Permit 202106162588
155 El Verano Wy
install energy storage system at 27 kwh/28 kwh total (2) on exterior of bldg. install n200a internal load center. install n200a distribution panel. - install solar roof at 3.45kw (59 active solar tiles) on a separate application.
- Outcome
- Completed (city status: complete, Mar 28, 2022)
- Filed
- Jun 16, 2021
- Permit issued
- Nov 23, 2021
- Final sign-off
- Mar 28, 2022
- Declared cost
- $47,000
- Building use
- 1 family dwelling
- Neighborhood
- West of Twin Peaks
- Contractor
- Tesla Energy Operations (license 888104)
- Property
- All permits at this address (block 3048, lot 018)
Everyone on the permit
The parties and license numbers written on the permit, as the city lists them; not a check with any state board. The person who paid the fee and the project contact are not shown.
- Contractor
- Tesla Energy Operations (license 888104)
- Authorized agent-others
- Alex Montilla, Tesla Energy (no license listed)
- Authorized agent-others
- Charlie Mau, Tesla Energy Operations (no license listed)