Back to bathroom remodel contractors
Occidental Express
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 106 permits filed
1,473 permits since 2000: 929 completed, 48 in progress, 173 never finaled, 323 expired or cancelled.
Of the 173 never-finaled permits, 14 are 3 to 5 years old, 17 are 5 to 10 years old, 142 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
281 bathroom remodel permits: 163 completed, 10 in progress, 42 never finaled, 66 expired or cancelled. Typically 0 days from filing to permit and 212 days from permit to final inspection.
Showing the 100 most recent of 281.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 691 Portola Dr | addition (n) ada bathroom - barrier removal.Details
addition (n) ada bathroom - barrier removal. | $21,000 |
| Jul 13, 2026 | In progress filed Jul 2026, not yet issued | 790 Ellis St | hotel remodel. 1st fl new ada parking spaces location, interior non bearing walls to be removed to make bathrooms larger. new 4 ada bathrooms. 2nd fl interior non bearing walls to be removed to make bathrooms larger.3rd: intioer non bearing walls to be removed to make bathrooms largerDetails
hotel remodel. 1st fl new ada parking spaces location, interior non bearing walls to be removed to make bathrooms larger. new 4 ada bathrooms. 2nd fl interior non bearing walls to be removed to make bathrooms larger.3rd: intioer non bearing walls to be removed to make bathrooms larger | $5,860,000 |
| May 14, 2026 | In progress issued Jun 2026 | 499 Alabama St | barrier removal, bathroom restorationDetails
barrier removal, bathroom restoration | $38,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 583 Missouri St | comply w/ nov 202546412. e) kitchen remodel @ 1st/f, e) non-bearing wall removal @ 2nd/f. e) bathroom remodel @ 2nd/f, addition new washer/dryer at 2nd/f, hvac system to be replaced, water heater to be replaced. no exterior workDetails
comply w/ nov 202546412. e) kitchen remodel @ 1st/f, e) non-bearing wall removal @ 2nd/f. e) bathroom remodel @ 2nd/f, addition new washer/dryer at 2nd/f, hvac system to be replaced, water heater to be replaced. no exterior work | $112,000 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 1437 Cabrillo St | 1st floor: add great room with kitchenette, bedroom and bathroomDetails
1st floor: add great room with kitchenette, bedroom and bathroom | $98,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 337 Arkansas St | 337-339 arkansas st: comply with nov 202541996. repair of non strucutral fire damage including replacing non structural fire damage including replacing bathroom and kitchen cabinets, plumbing and electrical fixt and devices, tiling in both units. in kindDetails
337-339 arkansas st: comply with nov 202541996. repair of non strucutral fire damage including replacing non structural fire damage including replacing bathroom and kitchen cabinets, plumbing and electrical fixt and devices, tiling in both units. in kind | $75,000 |
| Feb 24, 2025 | In progress issued Feb 2025 | 3032 16th St | adding new full bathrooms at bedrooms on 2nd and 3rd floors.Details
adding new full bathrooms at bedrooms on 2nd and 3rd floors. | $336,000 |
| Jan 10, 2025 | Expired or cancelled withdrawn Feb 2025 | 380 Day St | legalizing of living room, lavndry and bathroom on 1st floor.Details
legalizing of living room, lavndry and bathroom on 1st floor. | $18,500 |
| Oct 7, 2024 | Completed final sign-off Apr 2025 | 1500 Powell St | revision to pa#202406104059. new accessible bathroom. new 1 restroom (toilet and sink). new 2 showers. mep deferred. this bldg is a residential hotel, residenital units may not be converted. demollished or have their use changed w/o complying with chap 41. sf admin code.Details
revision to pa#202406104059. new accessible bathroom. new 1 restroom (toilet and sink). new 2 showers. mep deferred. this bldg is a residential hotel, residenital units may not be converted. demollished or have their use changed w/o complying with chap 41. sf admin code. | |
| Sep 26, 2024 | In progress issued Sep 2024 | 112 Hyde St | complying w/ nov#2023-04923. fire damage repair in rooms 34, 35, 14, 15 and adjacent lightwell. no structural damage. remodeling of bathrooms, painting, tiling + replacement. plumbing fixtures in both common areas and guest rooms 2nd & 3rd floors, 15 +/- total.Details
complying w/ nov#2023-04923. fire damage repair in rooms 34, 35, 14, 15 and adjacent lightwell. no structural damage. remodeling of bathrooms, painting, tiling + replacement. plumbing fixtures in both common areas and guest rooms 2nd & 3rd floors, 15 +/- total. | $168,000 |
| Jul 10, 2024 | In progress filed Jul 2024, not yet issued | 1449 Powell St | complying with nov 201644842, 201880811 and 202069111. restoring unwarranted habitable rooms at rear of commercial space on 1/f including bathrooms and kitchen to storage and removal of plumbing fixtures for kitchen and fixtures.Details
