Peacock Construction
- Based in
- Lafayette
- On San Francisco permits
- Jun 2013 to Sep 2026
- Last 24 months
- 96 permits filed
1,116 permits since 2000: 976 completed, 21 in progress, 104 never finaled, 15 expired or cancelled.
Of the 104 never-finaled permits, 15 are 3 to 5 years old, 61 are 5 to 10 years old, 28 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
20 stairs permits: 15 completed, 2 never finaled, 3 expired or cancelled. Typically 40 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2026 | Completed final sign-off May 2026 | 121 Spear St | b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices toDetails
b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices to | |
| Feb 5, 2024 | Completed final sign-off Apr 2024 | 564 Pacific Av | revision to 202206025517 new rated vestibule with closet built. new rated exit door to (e) alley. (n) pony wall to protect (e) stair opening to basement. (n) interior partition wall in basement area. (n) decorative light fixtures throughout, (n) tv and mounts, (n) decorative & acoustical finishes.Details
revision to 202206025517 new rated vestibule with closet built. new rated exit door to (e) alley. (n) pony wall to protect (e) stair opening to basement. (n) interior partition wall in basement area. (n) decorative light fixtures throughout, (n) tv and mounts, (n) decorative & acoustical finishes. | |
| Apr 20, 2023 | Completed final sign-off Sep 2024 | 160 Spear St | 16th & 17th fl: addition of non-rated enclosure of an (e) interconnecting stair to provide security separation between flrs 16 and 17. the (e) stair is not part of means of egress. mep under separate permit.Details
16th & 17th fl: addition of non-rated enclosure of an (e) interconnecting stair to provide security separation between flrs 16 and 17. the (e) stair is not part of means of egress. mep under separate permit. | $42,000 |
| Jan 20, 2023 | Completed final sign-off Mar 2023 | 33 New Montgomery St | rev to pa# 202210043686: to address sffd field inspection requirements, mushroom cap emergec release button at top of stair, emergency release placard at tope of stair, manual emergency release location placeard at door panel, manual emergency release pacecard at maual pull lever, door handle/ leverDetails
rev to pa# 202210043686: to address sffd field inspection requirements, mushroom cap emergec release button at top of stair, emergency release placard at tope of stair, manual emergency release location placeard at door panel, manual emergency release pacecard at maual pull lever, door handle/ lever | $1,000 |
| Jun 6, 2022 | Completed final sign-off Feb 2023 | 1 Lombard St | alternation to core restrooms on 2/f only: score will bring restrooms into full accessibility compliance. does not affect (e) renant suites, exit pats, egress or stairs.(n)finishes & plumbing fixtures, (e) to demo.(n) ceiling & power. sprinkler /fls under sep permit. maher n/aDetails
alternation to core restrooms on 2/f only: score will bring restrooms into full accessibility compliance. does not affect (e) renant suites, exit pats, egress or stairs.(n)finishes & plumbing fixtures, (e) to demo.(n) ceiling & power. sprinkler /fls under sep permit. maher n/a | $120,000 |
| Dec 9, 2021 | Completed final sign-off Apr 2023 | 33 New Montgomery St | basement: demo non load partitions, restrooms, concrete ramp, stair and small elevator, suspended ceiling and light fixtures, gypsum ceiling, and electrical. new construction: fill in ceiling, restrooms, doors, frames and hardware, ada lift, call button, card readers, fire extg, cabinet, finishes.Details
basement: demo non load partitions, restrooms, concrete ramp, stair and small elevator, suspended ceiling and light fixtures, gypsum ceiling, and electrical. new construction: fill in ceiling, restrooms, doors, frames and hardware, ada lift, call button, card readers, fire extg, cabinet, finishes. | $500,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2021 | 405 Howard St | build out of office space with new stairs and lift. 2 offices structural work included. life safety, mech, plmg, & sprinkler system modifications under seperate permits.Details
build out of office space with new stairs and lift. 2 offices structural work included. life safety, mech, plmg, & sprinkler system modifications under seperate permits. | $315,000 |
| Dec 23, 2019 | Expired or cancelled expired Aug 2026 | 149 09th St | interior tenant improvement: adding interior communicating stair and opening between basement and level 1 ( ground floor) to bring natural light to the basement.Details
interior tenant improvement: adding interior communicating stair and opening between basement and level 1 ( ground floor) to bring natural light to the basement. | $40,501 |
| Sep 16, 2019 | Completed final sign-off Mar 2020 | 580 California St | project consist of inetior retroom remodel on the 10th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.Details
