Steven Whitney
- Listed as
- architect, authorized agent-others, engineer
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Sep 2026
153 permits since 2000 (architect on 148 permits, authorized agent-others on 3 permits, engineer on 2 permits): 106 completed, 7 in progress, 6 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 153.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 341 Park St | revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening.Details
revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening. | $40,000 | |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 1090 Dolores St | convert ground floor (e) excercise and work out room into a habitable bedroom with wetbar. convert (e) half bath into full bathroom in garage.Details
convert ground floor (e) excercise and work out room into a habitable bedroom with wetbar. convert (e) half bath into full bathroom in garage. | $10,000 | |
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 108 Marietta Dr | rear 2-story horizontal addition; backyard landing, walkway, and stairs at ground level; three skylights at the (e) house and a parapet adjacent to a pair of skylights; interior remodeling; and front facade window.Details
rear 2-story horizontal addition; backyard landing, walkway, and stairs at ground level; three skylights at the (e) house and a parapet adjacent to a pair of skylights; interior remodeling; and front facade window. | $60,000 | |
| Jun 5, 2026 | In progress issued Aug 2026 | 1300 Kirkham St | Family Builders Inc, Future Vision Remodeling Inc. | interior remodel of both units, including (n) interior stairs and hall from both units to rear yard for (e) infilling of 2nd floor exterior nichs under 3rd floor building portion at rear yard, a firewall rated/fence adjacent to a new exterior stairs, deck and exit gate at (e) south fence. remodelDetails
interior remodel of both units, including (n) interior stairs and hall from both units to rear yard for (e) infilling of 2nd floor exterior nichs under 3rd floor building portion at rear yard, a firewall rated/fence adjacent to a new exterior stairs, deck and exit gate at (e) south fence. remodel | $300,000 |
| Dec 30, 2025 | In progress issued Mar 2026 | 715 Victoria St | Solher Iron Inc | proposed metal guardrails at the existing entry porch, and proposed metal guardrails/handrails at existing entry stair.Details
proposed metal guardrails at the existing entry porch, and proposed metal guardrails/handrails at existing entry stair. | $4,000 |
| Dec 22, 2025 | In progress issued Jul 2026 | 341 Park St | Munoz Villa Construction, Connor Daly Corporation | rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights.Details
rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights. | $600,000 |
| May 21, 2025 | Completed final sign-off Oct 2025 | 1300 Kirkham St | Jazo Construction | 1/f - revision to permit 202504013433. revision to exterior wall dryrot repair, sill plate repair, reframe window for a bigger size windown on 1/f.Details
1/f - revision to permit 202504013433. revision to exterior wall dryrot repair, sill plate repair, reframe window for a bigger size windown on 1/f. | $8,000 |
| Nov 1, 2024 | In progress filed Nov 2024, not yet issued | 645 Central Av | replacement of (e) wood guardrails with open metal guardrails. addition of metal hand rails at the sides of (e) exterior entry stairDetails
replacement of (e) wood guardrails with open metal guardrails. addition of metal hand rails at the sides of (e) exterior entry stair | $5,100 | |
| May 1, 2024 | Completed final sign-off Dec 2024 | 164 Marietta Dr | Spotlight Construction Groups Inc | structural strengthening at rear wall of ground floor, shearwall and grade beam at center of ground floor replacement footing and wall post at bedroom 3 hall interior wall and shift of (e) bedroom 3 window 9 1/4in east @ rear ground floor wall.Details
structural strengthening at rear wall of ground floor, shearwall and grade beam at center of ground floor replacement footing and wall post at bedroom 3 hall interior wall and shift of (e) bedroom 3 window 9 1/4in east @ rear ground floor wall. | $9,000 |
| Mar 18, 2024 | Completed final sign-off May 2024 | 645 Central Av | Grabher Construction | unit 645 and 647 -removal of (e) w&d in the basement. install (n) w&d and tankless water heater to the (e) utlitly room for each unit. replace tub/shower tile surround walls in kind in bathroom at upper dwelling unit.Details
unit 645 and 647 -removal of (e) w&d in the basement. install (n) w&d and tankless water heater to the (e) utlitly room for each unit. replace tub/shower tile surround walls in kind in bathroom at upper dwelling unit. | $23,500 |
| Feb 22, 2024 | Completed final sign-off Dec 2024 | 164 Marietta Dr | Spotlight Construction Groups Inc | install (n) skylight @ master bedroom and (1) window at rear of house at kitchen . u factor .3Details
install (n) skylight @ master bedroom and (1) window at rear of house at kitchen . u factor .3 | $4,000 |
| Feb 2, 2024 | Completed final sign-off May 2025 | 44 Sequoia Wy | Brendan Lalor Construction | revision to pa# 202010287615, removal of windows @ s wall, change of exterior door @ bedroom #6. removal of decorative trellises. change of window material.Details
revision to pa# 202010287615, removal of windows @ s wall, change of exterior door @ bedroom #6. removal of decorative trellises. change of window material. | |
| Dec 22, 2022 | Expired or cancelled withdrawn Mar 2023 | 834 27th Av | 35 sq ft rear in fill addition at ground floor under extg 2nd floor room projections.Details
35 sq ft rear in fill addition at ground floor under extg 2nd floor room projections. | $4,500 | |
| Dec 14, 2022 | Completed final sign-off Apr 2024 | 734 31st Av | interior remodel, enlarged southwest lightwell w/roof deck, infill souteast lightwell, new & replacement windows, new siding @ rear. permitting rear 3 e rooms on 2nd fl as bedrooms for assessor and dbi record.Details
interior remodel, enlarged southwest lightwell w/roof deck, infill souteast lightwell, new & replacement windows, new siding @ rear. permitting rear 3 e rooms on 2nd fl as bedrooms for assessor and dbi record. | $75,000 | |
| Dec 14, 2022 | Completed final sign-off May 2024 | 194 Cayuga Av | Hungto Co Incorporation | interior remodel & patio, new interior stairs, new skylights, (2) new bathrooms, & (2) new bedrooms @ ground floor. expand kitchen & (1) new bathroom @ 2nd floor.Details
interior remodel & patio, new interior stairs, new skylights, (2) new bathrooms, & (2) new bedrooms @ ground floor. expand kitchen & (1) new bathroom @ 2nd floor. | $75,000 |
