Back to kitchen remodel contractors
Casman Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2016 to Sep 2026
- Last 24 months
- 29 permits filed
179 permits since 2000: 131 completed, 9 in progress, 32 never finaled, 7 expired or cancelled.
Of the 32 never-finaled permits, 3 are 3 to 5 years old, 28 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
133 kitchen remodel permits: 98 completed, 8 in progress, 21 never finaled, 6 expired or cancelled. Typically 6 days from filing to permit and 119 days from permit to final inspection.
Showing the 100 most recent of 133.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 638 19th St | replace kitchen cabinets in kind and countertops. replace angle stops, p-trap and faucet. electrical will stay the same. will change two outlets.Details
replace kitchen cabinets in kind and countertops. replace angle stops, p-trap and faucet. electrical will stay the same. will change two outlets. | $20,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 1731 Moraga St | remodel kitchen in-kind. remodel bathroom in kind. new subpanel.Details
remodel kitchen in-kind. remodel bathroom in kind. new subpanel. | $50,000 |
| Jun 17, 2026 | In progress issued Aug 2026 | 420 14th St | unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes.Details
unit# 1: (e) kitchen relocation. (e) bathroom remodel. conversion of (e) kitchen into (n) office. office not designed or approved for sleeping purposes. | $65,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 1275 Lombard St | kitchen remodel in-kind: cabinets, counter tops, appliances. remodel 3 bathrooms in-kind: 3 new shower pans, 1 bathtub, 3 vanities, 3 toilets, shower valves, no lay out changes, no structual changes. new 5/8 drywall type x in bathrooms. not moving walls.Details
kitchen remodel in-kind: cabinets, counter tops, appliances. remodel 3 bathrooms in-kind: 3 new shower pans, 1 bathtub, 3 vanities, 3 toilets, shower valves, no lay out changes, no structual changes. new 5/8 drywall type x in bathrooms. not moving walls. | $250,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 3401 Clay St | unit #301: (e) kitchen relocation. (e) bathroom remodel. addition of (n) washer and dryer.Details
unit #301: (e) kitchen relocation. (e) bathroom remodel. addition of (n) washer and dryer. | $55,000 |
| Mar 19, 2026 | Completed final sign-off Apr 2026 | 1118 Newhall St | revision to pa # 202601284687: window removal, close window. remodel kitchen.Details
revision to pa # 202601284687: window removal, close window. remodel kitchen. | $500 |
| Jan 28, 2026 | Completed final sign-off Apr 2026 | 1118 Newhall St | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $15,000 |
| Nov 19, 2025 | Completed final sign-off May 2026 | 900 Chestnut St | #310: addition of new bedroom on 4th floor. remodel and relocate of existing kitchen. remodel of existing bathroom.Details
#310: addition of new bedroom on 4th floor. remodel and relocate of existing kitchen. remodel of existing bathroom. | $50,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 1807 Jones St | remodel kitchen in kind- (n) cabinets, countertops, appliances, drywall, paint, circuits, and electrical subpanel. no change to floor layout. no change to wall layout. no structural work. replacement gypboard at kitchen only and to be 5/8" type x w/ 5d cooler nails at 4 o.c or equivalent screws. maiDetails
remodel kitchen in kind- (n) cabinets, countertops, appliances, drywall, paint, circuits, and electrical subpanel. no change to floor layout. no change to wall layout. no structural work. replacement gypboard at kitchen only and to be 5/8" type x w/ 5d cooler nails at 4 o.c or equivalent screws. mai | $35,000 |
| Jul 2, 2025 | Completed final sign-off Dec 2025 | 1869 Stockton St | unit #3: (e) kitchen & bathroom remodel. (e) laundry room to be relocatedDetails
