Block 0688, lot 030
1533 Sutter St
- City’s use
- Multi-Family Residential
- Built
- 1889
- Stories
- 4
- Units
- 3
- Rooms
- 6 bedrooms, 8 bathrooms
- Building
- 6,936 sq ft
- Lot
- 2,750 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 17, 2023 | Completed final sign-off Aug 2023 | 1533 Sutter St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $40,000 |
| Jun 5, 2014 | Completed final sign-off May 2015 | 1533 Sutter St | Occidental Express | as-built drawings for work done under pa #201310300706, establish occupancy as 2 units and 1 housekeeping unit.Details
as-built drawings for work done under pa #201310300706, establish occupancy as 2 units and 1 housekeeping unit. | $7,500 |
| Oct 30, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | Occidental Express | 1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bathDetails
1/f- remove wall at media room, relocate bathroom & kitchen, reconfigurating stairs to code. 2/f- relocate kitchen, remove 2 bathrooms & add powder room, 3/f- remove 2 non bearing partitions, remove unpermitted kitchen, relocate 1 bath & add 1 bath, convert closet to laundry room, 4/f- relocate bath | $68,000 |
| Jul 2, 2013 | Completed final sign-off Mar 2016 | 1533 Sutter St | Occidental Express | garage addition with roof deck.Details
garage addition with roof deck. | $28,000 |
| Jun 5, 2013 | Completed final sign-off Mar 2015 | 1533 Sutter St | Occidental Express | voluntary foundation replacements. building strengthening. replace 180 ft perimeter footing, 70 ft interior footing. install bolt 14 hold downs, install plywood 1st to 2nd floor, repair 1/f dry rot. all work interior, not visable from street.Details
voluntary foundation replacements. building strengthening. replace 180 ft perimeter footing, 70 ft interior footing. install bolt 14 hold downs, install plywood 1st to 2nd floor, repair 1/f dry rot. all work interior, not visable from street. | $40,000 |
| May 17, 2013 | Completed final sign-off May 2015 | 1533 Sutter St | Occidental Express | remodeling kitchen and bathroom including dry rot repair.Details
remodeling kitchen and bathroom including dry rot repair. | $24,500 |
| May 5, 2000 | Expired or cancelled expired May 2001 | 1533 Sutter St | Standardconstr/Standardroof | re roofingDetails
re roofing | $33,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Occidental Express (5), Standardconstr/Standardroof, Ubr Construction & Roofing Inc
- Architects
- Christopher Mcmahon
- Engineers
- Philip Whitehead
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.