| Dec 14, 2022 | Expired or cancelled cancelled Jan 2026 | 834 27th Av | infill south lightwell. infill under bay windows in rear. interior remodel of ground floor. add 2 bedrooms, 2 baths, media room, wet bar, laundry room & mudroom. replace interior stair. add 5 new skylights. new roof access hatch with guardrail.Details
infill south lightwell. infill under bay windows in rear. interior remodel of ground floor. add 2 bedrooms, 2 baths, media room, wet bar, laundry room & mudroom. replace interior stair. add 5 new skylights. new roof access hatch with guardrail. | $95,000 | |
| Sep 20, 2022 | Completed final sign-off Apr 2024 | 45 Longview Ct | W C S S Dba Solid Build Construction | g/f interior remodel to add bedroom,b athroom, family room, laundry room & hall. legalization of (e) interior stairs. no changes to proposed to (e) facade. new window - street facing.Details
g/f interior remodel to add bedroom,b athroom, family room, laundry room & hall. legalization of (e) interior stairs. no changes to proposed to (e) facade. new window - street facing. | $80,000 |
| Mar 29, 2022 | Completed final sign-off Jul 2022 | 926 Teresita Bl | Grabher Construction | infill roof at (e) open entry courtyard. infill roof will be approx flush with top of (e) roof curbs around the court & have 2 skylights. top of skylights will be 12" maximum above the infill roof.Details
infill roof at (e) open entry courtyard. infill roof will be approx flush with top of (e) roof curbs around the court & have 2 skylights. top of skylights will be 12" maximum above the infill roof. | $7,500 |
| Mar 29, 2022 | Completed final sign-off Nov 2022 | 926 Teresita Bl | Grabher Construction | removal of interior utility stair between the garage and 2/f, floor infill at the 2/f where the stair is removed, and addition of a half bath at the infill.Details
removal of interior utility stair between the garage and 2/f, floor infill at the 2/f where the stair is removed, and addition of a half bath at the infill. | $15,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2024 | 70 Putnam St | Brothers Collins Woodworking Inc | infill of (e) 2nd fl lightwell (which is adjacent to vacant lot), interior remodel to expand & redo (e) kitchen, (n) skylight @ kitchen, roof parapet adjacent to skylight.Details
infill of (e) 2nd fl lightwell (which is adjacent to vacant lot), interior remodel to expand & redo (e) kitchen, (n) skylight @ kitchen, roof parapet adjacent to skylight. | $49,500 |
| Jun 4, 2021 | Completed final sign-off Mar 2023 | 365 Dellbrook Av | Iaconi Construction | interior remodel to add a bedroom, family room, and 2 baths to g/f. replace (e) interior stairs. remove bath at 2/f. add windows at sides of house. add doors & window at rear. add plywood to south of bedroom 1 and north of bedroom 2. (e) foundation will remain with (e) slab being replaced at rearDetails
interior remodel to add a bedroom, family room, and 2 baths to g/f. replace (e) interior stairs. remove bath at 2/f. add windows at sides of house. add doors & window at rear. add plywood to south of bedroom 1 and north of bedroom 2. (e) foundation will remain with (e) slab being replaced at rear | $125,000 |
| Apr 14, 2021 | Completed final sign-off Oct 2025 | 55 Marietta Dr | Blue Coast Contracting | replace (e) rear yard access stair with an upper walkway / deck, and 2 stair runs. will be cantilevered from rear building wall. max 10' high. replace (e) yard-level deck. max 3' height. retaining wall (2') at rear for planter. replace rear wall door & window at crawlspace utility/storage room.Details
replace (e) rear yard access stair with an upper walkway / deck, and 2 stair runs. will be cantilevered from rear building wall. max 10' high. replace (e) yard-level deck. max 3' height. retaining wall (2') at rear for planter. replace rear wall door & window at crawlspace utility/storage room. | $49,000 |
| Feb 5, 2021 | Completed final sign-off Oct 2022 | 1201 Shrader St | Grabher Construction | replacement of the existing entry stair and porch base in-kind with open guardrails and cosmetic changes, replacement of the existing porch roof supports and roof using a new design, and replacement of the existing under-stair storage closet in-kind.Details
replacement of the existing entry stair and porch base in-kind with open guardrails and cosmetic changes, replacement of the existing porch roof supports and roof using a new design, and replacement of the existing under-stair storage closet in-kind. | $25,000 |
| Oct 28, 2020 | Completed final sign-off May 2025 | 44 Sequoia Wy | Brendan Lalor Construction | third floor addition; interior remodeling at the existing ground floor and second floor; widening of the garage door; window and exterior door changes at the existing two floors; removal of the existing rear decks, stair, and gazebo; and addition of a rear yard stair to the second floor.Details
third floor addition; interior remodeling at the existing ground floor and second floor; widening of the garage door; window and exterior door changes at the existing two floors; removal of the existing rear decks, stair, and gazebo; and addition of a rear yard stair to the second floor. | $450,000 |
| Oct 20, 2020 | Completed final sign-off Jun 2021 | 773 44th Av | to comply with nov202027612: addition of storabe cabinetry and reinstallation of original wet bar sink at basement family room 1.Details
to comply with nov202027612: addition of storabe cabinetry and reinstallation of original wet bar sink at basement family room 1. | $1,000 | |
| Jul 24, 2019 | Completed final sign-off Dec 2020 | 1332 Diamond St | Brothers Collins Woodworking Inc | cosmetic facade remodel and partial infill of the entry portal. interior remodeling to replace the entry stair in-kind with an added top step, open the top of the entry stair to the 2nd fl hall, remodel kitchen, dining room, and bath. replacement windows and a replacement skylight.Details
cosmetic facade remodel and partial infill of the entry portal. interior remodeling to replace the entry stair in-kind with an added top step, open the top of the entry stair to the 2nd fl hall, remodel kitchen, dining room, and bath. replacement windows and a replacement skylight. | $220,000 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 355 Lansdale Av | O Donoghue Construction Inc. | interior remodel at 355 lansdale dwelling units, addition of a bath, bath #3 at the (e) 2nd fl. bath #1, (e) bath #1 window to be relaced in new configurationDetails
interior remodel at 355 lansdale dwelling units, addition of a bath, bath #3 at the (e) 2nd fl. bath #1, (e) bath #1 window to be relaced in new configuration | $19,000 |
