Back to kitchen remodel contractors
Occidental Express
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 106 permits filed
1,473 permits since 2000: 929 completed, 48 in progress, 173 never finaled, 323 expired or cancelled.
Of the 173 never-finaled permits, 14 are 3 to 5 years old, 17 are 5 to 10 years old, 142 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
180 kitchen remodel permits: 117 completed, 5 in progress, 15 never finaled, 43 expired or cancelled. Typically 0 days from filing to permit and 205 days from permit to final inspection.
Showing the 100 most recent of 180.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 1449 Powell St | to comply with complaint 202661972, 202661464, & 202658590: repair front window; misc. siding repair; replace cabinets, counter tops, & fixtures for 2 kitchens; & replace doors, including 20 min. rated doors for guest rooms. no work on ground floor.Details
to comply with complaint 202661972, 202661464, & 202658590: repair front window; misc. siding repair; replace cabinets, counter tops, & fixtures for 2 kitchens; & replace doors, including 20 min. rated doors for guest rooms. no work on ground floor. | $8,500 |
| Mar 17, 2026 | In progress issued Mar 2026 | 583 Missouri St | comply w/ nov 202546412. e) kitchen remodel @ 1st/f, e) non-bearing wall removal @ 2nd/f. e) bathroom remodel @ 2nd/f, addition new washer/dryer at 2nd/f, hvac system to be replaced, water heater to be replaced. no exterior workDetails
comply w/ nov 202546412. e) kitchen remodel @ 1st/f, e) non-bearing wall removal @ 2nd/f. e) bathroom remodel @ 2nd/f, addition new washer/dryer at 2nd/f, hvac system to be replaced, water heater to be replaced. no exterior work | $112,000 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 1437 Cabrillo St | 1st floor: add great room with kitchenette, bedroom and bathroomDetails
1st floor: add great room with kitchenette, bedroom and bathroom | $98,000 |
| Sep 22, 2025 | Completed final sign-off Apr 2026 | 3879 23rd St | complying with planning case# 202300760enf: existing kitchenette at storage area.Details
complying with planning case# 202300760enf: existing kitchenette at storage area. | $42,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 337 Arkansas St | 337-339 arkansas st: comply with nov 202541996. repair of non strucutral fire damage including replacing non structural fire damage including replacing bathroom and kitchen cabinets, plumbing and electrical fixt and devices, tiling in both units. in kindDetails
337-339 arkansas st: comply with nov 202541996. repair of non strucutral fire damage including replacing non structural fire damage including replacing bathroom and kitchen cabinets, plumbing and electrical fixt and devices, tiling in both units. in kind | $75,000 |
| Jun 6, 2025 | Completed final sign-off Aug 2026 | 90 Peralta Av | 1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level.Details
1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level. | $25,000 |
| Jan 29, 2025 | Completed final sign-off Apr 2025 | 543 Holloway Av | commencement of work not started under previously approved permit application pa#201808217899 (kitchen remodel).Details
commencement of work not started under previously approved permit application pa#201808217899 (kitchen remodel). | |
| Oct 11, 2024 | In progress filed Oct 2024, not yet issued | 575 Joost Av | complying with nov #202427470. removal of illegal kitchen at rear of building on ground floorDetails
complying with nov #202427470. removal of illegal kitchen at rear of building on ground floor | $3,000 |
| Jul 10, 2024 | In progress filed Jul 2024, not yet issued | 1449 Powell St | complying with nov 201644842, 201880811 and 202069111. restoring unwarranted habitable rooms at rear of commercial space on 1/f including bathrooms and kitchen to storage and removal of plumbing fixtures for kitchen and fixtures.Details
complying with nov 201644842, 201880811 and 202069111. restoring unwarranted habitable rooms at rear of commercial space on 1/f including bathrooms and kitchen to storage and removal of plumbing fixtures for kitchen and fixtures. | $18,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 343 Clement St | to comply w/ nov 202423787: work without permit. if unable to provide documentation for makeup air (kitchen hood) obtain a building/mechnical permit revision to permit: 202403258568Details
to comply w/ nov 202423787: work without permit. if unable to provide documentation for makeup air (kitchen hood) obtain a building/mechnical permit revision to permit: 202403258568 | $3,000 |
| Nov 3, 2022 | Completed final sign-off Nov 2022 | 1139 Market St | revision/correction of issued pa #202207077954 showing in error room #110 conversion to common kitchen, room being converted is 108. no residential guest rm will be converted under this permit.Details
revision/correction of issued pa #202207077954 showing in error room #110 conversion to common kitchen, room being converted is 108. no residential guest rm will be converted under this permit. | |
| Oct 5, 2022 | Completed final sign-off Sep 2026 | 95 Newton St | compliance with complaint 202183922. legalize a kitchenette, bathroom, and bedroom on gr floor levelDetails