complying with nov 201644842, 201880811 and 202069111. restoring unwarranted habitable rooms at rear of commercial space on 1/f including bathrooms and kitchen to storage and removal of plumbing fixtures for kitchen and fixtures. | $18,000 |
| Jun 10, 2024 | Completed final sign-off Apr 2025 | 1500 Powell St | ti work including: new 2 ada full bathrooms. new ada ramp.Details
ti work including: new 2 ada full bathrooms. new ada ramp. | $98,000 |
| Nov 14, 2023 | Completed final sign-off Dec 2023 | 912 Jackson St | replacing guest room doors with 20 min rated doors and also bathroom doors. no work on dwelling unitDetails
replacing guest room doors with 20 min rated doors and also bathroom doors. no work on dwelling unit | $7,200 |
| Aug 1, 2023 | In progress issued Apr 2024 | 1665 Haight St | addition of 2 new accessible suites with accessible bathrooms. addition of a new lula elevator to connect level 2 to the entry level. remodelings of all rooms.Details
addition of 2 new accessible suites with accessible bathrooms. addition of a new lula elevator to connect level 2 to the entry level. remodelings of all rooms. | $300,000 |
| Oct 5, 2022 | Completed final sign-off Sep 2026 | 95 Newton St | compliance with complaint 202183922. legalize a kitchenette, bathroom, and bedroom on gr floor levelDetails
compliance with complaint 202183922. legalize a kitchenette, bathroom, and bedroom on gr floor level | $128,000 |
| Jun 27, 2022 | Never finaled issued Jun 2022, no final | 310 Columbus Av | remodeling of 6 bathrooms including replacing plumbing fixtures and tiles.Details
remodeling of 6 bathrooms including replacing plumbing fixtures and tiles. | $78,000 |
| Jun 27, 2022 | Never finaled issued Jun 2022, no final | 1449 Powell St | remodeling of kitchens on 2nd and 3rd floors in cluding replacing cabinets, countertops, hood, cooktop, flooring, lighting and plugs. unit #20 renovations kitchen and bathroom. replacing 15 doors. no exterior changesDetails
remodeling of kitchens on 2nd and 3rd floors in cluding replacing cabinets, countertops, hood, cooktop, flooring, lighting and plugs. unit #20 renovations kitchen and bathroom. replacing 15 doors. no exterior changes | $75,000 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 590 Steiner St | complying with complaint #202289152: remodeling of (1) kitchen and (1) bathroom and replaced windows in kind in location listed on complaint. (6) windows (metal).Details
complying with complaint #202289152: remodeling of (1) kitchen and (1) bathroom and replaced windows in kind in location listed on complaint. (6) windows (metal). | $14,000 |
| Apr 1, 2022 | Completed final sign-off Apr 2024 | 3762 22nd St | remodeling kitchen, laundry and bathroom on 1/f. including replacing cabinets, counter tops, plumbing and elec fixtures and devices and rear door and windows.Details
remodeling kitchen, laundry and bathroom on 1/f. including replacing cabinets, counter tops, plumbing and elec fixtures and devices and rear door and windows. | $32,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2022 | 176 Valparaiso St | to comply with nov 202184667 no heat, stairway safety, hold, including removing of unwarranted bedroom and bathroom. bedroom #4. replace furnace.Details
to comply with nov 202184667 no heat, stairway safety, hold, including removing of unwarranted bedroom and bathroom. bedroom #4. replace furnace. | $5,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 292 Eureka St | comply w/nov 201996591 & planning enf case 2019-021966enf document add'l removal of bldg; demo calcs; (n) add'l unit @ ground fl; replace exterior windows size to size and inkind; (n) window to replace door @ ground fl; remodel of kitchen & bathrooms @ ground fl; new upper floor deckDetails
comply w/nov 201996591 & planning enf case 2019-021966enf document add'l removal of bldg; demo calcs; (n) add'l unit @ ground fl; replace exterior windows size to size and inkind; (n) window to replace door @ ground fl; remodel of kitchen & bathrooms @ ground fl; new upper floor deck | $300,000 |
| Dec 11, 2020 | Never finaled issued Apr 2021, no final | 1561 34th Av | remodel existing half bath to full bathroom. remodel laundry on ground floor. replace 2 windows and door at rear.Details
remodel existing half bath to full bathroom. remodel laundry on ground floor. replace 2 windows and door at rear. | $18,500 |
| Dec 8, 2020 | Completed final sign-off Jul 2023 | 218 11th Av | ground fl: seismic retrofit, new foundation, fire rated service corridor. 1st fl: kitchen remodel, move powder rm, new porch, new windows at rear, new staircase at rear. med upgrade. 2nd fl: bathroom remodel, add laundry rm, staircase, med upgrade. 3rd fl: move bedrooms, door to roof deck. ada stairDetails