| Apr 24, 2019 | Completed final sign-off Nov 2020 | 44 Midcrest Wy | Bethel Construction Inc Dba Aaa Construc | interior remodeling at ground fl and 2nd fl kitchen, dining, living area, including the addition of front, side and rear windows and a rear exit door. replacement interior stair as a convenience stair (the ground fl exiting will be to the backyard safe dispersal area).Details
interior remodeling at ground fl and 2nd fl kitchen, dining, living area, including the addition of front, side and rear windows and a rear exit door. replacement interior stair as a convenience stair (the ground fl exiting will be to the backyard safe dispersal area). | $190,000 |
| Apr 2, 2019 | Completed final sign-off Feb 2021 | 152 Evelyn Wy | Bethel Construction Inc Dba Aaa Construc | remove (e) backyard stair/porch, int remodel both flrs w/new habitable space. hall & bath at grnd flr. replacement foundation/slab at reportion of grnd flr. new/replacement windows at sides/rear/porch. new side doors & 2 new skylights. no proposed work at facadeDetails
remove (e) backyard stair/porch, int remodel both flrs w/new habitable space. hall & bath at grnd flr. replacement foundation/slab at reportion of grnd flr. new/replacement windows at sides/rear/porch. new side doors & 2 new skylights. no proposed work at facade | $210,000 |
| Mar 21, 2019 | Completed final sign-off Nov 2019 | 357 Lansdale Av | O Donoghue Construction Inc. | add units per ord 95-17. accessory dwelling unit addition at existing front crawlspace.Details
add units per ord 95-17. accessory dwelling unit addition at existing front crawlspace. | $100,000 |
| Nov 15, 2018 | Expired or cancelled withdrawn Feb 2020 | 19 Cityview Wy | Brendan Lalor Construction | rear addition with roof & spiral stair to rear yard. interior remodeling at both floors with (n) side windows and door. addition of one skylight.Details
rear addition with roof & spiral stair to rear yard. interior remodeling at both floors with (n) side windows and door. addition of one skylight. | $305,000 |
| Apr 26, 2018 | Completed final sign-off Feb 2020 | 275 Bella Vista Wy | Joseph Francis Lockary | infill of lightwell beside blank wall of adjacent bldl interior remodeling at all three floors; new doors, windows and finish at rear wall of each floor; and three new skylights not visible from street. no proposed work at street facade under this permitDetails
infill of lightwell beside blank wall of adjacent bldl interior remodeling at all three floors; new doors, windows and finish at rear wall of each floor; and three new skylights not visible from street. no proposed work at street facade under this permit | $240,000 |
| Apr 26, 2018 | Completed final sign-off Jun 2020 | 275 Bella Vista Wy | Joseph Francis Lockary | replacement of two bedroom windows at second floor of street facade. windows to be wood with metal cladding, conform to the bedroom window egress size requirements in sf building code 1030.2, and have a max .32 u-factor. no rough opening changes.Details
replacement of two bedroom windows at second floor of street facade. windows to be wood with metal cladding, conform to the bedroom window egress size requirements in sf building code 1030.2, and have a max .32 u-factor. no rough opening changes. | $3,000 |
| Feb 9, 2018 | Completed final sign-off Dec 2019 | 275 Bella Vista Wy | Joseph Francis Lockary | deck addition @ rear yard, replacement wood stair & landing @ rear yard, replacement patio & concrete stair portion @ rear yard, guardrail @ (e) rear yard planter & handrail @ (e) rear yard landscape stair.Details
deck addition @ rear yard, replacement wood stair & landing @ rear yard, replacement patio & concrete stair portion @ rear yard, guardrail @ (e) rear yard planter & handrail @ (e) rear yard landscape stair. | $35,000 |
| Jan 29, 2018 | Never finaled issued Sep 2019, no final | 450 Hearst Av | Clay Hill Construction | interior remodeling at both floors, (6)new skylights, roof parafet, replacement door @ ground fl facade, infill (2)(e) lightwells, (1)story rear addition with roof deck, (2)story privacy wall @ rear yard, garden shed,8' tall rear yard fences. added area of habitable space is 402 sqftDetails
interior remodeling at both floors, (6)new skylights, roof parafet, replacement door @ ground fl facade, infill (2)(e) lightwells, (1)story rear addition with roof deck, (2)story privacy wall @ rear yard, garden shed,8' tall rear yard fences. added area of habitable space is 402 sqft | $200,000 |
| Dec 22, 2017 | Completed final sign-off Oct 2021 | 2627 Hyde St | remove (e) utility room & add 3 decks @ rear of building. convert grount floor into a garage with a driveway in the rear yard to side alley. 10' tall firewalls & fences in rear yard. elevator addition with partial infill of (e) lightwell. changes to north & west walls of rear exit stair enclosure.Details
remove (e) utility room & add 3 decks @ rear of building. convert grount floor into a garage with a driveway in the rear yard to side alley. 10' tall firewalls & fences in rear yard. elevator addition with partial infill of (e) lightwell. changes to north & west walls of rear exit stair enclosure. | $400,000 | |
| Oct 25, 2017 | Never finaled issued Dec 2017, no final | 48 Coventry Ct | C G Adams Construction | remvoal of existing ground floor & 2nd floor rear decks. construction of a guardrail at the rear wall of the 2nd flr at the (e) slidign glass door & two adjacent widnows. construction of a landing outside the (e) rear ground floor door.Details
remvoal of existing ground floor & 2nd floor rear decks. construction of a guardrail at the rear wall of the 2nd flr at the (e) slidign glass door & two adjacent widnows. construction of a landing outside the (e) rear ground floor door. | $3,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2019 | 55 Sequoia Wy | Bethel Construction Inc Dba Aaa Construc | infill of (e) 2nd floor lightwell, 4 new skylights, 2 parapet walls (not visible from street), interior remodeling at 2nd flr w/new stair to ground floor. int remodel at ground flr to add a bedroom, family room, bath, & laundry room. no facade changes.Details
infill of (e) 2nd floor lightwell, 4 new skylights, 2 parapet walls (not visible from street), interior remodeling at 2nd flr w/new stair to ground floor. int remodel at ground flr to add a bedroom, family room, bath, & laundry room. no facade changes. | $140,000 |