compliance with complaint 202183922. legalize a kitchenette, bathroom, and bedroom on gr floor level | $128,000 |
| Jul 7, 2022 | Never finaled issued Jul 2022, no final | 1139 Market St | conversion of room #110 to a common kitchen within (e) footprint at 2nd fl. . no residential unit will be converted under this permit. (e) hvac systems to remain.Details
conversion of room #110 to a common kitchen within (e) footprint at 2nd fl. . no residential unit will be converted under this permit. (e) hvac systems to remain. | $15,000 |
| Jun 27, 2022 | Never finaled issued Jun 2022, no final | 1449 Powell St | remodeling of kitchens on 2nd and 3rd floors in cluding replacing cabinets, countertops, hood, cooktop, flooring, lighting and plugs. unit #20 renovations kitchen and bathroom. replacing 15 doors. no exterior changesDetails
remodeling of kitchens on 2nd and 3rd floors in cluding replacing cabinets, countertops, hood, cooktop, flooring, lighting and plugs. unit #20 renovations kitchen and bathroom. replacing 15 doors. no exterior changes | $75,000 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 590 Steiner St | complying with complaint #202289152: remodeling of (1) kitchen and (1) bathroom and replaced windows in kind in location listed on complaint. (6) windows (metal).Details
complying with complaint #202289152: remodeling of (1) kitchen and (1) bathroom and replaced windows in kind in location listed on complaint. (6) windows (metal). | $14,000 |
| Apr 1, 2022 | Completed final sign-off Apr 2024 | 3762 22nd St | remodeling kitchen, laundry and bathroom on 1/f. including replacing cabinets, counter tops, plumbing and elec fixtures and devices and rear door and windows.Details
remodeling kitchen, laundry and bathroom on 1/f. including replacing cabinets, counter tops, plumbing and elec fixtures and devices and rear door and windows. | $32,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 292 Eureka St | comply w/nov 201996591 & planning enf case 2019-021966enf document add'l removal of bldg; demo calcs; (n) add'l unit @ ground fl; replace exterior windows size to size and inkind; (n) window to replace door @ ground fl; remodel of kitchen & bathrooms @ ground fl; new upper floor deckDetails
comply w/nov 201996591 & planning enf case 2019-021966enf document add'l removal of bldg; demo calcs; (n) add'l unit @ ground fl; replace exterior windows size to size and inkind; (n) window to replace door @ ground fl; remodel of kitchen & bathrooms @ ground fl; new upper floor deck | $300,000 |
| Dec 8, 2020 | Completed final sign-off Jul 2024 | 1500 Powell St | remodeling of community kitchen, 1 shower & 2 toilet rooms (singles)Details
remodeling of community kitchen, 1 shower & 2 toilet rooms (singles) | $26,000 |
| Dec 8, 2020 | Completed final sign-off Jul 2023 | 218 11th Av | ground fl: seismic retrofit, new foundation, fire rated service corridor. 1st fl: kitchen remodel, move powder rm, new porch, new windows at rear, new staircase at rear. med upgrade. 2nd fl: bathroom remodel, add laundry rm, staircase, med upgrade. 3rd fl: move bedrooms, door to roof deck. ada stairDetails
ground fl: seismic retrofit, new foundation, fire rated service corridor. 1st fl: kitchen remodel, move powder rm, new porch, new windows at rear, new staircase at rear. med upgrade. 2nd fl: bathroom remodel, add laundry rm, staircase, med upgrade. 3rd fl: move bedrooms, door to roof deck. ada stair | $195,000 |
| Oct 6, 2020 | Expired or cancelled withdrawn Feb 2021 | 1014 Shotwell St | addition of kitchen in the lower flr to create a 2nd separate unit from upper level.Details
addition of kitchen in the lower flr to create a 2nd separate unit from upper level. | $28,000 |
| Jul 15, 2019 | Completed final sign-off Jun 2021 | 1038 Valencia St | #8 - comply w/complaint 201968291 - replace kitchen cabinets, counter tops, p& e fixtures. and gas wall heater. no structural work.Details
#8 - comply w/complaint 201968291 - replace kitchen cabinets, counter tops, p& e fixtures. and gas wall heater. no structural work. | $12,000 |
| Jun 28, 2019 | Expired or cancelled expired Apr 2026 | 942 Avalon Av | expand & remodel (e) kitchen in (e) temple hall: remove (e) non-structural partition walls, (e) kitchen equipment, fixtures & finishes - replace with (n) fixtures, finishes, casework, storage & services - no structural work.Details
expand & remodel (e) kitchen in (e) temple hall: remove (e) non-structural partition walls, (e) kitchen equipment, fixtures & finishes - replace with (n) fixtures, finishes, casework, storage & services - no structural work. | $18,000 |
| Jun 8, 2018 | Completed final sign-off Sep 2018 | 49 Seward St | remodeling of kitchen & bathrooms including replacing counters, cabinets, fixts & tiles in-kind. same location.Details
remodeling of kitchen & bathrooms including replacing counters, cabinets, fixts & tiles in-kind. same location. | $52,000 |
| Nov 9, 2015 | Expired or cancelled expired Mar 2026 | 753 39th Av | new bathrooms, kitchen at the upper level.Details
new bathrooms, kitchen at the upper level. | $30,000 |
| Oct 10, 2014 | Completed final sign-off Jan 2015 | 1441 Polk St | install prep table, hand sink and counter. showcase at kitchen area per plan. n/a for maherDetails