ground fl: seismic retrofit, new foundation, fire rated service corridor. 1st fl: kitchen remodel, move powder rm, new porch, new windows at rear, new staircase at rear. med upgrade. 2nd fl: bathroom remodel, add laundry rm, staircase, med upgrade. 3rd fl: move bedrooms, door to roof deck. ada stair | $195,000 |
| Aug 19, 2020 | In progress issued Jan 2026 | 1335 Clay St | comply w/planning violation #2018-001512ef. add 1 adu w/1 bedrm & 1 bath, unit #17 at ground fl. (legalize in-law unit #16 at rear of g/f under sep. permit pa# 202201045352). sprinkler g/f adu unit #15 & exit path under sep permit per fs-05 & nfpa 13. soft story pa# 201510089218 to be reinstated.Details
comply w/planning violation #2018-001512ef. add 1 adu w/1 bedrm & 1 bath, unit #17 at ground fl. (legalize in-law unit #16 at rear of g/f under sep. permit pa# 202201045352). sprinkler g/f adu unit #15 & exit path under sep permit per fs-05 & nfpa 13. soft story pa# 201510089218 to be reinstated. | $60,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 190 Ofarrell St | to comply with his 201956701 and 201970611, 201974362. repairing of rooms 301,306,314,401,408, & 609. including plaster repair, painting, flooring and tileing of bathrooms.Details
to comply with his 201956701 and 201970611, 201974362. repairing of rooms 301,306,314,401,408, & 609. including plaster repair, painting, flooring and tileing of bathrooms. | $52,000 |
| Jul 5, 2019 | Completed final sign-off Aug 2019 | 221 07th St | complying with nov: 201958091. installing grab bars in common bathrooms.Details
complying with nov: 201958091. installing grab bars in common bathrooms. | $650 |
| Jan 25, 2019 | Completed final sign-off Jan 2020 | 860 Hayes St | remodel of bathroom onn 2/f opposite room #13; incl tile work, 2 new showrs and replacing of plumbing and elect. fiextures.Details
remodel of bathroom onn 2/f opposite room #13; incl tile work, 2 new showrs and replacing of plumbing and elect. fiextures. | $15,000 |
| Jun 8, 2018 | Completed final sign-off Sep 2018 | 49 Seward St | remodeling of kitchen & bathrooms including replacing counters, cabinets, fixts & tiles in-kind. same location.Details
remodeling of kitchen & bathrooms including replacing counters, cabinets, fixts & tiles in-kind. same location. | $52,000 |
| Nov 9, 2016 | Completed final sign-off Oct 2018 | 475 Valencia St | change of use. comply with nov 201187815. add partition walls inside existing offices, grab bar at bathrooms and lever hardware at entry door and bathroom doorsDetails
change of use. comply with nov 201187815. add partition walls inside existing offices, grab bar at bathrooms and lever hardware at entry door and bathroom doors | $2,500 |
| Aug 10, 2016 | Never finaled issued Aug 2016, no final | 445 Ofarrell St | renovating private bathrooms floors 1-4, units #s 109,202,205,210,216,219,226,227,230,302,3015,309,326,327,330,402,405, 428: like for like replacement (e) 18 toilets, (e) 18 showers, (e) 18 exhaust fans, (n) gfi outlets, (e) 18 (e) lights, (e) 18 doors and frames. to comply with nov #201625063Details
renovating private bathrooms floors 1-4, units #s 109,202,205,210,216,219,226,227,230,302,3015,309,326,327,330,402,405, 428: like for like replacement (e) 18 toilets, (e) 18 showers, (e) 18 exhaust fans, (n) gfi outlets, (e) 18 (e) lights, (e) 18 doors and frames. to comply with nov #201625063 | $198,000 |
| Mar 21, 2016 | Completed final sign-off Jun 2016 | 74 Turk St | to comply with nov#201600811: restoring bathroom on 4 floors. replace fixtures, removed wwop. no walls moved, removed added or infilled. all (e) layouts to remain unchanged.Details
to comply with nov#201600811: restoring bathroom on 4 floors. replace fixtures, removed wwop. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. | $32,000 |
| Nov 9, 2015 | Expired or cancelled expired Mar 2026 | 753 39th Av | new bathrooms, kitchen at the upper level.Details
new bathrooms, kitchen at the upper level. | $30,000 |
| Mar 23, 2015 | Completed final sign-off Oct 2017 | 1188 Diamond St | (n) floor between (e) 1st & (e) 2nd story. fill-in lightwell, (n) rm w/bath @ (n) 4/f. rear addition, remodel interior totally replace all windows, replace electrical & plumbing including fixtures, (n) facade materials. sprinkler 13r; foundation under separate permit.Details
(n) floor between (e) 1st & (e) 2nd story. fill-in lightwell, (n) rm w/bath @ (n) 4/f. rear addition, remodel interior totally replace all windows, replace electrical & plumbing including fixtures, (n) facade materials. sprinkler 13r; foundation under separate permit. | $188,000 |
| Feb 11, 2015 | Completed final sign-off Mar 2016 | 1138 Rhode Island St | interior remodel, widening rear pop-out room, add stair penthouse, roof deck, penthouse rm/bathroom, clerestory above dining rm, upgrade foundation, alter facade & replace all windows w/ dual glazed wood clad windows.Details