unit #3: (e) kitchen & bathroom remodel. (e) laundry room to be relocated | $40,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 500 Leavenworth St | unit 205: to comply with nov 202421417. repair (2) broken windows in kind max 0.30 u-factor (street facing), install drywall on fire damaged unit(interior only) and paint. install kitchen cabinets.windows to be wood with true divided lights.Details
unit 205: to comply with nov 202421417. repair (2) broken windows in kind max 0.30 u-factor (street facing), install drywall on fire damaged unit(interior only) and paint. install kitchen cabinets.windows to be wood with true divided lights. | $20,500 |
| Apr 16, 2025 | Completed final sign-off Jan 2026 | 774 09th Av | unit #2 - install new kitchen cabinets. add washer/dryer in kitchen. new paint, flooring, lights, switches. no structural work. replace (4) windows at rear.Details
unit #2 - install new kitchen cabinets. add washer/dryer in kitchen. new paint, flooring, lights, switches. no structural work. replace (4) windows at rear. | $45,000 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 2100 Post St | unit #17 - replace kitchen cabinets. new electrical subpanel. new laundry box. new flooring. new paint. no structural work, like for like.Details
unit #17 - replace kitchen cabinets. new electrical subpanel. new laundry box. new flooring. new paint. no structural work, like for like. | $30,000 |
| Apr 1, 2025 | Completed final sign-off Jul 2025 | 2100 Post St | comply with nov: 202535625. unit #6: 1)convert existing kitchen to study. 2)relocate kitchen, 3)rehabilitate existing bathroom. 4) install washer and dryer.5. no exterior work visible from the streetDetails
comply with nov: 202535625. unit #6: 1)convert existing kitchen to study. 2)relocate kitchen, 3)rehabilitate existing bathroom. 4) install washer and dryer.5. no exterior work visible from the street | $67,000 |
| Mar 12, 2025 | In progress issued Apr 2025 | 2100 Post St | unit#: 14 1: rehabilitate existing kitchen, 2: rehabilitate existing bathroom, 3: install washer and dryer.Details
unit#: 14 1: rehabilitate existing kitchen, 2: rehabilitate existing bathroom, 3: install washer and dryer. | $75,000 |
| Nov 21, 2024 | Completed final sign-off Apr 2025 | 1462 20th Av | kitchen and bathroom remodel in kind, no wall demolition or construction, no change in plumbing fixture count, dmj 11/21/2024.Details
kitchen and bathroom remodel in kind, no wall demolition or construction, no change in plumbing fixture count, dmj 11/21/2024. | $48,000 |
| Oct 23, 2024 | Completed final sign-off May 2025 | 150 Lombard St | unit #304: replace kitchen cabinets in kind. replace bathroom vanity in kind. replace outlets in kind.Details
unit #304: replace kitchen cabinets in kind. replace bathroom vanity in kind. replace outlets in kind. | $30,000 |
| Sep 30, 2024 | In progress issued Dec 2024 | 1888 Golden Gate Av | unit 12 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom; install 2nd bathrom and install washer/dryer.Details
unit 12 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom; install 2nd bathrom and install washer/dryer. | $66,000 |
| Aug 14, 2024 | Completed final sign-off Feb 2025 | 900 Chestnut St | unit# 504: addition of (n) bedroom. remodel and relocation of (e) kitchen. remodel of (e) bathroom.Details
unit# 504: addition of (n) bedroom. remodel and relocation of (e) kitchen. remodel of (e) bathroom. | $55,000 |
| Jun 26, 2024 | In progress issued Jul 2024 | 474 Sanchez St | unit a: remodel kitchen and bathroom. upgrade subpanel. install new lvl flooring. no structural workDetails
unit a: remodel kitchen and bathroom. upgrade subpanel. install new lvl flooring. no structural work | $36,000 |
| Jun 26, 2024 | Completed final sign-off Aug 2024 | 2485 Chestnut St | remodel the kitchen, retile the bathroom wall. new subpanel. new level flooring unit 208 studio. no structural work.Details