install prep table, hand sink and counter. showcase at kitchen area per plan. n/a for maher | $6,000 |
| Aug 19, 2014 | Completed final sign-off Mar 2015 | 1522 Vallejo St | revision to approved bpa 201407010217, replace header at living room/kitchen, correct location of beam at master bedroom, fill in recess where exposed flue was removed.Details
revision to approved bpa 201407010217, replace header at living room/kitchen, correct location of beam at master bedroom, fill in recess where exposed flue was removed. | $8,500 |
| Jul 1, 2014 | Completed final sign-off Mar 2015 | 1522 Vallejo St | comply with nov #201464031. replacing reaer deck and stairs and interor remodeling of kitchen and bathroom.Details
comply with nov #201464031. replacing reaer deck and stairs and interor remodeling of kitchen and bathroom. | $18,000 |
| Jul 1, 2014 | Completed final sign-off Dec 2016 | 3598 Jackson St | revision to pba #2014-0225-9301. voluntary structural strengthening of the foundation and the replacement of finishes and fixtures within bathrooms, kitchen, pantry, childrens dining room, mvp room, trunk room, bedrooms, storage room, loundry room and closets. (n) concrete piers and moment frame.Details
revision to pba #2014-0225-9301. voluntary structural strengthening of the foundation and the replacement of finishes and fixtures within bathrooms, kitchen, pantry, childrens dining room, mvp room, trunk room, bedrooms, storage room, loundry room and closets. (n) concrete piers and moment frame. | $68,000 |
| Jun 30, 2014 | Completed final sign-off Jul 2016 | 24 Bennington St | interior remodeling including kitchen & bathroom, structural upgrade, installing skylights, new stairs and replacings windows, and exterior altertions incluing bay window replacement.Details
interior remodeling including kitchen & bathroom, structural upgrade, installing skylights, new stairs and replacings windows, and exterior altertions incluing bay window replacement. | $186,000 |
| Mar 6, 2014 | Completed final sign-off Mar 2015 | 1522 Vallejo St | remodeling kitchen & bathroom, including replacing counter tops, cabinets & fixtures and minor termite repair of rear stairs.Details
remodeling kitchen & bathroom, including replacing counter tops, cabinets & fixtures and minor termite repair of rear stairs. | $22,000 |
| Feb 25, 2014 | Completed final sign-off Dec 2016 | 3598 Jackson St | structural strengthening of the foundation, replacement of finished and fixtures within bathrooms, kitchen, pantry, children's dinning room, mud room, trunk room, bedrooms 8 and 9, storage room, laundary room inc. closets new pier under (e) foundation, 3 story moment frame at the cornerDetails
structural strengthening of the foundation, replacement of finished and fixtures within bathrooms, kitchen, pantry, children's dinning room, mud room, trunk room, bedrooms 8 and 9, storage room, laundary room inc. closets new pier under (e) foundation, 3 story moment frame at the corner | $350,000 |
| Jan 2, 2014 | Completed final sign-off Jan 2014 | 34 06th St | replacing water damaged plaster on walls and ceiling in community lounge and kitchen with 5/8" type x drywall, approx 1000 sf.Details
replacing water damaged plaster on walls and ceiling in community lounge and kitchen with 5/8" type x drywall, approx 1000 sf. | $3,580 |
| Nov 8, 2013 | Completed final sign-off Feb 2015 | 88 Whitney St | addition of bedroom, bath, mechanical closet, laundry room @ basement. addition of bay window on entry (2nd) floor , kitchen remodel @ 2nd floor. upper floor bath remodel. level floor at rear.Details
addition of bedroom, bath, mechanical closet, laundry room @ basement. addition of bay window on entry (2nd) floor , kitchen remodel @ 2nd floor. upper floor bath remodel. level floor at rear. | $185,000 |
| Oct 30, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | 1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bathDetails
1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bath | $68,000 |
| Oct 17, 2013 | Completed final sign-off Oct 2014 | 53 Sanchez St | revision to 201305076355 reconfigure interior and remodel of kitchen and baths. remove portion of wall between foyer and living room. replace windows with wood sash windows double hung to have og lugs, dual glazedDetails
revision to 201305076355 reconfigure interior and remodel of kitchen and baths. remove portion of wall between foyer and living room. replace windows with wood sash windows double hung to have og lugs, dual glazed | $8,500 |
| Oct 8, 2013 | Completed final sign-off Aug 2015 | 3307 20th St | revision of pa#2013-0709-1355 1)extend existing toilet to include new shower 2)convert existing closet to bathroom 3)infill existing sliding door 4)remove non-load bearing wallin kitchen and install header 5)no exterior change to building 6)replace wall&ceiling with need insulation and 5/8" x gym bdDetails
revision of pa#2013-0709-1355 1)extend existing toilet to include new shower 2)convert existing closet to bathroom 3)infill existing sliding door 4)remove non-load bearing wallin kitchen and install header 5)no exterior change to building 6)replace wall&ceiling with need insulation and 5/8" x gym bd | $65,000 |