interior remodel, widening rear pop-out room, add stair penthouse, roof deck, penthouse rm/bathroom, clerestory above dining rm, upgrade foundation, alter facade & replace all windows w/ dual glazed wood clad windows. | $145,000 |
| Nov 19, 2014 | Completed final sign-off Feb 2016 | 1138 Rhode Island St | 1st floor remodel: remodel extg bathroom and new bath, deck build out (balcony). 2nd floor remodel: remodel extg bath, and new bath, deck build out (balcony). relocate 2 bedroom to 1st floor.Details
1st floor remodel: remodel extg bathroom and new bath, deck build out (balcony). 2nd floor remodel: remodel extg bath, and new bath, deck build out (balcony). relocate 2 bedroom to 1st floor. | $125,000 |
| Oct 29, 2014 | Completed final sign-off May 2015 | 3780 22nd St | remodeling bathroom including replacing tub with shower, toilet & tiling. no wiring work under this permit.Details
remodeling bathroom including replacing tub with shower, toilet & tiling. no wiring work under this permit. | $7,500 |
| Sep 8, 2014 | Completed final sign-off Oct 2016 | 2040 20th St | add a media room, closet and half bath with laundry area at 1st flr level.Details
add a media room, closet and half bath with laundry area at 1st flr level. | $38,000 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 626 Clayton St | comply with nov 201322341. remove 1/2 bath at basement level, cap hot/cold water supply lines to source room to be restored to its original use as storageDetails
comply with nov 201322341. remove 1/2 bath at basement level, cap hot/cold water supply lines to source room to be restored to its original use as storage | $1,500 |
| Jul 1, 2014 | Completed final sign-off Mar 2015 | 1522 Vallejo St | comply with nov #201464031. replacing reaer deck and stairs and interor remodeling of kitchen and bathroom.Details
comply with nov #201464031. replacing reaer deck and stairs and interor remodeling of kitchen and bathroom. | $18,000 |
| Jul 1, 2014 | Completed final sign-off Dec 2016 | 3598 Jackson St | revision to pba #2014-0225-9301. voluntary structural strengthening of the foundation and the replacement of finishes and fixtures within bathrooms, kitchen, pantry, childrens dining room, mvp room, trunk room, bedrooms, storage room, loundry room and closets. (n) concrete piers and moment frame.Details
revision to pba #2014-0225-9301. voluntary structural strengthening of the foundation and the replacement of finishes and fixtures within bathrooms, kitchen, pantry, childrens dining room, mvp room, trunk room, bedrooms, storage room, loundry room and closets. (n) concrete piers and moment frame. | $68,000 |
| Jun 30, 2014 | Completed final sign-off Jul 2016 | 24 Bennington St | interior remodeling including kitchen & bathroom, structural upgrade, installing skylights, new stairs and replacings windows, and exterior altertions incluing bay window replacement.Details
interior remodeling including kitchen & bathroom, structural upgrade, installing skylights, new stairs and replacings windows, and exterior altertions incluing bay window replacement. | $186,000 |
| May 27, 2014 | Never finaled issued May 2014, no final | 504 04th St | complying with complaint 201473513, remodeling 3 half bathrooms common one on each floor including replacing tiles and fixtures;compliance with ord 155-13 not requiredDetails
complying with complaint 201473513, remodeling 3 half bathrooms common one on each floor including replacing tiles and fixtures;compliance with ord 155-13 not required | $18,000 |
| May 27, 2014 | Never finaled issued May 2014, no final | 2312 09th Av | remodeling of master bathroom including replaceing tiles and fixturesDetails
remodeling of master bathroom including replaceing tiles and fixtures | $12,000 |
| Apr 10, 2014 | Never finaled issued Apr 2014, no final | 633 Larkin St | complying with complaint # 201456941 and ord # 029-13 installing grab bars in public bathrooms. (to comply with ord # 029-13 only).Details
complying with complaint # 201456941 and ord # 029-13 installing grab bars in public bathrooms. (to comply with ord # 029-13 only). | $850 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 2048 Polk St | complying with ord 029-13 installing grab bars in public bathroomsDetails
complying with ord 029-13 installing grab bars in public bathrooms | $1,800 |
| Mar 28, 2014 | Completed final sign-off Dec 2014 | 710 Ellis St | comply with ord 029-13 installing grab bars in public bathroomDetails
comply with ord 029-13 installing grab bars in public bathroom | $1,800 |
| Mar 6, 2014 | Completed final sign-off Jun 2014 | 58 Collingwood St | replacing tiles and faucet in master bath.Details
replacing tiles and faucet in master bath. | $11,000 |
| Mar 6, 2014 | Completed final sign-off Mar 2015 | 1522 Vallejo St | remodeling kitchen & bathroom, including replacing counter tops, cabinets & fixtures and minor termite repair of rear stairs.Details