| Dec 29, 2016 | Expired or cancelled cancelled Oct 2022 | 44 Midcrest Wy | Bethel Construction Inc Dba Aaa Construc | rear (1)story addition w/ roof deck, rear replacement stair from proposed deck to rear yard w/ bottom concrete landing, interior remodel @ both floors (including (n) full bath & half bath), & (n) windows, doors & a skylight.Details
rear (1)story addition w/ roof deck, rear replacement stair from proposed deck to rear yard w/ bottom concrete landing, interior remodel @ both floors (including (n) full bath & half bath), & (n) windows, doors & a skylight. | $170,000 |
| Dec 15, 2016 | Completed final sign-off Oct 2019 | 70 Putnam St | Brothers Collins Woodworking Inc | addition of a bedroom, bath, laundry room, storage and a hall to the (e) ground fl interior. infill of the (e) covered north lightwell, and a (n) interior stair between floors at the infill. removal of the (e) interior stair to create a pantry. removal of wall portion between entry hall and kitchenDetails
addition of a bedroom, bath, laundry room, storage and a hall to the (e) ground fl interior. infill of the (e) covered north lightwell, and a (n) interior stair between floors at the infill. removal of the (e) interior stair to create a pantry. removal of wall portion between entry hall and kitchen | $97,000 |
| Dec 13, 2016 | Completed final sign-off Oct 2017 | 459 Teresita Bl | Bethel Construction Inc Dba Aaa Construc | convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft.Details
convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft. | $130,000 |
| Dec 13, 2016 | Completed final sign-off Mar 2018 | 1520 Santiago St | California Home Improvement Solutions | infill of (e) east entry court/lightwell w/skylight on roof, partial infill & expansion of (e)portal for proposed entry hall, replacement finish on (e) entry stair, replacement guardrail & handrail at (e) entry stair, removal of kitchen window & replacement wall opening adjacent to(e) entry door.Details
infill of (e) east entry court/lightwell w/skylight on roof, partial infill & expansion of (e)portal for proposed entry hall, replacement finish on (e) entry stair, replacement guardrail & handrail at (e) entry stair, removal of kitchen window & replacement wall opening adjacent to(e) entry door. | $55,000 |
| Dec 13, 2016 | Expired or cancelled cancelled Oct 2022 | 1332 Diamond St | rear addition to replace & expand upon the (e) rear most bldg portion. the addition is primarily 2 stories tall, but a portion will be 2 1/2 stories for a stair to the (e) elevated yard level. interior remodeling, remodel of the facade, and filling in of a portion of the existing entry portal. 86 sfDetails
rear addition to replace & expand upon the (e) rear most bldg portion. the addition is primarily 2 stories tall, but a portion will be 2 1/2 stories for a stair to the (e) elevated yard level. interior remodeling, remodel of the facade, and filling in of a portion of the existing entry portal. 86 sf | $515,000 | |
| Nov 2, 2016 | Completed final sign-off Nov 2017 | 320 Garfield St | Bethel Construction Inc Dba Aaa Construc | rear deck at second floor, door to deck, rear stair from ground floor to rear yard with firewall, guardrails at existing rear yard patio retaining walls and handrail at existing rear yard concrete stair and proposed stairDetails
rear deck at second floor, door to deck, rear stair from ground floor to rear yard with firewall, guardrails at existing rear yard patio retaining walls and handrail at existing rear yard concrete stair and proposed stair | $10,000 |
| Oct 31, 2016 | Completed final sign-off Sep 2017 | 28 Precita Av | Spotlight Construction Groups Inc | conversion of the (e) family room into bedroom 2. conversion of the (e) bedroom 2 into bath 2 & a walk-in closet for the new bedroom 2. the proposed bath will have a new window & skylight.Details
conversion of the (e) family room into bedroom 2. conversion of the (e) bedroom 2 into bath 2 & a walk-in closet for the new bedroom 2. the proposed bath will have a new window & skylight. | $7,600 |
| Oct 19, 2016 | Completed final sign-off Sep 2019 | 70 Putnam St | Brothers Collins Woodworking Inc | replacement foundation and ground floor lowered slab, replacement garage door and new facade window, rear yard lightwell and retaining walls, replacement rear yard fences, remodel of rear wall and extension of extg ground floor interior stair. approx. 170 cu yard excavationDetails
replacement foundation and ground floor lowered slab, replacement garage door and new facade window, rear yard lightwell and retaining walls, replacement rear yard fences, remodel of rear wall and extension of extg ground floor interior stair. approx. 170 cu yard excavation | $205,000 |
| Sep 15, 2016 | Completed final sign-off Feb 2017 | 320 Garfield St | Bethel Construction Inc Dba Aaa Construc | conversion of (e) ground floor social room into bedrm 4. interior remodeling at ground floor to add an entry closet and a walk-in closet and expand bath for bedroom 4. interior remodeling at 2nd floor to adjust the layout and remove the (e) wall between the living room and kitchen/dining room area.Details
conversion of (e) ground floor social room into bedrm 4. interior remodeling at ground floor to add an entry closet and a walk-in closet and expand bath for bedroom 4. interior remodeling at 2nd floor to adjust the layout and remove the (e) wall between the living room and kitchen/dining room area. | $90,000 |
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 459 Teresita Bl | Bethel Construction Inc Dba Aaa Construc | rear yard access stair from ground floor and door to stair at existing rear wall window location.Details
rear yard access stair from ground floor and door to stair at existing rear wall window location. | $15,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2020 | 70 Putnam St | Brothers Collins Woodworking Inc | install 3 skylights & 1 skylight/roof access hatch. 1 roof parapet @ ea side prop line. reooftop exhaust fan for kitchen range hood & replace hood. 4 in-kind replace double hung windows @ bedrms. handrail at entry & int. stairs. vents @ garage door, heat pump ducted heating system, on-demandDetails
install 3 skylights & 1 skylight/roof access hatch. 1 roof parapet @ ea side prop line. reooftop exhaust fan for kitchen range hood & replace hood. 4 in-kind replace double hung windows @ bedrms. handrail at entry & int. stairs. vents @ garage door, heat pump ducted heating system, on-demand | $40,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 460 Melrose Av | Modern Craft Construction | remodel of (e)kitchen,including new french doors & skylight. approx 2' tall walkway addition at existing rear yard concrete walkway adjacent to house.notch in (e)rear yard walkway retaining wall for new stair to yard.Details
