Block 0340, lot 010
74 Turk St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 4
- Units
- 1
- Rooms
- 18 bathrooms
- Building
- 15,168 sq ft
- Lot
- 4,356 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2022 | Never finaled filed Nov 2022, never issued | 74 Turk St | Occidental Express | fire and water damage repair within envelope no structural damage comply with nov's 201302041 and 202291493Details
fire and water damage repair within envelope no structural damage comply with nov's 201302041 and 202291493 | $82,000 |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 74 Turk St | Innovative Technologies | relocating existing fire alarm conduit inside walls . add 21 smoke detectors in corridorsDetails
relocating existing fire alarm conduit inside walls . add 21 smoke detectors in corridors | $5,000 |
| Mar 16, 2018 | Never finaled issued Mar 2018, no final | 74 Turk St | patch and paint walls and ceiling where all electrical work was done. paint all 3 floor hallways and common repaired floors. texture all walls and install tile in all hallways common areasDetails
patch and paint walls and ceiling where all electrical work was done. paint all 3 floor hallways and common repaired floors. texture all walls and install tile in all hallways common areas | $30,000 | |
| May 2, 2017 | Never finaled issued May 2017, no final | 74 Turk St | to comply with complaint #201302041. paint and patch holes where electrical repairs will be done. repair any tile work paint to rooms, paint and repair sheetrock in hallway. remove expose tv cables and 1/2 flexes. replair some water leaks and repair dry rot wood. repair for work stated only.Details
to comply with complaint #201302041. paint and patch holes where electrical repairs will be done. repair any tile work paint to rooms, paint and repair sheetrock in hallway. remove expose tv cables and 1/2 flexes. replair some water leaks and repair dry rot wood. repair for work stated only. | $20,000 | |
| Mar 21, 2016 | Completed final sign-off Jun 2016 | 74 Turk St | Occidental Express | to comply with nov#201600811: restoring bathroom on 4 floors. replace fixtures, removed wwop. no walls moved, removed added or infilled. all (e) layouts to remain unchanged.Details
to comply with nov#201600811: restoring bathroom on 4 floors. replace fixtures, removed wwop. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. | $32,000 |
| Mar 8, 2016 | Completed final sign-off Aug 2025 | 74 Turk St | to comply with complaint #201600811 adding 25 bathrooms renovating 3 (e) bathrooms and other minor alterationsDetails
to comply with complaint #201600811 adding 25 bathrooms renovating 3 (e) bathrooms and other minor alterations | $380,000 | |
| May 15, 2014 | Completed final sign-off Jul 2014 | 74 Turk St | to comply with nov 201467051, 201468856 & 201471644 (partial compliance) - reubstakk danaged grab barm reokace 9 windows & repair 12 windown, install 10 doors & repair or replace 11 door jamsDetails
to comply with nov 201467051, 201468856 & 201471644 (partial compliance) - reubstakk danaged grab barm reokace 9 windows & repair 12 windown, install 10 doors & repair or replace 11 door jams | $6,100 | |
| Jun 5, 2013 | Expired or cancelled cancelled Jul 2022 | 66 Turk St | route to planning for preservation sign-off. partial compliance with nov 201302041 dated may 2013. update current store front in vacant space. tenant improvement on a separate permit. accessibility compliance will be filed under separate permit per sfbc ab-017.Details
route to planning for preservation sign-off. partial compliance with nov 201302041 dated may 2013. update current store front in vacant space. tenant improvement on a separate permit. accessibility compliance will be filed under separate permit per sfbc ab-017. | $10,000 | |
| May 31, 2013 | Completed final sign-off Dec 2013 | 74 Turk St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location: 74 turk st 2nd to 4th floor.Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location: 74 turk st 2nd to 4th floor. | $720 | |
| Dec 16, 2009 | Completed final sign-off Dec 2009 | 74 Turk St | renew for final sign off to coplete with sro sprinkler ordinance. per app #200110090212. all work work is completeDetails
renew for final sign off to coplete with sro sprinkler ordinance. per app #200110090212. all work work is complete | ||
| Jun 21, 2005 | Completed final sign-off Aug 2005 | 74 Turk St | Occidental Express | reroofingDetails
reroofing | $18,000 |
| Feb 23, 2005 | Expired or cancelled expired Dec 2005 | 74 Turk St | Innovative Technologies | monitor fire alarm and sprinkler system for sprinklers installed under sro ordinance connection ofDetails
monitor fire alarm and sprinkler system for sprinklers installed under sro ordinance connection of | $900 |
| Jul 22, 2004 | Never finaled issued Jul 2004, no final | 74 Turk St | sidewalk repairDetails
sidewalk repair | ||
| Jun 11, 2004 | Completed final sign-off Dec 2004 | 66 Turk St | K Seismic Inc | umb special procedure seismic upgrade revision to approved bldg permit app #200307300753Details
umb special procedure seismic upgrade revision to approved bldg permit app #200307300753 | |
| Apr 30, 2004 | Never finaled issued Apr 2004, no final | 66 Turk St | renew appl#9922382 for final inspectionDetails
renew appl#9922382 for final inspection | ||
| Jul 30, 2003 | Completed final sign-off Dec 2004 | 66 Turk St | K Seismic Inc | umb special procedure - seismic upgradeDetails
umb special procedure - seismic upgrade | $90,000 |
| Oct 9, 2001 | Expired or cancelled expired Dec 2005 | 74 Turk St | Global Fire Protection **See Note*** | upgrade fire sprinklerDetails
upgrade fire sprinkler | $6,000 |
| Jun 6, 2001 | Completed final sign-off Dec 2004 | 66 Turk St | ubm:seismic retrofit wrks, general proceedureDetails
ubm:seismic retrofit wrks, general proceedure | $88,000 | |
| Mar 9, 2000 | Expired or cancelled expired Jul 2000 | 66 Turk St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Occidental Express (3), Innovative Technologies (2), K Seismic Inc (2), Global Fire Protection **See Note***
- Architects
- Patrick Ivan Mora
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.