Romain Curtis
- Listed as
- architect, engineer
- Firm
- Romain Curtis Architect
- Based in
- Pleasant Hill
- On San Francisco permits
- Sep 2017 to Sep 2026
76 permits since 2000 (architect on 73 permits, engineer on 3 permits): 40 completed, 17 in progress, 10 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 109 Cornwall St | a 488 sf addition in an existing fully detached single family residence.Details
a 488 sf addition in an existing fully detached single family residence. | $500,000 | |
| Sep 25, 2026 | In progress issued Sep 2026 | 2 Fallon Pl | Remodeling Heroes Inc. | unit # 52: laundry cabinet in the bathroom closetDetails
unit # 52: laundry cabinet in the bathroom closet | $10,000 |
| Sep 22, 2026 | In progress issued Sep 2026 | 4023 Folsom St | Green Group Remodeling Inc | revision to 202609097853. underpinning the foundation in specific locationsDetails
revision to 202609097853. underpinning the foundation in specific locations | $3,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 171 Parnassus Av | A2z Remodeling Inc. | 2/f -conversion of existing living room area into master bedroom and bath inside single family condo. no change to landscape, parking, impervious area, drainage.Details
2/f -conversion of existing living room area into master bedroom and bath inside single family condo. no change to landscape, parking, impervious area, drainage. | $40,000 |
| Sep 9, 2026 | In progress issued Sep 2026 | 4023 Folsom St | Green Group Remodeling Inc | new front stairs, reframe front porch walls and roof.Details
new front stairs, reframe front porch walls and roof. | $10,000 |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 100 Winston Dr | 398 sf garage conversion into jadu. separate application for kitchen remodel/alterationsDetails
398 sf garage conversion into jadu. separate application for kitchen remodel/alterations | $120,000 | |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 129 Collins St | Golden Grove Roofing And Construction | adding two new skylights and bathroom remodel like for like, no structural changes to layout. replace light, fan, toilet, vanity, shower to shower. all in same location of bathroom. update mep to code.Details
adding two new skylights and bathroom remodel like for like, no structural changes to layout. replace light, fan, toilet, vanity, shower to shower. all in same location of bathroom. update mep to code. | $5,250 |
| Aug 7, 2026 | Completed final sign-off Sep 2026 | 3241 Mission St | Green Group Remodeling Inc | revision to pa # 202606072274 - repair 100% of the patio structure on the 2nd floor. all work in-kind.Details
revision to pa # 202606072274 - repair 100% of the patio structure on the 2nd floor. all work in-kind. | $4,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 100 Winston Dr | Tree Builders Group | kitchen remodel to remove walls, remove and replace countertops, adding columns, new windows, adding mep fixtures. removing installed door between ktichen and living room, enlarged garage door. jadu on seperate application.Details
kitchen remodel to remove walls, remove and replace countertops, adding columns, new windows, adding mep fixtures. removing installed door between ktichen and living room, enlarged garage door. jadu on seperate application. | $180,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 143 Peralta Av | Edri Construction Inc *See Notes* | remodel (e) kitchen. remove bearing wall between kitchen and dining room. add double french door in the kitchen.Details
remodel (e) kitchen. remove bearing wall between kitchen and dining room. add double french door in the kitchen. | $55,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 30 Miraloma Dr | Golden Heights Remodeling Inc | interior remodel 1st fl kitchen and 2nd fl master suite, remodel including the whole house electrical remodel within an (e) fully detaced single family residence. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. modify window on master suite. new dDetails
interior remodel 1st fl kitchen and 2nd fl master suite, remodel including the whole house electrical remodel within an (e) fully detaced single family residence. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. modify window on master suite. new d | $105,000 |
