Thomas Meece
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Meece Engineering Inc.
- Based in
- Petaluma
- On San Francisco permits
- May 2003 to Sep 2026
168 permits since 2000 (engineer on 133 permits, architect on 30 permits, designer on 3 permits, authorized agent-others on 2 permits): 87 completed, 12 in progress, 26 never finaled, 43 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 168.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 375 Fair Oaks St | replace existing concrete stairs from sidewalk down to 1st floor utility area. project is subject to ab-112.Details
replace existing concrete stairs from sidewalk down to 1st floor utility area. project is subject to ab-112. | $7,000 | |
| Aug 6, 2026 | In progress issued Aug 2026 | 2900 Jackson St | revision to pa#202502039522: widens parking slab from previously approved permit configuration to accommodate passenger circulation to stair, addition of a vehicle rated linear drain at parking parking slab & new concrete slab at grade in paved area of patio.Details
revision to pa#202502039522: widens parking slab from previously approved permit configuration to accommodate passenger circulation to stair, addition of a vehicle rated linear drain at parking parking slab & new concrete slab at grade in paved area of patio. | $7,500 | |
| Jun 24, 2026 | In progress issued Jul 2026 | 1300 44th Av | Cal Am Construction Inc. | revision to 201907166048: simplifing structural framing note on s1.1. & interior front stair arch changesDetails
revision to 201907166048: simplifing structural framing note on s1.1. & interior front stair arch changes | |
| Apr 1, 2026 | In progress filed Apr 2026, not yet issued | 1723 Wallace Av | to erect 2 stories, no basement, type iii-b, light industrial. (building over 2 lots)Details
to erect 2 stories, no basement, type iii-b, light industrial. (building over 2 lots) | $280,000 | |
| Mar 16, 2026 | In progress issued Aug 2026 | 2914 Jackson St | revision to pa# 201809170527. to complete substaintial renovation: bring new condominium units up to code, correct cumulative defects discovered during work progress. structural stiffening at roof level. roof replacement. renovat service area on level 1. new access door to replace window at lowerDetails
revision to pa# 201809170527. to complete substaintial renovation: bring new condominium units up to code, correct cumulative defects discovered during work progress. structural stiffening at roof level. roof replacement. renovat service area on level 1. new access door to replace window at lower | $120,000 | |
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 405 Precita Av | to abate nov 202537414. demolish rear 2nd means of egree exterior stairs. build new required means of egress stairs. not visible from street.Details
to abate nov 202537414. demolish rear 2nd means of egree exterior stairs. build new required means of egress stairs. not visible from street. | $15,000 | |
| Jun 27, 2025 | In progress issued Nov 2025 | 2916 Jackson St | revise permit #2022-0304-9278 for field conditions and to document addition of new ceiling framing,skylights to be reduced in size, and stiffening of floor and property line wall. new lighting, electrical,and new hydronic radiator system and boiler in unit, and ventilation at new kitchen.Details
revise permit #2022-0304-9278 for field conditions and to document addition of new ceiling framing,skylights to be reduced in size, and stiffening of floor and property line wall. new lighting, electrical,and new hydronic radiator system and boiler in unit, and ventilation at new kitchen. | $110,000 | |
| Jun 2, 2025 | In progress issued Mar 2026 | 2900 Jackson St | establish an on-site, at grade parking space in rear yard. reinforce existing reytaining walls and footings to support slab. new sliding gate off broderick street. new curb cut at broderick street to access new driveway to parking space under separate street improvement permit.Details
