall be part of a separate permit as needed. | $220,000 |
| Nov 22, 2023 | Completed final sign-off May 2024 | 5245 California St | Torres Construction | reconfiguration of (e) 2/f bathroom layout.Details
reconfiguration of (e) 2/f bathroom layout. | $35,000 |
| Jun 29, 2023 | Never finaled issued Jul 2023, no final | 2501 Ocean Av | Egoodat Inc | t.i. for new cafe. interior remodel of partitions, plumbing fixturs, lighting and finihes. new kitchen, new counter, new finishes and fixtures througout (e) ada bathroom will remain.Details
t.i. for new cafe. interior remodel of partitions, plumbing fixturs, lighting and finihes. new kitchen, new counter, new finishes and fixtures througout (e) ada bathroom will remain. | $65,000 |
| Sep 13, 2021 | Completed final sign-off Jan 2022 | 598 Guerrero St | Egoodat Inc | minor remodel of (e) restaurant: new counter prep area/seating. (e) accessible entry, kitchen, lighitng to remain unchanged. (e) ada restroom to remain. no structural work, no changes to doors/storefront. mep/life safety engineering shall be part of a sep permit if reqd.Details
minor remodel of (e) restaurant: new counter prep area/seating. (e) accessible entry, kitchen, lighitng to remain unchanged. (e) ada restroom to remain. no structural work, no changes to doors/storefront. mep/life safety engineering shall be part of a sep permit if reqd. | $15,000 |
| Oct 16, 2019 | Never finaled issued Oct 2020, no final | 4 Douglass St | project proposes replacement of e back stair and landing. no expansion of building envelopeDetails
project proposes replacement of e back stair and landing. no expansion of building envelope | $5,000 | |
| Oct 16, 2019 | Completed final sign-off Nov 2023 | 777 Divisadero St | Los Compadres Construction | change of use from (e) retail store to a bakery. interior remodel of partitions, plumbing fixtures, lighting & finishes. new kitchen, new counter, new ada restroom, new finishes & fixtures throughout. no structural. mep, life safety separate permit.Details
change of use from (e) retail store to a bakery. interior remodel of partitions, plumbing fixtures, lighting & finishes. new kitchen, new counter, new ada restroom, new finishes & fixtures throughout. no structural. mep, life safety separate permit. | $75,000 |
| Sep 19, 2019 | Completed final sign-off Mar 2020 | 115 Scott St | Edenavow Construction & Design | dbi inspection report cc-8386, building comment# 5. exterior stairs required for fire safety / building replace / rear stairs.Details
dbi inspection report cc-8386, building comment# 5. exterior stairs required for fire safety / building replace / rear stairs. | $3,000 |
| May 23, 2019 | Never finaled issued Jun 2019, no final | 4 Douglass St | interior remodel of (e) single family resident. kitchen & bathroom remodelDetails
interior remodel of (e) single family resident. kitchen & bathroom remodel | $50,000 | |
| Sep 20, 2018 | Expired or cancelled expired Sep 2025 | 218 Roanoke St | L E D Construction | project proposes remodel of existing ground level bedroom & laundry room. mechanical, electrical, and plumbing to be under sep permit as required.Details
project proposes remodel of existing ground level bedroom & laundry room. mechanical, electrical, and plumbing to be under sep permit as required. | $30,000 |
| Aug 3, 2018 | Completed final sign-off Jan 2024 | 2651 Octavia St | Luke Gilligan Inc. | horizontal & vertical addition to an (e) 3-story residential bldg. interior layout changes to include (n) partitions, fixtures & finishes, mep & life safety to be deferred submittal as req'dDetails
horizontal & vertical addition to an (e) 3-story residential bldg. interior layout changes to include (n) partitions, fixtures & finishes, mep & life safety to be deferred submittal as req'd | $400,000 |
| Apr 23, 2018 | Completed final sign-off Dec 2022 | 709 Lyon St | to erect 4 stories, 1 basement, type iii-a, 5 unit residential bldg. arch/mep/sprinkler/standpipe/alarm deferred.Details