remodel of (e)kitchen,including new french doors & skylight. approx 2' tall walkway addition at existing rear yard concrete walkway adjacent to house.notch in (e)rear yard walkway retaining wall for new stair to yard. | $45,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2016 | 1441 14th Av | Modern Craft Construction | interior remodel of extg kitchen with enlarged wall opening to dining room, greenhouse window of extg north kitchen window opening, and new kitchen skylight.Details
interior remodel of extg kitchen with enlarged wall opening to dining room, greenhouse window of extg north kitchen window opening, and new kitchen skylight. | $38,000 |
| Nov 25, 2015 | Never finaled issued Dec 2015, no final | 65 Zircon Pl | E B W Builders Inc | replace (e) rear yard patio & bottom portion of (e) south side yard landscape stair. patio finish to be flagstone with gravel in gaps, & stair to beredwood with gravel infill, patio, patio landing, & stair to be man 2'-6" tall above finished grade & 3'-0" max tall above (e) grade.Details
replace (e) rear yard patio & bottom portion of (e) south side yard landscape stair. patio finish to be flagstone with gravel in gaps, & stair to beredwood with gravel infill, patio, patio landing, & stair to be man 2'-6" tall above finished grade & 3'-0" max tall above (e) grade. | $40,000 |
| Oct 21, 2015 | Never finaled issued Jun 2016, no final | 368 Capp St | C G Adams Construction | front facade & property remodel with 3 replacement windows, 1 resize window, new trim, replacement shingle siding & open porch addition. replacement north property line fence, new fence with gates @ front property line, reconfigure entry stairs, remodeled driveway portion & replacement tree.Details
front facade & property remodel with 3 replacement windows, 1 resize window, new trim, replacement shingle siding & open porch addition. replacement north property line fence, new fence with gates @ front property line, reconfigure entry stairs, remodeled driveway portion & replacement tree. | $15,000 |
| Dec 19, 2014 | Completed final sign-off Jun 2016 | 566 Eureka St | Brothers Collins Woodworking Inc | 6' deep, 1 story tall rear building addition at gr floor, 30" tall max landing and stair addition of exsiting deck. replacement of exterior wall finish at rear of house, interior remodeling at gr fl and dining room, including skylight, terracing of rear yard with new stairs, planters and walways,Details
6' deep, 1 story tall rear building addition at gr floor, 30" tall max landing and stair addition of exsiting deck. replacement of exterior wall finish at rear of house, interior remodeling at gr fl and dining room, including skylight, terracing of rear yard with new stairs, planters and walways, | $187,000 |
| Dec 10, 2014 | Completed final sign-off Jan 2016 | 56 Ledyard St | Spotlight Construction Groups Inc | addition of a 9'deep deck @ the 2nd fl & a 5'diameter spiral stair @ the rear yard. deck to be tiled, have glass & metal guardrails & privacy screens, & have metal planter box ledges @ its rear side. guardrails & privacy screen on the north & south sides to have privacy glass.Details
addition of a 9'deep deck @ the 2nd fl & a 5'diameter spiral stair @ the rear yard. deck to be tiled, have glass & metal guardrails & privacy screens, & have metal planter box ledges @ its rear side. guardrails & privacy screen on the north & south sides to have privacy glass. | $10,000 |
| Jun 13, 2014 | Completed final sign-off Dec 2014 | 164 Marietta Dr | Spotlight Construction Groups Inc | revision to pa#201404153217 to construct a vaulted ceiling within the existing building envelope at the living room.Details
revision to pa#201404153217 to construct a vaulted ceiling within the existing building envelope at the living room. | $900 |
| May 20, 2014 | Completed final sign-off Dec 2015 | 3173 Turk Bl | Brothers Collins Woodwork, Brothers Collins Woodworking Inc | rear bldg addition at all three floors (crawlspace at groud floor portion) with roof deck at third floor, rear deck addition at second floor, and interior remodeling at all floors. new bath at second floor.Details
rear bldg addition at all three floors (crawlspace at groud floor portion) with roof deck at third floor, rear deck addition at second floor, and interior remodeling at all floors. new bath at second floor. | $255,000 |
| Apr 15, 2014 | Completed final sign-off Dec 2014 | 164 Marietta Dr | Spotlight Construction Groups Inc | add skylight at rear facing portion of (e) decorative sloped roof over living room, replace (e) bath skylight and lowering of (e) skylight curb to 8" tall. skylight to be double glazed with low-e glass.Details
add skylight at rear facing portion of (e) decorative sloped roof over living room, replace (e) bath skylight and lowering of (e) skylight curb to 8" tall. skylight to be double glazed with low-e glass. | $3,000 |
| Mar 28, 2014 | Never finaled issued Apr 2014, no final | 65 Zircon Pl | Regan Scott Kosch | revision to 201304094115 for facade addition under existing entry door overhang, cosmetec facade changes, removal of rear wall bay window and reconfiguration of gr fl baths. existing interior stair to remain. adjustment of some window and exterior doors, change of skylight size and shape, adjustmentDetails
revision to 201304094115 for facade addition under existing entry door overhang, cosmetec facade changes, removal of rear wall bay window and reconfiguration of gr fl baths. existing interior stair to remain. adjustment of some window and exterior doors, change of skylight size and shape, adjustment | |
| Feb 27, 2014 | Completed final sign-off Aug 2014 | 1838 Laguna St | Dohrmann Construction Inc. | cosmetic interior remodeling at two existing 2/f baths. replacing vanities, toilets, shower pan, & curb at west bath, & tile.Details
cosmetic interior remodeling at two existing 2/f baths. replacing vanities, toilets, shower pan, & curb at west bath, & tile. | $40,000 |
| Feb 3, 2014 | Completed final sign-off Sep 2015 | 1648 Beach St | D Cappelletti & Sons Inc | infill of (e) 2nd floor courtyard, removal of (e) 3rd floor rear closet & expansion of (e) deck into that area, new window & door at (e) 3rd floor rear wall, interior remodeling at 2nd & 3rd floors wiht 3 new skylights at each floor, & structural work at all three floors; compliance with ord 155-13Details
infill of (e) 2nd floor courtyard, removal of (e) 3rd floor rear closet & expansion of (e) deck into that area, new window & door at (e) 3rd floor rear wall, interior remodeling at 2nd & 3rd floors wiht 3 new skylights at each floor, & structural work at all three floors; compliance with ord 155-13 | $74,000 |