| Oct 4, 2013 | Completed final sign-off Aug 2014 | 1100 Filbert St | remodelling of bathroom & kitchen including replacing cabinets, countertops, plumbing & electrical fixtures. installing washer/dryer at basement laundry.Details
remodelling of bathroom & kitchen including replacing cabinets, countertops, plumbing & electrical fixtures. installing washer/dryer at basement laundry. | $32,000 |
| Jul 9, 2013 | Completed final sign-off Aug 2015 | 3307 20th St | remodeling of 1 kitchen and 1 bathroom in three units, including replacing cabinets, countertops and plumbing fixtures.Details
remodeling of 1 kitchen and 1 bathroom in three units, including replacing cabinets, countertops and plumbing fixtures. | $63,000 |
| Jul 5, 2013 | Completed final sign-off May 2014 | 914 Sanchez St | interior renovation:remodel of kitchen and bathroom. addition of one bathroom and one half bathroom, new porch on 3rd floor. addition of 2 baywindows on 2nd and 3rd floors.Details
interior renovation:remodel of kitchen and bathroom. addition of one bathroom and one half bathroom, new porch on 3rd floor. addition of 2 baywindows on 2nd and 3rd floors. | $128,000 |
| Jun 25, 2013 | Completed final sign-off Apr 2015 | 157 Randall St | 28 sq ft horizontal addition to 3rd fl w/ raise roof 8'10". interior remodel of kitchen & misc improvements to finishes throughout building. create visable deck on top of (e) garage at 2nd fl. and 3rd floor rear deck.Details
28 sq ft horizontal addition to 3rd fl w/ raise roof 8'10". interior remodel of kitchen & misc improvements to finishes throughout building. create visable deck on top of (e) garage at 2nd fl. and 3rd floor rear deck. | $189,000 |
| Jun 12, 2013 | Completed final sign-off Dec 2013 | 246 Mcallister St | remodel community kitchen, dining room and reception area.Details
remodel community kitchen, dining room and reception area. | $18,500 |
| Jun 12, 2013 | Completed final sign-off Oct 2013 | 505 Ofarrell St | create community kitchen and dining area; removing a non bearing wall.Details
create community kitchen and dining area; removing a non bearing wall. | $13,850 |
| May 17, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | remodeling kitchen and bathroom including dry rot repair.Details
remodeling kitchen and bathroom including dry rot repair. | $24,500 |
| May 7, 2013 | Completed final sign-off Oct 2014 | 53 Sanchez St | re-configure of interior & remodeling of kitchens, bathrooms, replace front windows with wood sash windows, double hung to have o.g. lugs, dual glazed & add 2 skylights. add railings to stairs to code.Details
re-configure of interior & remodeling of kitchens, bathrooms, replace front windows with wood sash windows, double hung to have o.g. lugs, dual glazed & add 2 skylights. add railings to stairs to code. | $210,000 |
| Mar 5, 2013 | Expired or cancelled cancelled Apr 2013 | 3932 23rd St | remodeling kitchen including replaceing cabinets, counter top plumbing and electrical fixturesDetails
remodeling kitchen including replaceing cabinets, counter top plumbing and electrical fixtures | $14,500 |
| Jan 17, 2013 | Expired or cancelled expired Oct 2014 | 1930 Pine St | remodeling of kitchen and (2) bathrooms including replacing cabinets, counter tops, tiles, plumbing and electrical fixtures. lighting shall comply with title 24.Details
remodeling of kitchen and (2) bathrooms including replacing cabinets, counter tops, tiles, plumbing and electrical fixtures. lighting shall comply with title 24. | $32,000 |
| Oct 31, 2012 | Completed final sign-off Feb 2014 | 125 Mateo St | fill in lightwell to expand 28 s at kitchen on main floor level.expand laundry area 28 sf.Details
fill in lightwell to expand 28 s at kitchen on main floor level.expand laundry area 28 sf. | $23,000 |
| Oct 24, 2012 | Expired or cancelled withdrawn May 2013 | 840 Castro St | convert art studio to studio apartment at ground floor level work includes adding kitchenette, upgrade lighting, refinish (e) hardwood.Details
convert art studio to studio apartment at ground floor level work includes adding kitchenette, upgrade lighting, refinish (e) hardwood. | $15,000 |
| Sep 21, 2012 | Completed final sign-off Feb 2013 | 639 24th Av | renovate kitchen, family room, and 1/2 bath at 2nd floor, new interior stair, hall and landry at garage. renovate (e) bath at 3rd floor. new deck and stair at rear. two new skylights at rear.Details
renovate kitchen, family room, and 1/2 bath at 2nd floor, new interior stair, hall and landry at garage. renovate (e) bath at 3rd floor. new deck and stair at rear. two new skylights at rear. | $75,000 |
| Aug 31, 2012 | Completed final sign-off Oct 2012 | 780 Post St | unit #21-relocating kitchen & construction of non bearing partition wall to create 2 bedrooms.Details
unit #21-relocating kitchen & construction of non bearing partition wall to create 2 bedrooms. | $15,000 |
| Aug 6, 2012 | Completed final sign-off Aug 2013 | 1775 47th Av | 1)restore to a single family dwelling from 3 units by removing 2 illegal kitchens. 2)convert the attic floor from storage to home office.Details
1)restore to a single family dwelling from 3 units by removing 2 illegal kitchens. 2)convert the attic floor from storage to home office. | $68,250 |