remodel the kitchen, retile the bathroom wall. new subpanel. new level flooring unit 208 studio. no structural work. | $25,000 |
| Mar 18, 2024 | Completed final sign-off May 2024 | 2737 Polk St | unit #6: remodel unit. new electrical, remodel bathroom and kitchen. add washer and dryer. new insulation. refinish floors. install dryer per cmc 504.4.Details
unit #6: remodel unit. new electrical, remodel bathroom and kitchen. add washer and dryer. new insulation. refinish floors. install dryer per cmc 504.4. | $70,000 |
| Oct 23, 2023 | Completed final sign-off Feb 2024 | 1867 39th Av | 1 bathroom & 1 kitchen remodel in-kind. new lighting throighout house. replace 2 windows in-kind, street facing. u<=0.30Details
1 bathroom & 1 kitchen remodel in-kind. new lighting throighout house. replace 2 windows in-kind, street facing. u<=0.30 | $15,000 |
| Feb 24, 2023 | Completed final sign-off Aug 2023 | 900 Chestnut St | unit 702 - remodel and relocation of (e) kitchen; remodel of (e) bathroom; convert (e) kitchen into (n) bedroom; addition of (n) laundry roomDetails
unit 702 - remodel and relocation of (e) kitchen; remodel of (e) bathroom; convert (e) kitchen into (n) bedroom; addition of (n) laundry room | $55,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2023 | 3010 Buchanan St | unit #12: replace kitchen cabinets, install lvl flooring, retile bathroom walls and floor. full interior paint job.Details
unit #12: replace kitchen cabinets, install lvl flooring, retile bathroom walls and floor. full interior paint job. | $25,000 |
| Dec 1, 2022 | Never finaled issued Dec 2022, no final | 2228 Union St | unit #112: replace kitchen cabinets, paint and install new flooring in entire unit. new countertop & new fixtures.Details
unit #112: replace kitchen cabinets, paint and install new flooring in entire unit. new countertop & new fixtures. | $10,000 |
| Aug 15, 2022 | Completed final sign-off Apr 2023 | 967 Le Conte Av | kitchen remodel in kind. no removal of wallsDetails
kitchen remodel in kind. no removal of walls | $15,000 |
| Jul 22, 2022 | Completed final sign-off Jun 2023 | 329 Connecticut St | remodel kitchen in-kind.Details
remodel kitchen in-kind. | $18,000 |
| Apr 14, 2022 | Completed final sign-off Jul 2022 | 114 Beaumont Av | remodel of (1) kitchen in kind.Details
remodel of (1) kitchen in kind. | $20,000 |
| Apr 4, 2022 | Completed final sign-off Jun 2022 | 2300 22nd Av | unit 6: remodel kitchen and bathroom. add new subpanel. new appliances, new countertops, kitchen cabinets, paint and same floors.Details
unit 6: remodel kitchen and bathroom. add new subpanel. new appliances, new countertops, kitchen cabinets, paint and same floors. | $30,000 |
| Nov 16, 2021 | Completed final sign-off Jun 2022 | 900 Chestnut St | unit 610 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroomDetails
unit 610 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroom | $50,000 |
| Oct 20, 2021 | Completed final sign-off Jan 2022 | 525 Hyde St | unit 15: kitchen cabinets, add a subpanel inside unit. retile bathroom floors. new toilet, sink and paint.Details
unit 15: kitchen cabinets, add a subpanel inside unit. retile bathroom floors. new toilet, sink and paint. | $25,000 |
| Jul 20, 2021 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | unit 506 - addition of (n) bedroom; remodel of (e) kitchen and bathroom.Details
unit 506 - addition of (n) bedroom; remodel of (e) kitchen and bathroom. | $45,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 777 Haight St | unit #1: remodel kitchen and bathroom. new electrical subpanel. new led lighting. no structural workDetails
unit #1: remodel kitchen and bathroom. new electrical subpanel. new led lighting. no structural work | $30,000 |
| Apr 19, 2021 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | #502: addition of new bedroom, remodel of extg kitchen, remodel of extg bathroom.Details