| May 15, 2026 | Completed final sign-off Sep 2026 | 3241 Mission St | Green Group Remodeling Inc | 3rd floor unit# 97 - deck rebuild due to dry-rot/water damage. 2nd floor unit# 93 - ceiling repair due to water damage from unit 97. water damage on the outside deck around the unpermitted skylight above garage - 1st floor.Details
3rd floor unit# 97 - deck rebuild due to dry-rot/water damage. 2nd floor unit# 93 - ceiling repair due to water damage from unit 97. water damage on the outside deck around the unpermitted skylight above garage - 1st floor. | $45,000 |
| May 15, 2026 | In progress issued Jun 2026 | 153 Marview Wy | Remodeling Heroes Inc. | building a new deck and replacing existing window with a sliding door.Details
building a new deck and replacing existing window with a sliding door. | $20,000 |
| May 6, 2026 | Completed final sign-off Sep 2026 | 835 Alabama St | Home Quality Remodeling | revision to permits 202511260558 and 202604230024. remove so-fi, and match ceiling high on kitchen as rest of room (living room, dining room)Details
revision to permits 202511260558 and 202604230024. remove so-fi, and match ceiling high on kitchen as rest of room (living room, dining room) | |
| Mar 26, 2026 | In progress issued Mar 2026 | 89 Teddy Av | Golden Heights Remodeling Inc | interior remodel, new front stairs, new exterior window and new full bath between the mechanical room and bedroom at the lower floor of fully detached single family residence. no change to landscaping, no change to parking, no change to imperivous area. no change to drainage.Details
interior remodel, new front stairs, new exterior window and new full bath between the mechanical room and bedroom at the lower floor of fully detached single family residence. no change to landscaping, no change to parking, no change to imperivous area. no change to drainage. | $80,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 1527 11th Av | Remodeling Heroes Inc. | minor interior remodel of an attached sfd. including kitchen, bath, remodel 1st fl and new full bath and closets on 3rd flDetails
minor interior remodel of an attached sfd. including kitchen, bath, remodel 1st fl and new full bath and closets on 3rd fl | $110,000 |
| Nov 7, 2025 | Completed final sign-off Aug 2026 | 1187 Dolores St | Tree Builders Group | interior remodeling & replacing the existing, cantilevered deck, like-for-like, on the 2nd floor of 3 units building.Details
interior remodeling & replacing the existing, cantilevered deck, like-for-like, on the 2nd floor of 3 units building. | $85,000 |
| Sep 9, 2025 | Expired or cancelled cancelled Jun 2026 | 130 Alpine Tr | Remodeling Heroes Inc. | replace (e) covered deck with new 275 sf open deck attached to on fully detached two unit residence.Details
replace (e) covered deck with new 275 sf open deck attached to on fully detached two unit residence. | $30,000 |
| Jun 5, 2025 | In progress issued Sep 2025 | 592 29th St | Century Bay Builders Inc | minor interior remodel to 3/f of existing residential duplex, including converting unused attic spaces into closets and remodeling of an existing bedroom. new bathroom location.Details
minor interior remodel to 3/f of existing residential duplex, including converting unused attic spaces into closets and remodeling of an existing bedroom. new bathroom location. | $55,000 |
| Jan 30, 2025 | In progress issued Feb 2025 | 2068 03rd St | unit 11- revision to pa 202409060202 kitchen remodel; relocation of sink. remove non-load bearing pony wallDetails
unit 11- revision to pa 202409060202 kitchen remodel; relocation of sink. remove non-load bearing pony wall | $1,000 | |
| Sep 5, 2024 | Expired or cancelled withdrawn Dec 2024 | 64 Molimo Dr | full kitchen & 2 bathrooms remodel; reconfigure closets & doors; all windows replacements in-kind, new water heater, new furnace, update electrical panel, update garage door, new ac, drywall, update all electric, plumbing and mechanical to new. all front facade windows to be alum clad. legalize convDetails
full kitchen & 2 bathrooms remodel; reconfigure closets & doors; all windows replacements in-kind, new water heater, new furnace, update electrical panel, update garage door, new ac, drywall, update all electric, plumbing and mechanical to new. all front facade windows to be alum clad. legalize conv | $85,000 | |
