Back to kitchen remodel contractors
C C I Commercial Construction & Improv
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Sep 2026
- Last 24 months
- 55 permits filed
489 permits since 2000: 374 completed, 16 in progress, 70 never finaled, 29 expired or cancelled.
Of the 70 never-finaled permits, 10 are 3 to 5 years old, 49 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 13 completed, 2 never finaled, 1 expired or cancelled. Typically 21 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2023 | Completed final sign-off Nov 2024 | 255 Post St | 1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mepDetails
1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep | $1,500,000 |
| Aug 31, 2022 | Completed final sign-off Feb 2023 | 22 04th St | demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.Details
demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office. | $100,000 |
| Mar 29, 2022 | Never finaled issued Apr 2022, no final | 468 09th St | remove (e) non-load bearing interior partitions. remodel (e) toilet room, (n) kitchenette, and replace roll up door.Details
remove (e) non-load bearing interior partitions. remodel (e) toilet room, (n) kitchenette, and replace roll up door. | $48,000 |
| Feb 11, 2022 | Expired or cancelled expired Nov 2023 | 350 Parnassus Av | 3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017.Details
3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017. | $49,000 |
| Oct 28, 2021 | Completed final sign-off Jul 2022 | 20 Heron St | new interior wall partitions, ada shower, kitchenetts and pendant lighting on 1st to 4th floor.Details
new interior wall partitions, ada shower, kitchenetts and pendant lighting on 1st to 4th floor. | $225,000 |
| Sep 30, 2021 | Completed final sign-off Apr 2023 | 101 Henry Adams St | suite 144: t.i.-(n) non bearing partitions/finishes-install appliance/millwork/(n) electrical upgrade - hvac system and venting to exterior - demo prep kitchen - lighting design - enclosing mezzanine (e) w/ glass partition. mep deferredDetails
suite 144: t.i.-(n) non bearing partitions/finishes-install appliance/millwork/(n) electrical upgrade - hvac system and venting to exterior - demo prep kitchen - lighting design - enclosing mezzanine (e) w/ glass partition. mep deferred | $180,000 |
| May 5, 2021 | Never finaled issued May 2021, no final | 1128 Market St | 5th fl: revision to pa# 202009124049. add 1 kitchenette, remove 1 lavatory (sink) in (e) (#2) mens room with new finishes (paint and tile, as required).Details
5th fl: revision to pa# 202009124049. add 1 kitchenette, remove 1 lavatory (sink) in (e) (#2) mens room with new finishes (paint and tile, as required). | $35,000 |
| Dec 2, 2020 | Completed final sign-off Nov 2021 | 20 Heron St | minor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout.Details
minor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout. | |
| Jan 30, 2019 | Completed final sign-off Mar 2020 | 850 Brannan St | install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669.Details
install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669. | $1,400,000 |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 1125 Mission St | revision to pa #201612215649, ti to lowerl level ground fl, 2nd fl, and mezz. millwork, lighting, and kitchenettes. revision to pa 2016-1221-5649, correct verbage to "proposed work at lower & ground level." ref pa #201509308464. maher naDetails
revision to pa #201612215649, ti to lowerl level ground fl, 2nd fl, and mezz. millwork, lighting, and kitchenettes. revision to pa 2016-1221-5649, correct verbage to "proposed work at lower & ground level." ref pa #201509308464. maher na | $100,000 |
| Mar 24, 2016 | Completed final sign-off Aug 2016 | 580 Geary St | scope of work includes the installation of finishes, kitchen equipment, plumbing and electrical work to a kitchen prep area. lighting is part of a separate permit (pa#201510291180).Details
scope of work includes the installation of finishes, kitchen equipment, plumbing and electrical work to a kitchen prep area. lighting is part of a separate permit (pa#201510291180). | $10,000 |
| Mar 1, 2016 | Completed final sign-off Aug 2016 | 580 Geary St | installation of new lighting fixtures in hotel basement kitchen and new ceiling.Details
installation of new lighting fixtures in hotel basement kitchen and new ceiling. | $6,000 |
| Jan 27, 2016 | Completed final sign-off May 2016 | 2 Henry Adams St | #110- 1st floor: tenant imporvement for suite#110. install partition walls and kitchenette for office electrical and lighting as necessary. maher naDetails
#110- 1st floor: tenant imporvement for suite#110. install partition walls and kitchenette for office electrical and lighting as necessary. maher na | $50,000 |
| Feb 26, 2015 | Completed final sign-off Feb 2016 | 644 Broadway | t.i. to existing vacant office shell space on 4/f. improvements includes new demising wall between tenant spaces, office partitions & kitchenette.Details
t.i. to existing vacant office shell space on 4/f. improvements includes new demising wall between tenant spaces, office partitions & kitchenette. | $163,000 |
| Nov 4, 2014 | Completed final sign-off Mar 2016 | 644 Broadway | 3rd fl tenant improvement to existing vacant restaurant shell space. new demising walls between tenant spaces, office partitions, lounge with kitchenetteDetails
3rd fl tenant improvement to existing vacant restaurant shell space. new demising walls between tenant spaces, office partitions, lounge with kitchenette | $197,000 |
| May 30, 2014 | Completed final sign-off Jun 2015 | 644 Broadway | t.i. on 4th floor include new office with kitchenette, new partition walls, new lighting, electrical improvements, mechanical system - air conditioning and fire sprinklers.Details
t.i. on 4th floor include new office with kitchenette, new partition walls, new lighting, electrical improvements, mechanical system - air conditioning and fire sprinklers. | $30,000 |