#502: addition of new bedroom, remodel of extg kitchen, remodel of extg bathroom. | $45,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2024 | 900 Chestnut St | #302 -addition of new office, remodel of extg kitchen and remodel of extg bathroom.Details
#302 -addition of new office, remodel of extg kitchen and remodel of extg bathroom. | $45,000 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 2300 22nd Av | unit 5: kitchen & bath remodel. new cabinets, appliances, counters. new tile, new sink, new toilet. add a subpanel to unit. paintDetails
unit 5: kitchen & bath remodel. new cabinets, appliances, counters. new tile, new sink, new toilet. add a subpanel to unit. paint | $25,000 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 2575 Washington St | unit 5: replace kitchen cabinets, new tile, countertop, new appliances, new tub, valve, toilet,sink. new subpanel. paintDetails
unit 5: replace kitchen cabinets, new tile, countertop, new appliances, new tub, valve, toilet,sink. new subpanel. paint | $25,000 |
| Mar 17, 2021 | Never finaled issued Mar 2021, no final | 459 Lombard St | add dish washer in kitchen(no kitchen remodeling),upgrade electrical for the unit. replace back door & repair back stairs (less than 50%)Details
add dish washer in kitchen(no kitchen remodeling),upgrade electrical for the unit. replace back door & repair back stairs (less than 50%) | $15,000 |
| Mar 17, 2021 | Never finaled issued Mar 2021, no final | 457 Lombard St | remodel kitchen in kind,upgrade electrial in kitchen & two baths.remodel two bathroom in kind.no change to layout of walls & openingsDetails
remodel kitchen in kind,upgrade electrial in kitchen & two baths.remodel two bathroom in kind.no change to layout of walls & openings | $20,000 |
| Oct 27, 2020 | Never finaled issued Oct 2020, no final | 3010 Buchanan St | unit #5: paint and refinish hardwood floors, new kitchen cabinets and new tile in bathroom, (e) fixtures to remainDetails
unit #5: paint and refinish hardwood floors, new kitchen cabinets and new tile in bathroom, (e) fixtures to remain | $20,000 |
| Aug 28, 2020 | Completed final sign-off Apr 2021 | 900 Chestnut St | unit 602: addition of new bedroom, remodel (e) kitchen, remodel (e) bathroomDetails
unit 602: addition of new bedroom, remodel (e) kitchen, remodel (e) bathroom | $40,000 |
| Jun 30, 2020 | Completed final sign-off Jul 2020 | 3010 Buchanan St | unit #4:remodel kitchen & bath. add lights to ceiling, paint and refinishing floors,new lights and outlets. all remodel in-kindDetails
unit #4:remodel kitchen & bath. add lights to ceiling, paint and refinishing floors,new lights and outlets. all remodel in-kind | $30,000 |
| Feb 21, 2020 | Completed final sign-off Feb 2022 | 1370 Chestnut St | existing kitchen & bathroom remodelDetails
existing kitchen & bathroom remodel | $30,000 |
| Feb 10, 2020 | Completed final sign-off Jul 2021 | 2955 Van Ness Av | apt 11: convert e kitchen to study, convert e living rm to bedroom, relocate kitchen and living rm, rehabilitate e bath, install washer dryerDetails
apt 11: convert e kitchen to study, convert e living rm to bedroom, relocate kitchen and living rm, rehabilitate e bath, install washer dryer | $40,000 |
| Feb 4, 2020 | Completed final sign-off May 2020 | 1960 Fulton St | unit 3: remodel kitchen, retile bathroom. paint. no structural work. new kitchen cabinets, tile, countertops. faucet & sink. 8 x 7 kitchenDetails
unit 3: remodel kitchen, retile bathroom. paint. no structural work. new kitchen cabinets, tile, countertops. faucet & sink. 8 x 7 kitchen | $20,000 |
| Jan 10, 2020 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | apt 210: addition of new bedroom, remodel and relocation of e kitchen, remodel of e bathDetails
apt 210: addition of new bedroom, remodel and relocation of e kitchen, remodel of e bath | $45,000 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 1960 Fulton St | unit 8: 5x8 bath and 48 sqft kitchen remodel. electrical panel upgrade. no structural changes. add washer dryer. new tile, sink, toilet & shower. kitchen new cabinet, counterDetails