| Aug 13, 2024 | In progress filed Aug 2024, not yet issued | 835 Darien Wy | Remodeling Heroes Inc. | install (n) door at exterior of the house as well as installing steps & landingDetails
install (n) door at exterior of the house as well as installing steps & landing | $22,875 |
| Jun 6, 2024 | Expired or cancelled cancelled Jul 2025 | 230 24th Av | Home Quality Remodeling | legalize remodel of (e) kitchen on 4th flDetails
legalize remodel of (e) kitchen on 4th fl | $40,000 |
| May 22, 2024 | Completed final sign-off May 2025 | 453 Teresita Bl | Remodeling Heroes Inc. | remodel (e) basement. 8 new lights and relocate few outlets.Details
remodel (e) basement. 8 new lights and relocate few outlets. | $45,000 |
| Mar 21, 2024 | Completed final sign-off Oct 2024 | 450 Circular Av | to comply with nov 202419816 entire house windows retrofit in kind. new garage doors. no change inside/shape, outside balcony railing - glass railing instead of metal railing, same size and shape (just material & design upgrade), new furnace with heat pumpDetails
to comply with nov 202419816 entire house windows retrofit in kind. new garage doors. no change inside/shape, outside balcony railing - glass railing instead of metal railing, same size and shape (just material & design upgrade), new furnace with heat pump | $20,000 | |
| Mar 21, 2024 | Completed final sign-off Sep 2024 | 161 Delano Av | A2z Remodeling Inc. | revision to pa# 202306129772 (n) a/c unit to be anchored to trusses patch & repair flashing as necessary. remove the condenser from the approved location and install it on the roof.Details
revision to pa# 202306129772 (n) a/c unit to be anchored to trusses patch & repair flashing as necessary. remove the condenser from the approved location and install it on the roof. | |
| Mar 19, 2024 | Completed final sign-off Aug 2024 | 616 Teresita Bl | Ot Bay Builders Inc. | 49 sq ft addition by converting light well into conditioned spaceDetails
49 sq ft addition by converting light well into conditioned space | $30,000 |
| Jan 4, 2024 | Expired or cancelled expired Dec 2025 | 412 43rd Av | Rod's General Builders Inc | revision to permit # 202111172573 & 202304034885: new bedroom layout on lower floor & garage conversion to conditioned space complete interior remodel.Details
revision to permit # 202111172573 & 202304034885: new bedroom layout on lower floor & garage conversion to conditioned space complete interior remodel. | $10,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2024 | 161 Delano Av | A2z Remodeling Inc. | condition basement space, w/a tall ceiling into liveable space2 bedrooms, shearlwall retrofit for basement; relocate laundry, 2 exterior doors, tiny addition for the staircase expansion, ac furnace - new; pg&e panel relocate to the outside flip at the same locationDetails
condition basement space, w/a tall ceiling into liveable space2 bedrooms, shearlwall retrofit for basement; relocate laundry, 2 exterior doors, tiny addition for the staircase expansion, ac furnace - new; pg&e panel relocate to the outside flip at the same location | $70,000 |
| May 8, 2023 | Completed final sign-off Nov 2023 | 344 Liberty St | Remodeling Heroes Inc. | kitchen remodel, 2 bathroom remodels, changing 1/2 bath into full bath. adding new construction windows (unit 344)Details
kitchen remodel, 2 bathroom remodels, changing 1/2 bath into full bath. adding new construction windows (unit 344) | $70,000 |
| Nov 4, 2022 | Completed final sign-off Sep 2023 | 56 Moss St | Remodeling Heroes Inc. | complete bathroom remodel, converting tub to walk-in shower, and adding a new soaking tub. adding a new skylight.Details
complete bathroom remodel, converting tub to walk-in shower, and adding a new soaking tub. adding a new skylight. | $25,000 |
| Oct 18, 2022 | Completed final sign-off Jun 2023 | 1220 Silver Av | Remodeling Heroes Inc. | 2nd fl: new construction bathroom. existing bathroom remodeling with change of tub to shower relocation. kitchen remodeling with relocation of sink, like for like replacement. remove one (e) skylight, and replace one (e) skylight.Details
2nd fl: new construction bathroom. existing bathroom remodeling with change of tub to shower relocation. kitchen remodeling with relocation of sink, like for like replacement. remove one (e) skylight, and replace one (e) skylight. | $15,000 |
