Rodrigo Francisco Zenteno
- Listed as
- contractor, pmt consultant/expediter
- Firm
- Rozen Home Builders Inc
- Based in
- Sacramento
- On San Francisco permits
- Dec 2015 to Sep 2026
89 permits since 2000 (contractor on 89 permits, pmt consultant/expediter on 1 permit): 62 completed, 12 in progress, 8 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 663 San Jose Av | Rozen Home Builders Inc | to obtain final inspection for work approved under pa#202508203559. all work is complete.Details
to obtain final inspection for work approved under pa#202508203559. all work is complete. | |
| Aug 12, 2026 | In progress issued Aug 2026 | 277 Bemis St | Rozen Home Builders Inc | remove (e) tub, install (n) shower stall (same location); relocate toilet 15 15" to accommodate new vanity; remove (e) closet space. extend vanity in place. electrical add 1 wet rated recessed led light in shower. new exhaust fan; install new plumbing fixtures. water proofingDetails
remove (e) tub, install (n) shower stall (same location); relocate toilet 15 15" to accommodate new vanity; remove (e) closet space. extend vanity in place. electrical add 1 wet rated recessed led light in shower. new exhaust fan; install new plumbing fixtures. water proofing | $30,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 1647 38th Av | Rozen Home Builders Inc | recommencement and completion of work approved under pa#2023-0609-9718, #2024-0812-8430 & #202412207257.Details
recommencement and completion of work approved under pa#2023-0609-9718, #2024-0812-8430 & #202412207257. | $12,850 |
| Jul 10, 2026 | In progress issued Jul 2026 | 663 San Jose Av | Rozen Home Builders Inc | revision pa# 202508203559: joists repairs in kind. dry rot repair. work not visible from st.Details
revision pa# 202508203559: joists repairs in kind. dry rot repair. work not visible from st. | $2,000 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 53 Lapham Wy | Rozen Home Builders Inc | to obtain final inspection for work approved under pa 202409100483. all work is complete.Details
to obtain final inspection for work approved under pa 202409100483. all work is complete. | |
| Aug 20, 2025 | Completed final sign-off Dec 2025 | 100 Devonshire Wy | Rozen Home Builders Inc | remodel 2 bathrooms like for like, new plumbing and electrical for both.Details
remodel 2 bathrooms like for like, new plumbing and electrical for both. | $42,000 |
| Aug 20, 2025 | In progress issued Aug 2025 | 663 San Jose Av | Rozen Home Builders Inc | bathroom remodel like for like, plumbing and electrical updates as needed.Details
bathroom remodel like for like, plumbing and electrical updates as needed. | $4,800 |
| Jul 24, 2025 | Completed final sign-off Jan 2026 | 53 Lapham Wy | Rozen Home Builders Inc | revision to pa#: 202409100483; 1) remove hallway closet. 2) reduce rear deck size. ref. bpa# 2024 1203 6115Details
revision to pa#: 202409100483; 1) remove hallway closet. 2) reduce rear deck size. ref. bpa# 2024 1203 6115 | |
| Feb 4, 2025 | In progress issued Apr 2025 | 1463 Donner Av | Rozen Home Builders Inc, Toolbox Design Llc | to convert the (e) commercial space to autobody & cafe to comply with nov # 202429924Details
to convert the (e) commercial space to autobody & cafe to comply with nov # 202429924 | $10,000 |
| Jan 22, 2025 | In progress issued Jan 2025 | 741 Arguello Bl | Rozen Home Builders Inc | revision to pa 202410092671 convert 3rd fl bedroom to bathroom & closet. non structural interior work only ref pa 202412036064Details
revision to pa 202410092671 convert 3rd fl bedroom to bathroom & closet. non structural interior work only ref pa 202412036064 | $40,000 |
| Jan 15, 2025 | Completed final sign-off Apr 2025 | 9 Walter St | Rozen Home Builders Inc | kitchen remodel. drywall replacement. new water line from existing sink plumbing to new faucet over the stove only. new cabinets. new electrical.Details
