Permit GraphShortlistSan Francisco building permits since 2000

C C I Commercial Construction & Improv

Contractor license
985808
State license record
Based in
San Francisco
On San Francisco permits
Oct 2013 to Sep 2026
Last 24 months
55 permits filed

489 permits since 2000: 374 completed, 16 in progress, 70 never finaled, 29 expired or cancelled.

Of the 70 never-finaled permits, 10 are 3 to 5 years old, 49 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Kitchen remodel permits

AllRoof deck 11Pergola or trellis 3Deck 3Stairs 41Kitchen remodel 16Bathroom remodel 5

16 kitchen remodel permits: 13 completed, 2 never finaled, 1 expired or cancelled. Typically 21 days from filing to permit and 270 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 14, 2023Completed
final sign-off Nov 2024
255 Post St1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep
Details
Permit
202306140038
Status
complete
Filed
Jun 14, 2023
Permit issued
Aug 14, 2023
Final sign-off
Nov 20, 2024
Declared cost
$1,500,000
Address
255 Post St

1/f & mezz: t.i., demo nonstructural partitions, removal of (e)259 tenant stair, new retail back of house nonstructural partitions, finishes, new restrooms/staff kitchenette-structural mezz deck extension 800sq. ft, n43 259 tenant stair from 1/f to mezz, new mep

Open the permit page

$1,500,000
Aug 31, 2022Completed
final sign-off Feb 2023
22 04th Stdemolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.
Details
Permit
202208311622
Status
complete
Filed
Aug 31, 2022
Permit issued
Nov 18, 2022
Final sign-off
Feb 21, 2023
Declared cost
$100,000
Address
22 04th St

demolition and replacement of (e) office/conference rooms with (n) board rooms. replacementof (e) carpet with (n) replacement of existing kitchen/pantry with (n). demolition of (e) act ceiling in open office.

Open the permit page

$100,000
Mar 29, 2022Never finaled
issued Apr 2022, no final
468 09th Stremove (e) non-load bearing interior partitions. remodel (e) toilet room, (n) kitchenette, and replace roll up door.
Details
Permit
202203291131
Status
issued
Filed
Mar 29, 2022
Permit issued
Apr 22, 2022
Declared cost
$48,000
Address
468 09th St

remove (e) non-load bearing interior partitions. remodel (e) toilet room, (n) kitchenette, and replace roll up door.

Open the permit page

$48,000
Feb 11, 2022Expired or cancelled
expired Nov 2023
350 Parnassus Av3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017.
Details
Permit
202202117832
Status
expired
Filed
Feb 11, 2022
Permit issued
Feb 18, 2022
Declared cost
$49,000
Address
350 Parnassus Av

3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017.

Open the permit page

$49,000
Oct 28, 2021Completed
final sign-off Jul 2022
20 Heron Stnew interior wall partitions, ada shower, kitchenetts and pendant lighting on 1st to 4th floor.
Details
Permit
202110281420
Status
complete
Filed
Oct 28, 2021
Permit issued
Dec 17, 2021
Final sign-off
Jul 25, 2022
Declared cost
$225,000
Address
20 Heron St

new interior wall partitions, ada shower, kitchenetts and pendant lighting on 1st to 4th floor.

Open the permit page

$225,000
Sep 30, 2021Completed
final sign-off Apr 2023
101 Henry Adams Stsuite 144: t.i.-(n) non bearing partitions/finishes-install appliance/millwork/(n) electrical upgrade - hvac system and venting to exterior - demo prep kitchen - lighting design - enclosing mezzanine (e) w/ glass partition. mep deferred
Details
Permit
202109309528
Status
complete
Filed
Sep 30, 2021
Permit issued
Nov 30, 2021
Final sign-off
Apr 17, 2023
Declared cost
$180,000
Address
101 Henry Adams St

suite 144: t.i.-(n) non bearing partitions/finishes-install appliance/millwork/(n) electrical upgrade - hvac system and venting to exterior - demo prep kitchen - lighting design - enclosing mezzanine (e) w/ glass partition. mep deferred

Open the permit page

$180,000
May 5, 2021Never finaled
issued May 2021, no final
1128 Market St5th fl: revision to pa# 202009124049. add 1 kitchenette, remove 1 lavatory (sink) in (e) (#2) mens room with new finishes (paint and tile, as required).
Details
Permit
202105059849
Status
issued
Filed
May 5, 2021
Permit issued
May 19, 2021
Declared cost
$35,000
Address
1128 Market St

5th fl: revision to pa# 202009124049. add 1 kitchenette, remove 1 lavatory (sink) in (e) (#2) mens room with new finishes (paint and tile, as required).

Open the permit page

$35,000
Dec 2, 2020Completed
final sign-off Nov 2021
20 Heron Stminor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout.
Details
Permit
202012020112
Status
complete
Filed
Dec 2, 2020
Permit issued
Feb 19, 2021
Final sign-off
Nov 16, 2021
Address
20 Heron St

minor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout.

