Block 6631, lot 040
427 29th St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,070 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2013 | Never finaled issued Mar 2013, no final | 427 29th St | Jim Parr Dba Plumbing | install 12 sprinkler heads on 3rd fl only. nfpa 13r. 12' of underground piping. ref. to pa#201201303172Details
install 12 sprinkler heads on 3rd fl only. nfpa 13r. 12' of underground piping. ref. to pa#201201303172 | $4,000 |
| Jan 30, 2012 | Completed final sign-off Jul 2013 | 427 29th St | San Francisco Design & Constr. | third floor vertical addition with front and rear decks. interior remodeling at ground and second floors with additional windows. remodel of upper portion of existing facade.Details
third floor vertical addition with front and rear decks. interior remodeling at ground and second floors with additional windows. remodel of upper portion of existing facade. | $125,000 |
| May 2, 2006 | Expired or cancelled expired Aug 2007 | 427 29th St | Streiffer Burnham Const., Inc. | revisoin to 200602094242. remove part of wall between kitchen and living room. install 4x8 header to carry ceiling load. see drawing for details, load path, etc. also repair /replace dryrot damage found at rear of house below sliding door.Details
revisoin to 200602094242. remove part of wall between kitchen and living room. install 4x8 header to carry ceiling load. see drawing for details, load path, etc. also repair /replace dryrot damage found at rear of house below sliding door. | $500 |
| Feb 9, 2006 | Completed final sign-off Jul 2006 | 427 29th St | remodel exist kitchen. new cabinets, counter tops, appliances, replace window and glass door. flourescent lighting. 0.67 factor for window.Details
remodel exist kitchen. new cabinets, counter tops, appliances, replace window and glass door. flourescent lighting. 0.67 factor for window. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jim Parr Dba Plumbing, San Francisco Design & Constr., Streiffer Burnham Const., Inc.
- Architects
- Steven Whitney.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.