kitchen remodel. drywall replacement. new water line from existing sink plumbing to new faucet over the stove only. new cabinets. new electrical. | $14,000 |
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 2546 15th Av | Rozen Home Builders Inc | bathroom remodel with new fixtures.Details
bathroom remodel with new fixtures. | $20,000 |
| Dec 3, 2024 | In progress issued Dec 2024 | 741 Arguello Bl | Rozen Home Builders Inc | revision to pa# 202410092671: kitchen remodel- remove (e) interior wall between dining and kitchen. no exterior work visible from the street; bathroom remodel in-kind.Details
revision to pa# 202410092671: kitchen remodel- remove (e) interior wall between dining and kitchen. no exterior work visible from the street; bathroom remodel in-kind. | $50,000 |
| Oct 23, 2024 | In progress issued Oct 2024 | 741 Arguello Bl | Rozen Home Builders Inc | new service panel upgrade from (e) subpanel. rewire for the whole house. drywall remove, and patch drywall.Details
new service panel upgrade from (e) subpanel. rewire for the whole house. drywall remove, and patch drywall. | $18,000 |
| Oct 9, 2024 | In progress issued Oct 2024 | 741 Arguello Bl | Rozen Home Builders Inc | kitchen and two bathrooms remodel in-kind. electric and plumbing. change cabinets new kitchen sink. new vanity for bathrooms and paint. kitchen approx. 180 sq ft. each bathroom approx 40 sq ft. all fixtures to remain in same locationDetails
kitchen and two bathrooms remodel in-kind. electric and plumbing. change cabinets new kitchen sink. new vanity for bathrooms and paint. kitchen approx. 180 sq ft. each bathroom approx 40 sq ft. all fixtures to remain in same location | $78,000 |
| Sep 10, 2024 | Expired or cancelled expired Jan 2026 | 53 Lapham Wy | Rozen Home Builders Inc, Franklin's Construction | remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf.Details
remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf. | $30,000 |
| Feb 2, 2024 | In progress issued Feb 2024 | 2630 Greenwich St | Rozen Home Builders Inc | replace kitchen cabinets like for like only.Details
replace kitchen cabinets like for like only. | $16,000 |
| Jan 3, 2024 | Completed final sign-off Jun 2024 | 353 Molimo Dr | Rozen Home Builders Inc | kitchen remodel in kind. remove and replace counter tops, drywall (~200 sq ft), cabinets. update electrical and plumbing. no change to floor layout. no change to wall layout. no structural work. replacement drywall to be 5/8" type 'x'.Details
kitchen remodel in kind. remove and replace counter tops, drywall (~200 sq ft), cabinets. update electrical and plumbing. no change to floor layout. no change to wall layout. no structural work. replacement drywall to be 5/8" type 'x'. | $27,000 |
| Nov 16, 2023 | Completed final sign-off Dec 2023 | 1751 La Salle Av | Rozen Home Builders Inc | roof repair with 1/2" cdx plywood, reroof with shinglesDetails
roof repair with 1/2" cdx plywood, reroof with shingles | $16,000 |
| Nov 15, 2023 | In progress issued Nov 2023 | 156 Rose St | Rozen Home Builders Inc | (2) bathrooms and (2) kitchen restoration, new electrical wiring. work to be done in unit(s) #152 & 156. to comply with violation(s) #201525453 and 201893291, and 201896741Details
(2) bathrooms and (2) kitchen restoration, new electrical wiring. work to be done in unit(s) #152 & 156. to comply with violation(s) #201525453 and 201893291, and 201896741 | $10,000 |
| Oct 31, 2023 | Completed final sign-off Mar 2024 | 225 Cole St | Rozen Home Builders Inc | to comply with 202313576 windows repair h&m#5-8: roof repairs, back stairs repairs less than 50%Details
to comply with 202313576 windows repair h&m#5-8: roof repairs, back stairs repairs less than 50% | $3,500 |
| Oct 18, 2023 | Completed final sign-off Nov 2023 | 1540 Newhall St | Rozen Home Builders Inc | roof repair on plywood replacement in damaged areas. siding replacement on a wall. replace existing plywood in kind prior to installing (n) sidingDetails