unit 8: 5x8 bath and 48 sqft kitchen remodel. electrical panel upgrade. no structural changes. add washer dryer. new tile, sink, toilet & shower. kitchen new cabinet, counter | $30,000 |
| Dec 12, 2019 | Never finaled issued Feb 2020, no final | 2079 Market St | unit #3: rehabilitate existing kitchen. rehabilatate existing bathroom. install washer/dryerDetails
unit #3: rehabilitate existing kitchen. rehabilatate existing bathroom. install washer/dryer | $33,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 2079 Market St | unit 27: remodel one kitchen and one bathroom in kind. add under cabinet, washer and dryer in kitchen. "ventless dryer, electric, connect to drain.Details
unit 27: remodel one kitchen and one bathroom in kind. add under cabinet, washer and dryer in kitchen. "ventless dryer, electric, connect to drain. | $15,000 |
| Nov 19, 2019 | Completed final sign-off Jun 2022 | 900 Chestnut St | unti #412: addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundry roomDetails
unti #412: addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundry room | $45,000 |
| Nov 19, 2019 | Completed final sign-off Jun 2020 | 900 Chestnut St | unit #706 :addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundryDetails
unit #706 :addition of new bedroom. remodel & relocate of extg kitchen. remodel of extg bathroom. addition of nw laundry | $45,000 |
| Nov 7, 2019 | Completed final sign-off Jun 2020 | 1755 Van Ness Av | #202: addition of (n) bedroom, remodel & relocation of (e) kitchen. remodel of (e) bathroom.Details
#202: addition of (n) bedroom, remodel & relocation of (e) kitchen. remodel of (e) bathroom. | $45,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 2079 Market St | unit 29: remodel kitchen in-kind, bathroom in-kind, upgrade electric panel, install undercup ventless washer/dryer. all new lights to be ledDetails
unit 29: remodel kitchen in-kind, bathroom in-kind, upgrade electric panel, install undercup ventless washer/dryer. all new lights to be led | $25,000 |
| Oct 4, 2019 | Completed final sign-off Jun 2020 | 2079 Market St | remodel kitchen in kind. 100 sf, remodel bathroom in kind, 50 sf. install under cab washer.Details
remodel kitchen in kind. 100 sf, remodel bathroom in kind, 50 sf. install under cab washer. | $18,000 |
| Aug 15, 2019 | Completed final sign-off Dec 2019 | 2079 Market St | #9: remodel kitchen & (1) bathroom in kind. add washer & dryer under countertop in kitchen. no structural work to be done.Details
#9: remodel kitchen & (1) bathroom in kind. add washer & dryer under countertop in kitchen. no structural work to be done. | $15,000 |
| Aug 13, 2019 | Expired or cancelled expired Nov 2024 | 900 Chestnut St | unit 306 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroomDetails
unit 306 - addition of (n) bedroom; remodel and relocation of (e) kitchen and remodel of (e) bathroom | $65,000 |
| Aug 6, 2019 | Completed final sign-off Apr 2021 | 900 Chestnut St | unit # 402: addition of (n) office. remodel and relocation of (e) kitchen. remodel of (e) bathroom//must comply with 1103.7.6.1- fire alarm complianceDetails
unit # 402: addition of (n) office. remodel and relocation of (e) kitchen. remodel of (e) bathroom//must comply with 1103.7.6.1- fire alarm compliance | $65,000 |
| Aug 6, 2019 | Completed final sign-off Dec 2019 | 2079 Market St | unit 2: remodel kitchen in kind. remodel bathroom in kind. add washer/dryer under countertop in kitchen. add electrical subpanel. no structural work to be done.Details
unit 2: remodel kitchen in kind. remodel bathroom in kind. add washer/dryer under countertop in kitchen. add electrical subpanel. no structural work to be done. | $18,000 |
| Jul 23, 2019 | Never finaled issued Aug 2019, no final | 900 Chestnut St | unit 202. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroomDetails
unit 202. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroom | $45,000 |
| Jul 11, 2019 | Completed final sign-off Nov 2019 | 676 Geary St | unit #309: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maherDetails
unit #309: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maher | $32,000 |
| Jun 17, 2019 | Completed final sign-off Apr 2021 | 900 Chestnut St | #104: addition of new office. remodel and relocation of extg kitchen. remodel of extg bathroom. addition of new washer and dryer. remove (e) fire place and flue pipes n/a for maherDetails
#104: addition of new office. remodel and relocation of extg kitchen. remodel of extg bathroom. addition of new washer and dryer. remove (e) fire place and flue pipes n/a for maher | $45,000 |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 900 Chestnut St | unit 308. addition of (n) bedroom, remodel and relocate (e) kitchen, add (n) laundry, remodel (e) bathroom, remove (e) fireplaceDetails
unit 308. addition of (n) bedroom, remodel and relocate (e) kitchen, add (n) laundry, remodel (e) bathroom, remove (e) fireplace | $45,000 |
| May 30, 2019 | Never finaled issued Jun 2019, no final | 525 Hyde St | unit #11 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size. add washer and dryer in unitDetails
unit #11 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size. add washer and dryer in unit | $25,000 |
| May 30, 2019 | Never finaled issued Jun 2019, no final | 525 Hyde St | unit #12 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size.Details
unit #12 remodel of (e) kitchen & bath, remove non structural partition wall btw kitchen & liv rm, no common area work no structural, no chjanges in parcel size. | $25,000 |
| May 24, 2019 | Completed final sign-off Apr 2021 | 1430 Sacramento St | unit 5. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroom.Details
unit 5. addition of (n) office, remodel and relocation of (e) kitchen, remodel of (e) bathroom. | $45,000 |
| May 21, 2019 | Completed final sign-off Apr 2021 | 900 Chestnut St | unit #510; addition of (n) bedroom, remodel and relocation of (e) kitchen, remodel of (e) bathroom n/a maherDetails
unit #510; addition of (n) bedroom, remodel and relocation of (e) kitchen, remodel of (e) bathroom n/a maher | $45,000 |
| May 20, 2019 | Completed final sign-off Jun 2019 | 1020 Post St | unit # 407: rehabilitate existing bathroom and kitchen. no change of existing floor plans. no structural work.Details
unit # 407: rehabilitate existing bathroom and kitchen. no change of existing floor plans. no structural work. | $24,000 |
| Mar 5, 2019 | Completed final sign-off Aug 2019 | 320 Turk St | unit 103: convert existing kitchen to bedroom, relocate kitchen, rehabitate existing bathroomDetails
unit 103: convert existing kitchen to bedroom, relocate kitchen, rehabitate existing bathroom | $36,000 |
| Feb 20, 2019 | Never finaled issued Apr 2019, no final | 665 Pine St | unit # 803: convert e dining to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer dryer. no exterior work.Details
unit # 803: convert e dining to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer dryer. no exterior work. | $33,000 |
| Jan 30, 2019 | Completed final sign-off Aug 2019 | 645 Stockton St | unit 302 - relocate bedroom and living room, rehabilitate (e) kitchen and bathroom. install washer/dryer. maher n/a.Details
unit 302 - relocate bedroom and living room, rehabilitate (e) kitchen and bathroom. install washer/dryer. maher n/a. | $38,000 |
| Jan 30, 2019 | Completed final sign-off Jul 2019 | 1755 Van Ness Av | unit 306. addition of (n) bedroom, remodel and relocate (e) kitchen, remodel of (e) bathroom, addition of (n) laundry room, install washer & dryerDetails
