C C I Commercial Construction & Improv
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Sep 2026
- Last 24 months
- 55 permits filed
489 permits since 2000: 374 completed, 16 in progress, 70 never finaled, 29 expired or cancelled.
Of the 70 never-finaled permits, 10 are 3 to 5 years old, 49 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
41 stairs permits: 29 completed, 1 in progress, 7 never finaled, 4 expired or cancelled. Typically 36 days from filing to permit and 369 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress issued May 2026 | 240 Post St | revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demoDetails
revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demo | |
| Mar 25, 2026 | Completed final sign-off Sep 2026 | 240 Stockton St | 10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions per plan for 3 new private office rooms, (1) new conference room. addition of new drywall dropDetails
10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and glazing partitions per plan for 3 new private office rooms, (1) new conference room. addition of new drywall drop | $160,000 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 146 Geary St | revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of houseDetails
revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of house | |
| May 30, 2025 | Completed final sign-off Feb 2026 | 146 Geary St | basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remainDetails
basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remain | $200,000 |
| Dec 24, 2024 | Completed final sign-off Oct 2025 | 2197 Chestnut St | 1&2/fl- ti of retail for (n) retail tenants (n) retail and back of house non strucrtural partitions, celign finishes and casework. (n) restrooms and staff rooms with ada complaint drinking fountain, platform lift (approved under separte permit) demo portion of (e) retail stair from 1st to 2nd floorDetails
1&2/fl- ti of retail for (n) retail tenants (n) retail and back of house non strucrtural partitions, celign finishes and casework. (n) restrooms and staff rooms with ada complaint drinking fountain, platform lift (approved under separte permit) demo portion of (e) retail stair from 1st to 2nd floor | $400,000 |
| Aug 13, 2024 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | ref 202305198219 & 202305238412- for deferred interior stairs and guardrailsDetails
ref 202305198219 & 202305238412- for deferred interior stairs and guardrails | |
| Jun 7, 2024 | Completed final sign-off Dec 2024 | 233 Post St | ref 202403298929- interior ti to construct new walls, new gyp ceiling, new casework, new finishes,new stair to e mezzanine, new mep, demo, exterior modifications an signage under sep permitDetails
ref 202403298929- interior ti to construct new walls, new gyp ceiling, new casework, new finishes,new stair to e mezzanine, new mep, demo, exterior modifications an signage under sep permit | $397,520 |
| Aug 15, 2023 | Completed final sign-off Dec 2024 | 3140 16th St | defferred steel stair submittal for pa# 202111182702. no exterior work.Details
defferred steel stair submittal for pa# 202111182702. no exterior work. | $105,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2024 | 255 Post St | 1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mepDetails
1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep | $1,500,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | core and shell improvements. no lot merger for this project. n lift, walls, stairs & associated structural and mep.Details
core and shell improvements. no lot merger for this project. n lift, walls, stairs & associated structural and mep. | $400,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2025 | 275 South Van Ness Av | core and shell improvements. new platform lift , stairs. no lot merger for this project.Details
core and shell improvements. new platform lift , stairs. no lot merger for this project. | $400,000 |
| Nov 7, 2022 | Completed final sign-off Feb 2023 | 255 Post St | ab-017. demo (e) flooring, parition walls, stair finish, wall cladding, casework/cabinetry, ceiling light fixtures/soffits, hvac ducts/diffusers, electrical conduits. all finishes to be removed, all tenant mep services to be demo to base risers/shafts/panels. no structural demo.Details
ab-017. demo (e) flooring, parition walls, stair finish, wall cladding, casework/cabinetry, ceiling light fixtures/soffits, hvac ducts/diffusers, electrical conduits. all finishes to be removed, all tenant mep services to be demo to base risers/shafts/panels. no structural demo. | $30,000 |
| Oct 4, 2021 | Never finaled issued Dec 2021, no final | 220 Post St | revision of pa#2018-0621-2632 & #2019-0307-4683. finish fl level at lobby & egress stair #2Details
revision of pa#2018-0621-2632 & #2019-0307-4683. finish fl level at lobby & egress stair #2 | |
