Steven Perry
- Listed as
- architect, pmt consultant/expediter
- Firm
- Perry Architectus, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to Oct 2024
29 permits since 2000 (architect on 28 permits, pmt consultant/expediter on 1 permit): 22 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 790 Pennsylvania Av | Blueline Associates Inc | addition and relocation of lighting and ventilation as required for new partition wall. all mep, fire alarm and sprinkler under a separate permit. work not visible from streetDetails
addition and relocation of lighting and ventilation as required for new partition wall. all mep, fire alarm and sprinkler under a separate permit. work not visible from street | $40,000 |
| Oct 6, 2023 | Completed final sign-off Oct 2024 | 2750 19th St | Skyline Capital Builders Llc | add freight loading/service vehicle use in the pdr interior space with new curb-cut along bryant street. no change to the building as-built. ref 201712156655 s.Details
add freight loading/service vehicle use in the pdr interior space with new curb-cut along bryant street. no change to the building as-built. ref 201712156655 s. | |
| Aug 24, 2023 | Expired or cancelled withdrawn Jun 2024 | 2750 19th St | Skyline Capital Builders Llc | revision to pa# 201712156665-s. provide wheelchair lift as allowed per cbc 11b-410 to provide accessible route to mezzannie. provide new 2nd stari per 1006.2-1 & small metal deck / infill @ (e) opening @ mezzanine deck.Details
revision to pa# 201712156665-s. provide wheelchair lift as allowed per cbc 11b-410 to provide accessible route to mezzannie. provide new 2nd stari per 1006.2-1 & small metal deck / infill @ (e) opening @ mezzanine deck. | |
| Jul 7, 2023 | Completed final sign-off Oct 2023 | 921 Howard St | Swinerton Builders | build out all gender restroom 143 & 144 for retail spaces including plumbing fixtures, lighting & restroom accessories(ref#201912230270s)Details
build out all gender restroom 143 & 144 for retail spaces including plumbing fixtures, lighting & restroom accessories(ref#201912230270s) | $50,000 |
| May 26, 2023 | Expired or cancelled withdrawn Aug 2023 | 2750 19th St | Skyline Capital Builders Llc | revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1.Details
revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1. | |
| Aug 17, 2021 | Completed final sign-off Sep 2023 | 160 Folsom St | Peacock Construction, Bhogal Brothers Construction Inc | revision to pa# 201406259481 modify 6 units to meet cbc ch11b (from 11a to 11b).Details
revision to pa# 201406259481 modify 6 units to meet cbc ch11b (from 11a to 11b). | $25,000 |
| Jun 17, 2021 | Completed final sign-off Mar 2022 | 1 Bush St | Gci, Inc | 14th fl restroom remodel. remodel all finishes except floors and install new finishes, plumbing fixtures and partitions.Details
14th fl restroom remodel. remodel all finishes except floors and install new finishes, plumbing fixtures and partitions. | $100,000 |
| Jan 8, 2021 | Completed final sign-off Apr 2024 | 2750 19th St | Skyline Capital Builders Llc | demo of(e) wood frame structure with retention of brick facade. reference bpa# 201712156665 for new addition.Details
demo of(e) wood frame structure with retention of brick facade. reference bpa# 201712156665 for new addition. | $250,000 |
| Dec 15, 2020 | Completed final sign-off Apr 2021 | 160 Folsom St | Peacock Construction | revision to bpa#202009214618, remove kitchenette in detail a, adjust restroom locationsDetails
revision to bpa#202009214618, remove kitchenette in detail a, adjust restroom locations | |
| Oct 28, 2020 | Completed final sign-off Aug 2022 | 1395 22nd St | revision to pa 201512145054-s3 to document reduction in scope of work under this permit and defer convenience stair for public access in the right of way to seperate as originally documented on page c300.Details
revision to pa 201512145054-s3 to document reduction in scope of work under this permit and defer convenience stair for public access in the right of way to seperate as originally documented on page c300. | ||
| Sep 21, 2020 | Completed final sign-off Apr 2021 | 160 Folsom St | Peacock Construction | g/f: interior building out 3 retail spaces. accessible entries, restroom, power outlets, mep deffered. maher n/a.Details
g/f: interior building out 3 retail spaces. accessible entries, restroom, power outlets, mep deffered. maher n/a. | $250,000 |
| Jul 15, 2020 | Completed final sign-off Jan 2026 | 2750 19th St | Skyline Capital Builders Llc | change the construction type from iii-a to i-a for the issued pa# 201712156665-s. ** maher: n/a **Details
change the construction type from iii-a to i-a for the issued pa# 201712156665-s. ** maher: n/a ** | |
| Dec 23, 2019 | Completed final sign-off Oct 2023 | 921 Howard St | Swinerton Builders, Convergint Technologies Llc | erect 17-story, type 1, 203 dwelling units, residential/commercial building. new bldg will be on block 3732, lots 004, 099, 100, 145a, & 146. 100% affordable housing development by tenderloin neighborhood development corp(tndc). fee defer till 1st addendum issue. comply maher ord.Details
erect 17-story, type 1, 203 dwelling units, residential/commercial building. new bldg will be on block 3732, lots 004, 099, 100, 145a, & 146. 100% affordable housing development by tenderloin neighborhood development corp(tndc). fee defer till 1st addendum issue. comply maher ord. | $70,000,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 221 Main St | Lend Lease (Us) Construction Inc | 1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a.Details
1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a. | $8,000 |
| Oct 7, 2019 | Never finaled filed Oct 2019, never issued | 1011 03rd St | to erect a 24 story, type 1a , 283 residential building with common amenities, vacant ground floor retail spaces.Details