| Apr 9, 2013 | Never finaled issued Jun 2013, no final | 65 Zircon Pl | E B W Builders Inc | removal of existing lot, dormers, bath & stair; grout fl bay window addition at rear of bldg; ground fl hall addition inside existing bldg envelope; structural upgrade for bldg incl stair, hall, remodel 2nd fl w/ change size, doors replace bldg finish, roofing w/ composition singles.Details
removal of existing lot, dormers, bath & stair; grout fl bay window addition at rear of bldg; ground fl hall addition inside existing bldg envelope; structural upgrade for bldg incl stair, hall, remodel 2nd fl w/ change size, doors replace bldg finish, roofing w/ composition singles. | $240,000 |
| Jul 18, 2012 | Completed final sign-off Aug 2012 | 385 Chenery St | $300,000 increase in the construction cost of job under permit 200706285476. administrative permit for valuation increase only.Details
$300,000 increase in the construction cost of job under permit 200706285476. administrative permit for valuation increase only. | $300,000 | |
| Apr 12, 2012 | Completed final sign-off Mar 2013 | 30 Crestline Dr | D Cappelletti & Sons Inc | exterior addition and interior remodeling at grd fl garage. 2nd fl apt#10 & 3rd fl apt#12 (stories 5,6&7) to add a 3 story private hydaqulic elevator to serve apt#12 only. no fire sprinklers are proposed.1 garage parking space will be removed. a variance is being requested for this proj.Details
exterior addition and interior remodeling at grd fl garage. 2nd fl apt#10 & 3rd fl apt#12 (stories 5,6&7) to add a 3 story private hydaqulic elevator to serve apt#12 only. no fire sprinklers are proposed.1 garage parking space will be removed. a variance is being requested for this proj. | $57,000 |
| Feb 27, 2012 | Expired or cancelled withdrawn Apr 2025 | 56 Ulloa St | California Home Improvement Solutions | revision to pa #201104295042 to add two windowsw to rear wall of ground floor, with related structural improvements. proposed windows not visible from street.Details
revision to pa #201104295042 to add two windowsw to rear wall of ground floor, with related structural improvements. proposed windows not visible from street. | $2,000 |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 257 Clinton Pk | Brendan Waters Construction Inc | interior remodeling that includes wall removal, a new kitchen/dining wall opening, a new laundry closet, a kitchen remodel, the conversion of the (e) rear bedroom into a living room and the (e) living room into a bedroom, and new hardwood flooring throughout. see sheet a.1 for additional informatioDetails
interior remodeling that includes wall removal, a new kitchen/dining wall opening, a new laundry closet, a kitchen remodel, the conversion of the (e) rear bedroom into a living room and the (e) living room into a bedroom, and new hardwood flooring throughout. see sheet a.1 for additional informatio | $40,000 |
| Jan 30, 2012 | Completed final sign-off Jul 2013 | 427 29th St | San Francisco Design & Constr. | third floor vertical addition with front and rear decks. interior remodeling at ground and second floors with additional windows. remodel of upper portion of existing facade.Details
third floor vertical addition with front and rear decks. interior remodeling at ground and second floors with additional windows. remodel of upper portion of existing facade. | $125,000 |
| Jan 24, 2012 | Completed final sign-off Nov 2012 | 1421 Shrader St | San Francisco Design & Constr., Associated Trucking Inc | infill existing north lightwell with 1 story addition. interior remodel at gr floor for new foundation, bedroom suite and concrete stair to rear yard. utility closet, under stair closet, hall expanded garage. interior remodel 2nd fl to widen existing living room/dining rm wall opening,provide widenDetails
infill existing north lightwell with 1 story addition. interior remodel at gr floor for new foundation, bedroom suite and concrete stair to rear yard. utility closet, under stair closet, hall expanded garage. interior remodel 2nd fl to widen existing living room/dining rm wall opening,provide widen | $91,000 |
| Jan 6, 2012 | Completed final sign-off Nov 2012 | 1421 Shrader St | San Francisco Design & Constr. | replacement rear deck & stair.Details
replacement rear deck & stair. | $5,800 |
| Apr 29, 2011 | Expired or cancelled expired Sep 2022 | 56 Ulloa St | California Home Improvement Solutions | interior remodel at ground floor to legalize extg 2 rear rooms to create a bedroom and sitting room, replace an extg unwarrented bath, and add a hall, laundry room and storage room. interior remodel at second floor to remove extg door to stair. new habitable space is 282 square feet.Details
interior remodel at ground floor to legalize extg 2 rear rooms to create a bedroom and sitting room, replace an extg unwarrented bath, and add a hall, laundry room and storage room. interior remodel at second floor to remove extg door to stair. new habitable space is 282 square feet. | $26,300 |
| Dec 28, 2010 | Completed final sign-off Aug 2011 | 2048 Union St | interior remodel of unit 2052. remodel kitchen, combine the separate bath/toilet room int full bath, replace ceiling wall and floor finshed area in area of work, replace 2 windows, not visible, replace existing interior doors.Details
interior remodel of unit 2052. remodel kitchen, combine the separate bath/toilet room int full bath, replace ceiling wall and floor finshed area in area of work, replace 2 windows, not visible, replace existing interior doors. | $80,000 | |
| Dec 17, 2010 | Completed final sign-off Mar 2012 | 753 Vermont St | Dohrmann Construction Inc. | rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard.Details
rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard. | $85,000 |
| Aug 18, 2010 | Completed final sign-off Jan 2013 | 6139 California St | Vollmer Construction Company | rear additions and interior remodeling. 339 square foot increase of habitable space.Details
rear additions and interior remodeling. 339 square foot increase of habitable space. | $125,000 |
| Jun 30, 2010 | Completed final sign-off Sep 2011 | 275 Randall St | Dore Const. Of Calif. Inc. | infill of (e) decks @ 2nd & 3rd floors at front of building. lowering of top of (e) garage door facade niche, entry door canopy addition, west front property line fence additon, & cosmetic remodeling @ facade & (e) front retaining walls & planter.Details
infill of (e) decks @ 2nd & 3rd floors at front of building. lowering of top of (e) garage door facade niche, entry door canopy addition, west front property line fence additon, & cosmetic remodeling @ facade & (e) front retaining walls & planter. | $40,000 |
