Permit GraphShortlistSan Francisco building permits since 2000

C C I Commercial Construction & Improv

Contractor license
985808
State license record
Based in
San Francisco
On San Francisco permits
Oct 2013 to Sep 2026
Last 24 months
55 permits filed

489 permits since 2000: 374 completed, 16 in progress, 70 never finaled, 29 expired or cancelled.

Of the 70 never-finaled permits, 10 are 3 to 5 years old, 49 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Roof deck permits

AllRoof deck 11Pergola or trellis 3Deck 3Stairs 41Kitchen remodel 16Bathroom remodel 5

11 roof deck permits: 6 completed, 3 never finaled, 2 expired or cancelled. Typically 175 days from filing to permit and 442 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 3, 2021Expired or cancelled
withdrawn Mar 2022
1011 Bryant Stt.i. interior work: 2/f fill-in, new openings in (e) cmu or concrete walls w/structural reinforcement added. exterior work: converting roof to roof deck w/raised deck system & adding (5) exterior windows.
Details
Permit
202111031750
Status
withdrawn
Filed
Nov 3, 2021
Declared cost
$965,000
Address
1011 Bryant St

t.i. interior work: 2/f fill-in, new openings in (e) cmu or concrete walls w/structural reinforcement added. exterior work: converting roof to roof deck w/raised deck system & adding (5) exterior windows.

Open the permit page

$965,000
Oct 28, 2020Completed
final sign-off Apr 2022
2 Henry Adams Strevision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.
Details
Permit
202010287613
Status
complete
Filed
Oct 28, 2020
Permit issued
Apr 23, 2021
Final sign-off
Apr 27, 2022
Declared cost
$750,000
Address
2 Henry Adams St

revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.

Open the permit page

$750,000
Oct 8, 2020Completed
final sign-off Nov 2021
20 Heron St(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.
Details
Permit
202010086198
Status
complete
Filed
Oct 8, 2020
Permit issued
Mar 30, 2021
Final sign-off
Nov 16, 2021
Declared cost
$48,000
Address
20 Heron St

(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.

Open the permit page

$48,000
Oct 5, 2020Completed
final sign-off Apr 2022
2 Henry Adams Strevision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permi
Details
Permit
202010055936
Status
complete
Filed
Oct 5, 2020
Permit issued
Nov 10, 2020
Final sign-off
Apr 8, 2022
Declared cost
$85,000
Address
2 Henry Adams St

revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permi

Open the permit page

$85,000
Mar 7, 2019Never finaled
issued Dec 2019, no final
220 Post Streplace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.
Details
Permit
201903074683
Status
issued
Filed
Mar 7, 2019
Permit issued
Dec 6, 2019
Declared cost
$10,000
Address
220 Post St

replace ground floor store front. refurbish upper floor building facade. new elevator & lobby at "compton place". new roof deck.

Open the permit page

$10,000
Feb 4, 2019Never finaled
issued Nov 2019, no final
149 09th Stextend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma.
Details
Permit
201902042028
Status
issued
Filed
Feb 4, 2019
Permit issued
Nov 18, 2019
Declared cost
$85,000
Address
149 09th St

extend existing elevator & stair to rooftop creating stair/elevator enclosure with roof deck and trellis. 1st floor facade alterations at 9th and natoma.

Open the permit page

$85,000
Feb 4, 2019Never finaled
issued Mar 2021, no final
1128 Market Stadd new single story elevator access from (e) 6th fl to roof level and adding new roof deck with trellis
Details
Permit
201902042039
Status
issued
Filed
Feb 4, 2019
Permit issued
Mar 15, 2021
Declared cost
$90,000
Address
1128 Market St

add new single story elevator access from (e) 6th fl to roof level and adding new roof deck with trellis

Open the permit page

$90,000
Sep 13, 2018Completed
final sign-off Apr 2022
2 Henry Adams Stelevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairs
Details
Permit
201809139936
Status
complete
Filed
Sep 13, 2018
Permit issued
Oct 25, 2018
Final sign-off
Apr 8, 2022
Declared cost
$1,200,000
Address
2 Henry Adams St

elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairs

Open the permit page

$1,200,000
Nov 12, 2015Completed
final sign-off Oct 2016
30 03rd Strevision to pa 2015-0305-0030. reduction of roof deck. removal of partition wall. add showers back in basement (as previously approved). modify toilet rooms to add fixture count.
Details
Permit
201511122472
Status
complete
Filed
Nov 12, 2015
Permit issued
Dec 11, 2015
Final sign-off
Oct 12, 2016
Address
30 03rd St

revision to pa 2015-0305-0030. reduction of roof deck. removal of partition wall. add showers back in basement (as previously approved). modify toilet rooms to add fixture count.

Open the permit page

Sep 24, 2014Expired or cancelled
cancelled Mar 2017
400 Alabama Stconstruction of 724 s.f. roof deck and installation of an exit door from parking garage & security gate at stair 1 (alabama street level). n/a ordinance #155-13
Details
Permit
201409247188
Status
cancelled
Filed
Sep 24, 2014
Permit issued
Oct 6, 2014
Declared cost
$5,000
Address
400 Alabama St

construction of 724 s.f. roof deck and installation of an exit door from parking garage & security gate at stair 1 (alabama street level). n/a ordinance #155-13

Open the permit page

$5,000
Oct 17, 2013Completed
final sign-off Mar 2016
1263 Mission Stnew ada elevator enclosure to (e) roof & roof deck. addition of starter landing and new segment of inclined ladder at existing fire escape. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.
Details
Permit
201310179622
Status
complete
Filed
Oct 17, 2013
Permit issued
Jul 23, 2014
Final sign-off
Mar 3, 2016
Declared cost
$36,000
Address
1263 Mission St

new ada elevator enclosure to (e) roof & roof deck. addition of starter landing and new segment of inclined ladder at existing fire escape. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.

Open the permit page

$36,000