| Aug 11, 2022 | Completed final sign-off Dec 2022 | 627 San Bruno Av | rev to pa202205184531 sheet a-3: install a direct vent gas fireplace insert to the unit downstairs unit, north east corner of unit.Details
rev to pa202205184531 sheet a-3: install a direct vent gas fireplace insert to the unit downstairs unit, north east corner of unit. | ||
| May 19, 2022 | Completed final sign-off Sep 2023 | 760 Duboce Av | Remodeling Heroes Inc. | relocate kitchen. adding new construction half bath. adding new laundry room. increased closet space and relocate plumbing.Details
relocate kitchen. adding new construction half bath. adding new laundry room. increased closet space and relocate plumbing. | $40,000 |
| May 18, 2022 | Completed final sign-off Dec 2022 | 627 San Bruno Av | Remodeling Heroes Inc. | add second dwelling unit within density.Details
add second dwelling unit within density. | $25,000 |
| Apr 25, 2022 | Completed final sign-off Jan 2025 | 1261 48th Av | Nick Valaris | conversion of a portion of the (e) garage and into a 1 bedroom, full bathroom, and laundry room.Details
conversion of a portion of the (e) garage and into a 1 bedroom, full bathroom, and laundry room. | $135,000 |
| Feb 2, 2022 | Never finaled issued Apr 2022, no final | 985 Clayton St | Remodeling Heroes Inc. | bathroom remodel.Details
bathroom remodel. | $27,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2022 | 233 Alpha St | Golden Heights Remodeling Inc | remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom.Details
remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom. | $35,000 |
| Nov 17, 2021 | Expired or cancelled expired Dec 2025 | 412 43rd Av | garage conversion to conditioned space complete interior remodel - 2 bedrooms, 1 full bath & laundry; 1st fl - add bedroom & bathroom and relocate kitchen; no change to the following - landscaping, parking, impervious area and to drainage.Details
garage conversion to conditioned space complete interior remodel - 2 bedrooms, 1 full bath & laundry; 1st fl - add bedroom & bathroom and relocate kitchen; no change to the following - landscaping, parking, impervious area and to drainage. | $50,000 | |
| May 13, 2021 | In progress issued Jul 2026 | 2432 Santiago St | Remodeling Heroes Inc. | interior remodel of the 1st and 2nd floors of an existing fully-detached single family residence. including a new rear exterior deck with stairsDetails
interior remodel of the 1st and 2nd floors of an existing fully-detached single family residence. including a new rear exterior deck with stairs | $400,000 |
| Mar 15, 2021 | Completed final sign-off Sep 2022 | 330 Moultrie St | Gil Construction & Assoc Inc. | as-built drawing set. revision to pa# 201908300388. a grade beam detail was added to gridline b-5. it is listed as detail 10 on page s4.2 and in the foundation plan on page s1.0.Details
as-built drawing set. revision to pa# 201908300388. a grade beam detail was added to gridline b-5. it is listed as detail 10 on page s4.2 and in the foundation plan on page s1.0. | |
| Mar 10, 2021 | Expired or cancelled cancelled Nov 2024 | 2691 20th Av | A2z Remodeling Inc. | 7 retrofit windows installation. 2 bathroom remodel, master bath creation. framing work for walls removal. no foundation. kitchen remode, roofing, same framing, new waterproofing. new laundry room.Details
7 retrofit windows installation. 2 bathroom remodel, master bath creation. framing work for walls removal. no foundation. kitchen remode, roofing, same framing, new waterproofing. new laundry room. | $85,000 |
| Feb 1, 2021 | Never finaled issued Nov 2021, no final | 851 Rhode Island St | rear building: convert (e) 386 sf storage into 386 sf adu. no change to landscaping, no change to parking, no change to impervious area, no change to drainage.Details
rear building: convert (e) 386 sf storage into 386 sf adu. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. | $20,000 | |
| Dec 7, 2020 | Completed final sign-off Oct 2022 | 579 07th Av | Northbay Home Construction Solutions Inc, Sasso Construction Inc. | rear deck replacement.Details
rear deck replacement. | $35,000 |
| Nov 30, 2020 | Expired or cancelled expired Sep 2026 | 367 Fair Oaks St | Remodeling Heroes Inc. | bathroom remodel. powder room remodel and remove wall.Details
bathroom remodel. powder room remodel and remove wall. | $30,000 |