| Apr 2, 2010 | Completed final sign-off Mar 2012 | 463 Marietta Dr | infill of (e) court & partial infill of (e) entry portal. expansion of garage to 2' of front of building. addition of 3 skylights & adjacent parapet wall on northeast property line wall. interior remodeling on both floorsDetails
infill of (e) court & partial infill of (e) entry portal. expansion of garage to 2' of front of building. addition of 3 skylights & adjacent parapet wall on northeast property line wall. interior remodeling on both floors | $45,000 | |
| Mar 19, 2010 | Completed final sign-off Jun 2010 | 200 Robinhood Dr | interior remodeling at kitchen with 2 walls being removed, a beam added & replacement window at the south exterior wallDetails
interior remodeling at kitchen with 2 walls being removed, a beam added & replacement window at the south exterior wall | $20,000 | |
| Dec 11, 2009 | Completed final sign-off Jul 2010 | 1229 Noe St | Streiffer Burnham Const., Inc. | revision to appl. 200911131137, for arch/structural changes to ground floor. remodel of (e) bathroom, new step @ bedroom 4, new swing hall door, replace north foundation. add newbedroom 4 beam.. new lighting on bedroom 4 & 5.Details
revision to appl. 200911131137, for arch/structural changes to ground floor. remodel of (e) bathroom, new step @ bedroom 4, new swing hall door, replace north foundation. add newbedroom 4 beam.. new lighting on bedroom 4 & 5. | $6,500 |
| Nov 6, 2009 | Completed final sign-off Jan 2010 | 164 Marietta Dr | rear one story deck addition with stair to rear yard. replacement of exisitng kitchen window with sliding glass door.Details
rear one story deck addition with stair to rear yard. replacement of exisitng kitchen window with sliding glass door. | $3,000 | |
| Oct 9, 2009 | Expired or cancelled expired May 2011 | 1090 Dolores St | Peter Harris Construction Inc | revision to pa# 2009-0205-1446s1-changes at the (e) storage room at rear of ground floor: foundation work to lower slab, extend planner concrete exterior stair to new slab level, provide new exterior door and leave (e) windows at southwest area of roomDetails
revision to pa# 2009-0205-1446s1-changes at the (e) storage room at rear of ground floor: foundation work to lower slab, extend planner concrete exterior stair to new slab level, provide new exterior door and leave (e) windows at southwest area of room | $9,000 |
| Jun 5, 2009 | Completed final sign-off Aug 2009 | 1450 Post St | D Cappelletti & Sons Inc | unit 1015 - interior remodel at existing kitchen to remove kitchen/dining partition wall & expand kitchen cabinetry into existing dining area.Details
unit 1015 - interior remodel at existing kitchen to remove kitchen/dining partition wall & expand kitchen cabinetry into existing dining area. | $6,000 |
| Mar 20, 2009 | Completed final sign-off Jan 2010 | 1500 Diamond St | Ashfield Construction | ground floor interior remodel to add storage room and repalcement toilet room. 2nd fl interior remodeling at existing closet for furnace cold air return. exterior duct enclosure under existing rear building portion.install plywood and holddowns.Details
ground floor interior remodel to add storage room and repalcement toilet room. 2nd fl interior remodeling at existing closet for furnace cold air return. exterior duct enclosure under existing rear building portion.install plywood and holddowns. | $35,000 |
| Feb 17, 2009 | Completed final sign-off Dec 2009 | 1655 Beach St | D Cappelletti & Sons Inc | interior remodeling at 3rd fl to provide roof deck penthouse stairs adjacent closet & new window at (e) west lightwell. roof stair penthouse & roof deck at (e) roof to serve 1657 beach st unit only. note: structural reinforcing of (e) roof for deck and penthouse approved under pa# 2009-0115-0287Details
interior remodeling at 3rd fl to provide roof deck penthouse stairs adjacent closet & new window at (e) west lightwell. roof stair penthouse & roof deck at (e) roof to serve 1657 beach st unit only. note: structural reinforcing of (e) roof for deck and penthouse approved under pa# 2009-0115-0287 | $20,000 |
| Feb 5, 2009 | Expired or cancelled expired May 2011 | 1090 Dolores St | Peter Harris Construction Inc | rear garage addition, rear deck, connecting walkway and stair addition, roof deck and stair penthouse at main building, interior remodeling to include converting front gr fl into 2nd dwelling, new windows and ext doors, 3 new skylights, parapet extension at north elevation adjcnt to skylightsDetails
rear garage addition, rear deck, connecting walkway and stair addition, roof deck and stair penthouse at main building, interior remodeling to include converting front gr fl into 2nd dwelling, new windows and ext doors, 3 new skylights, parapet extension at north elevation adjcnt to skylights | $87,000 |
| Jan 15, 2009 | Completed final sign-off Nov 2009 | 1655 Beach St | D Cappelletti & Sons Inc | widening of garage door and rear balcony addition, replacment windows and siding at sides and rear, new doors at rear, 3 new skylights , 2 new parapets at roof, remodel gr floor with new full bath, remodel 3rd fl, kitchen and 2 baths, voluntary reinforcing of roof framing for future roof deck.Details
widening of garage door and rear balcony addition, replacment windows and siding at sides and rear, new doors at rear, 3 new skylights , 2 new parapets at roof, remodel gr floor with new full bath, remodel 3rd fl, kitchen and 2 baths, voluntary reinforcing of roof framing for future roof deck. | $125,000 |
| Jan 8, 2009 | Completed final sign-off Mar 2010 | 1555 Beach St | D Cappelletti & Sons Inc, Fahey Building/Remodeling | 3 story elevator addition at rear exterior. 1 story elevator equipment closet & hall at grd floor. infill 2 (e) property line windows at west side of 3rd floor rear. replacement of 2 doors at 2nd & 3rd floors (2 exterior doors total)Details
3 story elevator addition at rear exterior. 1 story elevator equipment closet & hall at grd floor. infill 2 (e) property line windows at west side of 3rd floor rear. replacement of 2 doors at 2nd & 3rd floors (2 exterior doors total) | $45,000 |
| Nov 26, 2008 | Completed final sign-off Mar 2009 | 19 Marietta Dr | Adam Bennes/ Blue Coast Contracting | revision to permit app# 200810305481 to add a full bath to the ground floor interior adjacent to the extg family roomDetails
revision to permit app# 200810305481 to add a full bath to the ground floor interior adjacent to the extg family room | $2,000 |