establish an on-site, at grade parking space in rear yard. reinforce existing reytaining walls and footings to support slab. new sliding gate off broderick street. new curb cut at broderick street to access new driveway to parking space under separate street improvement permit. | $125,000 | |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 456 Diamond St | Sgv Group Construction | infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new powder room, new electrical and plumbing in areas of workDetails
infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new powder room, new electrical and plumbing in areas of work | $104,162 |
| Apr 14, 2025 | In progress issued May 2025 | 377 Fair Oaks St | Bedrock Construction | foundation and slab work, add bathroom and shearwall at bathroom. all work to be performed at basement.Details
foundation and slab work, add bathroom and shearwall at bathroom. all work to be performed at basement. | $70,000 |
| Feb 6, 2025 | In progress issued Jul 2025 | 2900 Jackson St | at lower unit: provide at grade access from street,move (e) wdw,provide access door at side lightwell to access (e) front patio.at basement: insulate and enclose from light well, install partitions,provide ventilation, plumbing and electrical to basement level with new egress stair from lower court.Details
at lower unit: provide at grade access from street,move (e) wdw,provide access door at side lightwell to access (e) front patio.at basement: insulate and enclose from light well, install partitions,provide ventilation, plumbing and electrical to basement level with new egress stair from lower court. | $150,000 | |
| Mar 11, 2024 | In progress issued Mar 2024 | 528 Oak St | Mora Architect Construction | replace existing rear exterior stairs in kindDetails
replace existing rear exterior stairs in kind | $15,000 |
| Sep 15, 2023 | In progress issued Jan 2025 | 2900 Jackson St | foundation underpinning & deep peer basement creation below existing house to support reinforced slower slab and creating a(n) basement level below the ground floor (lower unit) and a sub-basement mechanical service area at foundation depth.Details
foundation underpinning & deep peer basement creation below existing house to support reinforced slower slab and creating a(n) basement level below the ground floor (lower unit) and a sub-basement mechanical service area at foundation depth. | ||
| Aug 2, 2023 | Completed final sign-off Feb 2024 | 708 Oak St | revision to 202011189221. change direction of rear deck 2x6's.Details
revision to 202011189221. change direction of rear deck 2x6's. | ||
| Jun 6, 2023 | Expired or cancelled cancelled Jan 2026 | 1869 Market St | accessible business entrance program per ordinance 51-16. add doorbell & color contrast striping installationg and front entry door closer adjustment. abe 202209294820Details
accessible business entrance program per ordinance 51-16. add doorbell & color contrast striping installationg and front entry door closer adjustment. abe 202209294820 | $1,000 | |
| Jun 6, 2023 | Expired or cancelled cancelled Jan 2026 | 541 Hayes St | accessible business entrance program per ordinance 51-16. add front door signage. abe 202010282984Details
accessible business entrance program per ordinance 51-16. add front door signage. abe 202010282984 | $500 | |
| May 9, 2023 | Completed final sign-off Mar 2024 | 456 Diamond St | Sgv Group Construction | reduce scope of pa#: 202212077788; replacing only about 1/2 foundation. replacing part of wall with new beam. elminating seismic retrofitDetails
reduce scope of pa#: 202212077788; replacing only about 1/2 foundation. replacing part of wall with new beam. elminating seismic retrofit | |
| Mar 14, 2023 | Expired or cancelled withdrawn Nov 2023 | 2900 Jackson St | install new partition walls at existing basement level. install new fixed ladder access to existing basement underfloor mech, area. install new fall protection for existing lightwell. install new ventilation to basement under floor area. install misc associated plumbing and elec work.Details
