Block 1173, lot 016
1960 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 2
- Units
- 8
- Rooms
- 8 bathrooms
- Building
- 5,008 sq ft
- Lot
- 3,326 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2020 | Completed final sign-off May 2020 | 1960 Fulton St | Casman Construction Inc | unit 3: remodel kitchen, retile bathroom. paint. no structural work. new kitchen cabinets, tile, countertops. faucet & sink. 8 x 7 kitchenDetails
unit 3: remodel kitchen, retile bathroom. paint. no structural work. new kitchen cabinets, tile, countertops. faucet & sink. 8 x 7 kitchen | $20,000 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 1960 Fulton St | Casman Construction Inc | unit 8: 5x8 bath and 48 sqft kitchen remodel. electrical panel upgrade. no structural changes. add washer dryer. new tile, sink, toilet & shower. kitchen new cabinet, counterDetails
unit 8: 5x8 bath and 48 sqft kitchen remodel. electrical panel upgrade. no structural changes. add washer dryer. new tile, sink, toilet & shower. kitchen new cabinet, counter | $30,000 |
| Mar 29, 2019 | Never finaled issued Mar 2019, no final | 1960 Fulton St | street space onlyDetails
street space only | ||
| Mar 1, 2019 | Expired or cancelled cancelled Jan 2026 | 1960 Fulton St | adding footinh work to 201810254128Details
adding footinh work to 201810254128 | $13,750 | |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 1960 Fulton St | street space onlyDetails
street space only | ||
| Oct 25, 2018 | Completed final sign-off Apr 2019 | 1960 Fulton St | D E F Co | install french drain on west foundation and 2 interior drains in basement. n/a for maher.Details
install french drain on west foundation and 2 interior drains in basement. n/a for maher. | $39,700 |
| May 10, 2017 | Completed final sign-off Jun 2017 | 1960 Fulton St | Forum Renovation Co. Inc | replace exisitng plastic frame windows in 7 of 8 units with wood frame, with clad exterior. visible from street - 48 windows. n/a maherDetails
replace exisitng plastic frame windows in 7 of 8 units with wood frame, with clad exterior. visible from street - 48 windows. n/a maher | $35,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 1960 Fulton St | street spaceDetails
street space | ||
| Mar 9, 2017 | Completed final sign-off Mar 2017 | 1960 Fulton St | All Four Season's Roofing | re-roofingDetails
re-roofing | $5,000 |
| Feb 9, 2017 | Never finaled issued Feb 2017, no final | 1960 Fulton St | streetspaceDetails
streetspace | ||
| Jul 1, 2016 | Completed final sign-off Jul 2017 | 1960 Fulton St | Forum Renovation Co. Inc | soft story retrofit per 2012 iebc appendix 4. n/a ordinance #155-13Details
soft story retrofit per 2012 iebc appendix 4. n/a ordinance #155-13 | $40,000 |
| Jul 26, 2013 | Completed final sign-off Sep 2013 | 1960 Fulton St | Forum Renovation Co. Inc | unit #2 & #6 - repair caulking & painting on window sills & frames for 2 units.Details
unit #2 & #6 - repair caulking & painting on window sills & frames for 2 units. | $2,000 |
| May 30, 2013 | Completed final sign-off Jul 2013 | 1960 Fulton St | Forum Renovation Co. Inc | provide selective capping of basement well and curb at rear yard. work is limited to 2nd floor west 2 units.Details
provide selective capping of basement well and curb at rear yard. work is limited to 2nd floor west 2 units. | $10,000 |
| Jun 26, 2007 | Completed final sign-off Aug 2007 | 1960 Fulton St | West Coast Property Mgnt Co | remove stucco at base of bay window, cut out/repair damaged wood. install ventilation, replace (e) wood trim w/ new stucco band matching adjacent bands at windows. repair/replace upper section of rear stair assembly wood decay & deterioration. less than 50%Details
remove stucco at base of bay window, cut out/repair damaged wood. install ventilation, replace (e) wood trim w/ new stucco band matching adjacent bands at windows. repair/replace upper section of rear stair assembly wood decay & deterioration. less than 50% | $11,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.