to erect 4 stories, 1 basement, type iii-a, 5 unit residential bldg. arch/mep/sprinkler/standpipe/alarm deferred. | $3,445,000 | |
| Jan 29, 2018 | Completed final sign-off Oct 2019 | 123 Ashbury St | Luke Gilligan Inc. | ordinance #162-16. conversion of a portion of an (e) attached garage into an adu which includes a new kitchen, bathroom, doors, finishes & fixtures throughout. mep to be under seperate permit as required.Details
ordinance #162-16. conversion of a portion of an (e) attached garage into an adu which includes a new kitchen, bathroom, doors, finishes & fixtures throughout. mep to be under seperate permit as required. | $75,000 |
| Jan 19, 2018 | Completed final sign-off Feb 2023 | 1839 26th Av | A-1 Dynamic Builders Inc. | horizontal rear addition which includes a remodeled kitchen ,roof, windows,finishes and fixtures throughout. 1 master bedroom, 1 bedroom,2 baths. life safety under seperate permit.Details
horizontal rear addition which includes a remodeled kitchen ,roof, windows,finishes and fixtures throughout. 1 master bedroom, 1 bedroom,2 baths. life safety under seperate permit. | $100,000 |
| Dec 22, 2017 | Expired or cancelled expired Dec 2025 | 484 Belvedere St | new 4th floor vertical addition includes 1.5 new bathrooms, 1 new bedroom, new windows, finishes & fixtures throughout area of work. m.e.p. life safety shall be part of a separate permit as required.Details
new 4th floor vertical addition includes 1.5 new bathrooms, 1 new bedroom, new windows, finishes & fixtures throughout area of work. m.e.p. life safety shall be part of a separate permit as required. | $90,000 | |
| Oct 19, 2017 | Expired or cancelled expired Jun 2025 | 808 Divisadero St | Los Compadres Construction | replace (e) storefront with (n) storefront. no structural work. interior ti under seperate permit. mech, elec, plumb, t-24 & life safety engineering shall be part of a seperate permit if required. maher naDetails
replace (e) storefront with (n) storefront. no structural work. interior ti under seperate permit. mech, elec, plumb, t-24 & life safety engineering shall be part of a seperate permit if required. maher na | $5,000 |
| Oct 3, 2017 | Expired or cancelled expired Jun 2025 | 808 Divisadero St | Los Compadres Construction | interior remodel of (e) restaurant. (n) kitchen equipment, (n) customer counter seating, (n) ada restroom, (n) finishes & fixtures throughout. no structural work. see path of travel. mep & life safety shall be part of seperate permit. maher naDetails
interior remodel of (e) restaurant. (n) kitchen equipment, (n) customer counter seating, (n) ada restroom, (n) finishes & fixtures throughout. no structural work. see path of travel. mep & life safety shall be part of seperate permit. maher na | $60,000 |
| Sep 8, 2017 | Completed final sign-off Mar 2019 | 738 Long Bridge St | Bevilacqua & Sons | 16th floor, unit 1609 - interior remodel to include (n) pocket doors, new closet, and new shelving in existing residential unit. mechanical, electrical, lighting and plumbing shall be part of a separate permit as required. no changes to bldg envelopeDetails
16th floor, unit 1609 - interior remodel to include (n) pocket doors, new closet, and new shelving in existing residential unit. mechanical, electrical, lighting and plumbing shall be part of a separate permit as required. no changes to bldg envelope | $2,000 |
| Sep 8, 2017 | Expired or cancelled expired Dec 2025 | 482 Belvedere St | L E D Construction | interior remodel to 2/f & 3/f residential units of (e) 2 family residence. scope includes reconfiguration of 1/f partitions, bathroom, kitchen remodel, 4 (n) windows at rear, finishes, fixtures & infill of (e) secondary noncompliant stairwell at all floors. meps, l/s under sep permit as req'd.Details
interior remodel to 2/f & 3/f residential units of (e) 2 family residence. scope includes reconfiguration of 1/f partitions, bathroom, kitchen remodel, 4 (n) windows at rear, finishes, fixtures & infill of (e) secondary noncompliant stairwell at all floors. meps, l/s under sep permit as req'd. | $60,000 |
