Block 2845, lot 011
30 Crestline Dr
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 2
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 10,684 sq ft
- Lot
- 12,331 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2024 | Completed final sign-off Nov 2024 | 30 Crestline Dr | unit 5-replace old kitchen tile counter top, backsplash and sink with quartz slab and (n) under mount sink. no change to in wall plumbing . use (e) supply and drain. replace sheetrock under tile backsplash and install (n) 4" backsplash no changes to (e) cabinets all work in kindDetails
unit 5-replace old kitchen tile counter top, backsplash and sink with quartz slab and (n) under mount sink. no change to in wall plumbing . use (e) supply and drain. replace sheetrock under tile backsplash and install (n) 4" backsplash no changes to (e) cabinets all work in kind | $2,500 | |
| Aug 5, 2020 | Completed final sign-off Sep 2020 | 30 Crestline Dr | Adullam Dba County Roofing Co | re-roof - work is for mid and lower level flat roof only. remove tar and gravel roof, apply base sheet, apply 1 layer smooth bitumen, apply 1 layer granular capDetails
re-roof - work is for mid and lower level flat roof only. remove tar and gravel roof, apply base sheet, apply 1 layer smooth bitumen, apply 1 layer granular cap | $37,200 |
| Nov 20, 2018 | Completed final sign-off Dec 2018 | 30 Crestline Dr | B Birmingham Inc. | rev to pa# 201708154831. added note: finishes 12" from exterior facade of garage & new partion wall added in garageDetails
rev to pa# 201708154831. added note: finishes 12" from exterior facade of garage & new partion wall added in garage | |
| Aug 15, 2017 | Completed final sign-off Dec 2018 | 30 Crestline Dr | compliance with mandatory seismic retofit program per 2016 sfebc chapter 4d & 2016 cebc appx a4.Details
compliance with mandatory seismic retofit program per 2016 sfebc chapter 4d & 2016 cebc appx a4. | $60,000 | |
| Apr 12, 2012 | Completed final sign-off Mar 2013 | 30 Crestline Dr | D Cappelletti & Sons Inc | exterior addition and interior remodeling at grd fl garage. 2nd fl apt#10 & 3rd fl apt#12 (stories 5,6&7) to add a 3 story private hydaqulic elevator to serve apt#12 only. no fire sprinklers are proposed.1 garage parking space will be removed. a variance is being requested for this proj.Details
exterior addition and interior remodeling at grd fl garage. 2nd fl apt#10 & 3rd fl apt#12 (stories 5,6&7) to add a 3 story private hydaqulic elevator to serve apt#12 only. no fire sprinklers are proposed.1 garage parking space will be removed. a variance is being requested for this proj. | $57,000 |
| Sep 13, 2011 | Completed final sign-off Oct 2011 | 30 Crestline Dr | D J Construction & Design | dryrot repair on 6 decks and replace 6' of guardrail on each deck. less than 50 %, replace deck boards and 6' guardrail. no framing replacementDetails
dryrot repair on 6 decks and replace 6' of guardrail on each deck. less than 50 %, replace deck boards and 6' guardrail. no framing replacement | $6,000 |
| May 16, 2005 | Expired or cancelled expired Oct 2007 | 30 Crestline Dr | Tim Borter Construction | repair and replace dryrot on deck, less than 20%Details
repair and replace dryrot on deck, less than 20% | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Adullam Dba County Roofing Co, B Birmingham Inc., D Cappelletti & Sons Inc, D J Construction & Design, Tim Borter Construction
- Architects
- Steven Whitney.
- Engineers
- Donald David
Find contractors for work like this