remodeling kitchen & bathroom, including replacing counter tops, cabinets & fixtures and minor termite repair of rear stairs. | $22,000 |
| Feb 25, 2014 | Completed final sign-off Dec 2016 | 3598 Jackson St | structural strengthening of the foundation, replacement of finished and fixtures within bathrooms, kitchen, pantry, children's dinning room, mud room, trunk room, bedrooms 8 and 9, storage room, laundary room inc. closets new pier under (e) foundation, 3 story moment frame at the cornerDetails
structural strengthening of the foundation, replacement of finished and fixtures within bathrooms, kitchen, pantry, children's dinning room, mud room, trunk room, bedrooms 8 and 9, storage room, laundary room inc. closets new pier under (e) foundation, 3 story moment frame at the corner | $350,000 |
| Feb 25, 2014 | Expired or cancelled expired Nov 2016 | 741 Noe St | g/f - 1) addition of window on reconfigured storage, 2) remodel of the stairway from garage to storage, 3)foyer adjacent to stairs, 4) addition of bathroomDetails
g/f - 1) addition of window on reconfigured storage, 2) remodel of the stairway from garage to storage, 3)foyer adjacent to stairs, 4) addition of bathroom | $28,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2015 | 91 Saint Germain Av | 70 sq ft addition at rear for (1) new bedroom (1) new bathroomDetails
70 sq ft addition at rear for (1) new bedroom (1) new bathroom | $38,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2014 | 80 Elmira St | change of occupancy (use) to dog training & boarding - dork fo rpainting, flooring & installing of portable modular partitions for dog training & boarding facility. barrier removal for unisex bathroom & accessible sink & counter in break room.Details
change of occupancy (use) to dog training & boarding - dork fo rpainting, flooring & installing of portable modular partitions for dog training & boarding facility. barrier removal for unisex bathroom & accessible sink & counter in break room. | |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 626 Clayton St | comply with nov #201322341 to legalize the half bath at basement level.Details
comply with nov #201322341 to legalize the half bath at basement level. | $11,000 |
| Nov 21, 2013 | Completed final sign-off Dec 2013 | 72 06th St | complying with nov 201322531. installing heating duct to room 208 from existing heating duct. also complying with novs - 201322682, 2013233512, 201322191 & ord 029-13 for installing grab bars in common bathroomsDetails
complying with nov 201322531. installing heating duct to room 208 from existing heating duct. also complying with novs - 201322682, 2013233512, 201322191 & ord 029-13 for installing grab bars in common bathrooms | $2,500 |
| Nov 8, 2013 | Completed final sign-off Feb 2015 | 88 Whitney St | addition of bedroom, bath, mechanical closet, laundry room @ basement. addition of bay window on entry (2nd) floor , kitchen remodel @ 2nd floor. upper floor bath remodel. level floor at rear.Details
addition of bedroom, bath, mechanical closet, laundry room @ basement. addition of bay window on entry (2nd) floor , kitchen remodel @ 2nd floor. upper floor bath remodel. level floor at rear. | $185,000 |
| Oct 30, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | 1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bathDetails
1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bath | $68,000 |
| Oct 18, 2013 | Completed final sign-off Sep 2014 | 120 Hyde St | installing grab bars in public bathrooms to comply with ordinance 029-13Details
installing grab bars in public bathrooms to comply with ordinance 029-13 | $1,200 |
| Oct 17, 2013 | Completed final sign-off Oct 2014 | 53 Sanchez St | revision to 201305076355 reconfigure interior and remodel of kitchen and baths. remove portion of wall between foyer and living room. replace windows with wood sash windows double hung to have og lugs, dual glazedDetails
revision to 201305076355 reconfigure interior and remodel of kitchen and baths. remove portion of wall between foyer and living room. replace windows with wood sash windows double hung to have og lugs, dual glazed | $8,500 |
| Oct 8, 2013 | Completed final sign-off Aug 2015 | 3307 20th St | revision of pa#2013-0709-1355 1)extend existing toilet to include new shower 2)convert existing closet to bathroom 3)infill existing sliding door 4)remove non-load bearing wallin kitchen and install header 5)no exterior change to building 6)replace wall&ceiling with need insulation and 5/8" x gym bdDetails
revision of pa#2013-0709-1355 1)extend existing toilet to include new shower 2)convert existing closet to bathroom 3)infill existing sliding door 4)remove non-load bearing wallin kitchen and install header 5)no exterior change to building 6)replace wall&ceiling with need insulation and 5/8" x gym bd | $65,000 |