install new partition walls at existing basement level. install new fixed ladder access to existing basement underfloor mech, area. install new fall protection for existing lightwell. install new ventilation to basement under floor area. install misc associated plumbing and elec work. | $30,000 | |
| Sep 27, 2022 | Never finaled filed Sep 2022, never issued | 377 Cumberland St | infill (e) lightwell on 3rd fl (43 sf). 3 new dormers. remodel 2 bathrooms. add one bathroom @ 2nd fl. add wet bar & relocate a bathroom @ basement.Details
infill (e) lightwell on 3rd fl (43 sf). 3 new dormers. remodel 2 bathrooms. add one bathroom @ 2nd fl. add wet bar & relocate a bathroom @ basement. | $80,000 | |
| Mar 4, 2022 | Never finaled issued May 2022, no final | 2916 Jackson St | apartment remodel on 3rd floor including (1) kitchen and (1) bath fixture replacement. install 4 skylights installed on 3rd floor roofDetails
apartment remodel on 3rd floor including (1) kitchen and (1) bath fixture replacement. install 4 skylights installed on 3rd floor roof | $30,000 | |
| Feb 24, 2022 | Completed final sign-off Jul 2025 | 722 Balboa St | Bedrock Construction | remodel (e) 2-story single family: (n) garage door within (e) ground fl foorprint. (n) driveway & curb cut for (n) ground fl garage. (n) stair (e) ground fl to (e) 1st fl. (n) small vertical addition for (n) master bathroom @ (e) unoccupied roof.Details
remodel (e) 2-story single family: (n) garage door within (e) ground fl foorprint. (n) driveway & curb cut for (n) ground fl garage. (n) stair (e) ground fl to (e) 1st fl. (n) small vertical addition for (n) master bathroom @ (e) unoccupied roof. | $100,000 |
| Nov 5, 2021 | Never finaled issued Nov 2021, no final | 2900 Jackson St | replace wood basement stairs(unsafe) with concrete stairs (not visible from stree)Details
replace wood basement stairs(unsafe) with concrete stairs (not visible from stree) | $3,000 | |
| Aug 10, 2021 | Completed final sign-off Oct 2022 | 232 Fillmore St | Bedrock Construction | partial foundation replacement. voluntery seismic strengthening. relocate 2 doors, install (n) sink, toilet, & showerDetails
partial foundation replacement. voluntery seismic strengthening. relocate 2 doors, install (n) sink, toilet, & shower | $20,000 |
| Jul 27, 2021 | Never finaled issued Jul 2021, no final | 401 Precita Av | revision to 202012019963. extend foundation replacement on south east portion of footing approx 23 ft.Details
revision to 202012019963. extend foundation replacement on south east portion of footing approx 23 ft. | $10,000 | |
| Feb 1, 2021 | Completed final sign-off Mar 2023 | 528 Oak St | Mora Architect Construction | remove 1st fl chimney & central support posts by strengthening 2nd fl framing. ref soft story pa# 202001303181.Details
remove 1st fl chimney & central support posts by strengthening 2nd fl framing. ref soft story pa# 202001303181. | $20,000 |
| Dec 1, 2020 | Never finaled issued Jun 2021, no final | 401 Precita Av | Bedrock Construction, Boaz Mor Design & Construction | revision to pa #201911227999 - to include foundation repairs and partition relocationDetails
revision to pa #201911227999 - to include foundation repairs and partition relocation | $25,000 |
| Dec 1, 2020 | Never finaled issued Feb 2021, no final | 2900 Jackson St | revision to pa #201809069332 - provide optional planter boxes instead of retaining wall. relocate one pierDetails
revision to pa #201809069332 - provide optional planter boxes instead of retaining wall. relocate one pier | $5,000 | |
| Nov 18, 2020 | Completed final sign-off Feb 2024 | 708 Oak St | comply w/ n.o.v 202035361. repair deck at 4th floor level flat roofDetails
comply w/ n.o.v 202035361. repair deck at 4th floor level flat roof | $7,000 | |
| May 22, 2020 | Never finaled issued Aug 2020, no final | 2900 Jackson St | revision to pa #2019-0829-0234: extend underpinning piers to east and west property line walls to 37ft from front wall.Details
revision to pa #2019-0829-0234: extend underpinning piers to east and west property line walls to 37ft from front wall. | $20,000 | |