| Oct 22, 2020 | Never finaled filed Oct 2020, never issued | 51 Kissling St | Remodeling Heroes Inc. | convert the basement & part of the garage into new 1st floor. new bathroom, bedroom, laundry room, dig down & redo the foundations & the slab and remove deck. ** maher: n/a **Details
convert the basement & part of the garage into new 1st floor. new bathroom, bedroom, laundry room, dig down & redo the foundations & the slab and remove deck. ** maher: n/a ** | $400,000 |
| Oct 16, 2020 | Completed final sign-off Apr 2024 | 1606 La Playa | Remodeling Heroes Inc., Lowry Construction Inc | remodel of one upstairs bathroom to convert to two en-suite bathrooms, creation of one bathroom downstairs in the garage workout area adjacent to the laundryDetails
remodel of one upstairs bathroom to convert to two en-suite bathrooms, creation of one bathroom downstairs in the garage workout area adjacent to the laundry | $20,000 |
| Oct 9, 2020 | Completed final sign-off Dec 2020 | 1751 Market St | Nomellini Construction * Ask For Id * | apt 44 - 3rd flr: rev to pa202008212285: as-builts to (e) layout: infill (e) bathroom door through kitchen and relocate to hallway. add non-bearing walls to great closet in (e) closet. all per plans. maher n/a.Details
apt 44 - 3rd flr: rev to pa202008212285: as-builts to (e) layout: infill (e) bathroom door through kitchen and relocate to hallway. add non-bearing walls to great closet in (e) closet. all per plans. maher n/a. | $500 |
| Sep 4, 2020 | Never finaled filed Sep 2020, never issued | 1489 23rd Av | create a new adu per ordinance 162-16 in an existing two story single family home by adding a new kitchen downstairs.Details
create a new adu per ordinance 162-16 in an existing two story single family home by adding a new kitchen downstairs. | $30,000 | |
| Dec 23, 2019 | Completed final sign-off Dec 2023 | 100 Joost Av | Arnold's Custom Homes Kitchens & Baths I | replace failing concrete retaining wall in-kind. replace failing stone retaining wall with concrete retaining wall. add new bathroom & bedroom to unfinished basement.Details
replace failing concrete retaining wall in-kind. replace failing stone retaining wall with concrete retaining wall. add new bathroom & bedroom to unfinished basement. | $100,000 |
| Sep 16, 2019 | Completed final sign-off Mar 2020 | 2755 Lombard St | E & M Bay Area Construction | the (e) stair wells have worn and will be replaced as -is with better materials. repair in kind.Details
the (e) stair wells have worn and will be replaced as -is with better materials. repair in kind. | $45,200 |
| Aug 30, 2019 | Completed final sign-off Sep 2022 | 330 Moultrie St | Gil Construction & Assoc Inc. | remodel basement to include family room (den), bedroom, and bathroom. modify layout of upstairs to accommodate stairs down to basement. bump out back approx 5 feet to accomodate stairwell.Details
remodel basement to include family room (den), bedroom, and bathroom. modify layout of upstairs to accommodate stairs down to basement. bump out back approx 5 feet to accomodate stairwell. | $275,000 |
| Aug 14, 2019 | Expired or cancelled cancelled Jul 2024 | 83 Mcallister St | new scissor door installation. ** maher: n/a **Details
new scissor door installation. ** maher: n/a ** | $2,500 | |
| Aug 2, 2019 | Never finaled issued Sep 2019, no final | 1557 Lombard St | revision to pa 201611031867. revision of roof deck. we are making the roof deck smaller and do not a glass wall. it will be stucco and not visible from the street.Details
revision to pa 201611031867. revision of roof deck. we are making the roof deck smaller and do not a glass wall. it will be stucco and not visible from the street. | ||
| May 31, 2019 | Completed final sign-off Feb 2020 | 1115 Hampshire St | Diversified Specialists Inc | interior remodel of 1029 sf 2nd flr. including remodel (e) kitchen & bathDetails
interior remodel of 1029 sf 2nd flr. including remodel (e) kitchen & bath | $160,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 775 Geary St | Nomellini Construction * Ask For Id * | unit 103: renovation of (e) unit on first floor. new fixtures and finishes at (e) kitchen and bathroom. no horizontal or vertical additionDetails
unit 103: renovation of (e) unit on first floor. new fixtures and finishes at (e) kitchen and bathroom. no horizontal or vertical addition | $25,000 |