| Nov 26, 2008 | Completed final sign-off Nov 2010 | 535 Arkansas St | D Cappelletti & Sons Inc | elevator addition at interior of ground floor and second floor. exterior addition at 3rd floor with elevator and powder room. interior remodeling at 3rd floor for new closet adjacent to proposed addition.Details
elevator addition at interior of ground floor and second floor. exterior addition at 3rd floor with elevator and powder room. interior remodeling at 3rd floor for new closet adjacent to proposed addition. | $42,000 |
| Nov 10, 2008 | Expired or cancelled expired May 2011 | 1090 Dolores St | removal of unwarranted ground floor second dwelling unit by removing the extg kitchenette, to restore the space to the previous family room use.Details
removal of unwarranted ground floor second dwelling unit by removing the extg kitchenette, to restore the space to the previous family room use. | $500 | |
| Oct 30, 2008 | Completed final sign-off Mar 2009 | 19 Marietta Dr | Adam Bennes/ Blue Coast Contracting | revision to appl. 200712039468 change proposed gr fl.rear windows and doors to (e) locations and do interior remodel at east end of (e) gr. fl. family room to expand (e) toilet room and add a hall. voluntary seismic strenghtening at rear wall.Details
revision to appl. 200712039468 change proposed gr fl.rear windows and doors to (e) locations and do interior remodel at east end of (e) gr. fl. family room to expand (e) toilet room and add a hall. voluntary seismic strenghtening at rear wall. | |
| Oct 30, 2008 | Completed final sign-off Apr 2009 | 330 Moraga St | elevator addition to serve all three floors, with proposed shaft extending approximately 11" into extg west lightwell.(note there are no neighbor wndw at the west lightwell). interior remodeling at ground floor to add habitable space, a toilet room, utility room and darkroomDetails
elevator addition to serve all three floors, with proposed shaft extending approximately 11" into extg west lightwell.(note there are no neighbor wndw at the west lightwell). interior remodeling at ground floor to add habitable space, a toilet room, utility room and darkroom | $80,000 | |
| Oct 23, 2008 | Completed final sign-off Jul 2009 | 1924 Filbert St | interior remodel to add elevator to serve all floors, elevator dors on upper two floors (unit 2) to be controlled seperately from second floor (unit 1) elevator doors.Details
interior remodel to add elevator to serve all floors, elevator dors on upper two floors (unit 2) to be controlled seperately from second floor (unit 1) elevator doors. | $60,000 | |
| Jul 22, 2008 | Completed final sign-off Dec 2008 | 773 44th Av | Spotlight Construction Groups Inc | revision to pa #200707035883 to remove proposed windows from south ext. wall of basement, to add windows to north ext. wall of basement, to remove stepped foundation at storage 1, to reconfigure portion walls in basement, to change north basement rooms to den & family room 2.Details
revision to pa #200707035883 to remove proposed windows from south ext. wall of basement, to add windows to north ext. wall of basement, to remove stepped foundation at storage 1, to reconfigure portion walls in basement, to change north basement rooms to den & family room 2. | |
| Jul 17, 2008 | Completed final sign-off Jan 2009 | 2032 Ellis St | interior remodel of 2032 ellis street (e) kitchen. no structural workDetails
interior remodel of 2032 ellis street (e) kitchen. no structural work | $9,000 | |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 1838 Laguna St | Dohrmann Construction Inc. | cosmetic remodel of (e) kitchen and pantry with exterior mechanical soffit under (e) rear building overhang per plan.Details
cosmetic remodel of (e) kitchen and pantry with exterior mechanical soffit under (e) rear building overhang per plan. | $20,000 |
| Jun 17, 2008 | Expired or cancelled cancelled Feb 2012 | 33 Samoset St | ground floor interior remodel & rear addition, landing & spiral stair at rear exterior, doors to exterior at 2nd floor rear, and rear yard retaining walls & patio.Details
ground floor interior remodel & rear addition, landing & spiral stair at rear exterior, doors to exterior at 2nd floor rear, and rear yard retaining walls & patio. | $35,000 | |
| May 20, 2008 | Expired or cancelled expired Jan 2010 | 1405 Douglass St | revision to 200610104534 for foundation only. all other parts of approved application to remain valid and unchanged under this revision.Details
revision to 200610104534 for foundation only. all other parts of approved application to remain valid and unchanged under this revision. | $40,000 | |
| Mar 21, 2008 | Completed final sign-off Jan 2010 | 1405 Douglass St | revision to site permit# 2007/12/28/1514/s to widen propose roof stair penthouse, change proposed floor plan, rear yard conc. retaining wall, enclose proposed rear yard under-stair and under-deck, replace front stair and replace garage door with aluminumDetails
revision to site permit# 2007/12/28/1514/s to widen propose roof stair penthouse, change proposed floor plan, rear yard conc. retaining wall, enclose proposed rear yard under-stair and under-deck, replace front stair and replace garage door with aluminum | $20,000 | |
| Mar 5, 2008 | Expired or cancelled withdrawn Jul 2008 | 495 Corbett Av | rear 1 story addition to (e) basement. proposed ground floor with roof deck. rear addition at 1st floor with roof deck. rear addition @ 2nd fl. rear spiral stair at exterior between 1st & 2nd floors, and interior remodeling.Details
rear 1 story addition to (e) basement. proposed ground floor with roof deck. rear addition at 1st floor with roof deck. rear addition @ 2nd fl. rear spiral stair at exterior between 1st & 2nd floors, and interior remodeling. | $165,000 | |
| Dec 28, 2007 | Completed final sign-off Jan 2010 | 1405 Douglass St | revision to approved site permit 2006-10-10-4534s: 36sf addtion on 2nd, addition of roof deck trellis & wind screen, etc. (see sheet a-1 for full detailed description)Details
revision to approved site permit 2006-10-10-4534s: 36sf addtion on 2nd, addition of roof deck trellis & wind screen, etc. (see sheet a-1 for full detailed description) | $15,000 | |
| Dec 19, 2007 | Completed final sign-off Nov 2009 | 1679 Noe St | work on 1679 noe street only - interior remodeling at ground floor with spiral stair to first floor, rear addition with existing deck structure, and remodel of existing front side yard ramp.Details
work on 1679 noe street only - interior remodeling at ground floor with spiral stair to first floor, rear addition with existing deck structure, and remodel of existing front side yard ramp. | $45,000 |