unit 306. addition of (n) bedroom, remodel and relocate (e) kitchen, remodel of (e) bathroom, addition of (n) laundry room, install washer & dryer | $45,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2019 | 1755 Van Ness Av | unit #408: addition of new bedroom. remodel and relocation of extg kitchen. remodel of extg bathroom.Details
unit #408: addition of new bedroom. remodel and relocation of extg kitchen. remodel of extg bathroom. | $45,000 |
| Jan 14, 2019 | Completed final sign-off Aug 2019 | 320 Turk St | unit 304 - convert (e) partial living room to bedroom, rehabilitate (e) kitchen and bathroomDetails
unit 304 - convert (e) partial living room to bedroom, rehabilitate (e) kitchen and bathroom | $26,000 |
| Dec 27, 2018 | Completed final sign-off Aug 2019 | 320 Turk St | #607: convert (e) kitchen to bedroom. relocate kitchen, rehabilitate (e) bathroom. install washer/dryer.Details
#607: convert (e) kitchen to bedroom. relocate kitchen, rehabilitate (e) bathroom. install washer/dryer. | $42,000 |
| Dec 11, 2018 | Completed final sign-off May 2019 | 1808 Pacific Av | unit 504. remodel and relocation of (e) kitchen, addition of (n) office, remodel of (e) bathroomDetails
unit 504. remodel and relocation of (e) kitchen, addition of (n) office, remodel of (e) bathroom | $45,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 1808 Pacific Av | unit 401. remodel and relocation of kitchen, addition of (n) office, addition 9f (n) half bathroom, remodel of (e) bathroomDetails
unit 401. remodel and relocation of kitchen, addition of (n) office, addition 9f (n) half bathroom, remodel of (e) bathroom | $45,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 665 Pine St | unit 301 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 301 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $32,000 |
| Nov 14, 2018 | Never finaled issued Dec 2018, no final | 900 Chestnut St | unit 102 - addition of (n) bedroom, remodel and relocation of (e) kitchen and remodel of (e) bathroom, new laundryDetails
unit 102 - addition of (n) bedroom, remodel and relocation of (e) kitchen and remodel of (e) bathroom, new laundry | $45,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2019 | 11 Dolores St | #9 -rehabilitate (e) kitchen & (e) bathroom. install w/dDetails
#9 -rehabilitate (e) kitchen & (e) bathroom. install w/d | $33,000 |
| Oct 26, 2018 | Never finaled issued Dec 2018, no final | 900 Chestnut St | unit # 204 -addition of new bedroom,( 2nd flr) remodel e bath. remodel & relocation of (e) kitchenDetails
unit # 204 -addition of new bedroom,( 2nd flr) remodel e bath. remodel & relocation of (e) kitchen | $42,000 |
| Oct 26, 2018 | Never finaled issued Dec 2018, no final | 320 Turk St | revision to pa# 201810011927 unit 203 - convert existing kitchen to study, relocate kitchen, rehabilitate existing bathroom. install washer/dryerDetails
revision to pa# 201810011927 unit 203 - convert existing kitchen to study, relocate kitchen, rehabilitate existing bathroom. install washer/dryer | $35,000 |
| Oct 9, 2018 | Completed final sign-off Apr 2019 | 990 Fulton St | unit #504: trehabilitate (e) kitchen and bathroom. install w/dDetails
unit #504: trehabilitate (e) kitchen and bathroom. install w/d | $32,000 |
| Oct 3, 2018 | Completed final sign-off Apr 2021 | 900 Chestnut St | unit 304. addition of (n) bedroom, remodel and relocation of (e) kitchen, remodel of (e) bathroom, (n) laundry (washer/dryer), maher n/aDetails
unit 304. addition of (n) bedroom, remodel and relocation of (e) kitchen, remodel of (e) bathroom, (n) laundry (washer/dryer), maher n/a | $40,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 665 Pine St | unit 403 - rehabilitate existing kitchen, rehabilitate existing bathroom, install washer/dryer. fire alarm and sprinkler on separtae permitDetails
unit 403 - rehabilitate existing kitchen, rehabilitate existing bathroom, install washer/dryer. fire alarm and sprinkler on separtae permit | $33,000 |