| Oct 11, 2016 | Completed final sign-off Oct 2017 | 52 Zoe St | Delvin Garcia Construction | upgrade existing mezzanine, upgrade ada bathrooms, new finishes and fixtures throughout and non rated partitions. n/a ordiance #155-13Details
upgrade existing mezzanine, upgrade ada bathrooms, new finishes and fixtures throughout and non rated partitions. n/a ordiance #155-13 | $50,000 |
| Apr 26, 2016 | Completed final sign-off Oct 2016 | 490 Post St | Dooher Construction | project proposes interior remodel of 2 extg office suites to allow one large office suite. new partitions, casework, finishes, & fixtures throughout. no structural work. no exterior work, see path of travel documents for extg bldg accessibility. mep, life safty separateDetails
project proposes interior remodel of 2 extg office suites to allow one large office suite. new partitions, casework, finishes, & fixtures throughout. no structural work. no exterior work, see path of travel documents for extg bldg accessibility. mep, life safty separate | $107,400 |
| Mar 9, 2016 | Never finaled issued Mar 2016, no final | 188 Montana St | Los Compadres Construction | revision to pa 2016-0121-7667 for stair & windows. revisions update structural drawings per existing conditions.Details
revision to pa 2016-0121-7667 for stair & windows. revisions update structural drawings per existing conditions. | |
| Mar 7, 2016 | Completed final sign-off Mar 2016 | 166 Hancock St | Leonardo Construction Inc | revision to pa#201509187438 to respond to correction notice 11/5/2015, raise and extend existing parpet at new skylight. not visable from streetDetails
revision to pa#201509187438 to respond to correction notice 11/5/2015, raise and extend existing parpet at new skylight. not visable from street | $1,000 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 3580 California St | K Bali Construction | ste. 202: minor revision to ada restroom only. reference permit # 201409307655.Details
ste. 202: minor revision to ada restroom only. reference permit # 201409307655. | |
| Sep 30, 2014 | Completed final sign-off Dec 2014 | 3580 California St | K Bali Construction | suite #202: revision to app#201408214427. revised layout to incorporate extg structural wall to remain.Details
suite #202: revision to app#201408214427. revised layout to incorporate extg structural wall to remain. | |
| Sep 5, 2013 | Completed final sign-off Jun 2014 | 32 Julius St | Cal C A D E Construction Inc | remodel (e) residence within 2 unit residential building, scope includes-remodeled laundry room, mechanical room, kitchen, bathrooms, bedrooms & living spaces. remodel shall additionally include various new & replacement windowsDetails
remodel (e) residence within 2 unit residential building, scope includes-remodeled laundry room, mechanical room, kitchen, bathrooms, bedrooms & living spaces. remodel shall additionally include various new & replacement windows | $175,000 |
| Jul 19, 2013 | Completed final sign-off Jul 2014 | 615 Spruce St | Drake Construction | project proposes raising headheights at 2 front 3rd floor bedrooms and replace extg windows with new doors to extg balcony.Details
project proposes raising headheights at 2 front 3rd floor bedrooms and replace extg windows with new doors to extg balcony. | $30,000 |
| Apr 23, 2013 | Completed final sign-off Oct 2013 | 300 Montgomery St | Bevilacqua & Sons | 12th floor-demo work under pa# 2012-0723-5524-interior bldg shell improvements-work includes new finishes, general lighting, electrical & mechanical, restrooms & disbaled accessibility. m.e.p, life safety, fire sprinklers, security & comm. engineering to be performed as required & sub on sep permit.Details
12th floor-demo work under pa# 2012-0723-5524-interior bldg shell improvements-work includes new finishes, general lighting, electrical & mechanical, restrooms & disbaled accessibility. m.e.p, life safety, fire sprinklers, security & comm. engineering to be performed as required & sub on sep permit. | $650,000 |