to erect a 24 story, type 1a , 283 residential building with common amenities, vacant ground floor retail spaces. | $121,921,920 | |
| Feb 7, 2019 | Completed final sign-off Aug 2022 | 1395 22nd St | Build Group Inc. | revise lobby (120) and cafe (180) layout, and reduce size of leasing office (123). reference pa#201512145054s3 n/a for maherDetails
revise lobby (120) and cafe (180) layout, and reduce size of leasing office (123). reference pa#201512145054s3 n/a for maher | |
| May 16, 2018 | Completed final sign-off Mar 2019 | 160 Spear St | Gci, Inc | ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferredDetails
ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred | $760,000 |
| May 15, 2018 | Completed final sign-off Dec 2019 | 501 Brannan St | Swinerton Builders | exterior finish to remain. rainscreen to be applied on top of extg plaster. n/a for maherDetails
exterior finish to remain. rainscreen to be applied on top of extg plaster. n/a for maher | $510,000 |
| Dec 15, 2017 | Completed final sign-off Jan 2026 | 2750 19th St | United Systems Fire And Security Llc, Skyline Capital Builders Llc | entire removal of (e) wood frame structure with retention of brick facade, 6 story addition including new subterranean parking, new ground floor commercial & 63 new residential units. (r-2,m,a-2,a-3,s-2) ** maher: n/a **Details
entire removal of (e) wood frame structure with retention of brick facade, 6 story addition including new subterranean parking, new ground floor commercial & 63 new residential units. (r-2,m,a-2,a-3,s-2) ** maher: n/a ** | $20,000,000 |
| Jul 7, 2017 | Completed final sign-off Feb 2018 | 800 Presidio Av | Fisher Development Inc | revision to addendum 2(s2) of pa #201204168406 issued 1/4/17: install playground in lower yard of non profit owned community center in place of previously approved decomposed granite. project managed by owner under grant from "kaboom", install pre-fab stair (ada compliant).Details
revision to addendum 2(s2) of pa #201204168406 issued 1/4/17: install playground in lower yard of non profit owned community center in place of previously approved decomposed granite. project managed by owner under grant from "kaboom", install pre-fab stair (ada compliant). | $5,000 |
| May 17, 2017 | Completed final sign-off Feb 2018 | 800 Presidio Av | Pribuss Engineering Inc | fire sprinkler as built(revisions) submittal under g.c. permit #201204168406Details
fire sprinkler as built(revisions) submittal under g.c. permit #201204168406 | |
| May 12, 2017 | Completed final sign-off Feb 2018 | 800 Presidio Av | Fisher Development Inc | revised mechanical drawing elevator hoist way smoke detector detail revision to 201204168406Details
revised mechanical drawing elevator hoist way smoke detector detail revision to 201204168406 | $5,000 |
| Mar 23, 2017 | Never finaled issued May 2017, no final | 333 Bush St | Plant Construction Co, Lp | lobby entry doors to be replaced and lobby storefront mullions to be repainted. replace security desk. refinish lobby floors. slatted wall system to be added to 3 walls facing into lobby atrium. paneled and coved lobby ceiling and lighting to be replaced. mechanical systems and life safetyDetails
lobby entry doors to be replaced and lobby storefront mullions to be repainted. replace security desk. refinish lobby floors. slatted wall system to be added to 3 walls facing into lobby atrium. paneled and coved lobby ceiling and lighting to be replaced. mechanical systems and life safety | $200,000 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 221 Main St | Premier Structures Inc | demolish planter in preparation for temporary playground on a sep permit pa#2017 0228 0316Details
demolish planter in preparation for temporary playground on a sep permit pa#2017 0228 0316 | $1,000 |
| Feb 15, 2017 | Completed final sign-off Mar 2018 | 333 Bush St | Plant Construction Co, Lp | new freestanding benches to be added to plaza. all (e) paving, stairs, ramp, handrails and planters to remain. all electrical and plumbing work to be done under sep permitDetails
new freestanding benches to be added to plaza. all (e) paving, stairs, ramp, handrails and planters to remain. all electrical and plumbing work to be done under sep permit | $113,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2017 | 333 Bush St | Premier Structures Inc | g/f- conversion of (e) storage space into a fitness space for building occupants includes adding in a verticial lift, locker rooms and relocate (e) corridor and stairs. fire alarm, sprinklers and mep. under seperate permit.Details
g/f- conversion of (e) storage space into a fitness space for building occupants includes adding in a verticial lift, locker rooms and relocate (e) corridor and stairs. fire alarm, sprinklers and mep. under seperate permit. | $750,000 |
| Dec 14, 2015 | Completed final sign-off Aug 2022 | 1395 22nd St | Build Group Inc. | to erect 8 stories, 1 basement, 256 residnetial, industrial building. (r-2,a-3,f-1,s-2) ** maher: n/a **Details
to erect 8 stories, 1 basement, 256 residnetial, industrial building. (r-2,a-3,f-1,s-2) ** maher: n/a ** | $80,000,000 |
| Oct 28, 2015 | Completed final sign-off Apr 2022 | 950 Gough St | to erect 8 stories, 1 basement, type i-a, 95 units residential, assembly, parking building. (r-2,a-3,s-2)Details
to erect 8 stories, 1 basement, type i-a, 95 units residential, assembly, parking building. (r-2,a-3,s-2) | $30,000,000 | |
| Jul 31, 2012 | Never finaled issued Jul 2012, no final | 845 Market St | 1st floor: interior demo only. removal of partitions, ceiling fixtures, flooring and millwork.Details
1st floor: interior demo only. removal of partitions, ceiling fixtures, flooring and millwork. | $9,000 |