Block 3048, lot 018
155 El Verano Way
- City’s use
- Single Family Residential
- Built
- 1948
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,701 sq ft
- Lot
- 4,046 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2022 | Completed final sign-off Mar 2022 | 155 El Verano Wy | Tesla Energy Operations | revision to permit 202106162588, update plans to reflect the new bos location after install. no electrical work changed, changed reflected on site plan, tlo, both elevations and placard.Details
revision to permit 202106162588, update plans to reflect the new bos location after install. no electrical work changed, changed reflected on site plan, tlo, both elevations and placard. | $14,000 |
| Jun 16, 2021 | Completed final sign-off Mar 2022 | 155 El Verano Wy | Tesla Energy Operations | install energy storage system at 27 kwh/28 kwh total (2) on exterior of bldg. install n200a internal load center. install n200a distribution panel. - install solar roof at 3.45kw (59 active solar tiles) on a separate application.Details
install energy storage system at 27 kwh/28 kwh total (2) on exterior of bldg. install n200a internal load center. install n200a distribution panel. - install solar roof at 3.45kw (59 active solar tiles) on a separate application. | $47,000 |
| Feb 4, 2020 | Never finaled filed Feb 2020, never issued | 155 El Verano Wy | Tesla Energy Operations | install solar panels 3.78 kw (12 panels). install energy storage system 27 kwh (2 powerwall). +200 a main service upgrade. + 200 a load center.Details
install solar panels 3.78 kw (12 panels). install energy storage system 27 kwh (2 powerwall). +200 a main service upgrade. + 200 a load center. | |
| Mar 18, 2011 | Completed final sign-off Apr 2011 | 155 El Verano Wy | Occidental Express | revision to pa# 2009-1006-8434-deleting installing of door from rear bedroom #2 to deckDetails
revision to pa# 2009-1006-8434-deleting installing of door from rear bedroom #2 to deck | |
| Jun 7, 2010 | Never finaled issued Jun 2010, no final | 155 El Verano Wy | street spaceDetails
street space | ||
| Oct 6, 2009 | Never finaled issued Oct 2009, no final | 155 El Verano Wy | Occidental Express | remodel kitchen & 2 1/2 bathrooms, rebuild winding stairs, new windows & doors, dormer, new bay window, pony wall at kitchen/living room, level & replace wood flooring bedroom, living room & dining roomDetails
remodel kitchen & 2 1/2 bathrooms, rebuild winding stairs, new windows & doors, dormer, new bay window, pony wall at kitchen/living room, level & replace wood flooring bedroom, living room & dining room | $185,000 |
| Aug 21, 2008 | Completed final sign-off Dec 2008 | 155 El Verano Wy | Occidental Express | remove/replace rear deck, replacing rear sliding door in existing opening.Details
remove/replace rear deck, replacing rear sliding door in existing opening. | $18,000 |
| Jul 30, 2002 | Expired or cancelled expired Dec 2008 | 155 El Verano Wy | E H B Roofing | reroofingDetails
reroofing | $6,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Occidental Express (3), Tesla Energy Operations (3), E H B Roofing
- Architects
- Christopher Mcmahon (2)
- Designers
- Erik Browlee Roth
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.