| Jan 30, 2020 | Never finaled issued Mar 2020, no final | 528 Oak St | Mora Architect Construction | revision to pa #2017-0914-8349: this permit supersedes and replce the original soft story permit.Details
revision to pa #2017-0914-8349: this permit supersedes and replce the original soft story permit. | |
| Jan 27, 2020 | Expired or cancelled cancelled Jul 2021 | 998 Filbert St | convert existing laundry & art sutdio to 2 adu. per ordinance 162-16.Details
convert existing laundry & art sutdio to 2 adu. per ordinance 162-16. | $70,000 | |
| Jan 15, 2020 | Completed final sign-off Nov 2020 | 447 Utah St | Bedrock Construction | voluntary anchor bolting and plywood installation at 1st floor level for seismic strengthening.Details
voluntary anchor bolting and plywood installation at 1st floor level for seismic strengthening. | $4,000 |
| Aug 29, 2019 | Never finaled issued Oct 2019, no final | 2900 Jackson St | Union Pierce Construction | partial underpinning of existing house along east, west property linesDetails
partial underpinning of existing house along east, west property lines | $10,000 |
| Aug 6, 2019 | Expired or cancelled expired Oct 2024 | 706 Oak St | commercial - soft story retrofit 2016 cebc appendix a-4Details
commercial - soft story retrofit 2016 cebc appendix a-4 | $10,710 | |
| Jun 12, 2019 | Never finaled issued Jan 2021, no final | 455 Haight St | Bedrock Construction | to comply with abe ord 51-16. provide landing & power operated entry doorDetails
to comply with abe ord 51-16. provide landing & power operated entry door | $3,000 |
| May 29, 2019 | Never finaled issued May 2022, no final | 429 Haight St | Bedrock Construction | replace front entry door & install power door operator to comply with accessible business entrance program per ordinance 51-16. replace front sidewalk areaDetails
replace front entry door & install power door operator to comply with accessible business entrance program per ordinance 51-16. replace front sidewalk area | $3,000 |
| Dec 19, 2018 | Expired or cancelled withdrawn Mar 2023 | 2900 Jackson St | garage addition under existing building. (e) bldg envelope unchanged.Details
garage addition under existing building. (e) bldg envelope unchanged. | $200,000 | |
| Sep 14, 2018 | Expired or cancelled expired Oct 2024 | 708 Oak St | residential - soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. commercial soft story under pa 2019-0806-8096Details
residential - soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. commercial soft story under pa 2019-0806-8096 | $90,000 | |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 2900 Jackson St | replace extg front retaining wall in kind and underpin south west corner of house. less than 10. cu yd excavationDetails
replace extg front retaining wall in kind and underpin south west corner of house. less than 10. cu yd excavation | $8,000 | |
| Sep 4, 2018 | Expired or cancelled cancelled Nov 2022 | 413 Haight St | residential soft story - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201809049014Details
residential soft story - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201809049014 | $140,596 | |
| Sep 4, 2018 | Expired or cancelled expired Jul 2024 | 401 Haight St | Bedrock Construction | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016- cebc appendix a-4. accessible entry & accessible bathroom remodel. residential soft story under pa 201809049010Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016- cebc appendix a-4. accessible entry & accessible bathroom remodel. residential soft story under pa 201809049010 | $32,175 |
| Sep 4, 2018 | Completed final sign-off Jul 2024 | 401 Haight St | Bedrock Construction | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016- cebc appendix a-4. commercial soft story under pa 201809049011Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016- cebc appendix a-4. commercial soft story under pa 201809049011 | $152,625 |
| Sep 4, 2018 | Expired or cancelled cancelled Nov 2022 | 419 Haight St | commercial soft story - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. accessible entry and accessible bathroom remodel residential soft story under pa 201809049013Details
