Block 0576, lot 008
1808 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 6
- Units
- 37
- Rooms
- 37 bedrooms, 37 bathrooms
- Building
- 25,818 sq ft
- Lot
- 6,522 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2025 | Completed final sign-off Jan 2026 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | unit#702: none structural remodel all in kind, upgrade one kitchen, replace cabinets, counter, tile floor, one bathroom - replace tub shower valve, toilet, vanity, tile wall & floor.Details
unit#702: none structural remodel all in kind, upgrade one kitchen, replace cabinets, counter, tile floor, one bathroom - replace tub shower valve, toilet, vanity, tile wall & floor. | $35,000 |
| Aug 22, 2024 | Completed final sign-off Oct 2024 | 1808 Pacific Av | Crime Watch Security Sys Llc | ti relocate (e) low frequency horn and 1 (n) low frequency horn for the newly renovated bedrm in unit 604 on the 6th fl. no chanes to any other devices. ref original fire 202212087934 ref remodel pa 202406174588Details
ti relocate (e) low frequency horn and 1 (n) low frequency horn for the newly renovated bedrm in unit 604 on the 6th fl. no chanes to any other devices. ref original fire 202212087934 ref remodel pa 202406174588 | $700 |
| Jul 29, 2024 | Completed final sign-off Aug 2024 | 1808 Pacific Av | Crime Watch Security Sys Llc | unit 703: t.i. fire alarm relocate e) low frequency horn & add a new low frefuency horn for newly renovated bedroom in unit 703. ref remodel pa #202402125728, ref fire alarm pa #202212087934Details
unit 703: t.i. fire alarm relocate e) low frequency horn & add a new low frefuency horn for newly renovated bedroom in unit 703. ref remodel pa #202402125728, ref fire alarm pa #202212087934 | $1,000 |
| Jun 17, 2024 | Completed final sign-off Nov 2024 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | unit 604- no structural interior remodel to relocate kitchen, add (n) bedroom. provide 2x (n) closets. emergency escape and resuce opening not required on 6th floor above grade per cbc 1031.2Details
unit 604- no structural interior remodel to relocate kitchen, add (n) bedroom. provide 2x (n) closets. emergency escape and resuce opening not required on 6th floor above grade per cbc 1031.2 | $30,000 |
| Feb 12, 2024 | Completed final sign-off Jul 2024 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | non-structural interior remodel apartment 703: relocate kitchen. remodel e bathroom. provide new bathroom. provide new bedroom. emergency escape and rescue opening not required 7th floor above grade per cb 1031.2.Details
non-structural interior remodel apartment 703: relocate kitchen. remodel e bathroom. provide new bathroom. provide new bedroom. emergency escape and rescue opening not required 7th floor above grade per cb 1031.2. | $35,000 |
| Nov 21, 2023 | Completed final sign-off Jan 2024 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | apt 601: remodel bathroom in kind- replace bath tub, shower valve, vanity. retile shower wall & floor. no structural work. no change to floor layout. no change to wall layout.Details
apt 601: remodel bathroom in kind- replace bath tub, shower valve, vanity. retile shower wall & floor. no structural work. no change to floor layout. no change to wall layout. | $20,550 |
| Aug 8, 2023 | Completed final sign-off Oct 2023 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | unit 302: upgrade 1 kitchen - replace cabinets, countertop, tile floor. 1 bathroom - replace bathtub, valve, vanity, toilet, tile wall & floor. no structural remodel. all in kind.Details
unit 302: upgrade 1 kitchen - replace cabinets, countertop, tile floor. 1 bathroom - replace bathtub, valve, vanity, toilet, tile wall & floor. no structural remodel. all in kind. | $25,000 |
| Dec 8, 2022 | Completed final sign-off Jun 2023 | 1808 Pacific Av | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to comply with sffc sec 1103.7.6.1Details
upgrade (e) fire alarm system to comply with sffc sec 1103.7.6.1 | $51,000 |
| Mar 11, 2022 | Completed final sign-off Jun 2022 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | unit 402. remodel and relocation of (e) one kitchen, remodel of (e) one bathroom: new fixtures; vanity; cabinets.Details