| Aug 28, 2018 | Completed final sign-off Dec 2018 | 1755 Van Ness Av | unit #504: addition of new bedroom. remodel and relocation of extg kitchen. remodel of extg bathroom.//vif 1103.7.6.1 for low frequency 75 dcb at the pillowDetails
unit #504: addition of new bedroom. remodel and relocation of extg kitchen. remodel of extg bathroom.//vif 1103.7.6.1 for low frequency 75 dcb at the pillow | $40,000 |
| Aug 14, 2018 | Completed final sign-off Feb 2019 | 320 Turk St | unit #408: remodel (e) kitchen and (e) bathroom in kind. upgrade eletric panel.Details
unit #408: remodel (e) kitchen and (e) bathroom in kind. upgrade eletric panel. | $14,000 |
| Aug 14, 2018 | Completed final sign-off Feb 2019 | 320 Turk St | unit #403: remodel (e) kitchen and (e) bathroom in kind. upgrade electric panel.Details
unit #403: remodel (e) kitchen and (e) bathroom in kind. upgrade electric panel. | $14,000 |
| Aug 3, 2018 | Completed final sign-off Dec 2018 | 947 Bush St | rehabilitate e kitchen, bathroom, install wahser and dryerDetails
rehabilitate e kitchen, bathroom, install wahser and dryer | $30,000 |
| May 31, 2018 | Completed final sign-off Sep 2018 | 1725 Van Ness Av | #503: addition of (n) bedroom, remodel & relocation of (e) kitchen, remodel of (e) bathroom.Details
#503: addition of (n) bedroom, remodel & relocation of (e) kitchen, remodel of (e) bathroom. | $35,000 |
| May 31, 2018 | Completed final sign-off Sep 2018 | 1725 Van Ness Av | #601: addition of (n) bedroom, remodel & relocation of (e) kitchen.Details
#601: addition of (n) bedroom, remodel & relocation of (e) kitchen. | $25,000 |
| Apr 24, 2018 | Completed final sign-off Jan 2022 | 1744 La Salle Av | interior remodel. relocate kitchen, bath and laundryDetails
interior remodel. relocate kitchen, bath and laundry | $25,000 |
| Apr 24, 2018 | Completed final sign-off Aug 2018 | 1755 Van Ness Av | unit #203: addition of new bedroom. remodel and relocation of extg kitchen. remodel of extg bathroom.Details
unit #203: addition of new bedroom. remodel and relocation of extg kitchen. remodel of extg bathroom. | $45,000 |
| Mar 2, 2018 | Completed final sign-off Jun 2018 | 665 Pine St | unit #303: convert dining to bedroom. rehabilitate (e) kitchen & bathroom. install washer/dryer. maher n/aDetails
unit #303: convert dining to bedroom. rehabilitate (e) kitchen & bathroom. install washer/dryer. maher n/a | $30,000 |
| Mar 1, 2018 | Completed final sign-off Aug 2018 | 3605 20th St | rehabilitate (e) bathrooms & kitchen install w/d maher naDetails
rehabilitate (e) bathrooms & kitchen install w/d maher na | $28,000 |
| Jan 25, 2018 | Completed final sign-off May 2018 | 737 Pine St | #57 - replace counter top in kitchen inkind and cabinets; replace finishes throughout in kind.Details
#57 - replace counter top in kitchen inkind and cabinets; replace finishes throughout in kind. | $10,000 |
| Jan 25, 2018 | Completed final sign-off Apr 2018 | 1360 Taylor St | #4 - repair drywall in kitchen and bathrooom from leakDetails
#4 - repair drywall in kitchen and bathrooom from leak | $600 |
| Jan 25, 2018 | Completed final sign-off May 2018 | 737 Pine St | #37 - replace countertop in kitchen in kind; replace finishes fixtures throught out unit in kind.Details
#37 - replace countertop in kitchen in kind; replace finishes fixtures throught out unit in kind. | $10,000 |
| Jan 16, 2018 | Completed final sign-off May 2018 | 130 Frederick St | apt 103: addition of new bathroom, laundry room. remodel and relocate (e) kitchen. add (n) bedroom.Details
apt 103: addition of new bathroom, laundry room. remodel and relocate (e) kitchen. add (n) bedroom. | $45,000 |
| Jan 12, 2018 | Completed final sign-off Jul 2018 | 920 Leavenworth St | unit #406: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. infill (e) window (2) with cmu. n/a for maherDetails
unit #406: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. infill (e) window (2) with cmu. n/a for maher | $33,000 |