commercial soft story - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. accessible entry and accessible bathroom remodel residential soft story under pa 201809049013 | $32,144 | |
| Aug 29, 2018 | Completed final sign-off Sep 2020 | 615 Wisconsin St | Straightedge Construction | temporary shoring for permit app#201806051020Details
temporary shoring for permit app#201806051020 | |
| Aug 15, 2018 | Expired or cancelled withdrawn Jul 2021 | 3018 Mission St | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. accessible entries improvement & remoedl bathroom on 1st fl to be ada compliant. residential pa #201808157419Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. accessible entries improvement & remoedl bathroom on 1st fl to be ada compliant. residential pa #201808157419 | $47,973 | |
| Aug 15, 2018 | Expired or cancelled withdrawn Jul 2021 | 3018 Mission St | redidential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201808157416Details
redidential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201808157416 | $180,267 | |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 423 Lansdale Av | D Cappelletti & Sons Inc | voulntary seismic upgradeDetails
voulntary seismic upgrade | $7,000 |
| Apr 11, 2018 | Completed final sign-off Jun 2019 | 636 Octavia St | Marvel Construction Company Inc | revision to 201712116133, revised configuration of ada bathroom, kitchen & rear yard door & windowDetails
revision to 201712116133, revised configuration of ada bathroom, kitchen & rear yard door & window | |
| Mar 16, 2018 | Never finaled issued May 2018, no final | 2900 Jackson St | Union Pierce Construction | revise app#201702179646 by extending excavationDetails
revise app#201702179646 by extending excavation | $5,000 |
| Jan 25, 2018 | Never finaled issued Jan 2018, no final | 4229 Moraga St | T C Construction | remove 2nd floor kitchen wall and associated kitchen remodel.Details
remove 2nd floor kitchen wall and associated kitchen remodel. | $8,000 |
| Dec 21, 2017 | Completed final sign-off Dec 2019 | 145 Hazelwood Av | raise the kitchen ceiling and replace 2 windowsDetails
raise the kitchen ceiling and replace 2 windows | $5,000 | |
| Dec 13, 2017 | Completed final sign-off Aug 2020 | 4100 Fulton St | Sgv Group Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $100,000 |
| Dec 11, 2017 | Completed final sign-off Jun 2019 | 636 Octavia St | Marvel Construction Company Inc | revision to pa #201605318786- minor change to kitchen/ada bath/rear door. patio in rear removed from scope, existing concrete floor to remain/lowered floor removed from scope, roof deck removed from scope of work.Details
revision to pa #201605318786- minor change to kitchen/ada bath/rear door. patio in rear removed from scope, existing concrete floor to remain/lowered floor removed from scope, roof deck removed from scope of work. | |
| Nov 1, 2017 | Completed final sign-off Jun 2019 | 636 Octavia St | Marvel Construction Company Inc | revise soft story pa#201602290800 by moving one columnDetails
revise soft story pa#201602290800 by moving one column | $2,000 |
| Oct 19, 2017 | Completed final sign-off Mar 2018 | 243 Oak St | Artcore Construction | revise pa 2016-0913-7489 - soft story retrofit per iebc a4Details
revise pa 2016-0913-7489 - soft story retrofit per iebc a4 | $6,500 |
| Sep 12, 2017 | Completed final sign-off Sep 2018 | 33 Guerrero St | Seismic Retrofitters Inc. | soft story retrofit per sfebc ch.4d, 2016 cebc appendix a4.Details
soft story retrofit per sfebc ch.4d, 2016 cebc appendix a4. | $50,000 |
| Aug 18, 2017 | Expired or cancelled withdrawn Dec 2018 | 146 Swiss Av | Beyond The Horizon Construction | revision to pa#2015-0811-3943 by expanding garade & loweing slab.Details
revision to pa#2015-0811-3943 by expanding garade & loweing slab. | $30,000 |
| Jul 20, 2017 | Expired or cancelled expired Mar 2019 | 146 Swiss Av | Beyond The Horizon Construction | revise permit app#201508113943 by expanding garage and lower slab.(excavation not to be greater than 50 cubic yards)Details