| Aug 3, 2012 | Expired or cancelled expired Feb 2016 | 959 Haight St | remodel studio apartment #3. new kitchen & washer/dryer closet for new electric ventless condensing washer&dryer combo. remodel (e) bathroom.Details
remodel studio apartment #3. new kitchen & washer/dryer closet for new electric ventless condensing washer&dryer combo. remodel (e) bathroom. | $42,000 |
| Jul 31, 2012 | Completed final sign-off Apr 2013 | 816 Ortega St | relocate study entry & reconfigure closet at lower level. reconfigure bathroom and upgrade kitchen, replace 3 windows at upper level.Details
relocate study entry & reconfigure closet at lower level. reconfigure bathroom and upgrade kitchen, replace 3 windows at upper level. | $19,500 |
| Jul 23, 2012 | Completed final sign-off Mar 2013 | 3883 20th St | revision to pa# 2008-0522-2724 & 2011-0728-1231-remodel kitchen in both units, also bathrooms. replacing furnaces, repair fire & water damage (non structural). remove laundry at 1st floor, new stairs between 1st & 2nd floors. re-configure main entry stairs (interior)Details
revision to pa# 2008-0522-2724 & 2011-0728-1231-remodel kitchen in both units, also bathrooms. replacing furnaces, repair fire & water damage (non structural). remove laundry at 1st floor, new stairs between 1st & 2nd floors. re-configure main entry stairs (interior) | $82,000 |
| Jul 20, 2012 | Completed final sign-off Feb 2013 | 744 Pacheco St | repair deck (less than 50%), renovate bath & kitchen.Details
repair deck (less than 50%), renovate bath & kitchen. | $10,000 |
| Jul 2, 2012 | Completed final sign-off Jul 2014 | 615 Union St | convert (e) lounges & kitchens on 2nd & 3rd floors into 2 new residential rooms (220 & 321). no changes in lighting.Details
convert (e) lounges & kitchens on 2nd & 3rd floors into 2 new residential rooms (220 & 321). no changes in lighting. | $6,000 |
| May 17, 2012 | Completed final sign-off May 2014 | 3456 16th St | victorian retrofit. removal of portion of existing ceiling. build mezzanine with bathroom. relocate kitchen in current dining room. flip current master bedroom and bath. widen current office space and open rear wall with nana wall on to e deck.Details
victorian retrofit. removal of portion of existing ceiling. build mezzanine with bathroom. relocate kitchen in current dining room. flip current master bedroom and bath. widen current office space and open rear wall with nana wall on to e deck. | $80,000 |
| May 8, 2012 | Never finaled issued Jun 2012, no final | 655 04th St | revision to pa# 2011-1215-0704-reconfiguring 1st floor plan, adding staff kitchen & deleting 1 bathroom. electrical under separate permit, mech./title-24 under separate permit.Details
revision to pa# 2011-1215-0704-reconfiguring 1st floor plan, adding staff kitchen & deleting 1 bathroom. electrical under separate permit, mech./title-24 under separate permit. | $36,000 |
| Mar 19, 2012 | Completed final sign-off Sep 2013 | 3027 22nd St | interior remodel of unit #1 at first floor - relocate bath. interior remodel of unit #3 - relocate bath, kitchen & bedrooms. add one bedroom & one powder room. repair/replace exterior rear stairs in-kind.Details
interior remodel of unit #1 at first floor - relocate bath. interior remodel of unit #3 - relocate bath, kitchen & bedrooms. add one bedroom & one powder room. repair/replace exterior rear stairs in-kind. | $42,800 |
| Mar 1, 2012 | Never finaled issued Mar 2012, no final | 2950 Broadway | remodel existing kitchen on ground level wiht additional powder room & master bathroom/walk-in closet on second level. remove illegal kitchen at basement, refinish misc storage rooms in basement.Details
remodel existing kitchen on ground level wiht additional powder room & master bathroom/walk-in closet on second level. remove illegal kitchen at basement, refinish misc storage rooms in basement. | $85,000 |
| Dec 27, 2011 | Completed final sign-off Oct 2014 | 1803 Folsom St | reconfigure restrooms and showers, add kitchenettes in 10 units at 2nd fl. and remodel 1 kitchenette in room 211. add one skylight as per planDetails
reconfigure restrooms and showers, add kitchenettes in 10 units at 2nd fl. and remodel 1 kitchenette in room 211. add one skylight as per plan | $98,500 |
| Nov 2, 2011 | Completed final sign-off Nov 2012 | 1940 Webster St | unit 1: infill under (e) 2nd floor (40 sq ft) remove (1) bathroom, remove & relocate kitchen. unit 2. renovate powder room into full bath and sliding door at patio off master bedroom, remove & relocate stairs to 3rd floor per plan, 8 front windows with dual clared in kind.Details
unit 1: infill under (e) 2nd floor (40 sq ft) remove (1) bathroom, remove & relocate kitchen. unit 2. renovate powder room into full bath and sliding door at patio off master bedroom, remove & relocate stairs to 3rd floor per plan, 8 front windows with dual clared in kind. | $28,000 |
| Oct 7, 2011 | Completed final sign-off Sep 2012 | 1473 Florida St | complying with complaint #201161167 install non bearing partition walls between hallway & bedrooms in both apt., remodel both kitchens including replacing cabinets, counter tops and plumbing fixtures. installing wiring for plugs, lights & switches. no window or door work.Details