| Jun 20, 2012 | Completed final sign-off Dec 2013 | 450 Sutter St | Derry Casey Builders | dental office t.i. demo (e) partial height interior walls and build (n0 partial height interior walls, framed ceiling and millwork. electrical and plumbing design to be part of separate permit.Details
dental office t.i. demo (e) partial height interior walls and build (n0 partial height interior walls, framed ceiling and millwork. electrical and plumbing design to be part of separate permit. | $125,000 |
| Apr 4, 2012 | Completed final sign-off Dec 2012 | 450 Sutter St | Derry Casey Builders | suite 1422: demo (e) partitions walls, ceilings light fixtures and finishes. (n) partitions walls, suspended ceiling, light fixtures and finishes. mech, electrical and plumbing and life safety work permformed on a design build basis and submitted as a separate permit.Details
suite 1422: demo (e) partitions walls, ceilings light fixtures and finishes. (n) partitions walls, suspended ceiling, light fixtures and finishes. mech, electrical and plumbing and life safety work permformed on a design build basis and submitted as a separate permit. | $30,423 |
| Feb 10, 2012 | Completed final sign-off Sep 2013 | 4 Embarcadero Center | Peacock Construction Inc | 9th flr-demo (e) partition walls, ceiling, flring & finishes throughout tenant space. new elevator lobby, 8th fl. repl finishes, fixts in men's restrms layout to remain the same. demo (e) women's restrms & relocate. new fixtures, finishes throughout, demo inter stairs 8th/9th flrs, infill stairDetails
9th flr-demo (e) partition walls, ceiling, flring & finishes throughout tenant space. new elevator lobby, 8th fl. repl finishes, fixts in men's restrms layout to remain the same. demo (e) women's restrms & relocate. new fixtures, finishes throughout, demo inter stairs 8th/9th flrs, infill stair | $260,000 |
| Feb 10, 2012 | Completed final sign-off Nov 2012 | 4 Embarcadero Center | Peacock Construction Inc | 8th floor-demo (e) partition walls, ceiling, flring & finishes throughout tenant space. new elevator lobby, 8th fl. repl finishes, fixtures in men's restrms, layout to remain the same. demo (e) women's restrms & relocate. new fixtures, finishes throughout women's restrms. life safety sep. permitDetails
8th floor-demo (e) partition walls, ceiling, flring & finishes throughout tenant space. new elevator lobby, 8th fl. repl finishes, fixtures in men's restrms, layout to remain the same. demo (e) women's restrms & relocate. new fixtures, finishes throughout women's restrms. life safety sep. permit | $200,000 |
| Feb 10, 2012 | Completed final sign-off Nov 2012 | 4 Embarcadero Center | Peacock Construction Inc | 10th flr-demo (e) partition walls, ceiling, flring & finishes throughout tenant space. new elevator lobby, 8th fl. repl finishes, fixtures in men's restrms, layout to remain the same. demo (e) women's restrms & relocate. new fixtures, finishes throughout women's restrms. life safety permits sep.Details
10th flr-demo (e) partition walls, ceiling, flring & finishes throughout tenant space. new elevator lobby, 8th fl. repl finishes, fixtures in men's restrms, layout to remain the same. demo (e) women's restrms & relocate. new fixtures, finishes throughout women's restrms. life safety permits sep. | $200,000 |
| Jul 12, 2011 | Completed final sign-off Aug 2011 | 1 Embarcadero Center | Gci, Inc | 38th floor-demolish (e) partition walls, new ceiling grid, light fixtures & finishes. (e) ada complaint drinking fountain & restroom. mechanical, electrical, plumbing, life safety engineering to be performed on a design-build basis & shall be submitted as part of a seperate permit if required.Details
38th floor-demolish (e) partition walls, new ceiling grid, light fixtures & finishes. (e) ada complaint drinking fountain & restroom. mechanical, electrical, plumbing, life safety engineering to be performed on a design-build basis & shall be submitted as part of a seperate permit if required. | $60,000 |