revise permit app#201508113943 by expanding garage and lower slab.(excavation not to be greater than 50 cubic yards) | $30,000 |
| Jun 6, 2017 | Completed final sign-off Mar 2018 | 101 28th St | soft story retrofit pper sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit pper sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinance | $45,000 | |
| May 19, 2017 | Expired or cancelled cancelled Oct 2017 | 3023 25th St | Trim Fit Constr. - O'reilly Engineering | replace (e) rear stairs to match (e). address complaint 201458291, item 3, dated 3/18/2014.Details
replace (e) rear stairs to match (e). address complaint 201458291, item 3, dated 3/18/2014. | $6,000 |
| May 19, 2017 | Completed final sign-off Feb 2018 | 225 Fell St | Artcore Construction | commercial - soft story retrofit, per 2016 cebc appendix a-4, install new accessible entry. commercialDetails
commercial - soft story retrofit, per 2016 cebc appendix a-4, install new accessible entry. commercial | $13,000 |
| May 15, 2017 | Completed final sign-off Jul 2018 | 145 Hazelwood Av | interior renovation on basement and main fl. new windows (except @ front elevation) no exterior work.Details
interior renovation on basement and main fl. new windows (except @ front elevation) no exterior work. | $156,000 | |
| Apr 25, 2017 | Never finaled issued Oct 2018, no final | 1715 Mcallister St | D E F Co | excavate existing storage and replace bearing walls with beams. ** maher: n/a **Details
excavate existing storage and replace bearing walls with beams. ** maher: n/a ** | $60,000 |
| Mar 31, 2017 | Completed final sign-off Feb 2020 | 2037 Castro St | Schalich Brothers Construction Inc | repaire of (e) rotten deck areas in kindDetails
repaire of (e) rotten deck areas in kind | $10,000 |
| Mar 22, 2017 | Expired or cancelled expired Jun 2018 | 448 Haight St | Bedrock Construction | enlarge & remodel existing bathroom (half bath to full bath) on ground floor residential unit by combining with adjacent closet.Details
enlarge & remodel existing bathroom (half bath to full bath) on ground floor residential unit by combining with adjacent closet. | $5,000 |
| Feb 17, 2017 | Expired or cancelled cancelled Oct 2018 | 2900 Jackson St | replace existing front concrete stairs to match existing stairs.Details
replace existing front concrete stairs to match existing stairs. | $8,000 | |
| Feb 14, 2017 | Never finaled issued Mar 2017, no final | 1715 Mcallister St | D E F Co | to comply with complaint 201624541: excavate (e) stroage space and replace stud wall with beam line maher naDetails
to comply with complaint 201624541: excavate (e) stroage space and replace stud wall with beam line maher na | $30,000 |
| Dec 13, 2016 | Completed final sign-off Dec 2017 | 861 Hayes St | Sgv Group Construction | stregthening bldg to comform to soft story ordinance ab107, part f, iebc appx a4. basis of rational analysis. ** maher: n/a **Details
stregthening bldg to comform to soft story ordinance ab107, part f, iebc appx a4. basis of rational analysis. ** maher: n/a ** | $60,000 |
| Nov 21, 2016 | Expired or cancelled expired Jun 2018 | 448 Haight St | Bedrock Construction | replace portion of (e) footing. add ada/accessible compliant bathroom to retail location.Details
replace portion of (e) footing. add ada/accessible compliant bathroom to retail location. | $50,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 926 Haight St | Sgv Group Construction | revision to pa 201607122055; moving a shear wall by 3 ft.Details
revision to pa 201607122055; moving a shear wall by 3 ft. | |
| Sep 14, 2016 | Completed final sign-off Feb 2018 | 225 Fell St | residential- soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4.Details
residential- soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4. | $45,000 | |
| Sep 14, 2016 | Completed final sign-off Oct 2018 | 2001 Broadway | Seismic Retrofitters Inc. | soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, engineering criteria, 2012 iebc appendix a-4. | $100,000 |