complying with complaint #201161167 install non bearing partition walls between hallway & bedrooms in both apt., remodel both kitchens including replacing cabinets, counter tops and plumbing fixtures. installing wiring for plugs, lights & switches. no window or door work. | $19,500 |
| Sep 29, 2011 | Expired or cancelled expired Feb 2013 | 4534 19th St | remodeling existig kitchen including replacing cabinets, plumbing, and electrical. relocating bathroom on main floorDetails
remodeling existig kitchen including replacing cabinets, plumbing, and electrical. relocating bathroom on main floor | $26,000 |
| Aug 11, 2011 | Completed final sign-off Nov 2011 | 207 Eureka St | remodel kitchen and bathroom..new cabinets, countertops, plumbing and electrical fixtures and tiles. comply w/ cec 150 (k) lighting requirements. no change to exhaust system.Details
remodel kitchen and bathroom..new cabinets, countertops, plumbing and electrical fixtures and tiles. comply w/ cec 150 (k) lighting requirements. no change to exhaust system. | $25,000 |
| Jul 18, 2011 | Completed final sign-off Sep 2011 | 416 Duncan St | unit #5: remoeling kitchen & bathroom including replacing cabinets, countertops, tiles, plumbing & electrical fixtures. all (n) lighting must cec150(k) 8-kitchens, cec 150(k)10-bathrooms.Details
unit #5: remoeling kitchen & bathroom including replacing cabinets, countertops, tiles, plumbing & electrical fixtures. all (n) lighting must cec150(k) 8-kitchens, cec 150(k)10-bathrooms. | $19,500 |
| Jul 1, 2011 | Never finaled issued Sep 2011, no final | 250 Kearny St | reconfiguring of rooms on all floors including creating of community kitchen & accessible bathrms. reducing # of rooms from 145 to 136 & increasing # of bathrms. from 110 to 131, structural work address all outstanding complaints & nov's; 200005134 & 201061908.Details
reconfiguring of rooms on all floors including creating of community kitchen & accessible bathrms. reducing # of rooms from 145 to 136 & increasing # of bathrms. from 110 to 131, structural work address all outstanding complaints & nov's; 200005134 & 201061908. | $476,000 |
| Jun 16, 2011 | Expired or cancelled cancelled Aug 2011 | 415 Duncan St | #5- remodeling kitchen and bathroom including, replace cabinets, counter tops, tiles, plumbing and electrical fixtures. all (n) lighting must cec150(k) 8-kitchen cec 150(k) 10- bathroom.Details
#5- remodeling kitchen and bathroom including, replace cabinets, counter tops, tiles, plumbing and electrical fixtures. all (n) lighting must cec150(k) 8-kitchen cec 150(k) 10- bathroom. | $19,500 |
| Jun 2, 2011 | Expired or cancelled cancelled Aug 2011 | 235 Anzavista Av | exposing walls to install concealed low voltage wiring, patching and painting, re-finishing floor, living room, bedroom, dining room, kitchen.Details
exposing walls to install concealed low voltage wiring, patching and painting, re-finishing floor, living room, bedroom, dining room, kitchen. | $15,000 |
| May 24, 2011 | Completed final sign-off Aug 2011 | 2225 23rd St | remodel kitchen and bathroom including replacing kitchen cabinets, countertop & sink. bathroom vanity, wash basin and floor tile.Details
remodel kitchen and bathroom including replacing kitchen cabinets, countertop & sink. bathroom vanity, wash basin and floor tile. | $28,000 |
| May 12, 2011 | Completed final sign-off May 2012 | 2914 21st St | repair of upper floor/ 3rd floor incl. replacing misc. framing, kitchen and add one half bath. remodeling incl. replacing cabinets, counter tops, tiles and plbg and elec. fixtures. fire damage repair. no exterior work, reroofing, tilesDetails
repair of upper floor/ 3rd floor incl. replacing misc. framing, kitchen and add one half bath. remodeling incl. replacing cabinets, counter tops, tiles and plbg and elec. fixtures. fire damage repair. no exterior work, reroofing, tiles | $38,000 |
| May 4, 2011 | Completed final sign-off Apr 2013 | 143 Collingwood St | remodeling of 1 kitchen and 1 bathroom, including replacing cabinet, counter tops, tiles, plumbing and electrical fixtures, dry wall, flooring & painting, lighting to comply with cec 150(k); no change to window walls or doorsDetails
remodeling of 1 kitchen and 1 bathroom, including replacing cabinet, counter tops, tiles, plumbing and electrical fixtures, dry wall, flooring & painting, lighting to comply with cec 150(k); no change to window walls or doors | $58,000 |
| Apr 4, 2011 | Completed final sign-off Oct 2011 | 2713 Clay St | to comply with nov 201194856 remodleing or (e) kitchen including replacing determined framing, wireing, cabinets, counter tops, lighting & plumbing fixture. no exterior work, no change to window or doors.Details
to comply with nov 201194856 remodleing or (e) kitchen including replacing determined framing, wireing, cabinets, counter tops, lighting & plumbing fixture. no exterior work, no change to window or doors. | $8,500 |
| Mar 2, 2011 | Completed final sign-off Oct 2011 | 1110 Filbert St | remodeling kitchen & bathroom including replacing cabinets, countertops & plumbing fixtures. no structural, in-kind. kitchen: at least 50% high efficiency. (he) lighting. bathroom: he or occupancy sensor control.Details