Open the permit page

Jan 30, 2019Completed
final sign-off Mar 2020
850 Brannan Stinstall windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669.
Details
Permit
201901301670
Status
complete
Filed
Jan 30, 2019
Permit issued
Feb 22, 2019
Final sign-off
Mar 9, 2020
Declared cost
$1,400,000
Address
850 Brannan St

install windows/storefront at brannan st & courtyard.add rooms, kitchenette,restrooms & showers & foyer.infill floor slab opening from prior stair removed; elevate decks with fountain & ramp (separate struct.permit for decks,ramps,sign).no change of use/occupancy.ref pa #201808137227 & 201112140669.

Open the permit page

$1,400,000
Aug 24, 2017Completed
final sign-off Jan 2018
1125 Mission Strevision to pa #201612215649, ti to lowerl level ground fl, 2nd fl, and mezz. millwork, lighting, and kitchenettes. revision to pa 2016-1221-5649, correct verbage to "proposed work at lower & ground level." ref pa #201509308464. maher na
Details
Permit
201708245786
Status
complete
Filed
Aug 24, 2017
Permit issued
Oct 11, 2017
Final sign-off
Jan 12, 2018
Declared cost
$100,000
Address
1125 Mission St

revision to pa #201612215649, ti to lowerl level ground fl, 2nd fl, and mezz. millwork, lighting, and kitchenettes. revision to pa 2016-1221-5649, correct verbage to "proposed work at lower & ground level." ref pa #201509308464. maher na

Open the permit page

$100,000
Mar 24, 2016Completed
final sign-off Aug 2016
580 Geary Stscope of work includes the installation of finishes, kitchen equipment, plumbing and electrical work to a kitchen prep area. lighting is part of a separate permit (pa#201510291180).
Details
Permit
201603243026
Status
complete
Filed
Mar 24, 2016
Permit issued
Mar 31, 2016
Final sign-off
Aug 19, 2016
Declared cost
$10,000
Address
580 Geary St

scope of work includes the installation of finishes, kitchen equipment, plumbing and electrical work to a kitchen prep area. lighting is part of a separate permit (pa#201510291180).

Open the permit page

$10,000
Mar 1, 2016Completed
final sign-off Aug 2016
580 Geary Stinstallation of new lighting fixtures in hotel basement kitchen and new ceiling.
Details
Permit
201603010865
Status
complete
Filed
Mar 1, 2016
Permit issued
Mar 7, 2016
Final sign-off
Aug 19, 2016
Declared cost
$6,000
Address
580 Geary St

installation of new lighting fixtures in hotel basement kitchen and new ceiling.

Open the permit page

$6,000
Jan 27, 2016Completed
final sign-off May 2016
2 Henry Adams St#110- 1st floor: tenant imporvement for suite#110. install partition walls and kitchenette for office electrical and lighting as necessary. maher na
Details
Permit
201601278081
Status
complete
Filed
Jan 27, 2016
Permit issued
Jan 29, 2016
Final sign-off
May 16, 2016
Declared cost
$50,000
Address
2 Henry Adams St

#110- 1st floor: tenant imporvement for suite#110. install partition walls and kitchenette for office electrical and lighting as necessary. maher na

Open the permit page

$50,000
Feb 26, 2015Completed
final sign-off Feb 2016
644 Broadwayt.i. to existing vacant office shell space on 4/f. improvements includes new demising wall between tenant spaces, office partitions & kitchenette.
Details
Permit
201502269397
Status
complete
Filed
Feb 26, 2015
Permit issued
Feb 26, 2015
Final sign-off
Feb 11, 2016
Declared cost
$163,000
Address
644 Broadway

t.i. to existing vacant office shell space on 4/f. improvements includes new demising wall between tenant spaces, office partitions & kitchenette.

Open the permit page

$163,000
Nov 4, 2014Completed
final sign-off Mar 2016
644 Broadway3rd fl tenant improvement to existing vacant restaurant shell space. new demising walls between tenant spaces, office partitions, lounge with kitchenette
Details
Permit
201411040679
Status
complete
Filed
Nov 4, 2014
Permit issued
Nov 17, 2014
Final sign-off
Mar 22, 2016
Declared cost
$197,000
Address
644 Broadway

3rd fl tenant improvement to existing vacant restaurant shell space. new demising walls between tenant spaces, office partitions, lounge with kitchenette

Open the permit page

$197,000
May 30, 2014Completed
final sign-off Jun 2015
644 Broadwayt.i. on 4th floor include new office with kitchenette, new partition walls, new lighting, electrical improvements, mechanical system - air conditioning and fire sprinklers.
Details
Permit
201405307163
Status
complete
Filed
May 30, 2014
Permit issued
Jun 18, 2014
Final sign-off
Jun 29, 2015
Declared cost
$30,000
Address
644 Broadway

t.i. on 4th floor include new office with kitchenette, new partition walls, new lighting, electrical improvements, mechanical system - air conditioning and fire sprinklers.

Open the permit page

$30,000