| Sep 14, 2016 | Completed final sign-off Oct 2016 | 1629 Mcallister St | revision to app#201602048881. installing plywood sw instead of simpson strong wall. n/a for maher.Details
revision to app#201602048881. installing plywood sw instead of simpson strong wall. n/a for maher. | ||
| Sep 13, 2016 | Completed final sign-off Mar 2018 | 249 Oak St | Artcore Construction | soft story retrofit to conform to sfbc ch 34b and ab107 part f iebc a4Details
soft story retrofit to conform to sfbc ch 34b and ab107 part f iebc a4 | $65,000 |
| Sep 13, 2016 | Completed final sign-off Oct 2017 | 490 Lombard St | D Cappelletti & Sons Inc | soft story retrofit to conform to sfbc chapter 34b and ab107 part f, iebc a4Details
soft story retrofit to conform to sfbc chapter 34b and ab107 part f, iebc a4 | $85,000 |
| Jul 15, 2016 | Completed final sign-off May 2017 | 435 Oak St | replace north & east brick foundations, strengthe south & west brick foundation, install new garage beam.Details
replace north & east brick foundations, strengthe south & west brick foundation, install new garage beam. | $50,000 | |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 926 Haight St | Sgv Group Construction | soft story retrofit per sfbc chapther 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapther 34b engineering criteria 2012 iebc appendix a-4 | $47,000 |
| Jul 12, 2016 | Completed final sign-off Jan 2019 | 439 Haight St | Bedrock Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $51,000 |
| Jun 3, 2016 | Expired or cancelled expired Jun 2018 | 448 Haight St | Bedrock Construction | revision to ref pa 2015 1203 4068: replace footing at front of commercial space (and front stud wall-like for like)Details
revision to ref pa 2015 1203 4068: replace footing at front of commercial space (and front stud wall-like for like) | $7,000 |
| Jun 2, 2016 | Completed final sign-off Jun 2017 | 459 Haight St | Bedrock Construction | revision to pa #201506179202 by extending & improving foundation repairs.Details
revision to pa #201506179202 by extending & improving foundation repairs. | $5,000 |
| May 17, 2016 | Expired or cancelled cancelled Jan 2026 | 47 Vicksburg St | replace (e) 4x8 beam in kind & replace (e) 4x4 post/support at rear 3/f.Details
replace (e) 4x8 beam in kind & replace (e) 4x4 post/support at rear 3/f. | $2,500 | |
| May 17, 2016 | Expired or cancelled cancelled Jan 2026 | 49 Vicksburg St | 1) replace extg rear decking, joists, guardrail and stairs at 2nd floor in kind. 2)install holdowns at extg posts.Details
1) replace extg rear decking, joists, guardrail and stairs at 2nd floor in kind. 2)install holdowns at extg posts. | $10,000 | |
| May 11, 2016 | Never finaled issued Jun 2016, no final | 2717 Pacific Av | Cook Construction | revise permit application 201503272067 by changing floor framing.Details
revise permit application 201503272067 by changing floor framing. | $5,000 |
| May 11, 2016 | Never finaled issued Jun 2016, no final | 2717 Pacific Av | Cook Construction | revise permit application 201107019377 by improving framing for field conditions.Details
revise permit application 201107019377 by improving framing for field conditions. | |
| Apr 26, 2016 | Completed final sign-off Oct 2016 | 2140 Fell St | D Cappelletti & Sons Inc | revision to ref pa 2015 0730 2877: moment frame columns moved slightly due to field conditionsDetails
revision to ref pa 2015 0730 2877: moment frame columns moved slightly due to field conditions | |
| Apr 12, 2016 | Completed final sign-off Feb 2019 | 171 Collingwood St | Good Neighbor Construction | soft story retrofit to strengthen building to conform to sfebc chapter 4d: 2016 cebc apprndix a-4. revision to original plans that were never paid for but they were approved.Details
soft story retrofit to strengthen building to conform to sfebc chapter 4d: 2016 cebc apprndix a-4. revision to original plans that were never paid for but they were approved. | $75,000 |
| Mar 31, 2016 | Never finaled issued Dec 2016, no final | 2900 Jackson St | revision to appl #201502057647 by revising 1st floor partition wall locations & removing (2) posts & installing 2nd floor beam.Details