| Oct 4, 2013 | Completed final sign-off Aug 2014 | 1100 Filbert St | remodelling of bathroom & kitchen including replacing cabinets, countertops, plumbing & electrical fixtures. installing washer/dryer at basement laundry.Details
remodelling of bathroom & kitchen including replacing cabinets, countertops, plumbing & electrical fixtures. installing washer/dryer at basement laundry. | $32,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 373 Ellis St | replacing tiles at 1st and 2nd floor showers and 4th floor bath.Details
replacing tiles at 1st and 2nd floor showers and 4th floor bath. | $12,000 |
| Jul 9, 2013 | Completed final sign-off Aug 2015 | 3307 20th St | remodeling of 1 kitchen and 1 bathroom in three units, including replacing cabinets, countertops and plumbing fixtures.Details
remodeling of 1 kitchen and 1 bathroom in three units, including replacing cabinets, countertops and plumbing fixtures. | $63,000 |
| Jul 5, 2013 | Completed final sign-off May 2014 | 914 Sanchez St | interior renovation:remodel of kitchen and bathroom. addition of one bathroom and one half bathroom, new porch on 3rd floor. addition of 2 baywindows on 2nd and 3rd floors.Details
interior renovation:remodel of kitchen and bathroom. addition of one bathroom and one half bathroom, new porch on 3rd floor. addition of 2 baywindows on 2nd and 3rd floors. | $128,000 |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 162 Taylor St | installing grab bars in all common bathrooms per ordinance #029-13Details
installing grab bars in all common bathrooms per ordinance #029-13 | $500 |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 868 Valencia St | installing grab bars in all common bathrooms per ordinance 029-13Details
installing grab bars in all common bathrooms per ordinance 029-13 | $1,200 |
| Jun 4, 2013 | Never finaled issued Jun 2013, no final | 439 Jones St | comply with ordinance 029-13 only-installing grab bars in all common bathroomsDetails
comply with ordinance 029-13 only-installing grab bars in all common bathrooms | $2,200 |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 445 Ofarrell St | installing grab bars in all common bathrooms per ordinance #029-13Details
installing grab bars in all common bathrooms per ordinance #029-13 | $2,800 |
| Jun 3, 2013 | Completed final sign-off Oct 2013 | 1018 Mission St | comply with ordinance 029-13 only-installing grab bars-all common bathroomsDetails
comply with ordinance 029-13 only-installing grab bars-all common bathrooms | $2,200 |
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 161 Leavenworth St | comply with ordinance 029-13 only-installing grab bars-all common bathroomsDetails
comply with ordinance 029-13 only-installing grab bars-all common bathrooms | $1,200 |
| Jun 3, 2013 | Completed final sign-off Oct 2013 | 130 Eddy St | installing grab bars in all common bathrooms per ordinace # 029-13.Details
installing grab bars in all common bathrooms per ordinace # 029-13. | $1,200 |
| Jun 3, 2013 | Completed final sign-off Jan 2015 | 20 12th St | comply with ordinance 029-13 only-installing grab bars-all common bathroomsDetails
comply with ordinance 029-13 only-installing grab bars-all common bathrooms | $3,800 |
| May 31, 2013 | Expired or cancelled expired Nov 2024 | 44 05th St | installing grab bars in all bathrooms per ordinance 029-13 only. grab bar min load rating of 250 lbs.Details
installing grab bars in all bathrooms per ordinance 029-13 only. grab bar min load rating of 250 lbs. | $2,100 |
| May 31, 2013 | Completed final sign-off Dec 2013 | 45 06th St | installing grab bars in all bathrooms per ordinance 029-13 only. grab bar min load rating of 250 lbs.Details
installing grab bars in all bathrooms per ordinance 029-13 only. grab bar min load rating of 250 lbs. | $450 |
| May 31, 2013 | Completed final sign-off Nov 2013 | 420 Jones St | installing grab bars in all bathrooms per ordinance 029-13 only, grab bar min load rating of 250 lbs.Details
installing grab bars in all bathrooms per ordinance 029-13 only, grab bar min load rating of 250 lbs. | $1,050 |
| May 24, 2013 | Completed final sign-off Jul 2013 | 130 Eddy St | remodeling bathroom in unit #400 including replacing plumbing fixtures and tilingDetails
remodeling bathroom in unit #400 including replacing plumbing fixtures and tiling | $2,800 |
| May 24, 2013 | Completed final sign-off Sep 2013 | 840 Castro St | establish use of guest room full bathroom originally built as office/workshop and tradesman's bath room at ground floor level.Details
establish use of guest room full bathroom originally built as office/workshop and tradesman's bath room at ground floor level. | $9,500 |
| May 17, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | remodeling kitchen and bathroom including dry rot repair.Details
remodeling kitchen and bathroom including dry rot repair. | $24,500 |