| Apr 12, 2019 | Completed final sign-off Oct 2019 | 354 Turk St | Wickman Development And Construction | g/f -vacant space. barrier removal only for disabled access: new ada compliant entry door at existing entry door location. new ada compliant bathroom at existing bathroom location. new ada compliant ramp to access bathroom.Details
g/f -vacant space. barrier removal only for disabled access: new ada compliant entry door at existing entry door location. new ada compliant bathroom at existing bathroom location. new ada compliant ramp to access bathroom. | $90,000 |
| Dec 27, 2018 | Completed final sign-off Dec 2019 | 5 Burnett Ave North Av | Sykes General Contractors Inc | remove e floor joist affected by dry rot and install new 3x10 joists following drawn and scope of work base off of romain curtis architect polygon design studios at the following building 5 unit 1, 4 repair less than 50%Details
remove e floor joist affected by dry rot and install new 3x10 joists following drawn and scope of work base off of romain curtis architect polygon design studios at the following building 5 unit 1, 4 repair less than 50% | $25,000 |
| Dec 27, 2018 | Expired or cancelled withdrawn Jan 2020 | 5 Burnett Ave North Av | Sykes General Contractors Inc | Details
| $35,000 |
| Dec 27, 2018 | Never finaled issued Dec 2018, no final | 1700 California St | Nomellini Construction * Ask For Id * | suite #335 on 3rd fl: install demising wall. add electrical outlet. no change to hvac or ceiling grid. add 2 new doors. install carpet. one of doors 20 min 8Details
suite #335 on 3rd fl: install demising wall. add electrical outlet. no change to hvac or ceiling grid. add 2 new doors. install carpet. one of doors 20 min 8 | $15,000 |
| Dec 27, 2018 | Completed final sign-off Jan 2020 | 5 Burnett Ave North Av | Sykes General Contractors Inc | remove e floor joists affected by dryrot and einstall 3x10 joists. building 7, units 1, 2. repair less than 50%Details
remove e floor joists affected by dryrot and einstall 3x10 joists. building 7, units 1, 2. repair less than 50% | $25,000 |
| Oct 2, 2018 | Completed final sign-off Feb 2020 | 390 Franconia St | Tosick Remodels | legalize downstairs renovation done by previous owner. space includes 1 bathroom and 2 roomsDetails
legalize downstairs renovation done by previous owner. space includes 1 bathroom and 2 rooms | $10,000 |
| Sep 28, 2018 | Never finaled issued Oct 2019, no final | 1900 Leavenworth St | building of dormer with window, electrical outlets and ceiling light. flooring and sheet rocking no change to egress, occupancy or area increase, no fire alarm or sprinkler work on separate permits.Details
building of dormer with window, electrical outlets and ceiling light. flooring and sheet rocking no change to egress, occupancy or area increase, no fire alarm or sprinkler work on separate permits. | $15,000 | |
| Jul 18, 2018 | Completed final sign-off Aug 2018 | 425 Hyde St | Nomellini Construction * Ask For Id * | apts 42 & 51: to comply with nov 201851641: (n) fixtures in kitchen & bathroom, paint, flooring. remove non-load bearing partition walls between kitchen & living room, layout remains unchanged. maher n/a. item #1 and #2 onlyDetails
apts 42 & 51: to comply with nov 201851641: (n) fixtures in kitchen & bathroom, paint, flooring. remove non-load bearing partition walls between kitchen & living room, layout remains unchanged. maher n/a. item #1 and #2 only | $25,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2018 | 750 Ofarrell St | Nomellini Construction * Ask For Id * | renovation of (e) unit #405 on 4th fl. addition of bedroom and closet, relocation of (e) kitchen (n) fixtures and finishes at (e) bathroom no horizontal or vertical additions. n/a maherDetails
renovation of (e) unit #405 on 4th fl. addition of bedroom and closet, relocation of (e) kitchen (n) fixtures and finishes at (e) bathroom no horizontal or vertical additions. n/a maher | $30,000 |
| Feb 27, 2018 | Completed final sign-off May 2018 | 1970 Filbert St | Ps2 Inc | renovation of existing unit #1970 on 1st fl, new fixtures & configuration at kitchen & bathroom, addition of laundry closet.Details
renovation of existing unit #1970 on 1st fl, new fixtures & configuration at kitchen & bathroom, addition of laundry closet. | $25,000 |