revision to appl #201502057647 by revising 1st floor partition wall locations & removing (2) posts & installing 2nd floor beam. | $5,000 | |
| Feb 29, 2016 | Completed final sign-off Jun 2019 | 636 Octavia St | Marvel Construction Company Inc | soft storey retrofit sfbc ab107 oart f, iebc 2012 a4Details
soft storey retrofit sfbc ab107 oart f, iebc 2012 a4 | $57,000 |
| Feb 4, 2016 | Completed final sign-off Oct 2016 | 1570 Hayes St | soft story retrofit to strengthen building to conorm to sfbc ab107 part f iebc a4Details
soft story retrofit to strengthen building to conorm to sfbc ab107 part f iebc a4 | $56,000 | |
| Feb 4, 2016 | Completed final sign-off Oct 2016 | 1629 Mcallister St | Liberty Construction | soft story rerofit to strengthen building to conform to sfbc ab107, part f a4Details
soft story rerofit to strengthen building to conform to sfbc ab107, part f a4 | $62,000 |
| Dec 11, 2015 | Completed final sign-off Sep 2019 | 775 Haight St | (commercial). soft story retrofit per sfbc chapter 34b and ab107 per 2012 iebc appendix a-4Details
(commercial). soft story retrofit per sfbc chapter 34b and ab107 per 2012 iebc appendix a-4 | $12,500 | |
| Dec 11, 2015 | Completed final sign-off Sep 2019 | 775 Haight St | (residential) soft story retrofit per sfbc chapter 34b and ab107 per 2012 iebc appendix a-4.Details
(residential) soft story retrofit per sfbc chapter 34b and ab107 per 2012 iebc appendix a-4. | $67,000 | |
| Dec 3, 2015 | Expired or cancelled expired Jun 2018 | 448 Haight St | Bedrock Construction | soft story retrofit to strenghthen building to conform to sfbc ab107 part b, p807, ch 34b iebc a-4 (ground floor commercial)Details
soft story retrofit to strenghthen building to conform to sfbc ab107 part b, p807, ch 34b iebc a-4 (ground floor commercial) | $17,295 |
| Nov 24, 2015 | Completed final sign-off Aug 2016 | 965 Alvarado St | Sgv Group Construction | soft story retrofit to strengthen bldg to conform to sfbc chapter 34b, iebc appendix a-4.Details
soft story retrofit to strengthen bldg to conform to sfbc chapter 34b, iebc appendix a-4. | $70,000 |
| Nov 5, 2015 | Completed final sign-off Jun 2016 | 128 Montcalm St | kitchen wall remodelDetails
kitchen wall remodel | $5,000 | |
| Oct 27, 2015 | Never finaled filed Oct 2015, never issued | 838 Bay St | site permit to adress notice of violation #201153447, strengthen (e) deck 3 access door at 2nd fl rear of property, replace (e) windows at rear & install juliet balcony.Details
site permit to adress notice of violation #201153447, strengthen (e) deck 3 access door at 2nd fl rear of property, replace (e) windows at rear & install juliet balcony. | $20,000 | |
| Sep 11, 2015 | Completed final sign-off Jun 2017 | 715 Haight St | Bedrock Construction | soft story retrofit to strengthen building to conform to sfbc ab107 part b p-807, chapter 34b.Details
soft story retrofit to strengthen building to conform to sfbc ab107 part b p-807, chapter 34b. | $45,000 |
| Sep 11, 2015 | Expired or cancelled expired Jun 2018 | 448 Haight St | Bedrock Construction | soft story retrofit to strengthen building to conform to sfbc ab107 chapter 34b, part f, iebc a-4Details
soft story retrofit to strengthen building to conform to sfbc ab107 chapter 34b, part f, iebc a-4 | $70,705 |
| Jul 30, 2015 | Completed final sign-off Sep 2017 | 1747 Mcallister St | Flying Colors | soft story retrofit to strenthen building in accordance with sfbc ab107 part b, ch 34 b, fema p 807 maher not reqDetails
soft story retrofit to strenthen building in accordance with sfbc ab107 part b, ch 34 b, fema p 807 maher not req | $34,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2017 | 459 Haight St | Bedrock Construction | replacing retaining wall at rear of lot. repair (e) ret wall in kind no proposed excavation/soil disturbance beyond 8'Details
replacing retaining wall at rear of lot. repair (e) ret wall in kind no proposed excavation/soil disturbance beyond 8' | $20,000 |