| May 16, 2013 | Completed final sign-off May 2016 | 3435 Mission St | interior office & storefront remodel, removal of non bearing work & bathroom fixtures. reconfigure front glazing. installing steel security curtain at front. per ab017 voluntary strengthening at front framing.Details
interior office & storefront remodel, removal of non bearing work & bathroom fixtures. reconfigure front glazing. installing steel security curtain at front. per ab017 voluntary strengthening at front framing. | $11,500 |
| May 14, 2013 | Completed final sign-off Jul 2015 | 3161 16th St | complaint #201386531. add one bathroom. remodel extg on 2nd floor. remove and replace 2 doors on 4th and 5th floor. replace bathtubs in 3rd and 4th floor bathrooms with shower stalls (common bathrooms)Details
complaint #201386531. add one bathroom. remodel extg on 2nd floor. remove and replace 2 doors on 4th and 5th floor. replace bathtubs in 3rd and 4th floor bathrooms with shower stalls (common bathrooms) | $15,000 |
| May 7, 2013 | Completed final sign-off Oct 2014 | 53 Sanchez St | re-configure of interior & remodeling of kitchens, bathrooms, replace front windows with wood sash windows, double hung to have o.g. lugs, dual glazed & add 2 skylights. add railings to stairs to code.Details
re-configure of interior & remodeling of kitchens, bathrooms, replace front windows with wood sash windows, double hung to have o.g. lugs, dual glazed & add 2 skylights. add railings to stairs to code. | $210,000 |
| May 3, 2013 | Completed final sign-off Aug 2014 | 3810 22nd St | remodeling one bathroom. adding 4 dormers.Details
remodeling one bathroom. adding 4 dormers. | $54,000 |
| Apr 5, 2013 | Completed final sign-off Nov 2013 | 1038 Larkin St | comply with nov#201271381, walls and ceiling exposed to repair plumbing for hotel above and repair of same after completion of plumbing repairs. new accessible bathroom and remove partition wall per plan.Details
comply with nov#201271381, walls and ceiling exposed to repair plumbing for hotel above and repair of same after completion of plumbing repairs. new accessible bathroom and remove partition wall per plan. | $5,000 |
| Jan 17, 2013 | Expired or cancelled expired Oct 2014 | 1930 Pine St | remodeling of kitchen and (2) bathrooms including replacing cabinets, counter tops, tiles, plumbing and electrical fixtures. lighting shall comply with title 24.Details
remodeling of kitchen and (2) bathrooms including replacing cabinets, counter tops, tiles, plumbing and electrical fixtures. lighting shall comply with title 24. | $32,000 |
| Nov 2, 2012 | Expired or cancelled expired Apr 2014 | 710 Ellis St | remodel (e) bathroom on 2nd floor into 2 shower rooms & toilet roomDetails
remodel (e) bathroom on 2nd floor into 2 shower rooms & toilet room | $23,000 |
| Oct 31, 2012 | Never finaled issued Feb 2014, no final | 121 Mateo St | add full bath at upper level. reconfigure and enclose rear stairway to rear yard. legalize media rooms. storage room & bathroom at lower floor.Details
add full bath at upper level. reconfigure and enclose rear stairway to rear yard. legalize media rooms. storage room & bathroom at lower floor. | $19,850 |
| Oct 29, 2012 | Expired or cancelled cancelled Jan 2026 | 1528 Pacific Av | interior remodel of existing 1st fl commercial space to include new interior passageway into adjacent existing 1st fl commercial space. accessibility upgrade includes new 1st fl accessible bathroom 1528 pacific per requirement of ca sp survey of nov.10,2011 by kim blacksethDetails
interior remodel of existing 1st fl commercial space to include new interior passageway into adjacent existing 1st fl commercial space. accessibility upgrade includes new 1st fl accessible bathroom 1528 pacific per requirement of ca sp survey of nov.10,2011 by kim blackseth | $18,750 |
| Sep 21, 2012 | Completed final sign-off Feb 2013 | 639 24th Av | renovate kitchen, family room, and 1/2 bath at 2nd floor, new interior stair, hall and landry at garage. renovate (e) bath at 3rd floor. new deck and stair at rear. two new skylights at rear.Details
renovate kitchen, family room, and 1/2 bath at 2nd floor, new interior stair, hall and landry at garage. renovate (e) bath at 3rd floor. new deck and stair at rear. two new skylights at rear. | $75,000 |
| Sep 21, 2012 | Completed final sign-off Jan 2014 | 710 Cole St | at lower level and art studio and relocate stairs to main fl. at main fl reconfigure floor plan. add 2 hair baths at upper floor, reconfigure floor plan and full bathDetails
at lower level and art studio and relocate stairs to main fl. at main fl reconfigure floor plan. add 2 hair baths at upper floor, reconfigure floor plan and full bath | $48,000 |
| Sep 14, 2012 | Completed final sign-off May 2013 | 1911 Baker St | on 2nd floor: seperate front room into 3 bedrooms with closets, add window in bedroom 2, add bathroom, add landry room, remodel master bath & bedroom, remove sunroom, replace master bedroom windows. remove porch, remove brick chimney, add gas fireplace.Details