| May 27, 2021 | Completed final sign-off Apr 2022 | 2 Henry Adams St | revision to roof and stairs lighting. ref. bpa 202010287613Details
revision to roof and stairs lighting. ref. bpa 202010287613 | $5,000 |
| Oct 28, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.Details
revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit. | $750,000 |
| Sep 23, 2020 | Never finaled issued Jan 2021, no final | 454 Shotwell St | 452-454 shotwell st: demo of (e) ramp, and construction of new stair, rmap, elevator upgtrade and enw restrooms on 2/f.Details
452-454 shotwell st: demo of (e) ramp, and construction of new stair, rmap, elevator upgtrade and enw restrooms on 2/f. | $1,400,000 |
| Mar 3, 2020 | Completed final sign-off Nov 2021 | 20 Heron St | new elevator, new communicating stair, ada compliant restroom at each levelDetails
new elevator, new communicating stair, ada compliant restroom at each level | $245,000 |
| Jan 6, 2020 | Completed final sign-off May 2020 | 2 Henry Adams St | replace (e) stair from 5th floor to roof penthouse;Details
replace (e) stair from 5th floor to roof penthouse; | $20,000 |
| Apr 3, 2019 | Expired or cancelled expired Aug 2026 | 149 09th St | interior t.i. including removal of extg stair, and construction of new interior stair and new restrooms, with cleaned up finishes. n/a for maherDetails
interior t.i. including removal of extg stair, and construction of new interior stair and new restrooms, with cleaned up finishes. n/a for maher | $148,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2021 | 2 Henry Adams St | renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window.Details
renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window. | $650,000 |
| Feb 5, 2019 | Expired or cancelled expired Aug 2026 | 149 09th St | proposed installation of ada compliant elevator with new 4 story egress stairs and improved entrance lobby, new restroomsDetails
proposed installation of ada compliant elevator with new 4 story egress stairs and improved entrance lobby, new restrooms | $180,525 |
| Feb 4, 2019 | Never finaled issued Nov 2019, no final | 149 09th St | extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma.Details
extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma. | $85,000 |
| Jan 30, 2019 | Completed final sign-off Mar 2020 | 850 Brannan St | install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669.Details
install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669. | $1,400,000 |
| Sep 13, 2018 | Completed final sign-off Apr 2022 | 2 Henry Adams St | elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairsDetails
elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairs | $1,200,000 |
| Jun 21, 2018 | Never finaled issued Mar 2019, no final | 220 Post St | core & shell, install new enclosed exit staircases, (elevator system design & specifications to follow). staircases to be design build & store front systems to be design build. no exterior work under this permit no change of use-retail use to remainDetails
core & shell, install new enclosed exit staircases, (elevator system design & specifications to follow). staircases to be design build & store front systems to be design build. no exterior work under this permit no change of use-retail use to remain | $2,000,000 |
| Apr 16, 2018 | Completed final sign-off Sep 2021 | 146 Geary St | install new enclosed exit staircase - core and shell. new elevator. mep under separate permit. no exterior work under this permit. no change of use. retail use to remain.Details
install new enclosed exit staircase - core and shell. new elevator. mep under separate permit. no exterior work under this permit. no change of use. retail use to remain. | $350,000 |
| Dec 1, 2017 | Never finaled issued Jun 2018, no final | 217 Sutter St | 1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13Details
1/f & mezz.- demo (e) tenant build out, install 2 stop lu/la elevator from 1/f to (e) vacant mezzanize, new interior stairs and ramps within tenant space, new restroom, provide for future staur up from vacant basement. n/a ordinance #155-13 | $300,000 |
| Oct 13, 2017 | Completed final sign-off Aug 2020 | 2 Henry Adams St | demolition only of convenience staircase connecting 2nd and 3rd floors and infill remaining fenestration. n/a for maherDetails
demolition only of convenience staircase connecting 2nd and 3rd floors and infill remaining fenestration. n/a for maher | $8,500 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 600 Townsend St | emergency lighting in common areas, garage, stairways throughout the building. lighting above the proposed elevator lift-electrical utility for elevator liftDetails
emergency lighting in common areas, garage, stairways throughout the building. lighting above the proposed elevator lift-electrical utility for elevator lift | $30,000 |