remodeling kitchen & bathroom including replacing cabinets, countertops & plumbing fixtures. no structural, in-kind. kitchen: at least 50% high efficiency. (he) lighting. bathroom: he or occupancy sensor control. | $20,000 |
| Jan 27, 2011 | Completed final sign-off Mar 2011 | 3550 Fulton St | upgrade existing kitchen & 2 bathrooms including replacing cabinets, countertops, plubming and electrical fixtures & re-tile (e) showers.Details
upgrade existing kitchen & 2 bathrooms including replacing cabinets, countertops, plubming and electrical fixtures & re-tile (e) showers. | $30,000 |
| Jan 24, 2011 | Never finaled issued Jan 2011, no final | 138 Hyde St | minor remodeling of 23 kitchens and bathrooms including replacing cabinets, counter tops,plmg,& electrical fixtures and retiling bathrooms. min 50% light wattage in kchn shall be from high efficancy light fixture.Details
minor remodeling of 23 kitchens and bathrooms including replacing cabinets, counter tops,plmg,& electrical fixtures and retiling bathrooms. min 50% light wattage in kchn shall be from high efficancy light fixture. | $230,000 |
| Dec 9, 2010 | Completed final sign-off Aug 2014 | 250 Kearny St | comply w/ nov#201060593. repair/replace doors, windows, plumbing & electrical fixtures, heating, fire escapes, door hardware, damaged walls, handrails, alarm system, repair elevator. all his nov's & ces nov restore community kitchen next to #105 to guest room.Details
comply w/ nov#201060593. repair/replace doors, windows, plumbing & electrical fixtures, heating, fire escapes, door hardware, damaged walls, handrails, alarm system, repair elevator. all his nov's & ces nov restore community kitchen next to #105 to guest room. | $395,000 |
| Nov 29, 2010 | Never finaled issued Nov 2010, no final | 589 Post St | remodeling of community kitchen on 4th floor including replacing tiles, cabinets, counter top and fixtures, provide min. 50% per watt high efficency light in kitchen per cec150(k)Details
remodeling of community kitchen on 4th floor including replacing tiles, cabinets, counter top and fixtures, provide min. 50% per watt high efficency light in kitchen per cec150(k) | $10,500 |
| Nov 24, 2010 | Expired or cancelled cancelled Mar 2011 | 138 Hyde St | remodeling kitchens including replacing cabinets, counter tops and fixtures in units #4,16,22 & 28; at least 50% high efficacy lighting (by wattage) no change to exhaust systemDetails
remodeling kitchens including replacing cabinets, counter tops and fixtures in units #4,16,22 & 28; at least 50% high efficacy lighting (by wattage) no change to exhaust system | $25,000 |
| Nov 18, 2010 | Completed final sign-off Mar 2011 | 2240 Bay St | remodel (e) kitchen in unit #203-relocate non-bearing wall to re-configure (e) kitchen & home office spaceDetails
remodel (e) kitchen in unit #203-relocate non-bearing wall to re-configure (e) kitchen & home office space | $18,000 |
| Oct 4, 2010 | Completed final sign-off Feb 2011 | 1250 Missouri St | installing photography studio kitchen in unit 205, remove staircase and build partition walls in unit 206.units #205 + #206 are commercial spaces only. the kitchen is an accessory to the commercial photography studio.Details
installing photography studio kitchen in unit 205, remove staircase and build partition walls in unit 206.units #205 + #206 are commercial spaces only. the kitchen is an accessory to the commercial photography studio. | $21,500 |
| Aug 27, 2010 | Completed final sign-off Mar 2011 | 2240 Bay St | kitchen cabinets, countertops and plumbing fixture replacement.Details
kitchen cabinets, countertops and plumbing fixture replacement. | $4,150 |
| Aug 4, 2010 | Completed final sign-off Nov 2010 | 949 Post St | relocate manager's unit from second to first floor. move extg recreation room to extg managers unit. size of extg and proposed recreation room as same size . add full bath and kitchen in managers unit.Details
relocate manager's unit from second to first floor. move extg recreation room to extg managers unit. size of extg and proposed recreation room as same size . add full bath and kitchen in managers unit. | $22,000 |
| Jul 8, 2010 | Completed final sign-off Oct 2011 | 2248 Washington St | redistribute 2 units internally addition @ lower level @ 3rd level. remove (e) illegal unit@ lower level & illegal additions @ 3rd level. remodel / reconfigure all levels. new windows & doors (wood insulated). new stucco @ front & rear. 4 full baths, 1 half bath, 2 kitchen.Details
redistribute 2 units internally addition @ lower level @ 3rd level. remove (e) illegal unit@ lower level & illegal additions @ 3rd level. remodel / reconfigure all levels. new windows & doors (wood insulated). new stucco @ front & rear. 4 full baths, 1 half bath, 2 kitchen. | $300,000 |
| May 19, 2010 | Completed final sign-off Oct 2010 | 19 07th Av | remodel kitchen, relocate appliances, add door and header, add bookshelevesDetails
remodel kitchen, relocate appliances, add door and header, add booksheleves | $15,000 |
| Apr 19, 2010 | Never finaled issued Apr 2010, no final | 4421 Mission St | (e) restaurant remodel, unisex bathroom remodel. (n) kitchen hood, change of use from retail to restaurant.Details