on 2nd floor: seperate front room into 3 bedrooms with closets, add window in bedroom 2, add bathroom, add landry room, remodel master bath & bedroom, remove sunroom, replace master bedroom windows. remove porch, remove brick chimney, add gas fireplace. | $28,500 |
| Aug 20, 2012 | Completed final sign-off Feb 2018 | 128 Jones St | barrier removal; upgrade bathrooms for access, upgrade door hardwares, railings, add sink to rooms, replace interior window in-kind.Details
barrier removal; upgrade bathrooms for access, upgrade door hardwares, railings, add sink to rooms, replace interior window in-kind. | $50,000 |
| Aug 3, 2012 | Expired or cancelled expired Feb 2016 | 959 Haight St | remodel studio apartment #3. new kitchen & washer/dryer closet for new electric ventless condensing washer&dryer combo. remodel (e) bathroom.Details
remodel studio apartment #3. new kitchen & washer/dryer closet for new electric ventless condensing washer&dryer combo. remodel (e) bathroom. | $42,000 |
| Jul 31, 2012 | Completed final sign-off Apr 2013 | 816 Ortega St | relocate study entry & reconfigure closet at lower level. reconfigure bathroom and upgrade kitchen, replace 3 windows at upper level.Details
relocate study entry & reconfigure closet at lower level. reconfigure bathroom and upgrade kitchen, replace 3 windows at upper level. | $19,500 |
| Jul 23, 2012 | Completed final sign-off Mar 2013 | 3883 20th St | revision to pa# 2008-0522-2724 & 2011-0728-1231-remodel kitchen in both units, also bathrooms. replacing furnaces, repair fire & water damage (non structural). remove laundry at 1st floor, new stairs between 1st & 2nd floors. re-configure main entry stairs (interior)Details
revision to pa# 2008-0522-2724 & 2011-0728-1231-remodel kitchen in both units, also bathrooms. replacing furnaces, repair fire & water damage (non structural). remove laundry at 1st floor, new stairs between 1st & 2nd floors. re-configure main entry stairs (interior) | $82,000 |
| Jul 20, 2012 | Completed final sign-off Feb 2013 | 744 Pacheco St | repair deck (less than 50%), renovate bath & kitchen.Details
repair deck (less than 50%), renovate bath & kitchen. | $10,000 |
| Jun 21, 2012 | Completed final sign-off Apr 2013 | 3373 22nd St | remodeling of master suite and bathroom include. removal of non bearing partition wall.Details
remodeling of master suite and bathroom include. removal of non bearing partition wall. | $14,000 |
| May 17, 2012 | Completed final sign-off May 2014 | 3456 16th St | victorian retrofit. removal of portion of existing ceiling. build mezzanine with bathroom. relocate kitchen in current dining room. flip current master bedroom and bath. widen current office space and open rear wall with nana wall on to e deck.Details
victorian retrofit. removal of portion of existing ceiling. build mezzanine with bathroom. relocate kitchen in current dining room. flip current master bedroom and bath. widen current office space and open rear wall with nana wall on to e deck. | $80,000 |
| May 8, 2012 | Never finaled issued May 2012, no final | 2001 17th St | remodeling of bathrooms including replacing tiles, plumbing and electrical fixtures; to comply with nov 200879593 dtd 11-21-08, high efficiency lights on manual on o.s.Details
remodeling of bathrooms including replacing tiles, plumbing and electrical fixtures; to comply with nov 200879593 dtd 11-21-08, high efficiency lights on manual on o.s. | $20,000 |
| May 8, 2012 | Never finaled issued Jun 2012, no final | 655 04th St | revision to pa# 2011-1215-0704-reconfiguring 1st floor plan, adding staff kitchen & deleting 1 bathroom. electrical under separate permit, mech./title-24 under separate permit.Details
revision to pa# 2011-1215-0704-reconfiguring 1st floor plan, adding staff kitchen & deleting 1 bathroom. electrical under separate permit, mech./title-24 under separate permit. | $36,000 |
| Mar 19, 2012 | Completed final sign-off Sep 2013 | 3027 22nd St | interior remodel of unit #1 at first floor - relocate bath. interior remodel of unit #3 - relocate bath, kitchen & bedrooms. add one bedroom & one powder room. repair/replace exterior rear stairs in-kind.Details
interior remodel of unit #1 at first floor - relocate bath. interior remodel of unit #3 - relocate bath, kitchen & bedrooms. add one bedroom & one powder room. repair/replace exterior rear stairs in-kind. | $42,800 |
| Mar 1, 2012 | Never finaled issued Mar 2012, no final | 2950 Broadway | remodel existing kitchen on ground level wiht additional powder room & master bathroom/walk-in closet on second level. remove illegal kitchen at basement, refinish misc storage rooms in basement.Details
remodel existing kitchen on ground level wiht additional powder room & master bathroom/walk-in closet on second level. remove illegal kitchen at basement, refinish misc storage rooms in basement. | $85,000 |