Block 0611, lot 024
2575 Washington St
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 3
- Units
- 7
- Rooms
- 7 bathrooms
- Building
- 6,836 sq ft
- Lot
- 3,188 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 3, 2024 | Completed final sign-off Jul 2024 | 2575 Washington St | Generation Builders Inc | to comply w/ complaint# 202422154 item #4: demo cracks and patch the stucco on the facade under 50% area. paint the facade - matching in existing color.Details
to comply w/ complaint# 202422154 item #4: demo cracks and patch the stucco on the facade under 50% area. paint the facade - matching in existing color. | $44,740 |
| Mar 1, 2023 | Completed final sign-off Jan 2024 | 2575 Washington St | Commercial Fire Protection Llc | fire alarm as-builts per sffd request for pa: 2021-0617-2729. cfp shall add one new smoke detector in the lobby area and one monitor module for the waterflow switch. we shall also show the sprinkler bell per on the plans. no other revisions shall be done.Details
fire alarm as-builts per sffd request for pa: 2021-0617-2729. cfp shall add one new smoke detector in the lobby area and one monitor module for the waterflow switch. we shall also show the sprinkler bell per on the plans. no other revisions shall be done. | |
| Jun 17, 2021 | Completed final sign-off Jan 2024 | 2575 Washington St | Commercial Fire Protection Inc | install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. existing fire alarm devices to be replaced including manual pull stations, detectors. existing bells to be replaced with horn strobes.Details
install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. existing fire alarm devices to be replaced including manual pull stations, detectors. existing bells to be replaced with horn strobes. | $16,800 |
| Apr 8, 2021 | Completed final sign-off Jun 2021 | 2575 Washington St | Casman Construction Inc | unit 5: replace kitchen cabinets, new tile, countertop, new appliances, new tub, valve, toilet,sink. new subpanel. paintDetails
unit 5: replace kitchen cabinets, new tile, countertop, new appliances, new tub, valve, toilet,sink. new subpanel. paint | $25,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2019 | 2575 Washington St | Daniel Knight Construction | apt 4: renovation of kitchen (new cabinets, new location for sink,stove, fridge) & bathroom (new fixtures, same location, toilet, sink, tub), add a laundry dryer vent to outside w/ bdd.Details
apt 4: renovation of kitchen (new cabinets, new location for sink,stove, fridge) & bathroom (new fixtures, same location, toilet, sink, tub), add a laundry dryer vent to outside w/ bdd. | $25,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 2575 Washington St | street space onlyDetails
street space only | ||
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 2575 Washington St | Velox Construction | unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing)Details
unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing) | $15,000 |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 2575 Washington St | street spaceDetails
street space | ||
| Aug 2, 2016 | Completed final sign-off Mar 2019 | 2575 Washington St | Velox Construction | soft story retrofit per sfbc chapter 4d engineering criteria 2016 iebc appendix a-4Details
soft story retrofit per sfbc chapter 4d engineering criteria 2016 iebc appendix a-4 | $58,500 |
| Jul 1, 2016 | Completed final sign-off Jul 2016 | 2575 Washington St | Sabah International Incorporated | as built drawings for ref pa 2016 0114 7074Details
as built drawings for ref pa 2016 0114 7074 | |
| Jan 14, 2016 | Completed final sign-off Jul 2016 | 2575 Washington St | Sabah International Incorporated | replace existing est-1 conatrol panel with new fire shield conventional fire alarm panel. all existing initiating and signaling devices to remain and to be reconnected to new panelDetails
replace existing est-1 conatrol panel with new fire shield conventional fire alarm panel. all existing initiating and signaling devices to remain and to be reconnected to new panel | $10,739 |
| Sep 9, 2013 | Completed final sign-off Oct 2013 | 2575 Washington St | D L Construction | repair work is less than 50% of stair, repair stairs like for like design, to comply with nov 201313461Details
repair work is less than 50% of stair, repair stairs like for like design, to comply with nov 201313461 | $13,000 |
| Aug 24, 2004 | Completed final sign-off Nov 2004 | 2575 Washington St | Edwards Systems Technology Inc/Est Servi | replace existing facp w/n panel due to obsolescense. emergencey panel repairs implimentations plan *Details
replace existing facp w/n panel due to obsolescense. emergencey panel repairs implimentations plan * | $3,800 |
| Nov 15, 2002 | Completed final sign-off Jan 2003 | 2575 Washington St | Bruce Hauschildt Construction | remove detailed facia and plywood off. stucco scratch coat and apply decorative foam detail and stucDetails
remove detailed facia and plywood off. stucco scratch coat and apply decorative foam detail and stuc | $22,000 |
| Jun 11, 2002 | Never finaled issued Jun 2002, no final | 2575 Washington St | M S I Technologies | reroofingDetails
reroofing | $13,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.