| May 4, 2017 | Completed final sign-off Oct 2017 | 2 Henry Adams St | 2nd floor - create a new exit stairway access and vestibule on the 2nd floor structural included. rated walls some lighting, signage. no plumbing disabled access compliance under pa 2016-1007-9829 per ab-056. n/a maher ordinanceDetails
2nd floor - create a new exit stairway access and vestibule on the 2nd floor structural included. rated walls some lighting, signage. no plumbing disabled access compliance under pa 2016-1007-9829 per ab-056. n/a maher ordinance | $45,000 |
| Mar 3, 2017 | Never finaled issued Mar 2017, no final | 153 Kearny St | interior improvment to stairs & elevator lobbies on 4th & 5th floor. also includes demo of smoke guards at elevator. lobbies of all floors. n/a for maher.Details
interior improvment to stairs & elevator lobbies on 4th & 5th floor. also includes demo of smoke guards at elevator. lobbies of all floors. n/a for maher. | $30,000 |
| May 20, 2016 | Completed final sign-off Mar 2017 | 170 09th St | 1st, 2nd, 3rd floors: ti accessible restrooms @ each floor. passenger elevator cab finish alt. main entry alt. to provide accessible entry alt. to int stairs to provide improved accessibility m/e/p included. maher naDetails
1st, 2nd, 3rd floors: ti accessible restrooms @ each floor. passenger elevator cab finish alt. main entry alt. to provide accessible entry alt. to int stairs to provide improved accessibility m/e/p included. maher na | $1,000,000 |
| Mar 8, 2016 | Expired or cancelled cancelled Sep 2016 | 3000 16th St | revision to pa 2015-0402-2593. exit passage way from basement stairs 1 & 2 to lobby. staircase #1 create 2 hour rating on level1.Details
revision to pa 2015-0402-2593. exit passage way from basement stairs 1 & 2 to lobby. staircase #1 create 2 hour rating on level1. | $30,000 |
| Oct 23, 2015 | Completed final sign-off Jul 2016 | 1000 Sansome St | revision to 201406178678, addition 2 hr exit passageway to public way, revisino of location of ramps and stairs from basement tenant spaceDetails
revision to 201406178678, addition 2 hr exit passageway to public way, revisino of location of ramps and stairs from basement tenant space | $25,000 |
| Aug 11, 2015 | Completed final sign-off Aug 2016 | 703 Market St | basement - (n) ada accessible ramp & stairs to replace (e) non accessible ramp & stairs; (n) rated walls, doors & smoke detector at (e) passenger elevator lobbyDetails
basement - (n) ada accessible ramp & stairs to replace (e) non accessible ramp & stairs; (n) rated walls, doors & smoke detector at (e) passenger elevator lobby | $16,850 |
| Apr 2, 2015 | Completed final sign-off Dec 2016 | 3000 16th St | voulntary code and life safety upgrade of (e) retail and office space within the bldg - demo of (e) elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairsDetails
voulntary code and life safety upgrade of (e) retail and office space within the bldg - demo of (e) elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairs | $825,000 |
| Sep 24, 2014 | Expired or cancelled cancelled Mar 2017 | 400 Alabama St | construction of 724 s.f. roof deck and installation of an exit door from parking garage & security gate at stair 1 (alabama street level). n/a ordinance #155-13Details
construction of 724 s.f. roof deck and installation of an exit door from parking garage & security gate at stair 1 (alabama street level). n/a ordinance #155-13 | $5,000 |
| Jun 23, 2014 | Completed final sign-off Aug 2016 | 703 Market St | enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs.Details
enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs. | $41,490 |
| May 27, 2014 | Completed final sign-off Apr 2018 | 660 Broadway | removal of e mezzanine floor, stairs, finishes, and plumbing finishesDetails
removal of e mezzanine floor, stairs, finishes, and plumbing finishes | $5,000 |
| May 14, 2014 | Completed final sign-off Aug 2015 | 501 Geary St | renovation of 6449 sf on lev 1 of a restaurant and meeting rom and 3147 sf of floor area added to level 2 for storage, meeting rooms, and offices. includes new floor area, walls, ceilings, stairs, casework and finishes,. non strucural demo, fire sparinker and alarm and mep for level 2 are sep permitDetails
renovation of 6449 sf on lev 1 of a restaurant and meeting rom and 3147 sf of floor area added to level 2 for storage, meeting rooms, and offices. includes new floor area, walls, ceilings, stairs, casework and finishes,. non strucural demo, fire sparinker and alarm and mep for level 2 are sep permit | $600,000 |
| Nov 8, 2013 | Completed final sign-off Mar 2016 | 1263 Mission St | voluntary partial structural upgrade. (n) elevator/stair. (n) replacement bathrooms (accessible) on 2nd & 3rd fl.(compliance with ordinance no.155-13 not required)Details
voluntary partial structural upgrade. (n) elevator/stair. (n) replacement bathrooms (accessible) on 2nd & 3rd fl.(compliance with ordinance no.155-13 not required) | $360,300 |