| Jul 12, 2011 | Never finaled issued Aug 2011, no final | 3251 Scott St | R 3 Builders Inc. | revision to pa# 2011-0321-2450-replace damaged wall (exterior) & remove interior partition wall. no change in occupant load, occupant load to remain the same.Details
revision to pa# 2011-0321-2450-replace damaged wall (exterior) & remove interior partition wall. no change in occupant load, occupant load to remain the same. | $500 |
| Jul 12, 2011 | Completed final sign-off Aug 2011 | 3 Embarcadero Center | Gci, Inc | 15th floor-demolish (e) partition walls, ceiling, flooring & finishes. mechanical, electrical, plumbing, life safety engineering to be performed on a design-build basis & shall be submitted as part of a seperate permit if required. space will remain vacant, per ab-017Details
15th floor-demolish (e) partition walls, ceiling, flooring & finishes. mechanical, electrical, plumbing, life safety engineering to be performed on a design-build basis & shall be submitted as part of a seperate permit if required. space will remain vacant, per ab-017 | $86,000 |
| Oct 5, 2010 | Completed final sign-off Nov 2010 | 2 Embarcadero Center | Bcci Construction Company | barrier removal. replace (e)revolving door (exterior entry door) with new fully complaint double doors, new finishes to accomodate new work. m.e.p & life safety engineering to be performed as required on a design/build basis & submitted as seperate permitDetails
barrier removal. replace (e)revolving door (exterior entry door) with new fully complaint double doors, new finishes to accomodate new work. m.e.p & life safety engineering to be performed as required on a design/build basis & submitted as seperate permit | $41,497 |
| Oct 5, 2010 | Completed final sign-off Nov 2010 | 1 Embarcadero Center | Bcci Construction Company | barrier removal. replace (e) revolving door (exterior entry door) with new fully complaint double doors, new finishes to accomodate new work. m.e.p & life safety engineering to be performed as required on a design/build basis & submitted as seperate permitDetails
barrier removal. replace (e) revolving door (exterior entry door) with new fully complaint double doors, new finishes to accomodate new work. m.e.p & life safety engineering to be performed as required on a design/build basis & submitted as seperate permit | $41,497 |
| Oct 5, 2010 | Completed final sign-off Nov 2010 | 3 Embarcadero Center | Bcci Construction Company | barrier removal. replace (e)revolving door (exterior entry door) with new fully complaint double doors, new finishes to accomodate new work. m.e.p & life safety engineering to be performed as required on a design/build basis & submitted as seperate permitDetails
barrier removal. replace (e)revolving door (exterior entry door) with new fully complaint double doors, new finishes to accomodate new work. m.e.p & life safety engineering to be performed as required on a design/build basis & submitted as seperate permit | $41,497 |
| Oct 5, 2010 | Expired or cancelled expired Feb 2021 | 450 Sutter St | Marchetti Construction Inc. | 14th fl-1400a-partial demolition of (e) partition walls to accomodate new partition wall, new suspended ceiling, new lighting, new finishes, new plumbing fixtures. m.e.p, life safety work performed under a design build basis, submitted as seperate permit. suite 1400a.Details
14th fl-1400a-partial demolition of (e) partition walls to accomodate new partition wall, new suspended ceiling, new lighting, new finishes, new plumbing fixtures. m.e.p, life safety work performed under a design build basis, submitted as seperate permit. suite 1400a. | $22,000 |
| Oct 23, 2007 | Completed final sign-off Mar 2008 | 110 Sutter St | tenant improvement on the vacant 6th floor. new partitions,ceilings, lighting,mechanical and electrical workDetails
tenant improvement on the vacant 6th floor. new partitions,ceilings, lighting,mechanical and electrical work | $200,000 | |
| Mar 19, 2003 | Completed final sign-off Jul 2003 | 801 Montgomery St | oti-1 2nd floor, el, me, lsDetails
oti-1 2nd floor, el, me, ls | $150,000 |