unit 402. remodel and relocation of (e) one kitchen, remodel of (e) one bathroom: new fixtures; vanity; cabinets. | $3,000 |
| Jun 25, 2019 | Completed final sign-off Sep 2019 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | unit 305: upgrade kitchen and bath, replace cabinets, countertop, sink faucet, tile floor 7'x12', replace bathtub, shower valve, retile shower & floor 5'x6'Details
unit 305: upgrade kitchen and bath, replace cabinets, countertop, sink faucet, tile floor 7'x12', replace bathtub, shower valve, retile shower & floor 5'x6' | $15,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2019 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | unit 403 - non-structural remodel - relocate (e) kitchen, remodel (e) bath. provide (n) bath, provide (n) bedroom. emergency espace and rescue window not req 4th story above grade per cbc 1030.1Details
unit 403 - non-structural remodel - relocate (e) kitchen, remodel (e) bath. provide (n) bath, provide (n) bedroom. emergency espace and rescue window not req 4th story above grade per cbc 1030.1 | $40,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 1808 Pacific Av | Casman Construction Inc | unit 401. remodel and relocation of kitchen, addition of (n) office, addition 9f (n) half bathroom, remodel of (e) bathroomDetails
unit 401. remodel and relocation of kitchen, addition of (n) office, addition 9f (n) half bathroom, remodel of (e) bathroom | $45,000 |
| Dec 11, 2018 | Completed final sign-off May 2019 | 1808 Pacific Av | Casman Construction Inc | unit 504. remodel and relocation of (e) kitchen, addition of (n) office, remodel of (e) bathroomDetails
unit 504. remodel and relocation of (e) kitchen, addition of (n) office, remodel of (e) bathroom | $45,000 |
| Jun 12, 2018 | Completed final sign-off Oct 2018 | 1808 Pacific Av | J T & M Hardwood Flooring Construcing | non-structural interior remodel apt #501: remove non-load bearing walls to relocate kitchen, provide new office, remodel (e) bath. provide (n) 1/2 bath. rpelace window at bathroom. not visible to street.Details
non-structural interior remodel apt #501: remove non-load bearing walls to relocate kitchen, provide new office, remodel (e) bath. provide (n) 1/2 bath. rpelace window at bathroom. not visible to street. | $45,000 |
| Feb 2, 2018 | Never finaled issued Feb 2018, no final | 1808 Pacific Av | Mendez-Ortiz Contractors | renovate bathroom in apt # 303 all in kind ,plumibing & electrical as needed, no walls moved removed added or infilled, all (e) layouts to remain unchangedDetails
renovate bathroom in apt # 303 all in kind ,plumibing & electrical as needed, no walls moved removed added or infilled, all (e) layouts to remain unchanged | $7,500 |
| Apr 24, 2017 | Never finaled issued Apr 2017, no final | 1808 Pacific Av | street spaceDetails
street space | ||
| Mar 27, 2017 | Never finaled issued Mar 2017, no final | 1808 Pacific Av | Mendez-Ortiz Contractors | unit 505: renovate kitchen & bathroom in-kind, plumbing & electrical as needed.Details
unit 505: renovate kitchen & bathroom in-kind, plumbing & electrical as needed. | $12,000 |
| Jul 22, 2016 | Completed final sign-off Nov 2016 | 1808 Pacific Av | Mendez-Ortiz Contractors | apt #503 interior remodel - relocate kitchen & remodel (e) bath. provide new bedroom. add new bathroomDetails
apt #503 interior remodel - relocate kitchen & remodel (e) bath. provide new bedroom. add new bathroom | $50,000 |
| Feb 10, 2016 | Completed final sign-off Jul 2016 | 1808 Pacific Av | M H M Construction | apt #203 interior remodel; non-structural alteration, relocate (e) kitchen, remodel existing bathroom, provide new bathroom & new bedroom.Details
apt #203 interior remodel; non-structural alteration, relocate (e) kitchen, remodel existing bathroom, provide new bathroom & new bedroom. | $40,000 |
| May 27, 2014 | Completed final sign-off Jul 2014 | 1808 Pacific Av | M H M Construction | to remove wood ladder & planking w/in. to lightwells working on common area only.Details
to remove wood ladder & planking w/in. to lightwells working on common area only. | $500 |