(e) restaurant remodel, unisex bathroom remodel. (n) kitchen hood, change of use from retail to restaurant. | $80,000 |
| Apr 1, 2010 | Completed final sign-off Oct 2010 | 1139 Market St | comply with nov #201038402 correct electrical conduit on hallways; remodelling of managers living unit on 2nd floor including rewiring bathroom & kitchen remodel, misc drywall (min 5/8" type x painting & tiling.Details
comply with nov #201038402 correct electrical conduit on hallways; remodelling of managers living unit on 2nd floor including rewiring bathroom & kitchen remodel, misc drywall (min 5/8" type x painting & tiling. | $32,000 |
| Mar 17, 2010 | Expired or cancelled expired May 2013 | 340 Ofarrell St | revision to pa #200703136149: new dining room table configuration, convert non required h/c bath & office to storage. new front counter configuration, walk-in fridge convert to double door fridge kitchen entry relocation.Details
revision to pa #200703136149: new dining room table configuration, convert non required h/c bath & office to storage. new front counter configuration, walk-in fridge convert to double door fridge kitchen entry relocation. | |
| Mar 16, 2010 | Completed final sign-off Jul 2010 | 1655 Mason St | to establish use of rear building as two (2) dwelling units. comply with nov. #200865993. added unit in basement area kitchen, bedroom. at rear building, 2-bldgs. on one lot).Details
to establish use of rear building as two (2) dwelling units. comply with nov. #200865993. added unit in basement area kitchen, bedroom. at rear building, 2-bldgs. on one lot). | $10,000 |
| Jan 26, 2010 | Completed final sign-off Mar 2010 | 1857 Newhall St | remodeling kitchen & bathroom including replacing cabinets, countertops & fixtures.Details
remodeling kitchen & bathroom including replacing cabinets, countertops & fixtures. | $20,000 |
| Jan 21, 2010 | Completed final sign-off May 2012 | 3129 Folsom St | interior remodel of all bathrooms & kitchens, including removal of non-bearing walls. (all units).Details
interior remodel of all bathrooms & kitchens, including removal of non-bearing walls. (all units). | $185,000 |
| Dec 31, 2009 | Expired or cancelled expired May 2013 | 340 Ofarrell St | to comply with nov#200922102; new kitchen exhaust hood for type 1 hood.Details
to comply with nov#200922102; new kitchen exhaust hood for type 1 hood. | $3,500 |
| Nov 3, 2009 | Completed final sign-off Nov 2009 | 49 Seward St | replacing single glazed aluminum windows in kitchen with dual glazed clad wood window. uf max .67Details
replacing single glazed aluminum windows in kitchen with dual glazed clad wood window. uf max .67 | $650 |
| Nov 3, 2009 | Completed final sign-off Nov 2009 | 49 Seward St | replacing single glazed aluminum windows in kitchen, bath and two bedrooms with dual glazed clad wood windows (4 windows) uf max. .67Details
replacing single glazed aluminum windows in kitchen, bath and two bedrooms with dual glazed clad wood windows (4 windows) uf max. .67 | $1,800 |
| Nov 3, 2009 | Completed final sign-off Nov 2009 | 49 Seward St | replacing single glazed aluminum windows in kitchen with dual glazed clad wood window. uf max .67Details
replacing single glazed aluminum windows in kitchen with dual glazed clad wood window. uf max .67 | $650 |
| Oct 6, 2009 | Never finaled issued Oct 2009, no final | 155 El Verano Wy | remodel kitchen & 2 1/2 bathrooms, rebuild winding stairs, new windows & doors, dormer, new bay window, pony wall at kitchen/living room, level & replace wood flooring bedroom, living room & dining roomDetails
remodel kitchen & 2 1/2 bathrooms, rebuild winding stairs, new windows & doors, dormer, new bay window, pony wall at kitchen/living room, level & replace wood flooring bedroom, living room & dining room | $185,000 |
| Sep 25, 2009 | Completed final sign-off Jul 2010 | 1040 Folsom St | reverse location of kitchen equipment for restaurant fire, mechanical under separate permit. revision to appl 200409144008. electric and kitchen hood under separate permit.Details
reverse location of kitchen equipment for restaurant fire, mechanical under separate permit. revision to appl 200409144008. electric and kitchen hood under separate permit. | $31,000 |
| Jun 9, 2009 | Completed final sign-off Dec 2010 | 910 York St | legalization of existing ground floor unit. 1 bedroom, living room, full bathroom & kitchen.approx 650 sf.Details
legalization of existing ground floor unit. 1 bedroom, living room, full bathroom & kitchen.approx 650 sf. | $25,000 |
| Jun 3, 2009 | Completed final sign-off Jan 2010 | 2085 Ellis St | remodeling of interior including bathroom & kitchen. structural strenthening of rear porchDetails
remodeling of interior including bathroom & kitchen. structural strenthening of rear porch | $32,000 |
| Apr 1, 2009 | Completed final sign-off May 2009 | 235 San Fernando Wy | remodel kitchen & adjacent powder room including replacing cabinets, counters, plumbing & electrical fixtures. no change to layout / partitions.Details
remodel kitchen & adjacent powder room including replacing cabinets, counters, plumbing & electrical fixtures. no change to layout / partitions. | $32,000 |