Tree Builders Group
- Based in
- San Jose
- On San Francisco permits
- Aug 2020 to Jul 2026
- Last 24 months
- 7 permits filed
14 permits since 2000: 10 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2026 | In progress issued Aug 2026 | 100 Winston Dr | kitchen remodel to remove walls, remove and replace countertops, adding columns, new windows, adding mep fixtures. removing installed door between ktichen and living room, enlarged garage door. jadu on seperate application.Details
kitchen remodel to remove walls, remove and replace countertops, adding columns, new windows, adding mep fixtures. removing installed door between ktichen and living room, enlarged garage door. jadu on seperate application. | $180,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 879 Rolph St | kitchen & bathroom remodel on 2/f - like for like. demo of non-bearing wall between kitchen & dining (non-lateral bracing wall). replace sliding in kitchen.Details
kitchen & bathroom remodel on 2/f - like for like. demo of non-bearing wall between kitchen & dining (non-lateral bracing wall). replace sliding in kitchen. | $70,000 |
| Nov 7, 2025 | Completed final sign-off Aug 2026 | 1187 Dolores St | interior remodeling & replacing the existing, cantilevered deck, like-for-like, on the 2nd floor of 3 units building.Details
interior remodeling & replacing the existing, cantilevered deck, like-for-like, on the 2nd floor of 3 units building. | $85,000 |
| Apr 25, 2025 | In progress issued Oct 2025 | 224 03rd Av | revision 202502110126- addition of sauna in common areaDetails
revision 202502110126- addition of sauna in common area | |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 270 San Fernando Wy | bathroom remodeling and kitchen remodeling.Details
bathroom remodeling and kitchen remodeling. | $70,000 |
| Mar 24, 2025 | Completed final sign-off Sep 2025 | 25 Bennington St | proposed hot tub.Details
proposed hot tub. | $30,000 |
| Feb 11, 2025 | In progress issued Mar 2025 | 224 03rd Av | proposed hot tub and shower area at rear yard.Details
proposed hot tub and shower area at rear yard. | $90,000 |
| Jan 25, 2024 | Completed final sign-off Feb 2024 | 3483 18th St | new skylight in (e) roof.Details
new skylight in (e) roof. | $25,000 |
| Nov 22, 2023 | Completed final sign-off Jan 2024 | 3483 18th St | replacing like for like retrofit vinyl like for like 1 window in the livingroom, 1 window in the bathroomDetails
replacing like for like retrofit vinyl like for like 1 window in the livingroom, 1 window in the bathroom | $8,000 |
| Jul 6, 2023 | Completed final sign-off May 2024 | 1407 Shafter Av | remove walls in kitchen area, remodel 1st flr bathroom, convert family room into bedroom, add doors, move front doorDetails
remove walls in kitchen area, remodel 1st flr bathroom, convert family room into bedroom, add doors, move front door | $50,000 |
| Apr 19, 2023 | Completed final sign-off Sep 2023 | 1665 Oak St | remodel bathroom like for like. no walls or layout changeDetails
remodel bathroom like for like. no walls or layout change | $20,000 |
| Jan 26, 2023 | Completed final sign-off Sep 2023 | 275 Dalewood Wy | one bathroom remodel like for like. shower pan, no walls or layout change.Details
one bathroom remodel like for like. shower pan, no walls or layout change. | $15,000 |
| Nov 16, 2022 | Completed final sign-off Feb 2023 | 1700 Gough St | one complete bathroom remodel like for like. no walls or layout change, converting to shower pan, removing tub. no structural work.Details
one complete bathroom remodel like for like. no walls or layout change, converting to shower pan, removing tub. no structural work. | $25,000 |
| Aug 26, 2020 | Completed final sign-off Jun 2023 | 578 Cordova St | kitchen remodel, remove wall between kitchen and family room.Details
kitchen remodel, remove wall between kitchen and family room. | $26,600 |