| Apr 30, 2014 | Completed final sign-off Jul 2014 | 1808 Pacific Av | M H M Construction | remodel kitchen & bathroom kitchen new kitchen cabinets, bathroom new plumbing all plumbing ,electrical as needed, no structural work (unit #602 )Details
remodel kitchen & bathroom kitchen new kitchen cabinets, bathroom new plumbing all plumbing ,electrical as needed, no structural work (unit #602 ) | $18,000 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 1808 Pacific Av | M H M Construction | interior remodel at apt 701. remove non load bearing walls to relocate kitchen. provide new bedroom. remodel e bath. replace window in kind in lightwell.Details
interior remodel at apt 701. remove non load bearing walls to relocate kitchen. provide new bedroom. remodel e bath. replace window in kind in lightwell. | $30,000 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 1808 Pacific Av | M H M Construction | interior remodel apt 301. remove non load bearing walls to relocate kitchen. provide new bedroom. remodel e bath. replace window in kind in lightwell.Details
interior remodel apt 301. remove non load bearing walls to relocate kitchen. provide new bedroom. remodel e bath. replace window in kind in lightwell. | $30,000 |
| Jan 24, 2014 | Completed final sign-off Apr 2014 | 1808 Pacific Av | M H M Construction | unit 406. renovate kitchen and bathroom. new cabinets at kitchen with counter top. bathroom replace tub-toilet faucet, replace window on bath. not visible from street. all plumbing and electrical needed.Details
unit 406. renovate kitchen and bathroom. new cabinets at kitchen with counter top. bathroom replace tub-toilet faucet, replace window on bath. not visible from street. all plumbing and electrical needed. | $18,000 |
| Jul 29, 2013 | Completed final sign-off Sep 2013 | 1808 Pacific Av | M H M Construction | #506- renovate kitchen area 5'x6' and bathroom area 6'x6'. replace kitchen counter-top & install new one. replace bathtub, toilet, faucet & replace window on bathroom, not visible from street.Details
#506- renovate kitchen area 5'x6' and bathroom area 6'x6'. replace kitchen counter-top & install new one. replace bathtub, toilet, faucet & replace window on bathroom, not visible from street. | $18,000 |
| Nov 1, 2012 | Completed final sign-off Jan 2013 | 1808 Pacific Av | M H M Construction | unit #606-renovate kitchen & bathroom, replace countertop, cabinets, replace tub & toilet, faucets. no structural work. update electrical, replace in kind, some locationDetails
unit #606-renovate kitchen & bathroom, replace countertop, cabinets, replace tub & toilet, faucets. no structural work. update electrical, replace in kind, some location | $18,000 |
| Jul 17, 2008 | Completed final sign-off Jul 2008 | 1808 Pacific Av | renewal of old application # 200703156350. underpinning under the existing bldg.Details
renewal of old application # 200703156350. underpinning under the existing bldg. | ||
| Mar 15, 2007 | Expired or cancelled expired May 2008 | 1808 Pacific Av | underpinning under the existing bldg. at 1808 pacific ave. addition to appl#200603025859Details
underpinning under the existing bldg. at 1808 pacific ave. addition to appl#200603025859 | $5,000 | |
| Jun 14, 2005 | Expired or cancelled expired Feb 2006 | 1808 Pacific Av | Beacon Fire & Safety Lp/Nickell Fire Equ | sprinkler system to be added over trash area.comply nov 200559606 item#2&3.Details
sprinkler system to be added over trash area.comply nov 200559606 item#2&3. | $1,200 |
| Apr 21, 2003 | Completed final sign-off May 2003 | 1808 Pacific Av | M S R P Construction | remove a section of concrete slab in garage area (approx 30 by 30) and pour new 4" concrete padDetails
remove a section of concrete slab in garage area (approx 30 by 30) and pour new 4" concrete pad | $3,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- J T & M Hardwood Flooring Construcing (9), M H M Construction (8), Crime Watch Security Sys Llc (3), Mendez-Ortiz Contractors (3), Casman Construction Inc (2), Beacon Fire & Safety Lp/Nickell Fire Equ, M S R P Construction
- Architects
- George Fong, Jaime Pasion Arafiles
- Engineers
- Michael Chan (3), George Fong, Jaime Pasion Arafiles
- Designers
- Jaime Pasion Arafiles
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.