project consist of inetior retroom remodel on the 10th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit. | $200,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2020 | 580 California St | project consist of inetior retroom remodel on the 9th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit.Details
project consist of inetior retroom remodel on the 9th fl scope does not affect existing tenant suites, exit access, path of agress or exit stairs. existing exiting to remain as is. mep sprinklers under sep permit. | $200,000 |
| May 31, 2019 | Completed final sign-off May 2020 | 580 California St | 5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permitDetails
5th flr - interior restroom remodel. does not affect (e) tenant suites exit access, path of egress or exit stairs, (e) exiting to remain as is. mep & sprinklers under sep permit | $200,000 |
| Apr 3, 2019 | Expired or cancelled expired Aug 2026 | 149 09th St | interior t.i. including removal of extg stair, and construction of new interior stair and new restrooms, with cleaned up finishes. n/a for maherDetails
interior t.i. including removal of extg stair, and construction of new interior stair and new restrooms, with cleaned up finishes. n/a for maher | $148,000 |
| Feb 5, 2019 | Expired or cancelled expired Aug 2026 | 149 09th St | proposed installation of ada compliant elevator with new 4 story egress stairs and improved entrance lobby, new restroomsDetails
proposed installation of ada compliant elevator with new 4 story egress stairs and improved entrance lobby, new restrooms | $180,525 |
| Feb 4, 2019 | Never finaled issued Nov 2019, no final | 149 09th St | extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma.Details
extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma. | $85,000 |
| Jun 18, 2018 | Never finaled issued Aug 2018, no final | 800 Market St | 2nd and 3rd floors - interior remodel to return 3rd flr of existing diesel retail store back to building owner. demo & infill of existing stair opening between 2nd & 3rd flrs. non-structural demo at 3rd flr. new non-structural partitions at 2nd flr to relocate stock room. replacement of lightingDetails
2nd and 3rd floors - interior remodel to return 3rd flr of existing diesel retail store back to building owner. demo & infill of existing stair opening between 2nd & 3rd flrs. non-structural demo at 3rd flr. new non-structural partitions at 2nd flr to relocate stock room. replacement of lighting | $157,960 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 580 California St | 19th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to reamin as is. mep, (e) fire/life safety under sep permit maher naDetails
19th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to reamin as is. mep, (e) fire/life safety under sep permit maher na | $13,000 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 580 California St | 20th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to remain as is. mep, (e) fire/life safety under sep permit maher naDetails
20th flr - interior work to restrooms. does not affect (e) tenant suites, exit access, paths of travel or ecit stairs. (e) exiting is to remain as is. mep, (e) fire/life safety under sep permit maher na | $14,000 |
| Feb 15, 2018 | Completed final sign-off Jan 2019 | 580 California St | interior work to restrooms on 23rd fl. this scope of work does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler system under separate permit. maher naDetails
interior work to restrooms on 23rd fl. this scope of work does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting is to remain as is. mep, fire life safety and sprinkler system under separate permit. maher na | $175,000 |
| Jan 16, 2018 | Completed final sign-off Dec 2018 | 50 Fremont St | modification to mission st lobby doors, add operator and card reader. add door at each level exit stair that allow free egress but require card key to climb. add fail-safe hardware and card readers at basement exit stair doors. add card readers to all phone closets. maher naDetails
modification to mission st lobby doors, add operator and card reader. add door at each level exit stair that allow free egress but require card key to climb. add fail-safe hardware and card readers at basement exit stair doors. add card readers to all phone closets. maher na | $187,000 |
| Aug 3, 2016 | Completed final sign-off Jun 2017 | 4 Embarcadero Center | 24 & 25 floor - demolition of (e) stair between 24th & 25th floor, infill of slab on 25, both floors unoccupied. no change in occupancy use, or area. maher ord 155-13 not required.Details
24 & 25 floor - demolition of (e) stair between 24th & 25th floor, infill of slab on 25, both floors unoccupied. no change in occupancy use, or area. maher ord 155-13 not required. | $190,000 |