Shahram Adabi
- License
- C81489
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C81489 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2020 to Dec 2020
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- G C Builders, Northbay Home Construction Solutions Inc, Sasso Construction Inc.
- Architects
- Mark Hart
- Engineers
- Romain Curtis
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 7, 2020 | Completed final sign-off Oct 2022 | 579 07th Av | Northbay Home Construction Solutions Inc, Sasso Construction Inc. | rear deck replacement.Details
rear deck replacement. | $35,000 |
| Oct 28, 2020 | Completed final sign-off May 2022 | 1725 Jones St | G C Builders | remove (e) roof deck . make structural amendments per design everest engineer notes. re-roof framing. install (n) pedestal deck system consisting of wood (not to exceed legal limits) and pedestal tile on remainder. no changes to exiting and minor structural improvement on deck framingDetails
remove (e) roof deck . make structural amendments per design everest engineer notes. re-roof framing. install (n) pedestal deck system consisting of wood (not to exceed legal limits) and pedestal tile on remainder. no changes to exiting and minor structural improvement on deck framing | $50,000 |
| Mar 4, 2020 | Expired or cancelled cancelled Jan 2026 | 111 States St | build new stairs at front of building. | $21,000 |