| Nov 14, 2017 | Completed final sign-off Apr 2019 | 46 Portola Dr | Atn Builders Inc | revision to 201711033056. to add a new roof deck and a staircase to the roof deck from 2nd floor. change a side window to a wall in living room area. install a fireplace in that wall, add a closet in the lobbyDetails
revision to 201711033056. to add a new roof deck and a staircase to the roof deck from 2nd floor. change a side window to a wall in living room area. install a fireplace in that wall, add a closet in the lobby | $20,000 |
| Nov 3, 2017 | Completed final sign-off Mar 2019 | 46 Portola Dr | Atn Builders Inc | roof repair, add scope to pa #201707071250, reconfigure kitchen & bathroom, new half bath, new tempered glass railing in leiu of wall railing, new skylight. change (1) window to doors at rear. re-roof &roof repair. new washer/dryer hookup & related appliances. local structural reinforcing.Details
roof repair, add scope to pa #201707071250, reconfigure kitchen & bathroom, new half bath, new tempered glass railing in leiu of wall railing, new skylight. change (1) window to doors at rear. re-roof &roof repair. new washer/dryer hookup & related appliances. local structural reinforcing. | $14,000 |
| Oct 19, 2017 | Completed final sign-off May 2018 | 1972 Filbert St | Ps2 Inc | 2nd floor unit #1972 renovation - new fixtures/configuration at kitchen & bathroom, addition of laundry closet. no horizontal or vertical additions.Details
2nd floor unit #1972 renovation - new fixtures/configuration at kitchen & bathroom, addition of laundry closet. no horizontal or vertical additions. | $25,000 |
| Oct 19, 2017 | Completed final sign-off Feb 2018 | 1745 Market St | Nomellini Construction * Ask For Id * | 3rd floor unit #52 renovation - relocation of kitchen, addition of bedroom & laundry closet. no horizontal or vertical additions. n/a maher ordinanceDetails
3rd floor unit #52 renovation - relocation of kitchen, addition of bedroom & laundry closet. no horizontal or vertical additions. n/a maher ordinance | $40,000 |
| Oct 12, 2017 | Completed final sign-off Nov 2018 | 1745 Market St | Nomellini Construction * Ask For Id * | #42: conversion of one bedroom into two bedrooms, kitchen & bathroom relocation. addition of laundry closet. no horizontal & vertical additions. maher naDetails
#42: conversion of one bedroom into two bedrooms, kitchen & bathroom relocation. addition of laundry closet. no horizontal & vertical additions. maher na | $25,000 |
| Oct 12, 2017 | Completed final sign-off Nov 2018 | 1745 Market St | Nomellini Construction * Ask For Id * | renovation of (e) unit #47 on the 3rd fl. relocation of kitchen & bathroom. addition of bedroom & laundry closet. no horizontal or vertical additions. maher naDetails
renovation of (e) unit #47 on the 3rd fl. relocation of kitchen & bathroom. addition of bedroom & laundry closet. no horizontal or vertical additions. maher na | $25,000 |
| Oct 11, 2017 | Completed final sign-off Feb 2018 | 1745 Market St | Nomellini Construction * Ask For Id * | renovation of (e) unit #56 on 3rd fl. relocation of kitchen, addition of bedroom & laundry closet. no horizontal or vertical addition. & bathroom remodel. maher naDetails
renovation of (e) unit #56 on 3rd fl. relocation of kitchen, addition of bedroom & laundry closet. no horizontal or vertical addition. & bathroom remodel. maher na | $25,000 |
| Oct 10, 2017 | Completed final sign-off Jan 2018 | 1745 Market St | Nomellini Construction * Ask For Id * | unit #4: renovation of (e) unit on 1/f: relocation of kitchen, bathroom and bedroom. addtion lf bedroom and laundry closet. no hoirzontal or verticle additions. maher n/a.Details
unit #4: renovation of (e) unit on 1/f: relocation of kitchen, bathroom and bedroom. addtion lf bedroom and laundry closet. no hoirzontal or verticle additions. maher n/a. | $25,000 |
| Sep 25, 2017 | Never finaled issued Sep 2017, no final | 1359 Hayes St | Nomellini Construction * Ask For Id * | #12- conversion of studio into one bedroom, relocate kitchen.Details
#12- conversion of studio into one bedroom, relocate kitchen. | $24,000 |
| Sep 19, 2017 | Never finaled issued Oct 2017, no final | 1359 Hayes St | Nomellini Construction * Ask For Id * | #11- conversion of one bedroom into 2 bedrooms, relocation of kitchen.Details
#11- conversion of one bedroom into 2 bedrooms, relocation of kitchen. | $24,000 |