roof repair on plywood replacement in damaged areas. siding replacement on a wall. replace existing plywood in kind prior to installing (n) siding | $24,000 |
| Oct 5, 2023 | Never finaled issued Oct 2023, no final | 1647 38th Av | Rozen Home Builders Inc, Kelun Construction | revision to permit 202306099718. 2/f: reconfigure bathrooms and interior stairs. add (2) skylights. 1/f: remodel bathroom, reconfigure laundry and hallway. add kitchenette.Details
revision to permit 202306099718. 2/f: reconfigure bathrooms and interior stairs. add (2) skylights. 1/f: remodel bathroom, reconfigure laundry and hallway. add kitchenette. | $54,000 |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 226 Cole St | Rozen Home Builders Inc | (1) bathroom remodel like for like. no floor layout change. no wall layout change. no structural work.Details
(1) bathroom remodel like for like. no floor layout change. no wall layout change. no structural work. | $8,800 |
| Jun 13, 2023 | Completed final sign-off Nov 2023 | 283 Silver Av | Rozen Home Builders Inc | bathroom remodel. new tile flooring and wall finishes. update electrical and plumbing fixtures.Details
bathroom remodel. new tile flooring and wall finishes. update electrical and plumbing fixtures. | $13,000 |
| Jun 9, 2023 | Never finaled issued Jun 2023, no final | 1647 38th Av | Rozen Home Builders Inc | 2nd floor. remodel ktichen, bath and bedroom. add (1) bathroom.Details
2nd floor. remodel ktichen, bath and bedroom. add (1) bathroom. | $50,000 |
| Apr 3, 2023 | Completed final sign-off Oct 2023 | 2798 San Bruno Av | Rozen Home Builders Inc | tenant improvement for n coffee shop, n type i hood, n plumbing for sinks, relocate plumbing for restrooms accessibility, n electrical outlets for equipment.Details
tenant improvement for n coffee shop, n type i hood, n plumbing for sinks, relocate plumbing for restrooms accessibility, n electrical outlets for equipment. | $20,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 1455 05th Av | Rozen Home Builders Inc | revision to pa# 2022-1721-9005: repair of (e) decks and relace in-kind of exterior stairs document existing as buld 3 levels rear deck and non conforming stairs and make structural upgradesDetails
revision to pa# 2022-1721-9005: repair of (e) decks and relace in-kind of exterior stairs document existing as buld 3 levels rear deck and non conforming stairs and make structural upgrades | |
| Oct 24, 2022 | Completed final sign-off Jan 2024 | 3748 Cesar Chavez St | Rozen Home Builders Inc | bathroom renovation and new deck in rear yard.Details
bathroom renovation and new deck in rear yard. | $20,000 |
| Jul 21, 2022 | Completed final sign-off Mar 2023 | 1455 05th Av | Rozen Home Builders Inc | demo dry rot stairs and deck to be replaced as per code if possible by demolition per customer request. less than 50%, stairs in backyard.Details
demo dry rot stairs and deck to be replaced as per code if possible by demolition per customer request. less than 50%, stairs in backyard. | $22,500 |
| Nov 5, 2021 | Never finaled issued Dec 2022, no final | 267 Richland Av | Rozen Home Builders Inc | revision to bpa# 202003167175 to add 38 sq. ft. on the 3/f as horizontal expansionDetails
revision to bpa# 202003167175 to add 38 sq. ft. on the 3/f as horizontal expansion | $7,500 |
| Sep 10, 2021 | Expired or cancelled cancelled Jan 2026 | 267 Richland Av | Rozen Home Builders Inc | revision to 202003167175 and 202003167179 to replace existing foundationDetails
revision to 202003167175 and 202003167179 to replace existing foundation | $22,000 |
| May 24, 2021 | Completed final sign-off Jul 2021 | 285 Main St | Rozen Home Builders Inc | block/lot is 3740/075: unit 208: replace (e) laminated flooring on living room and bedrooms.rpelace (e) tub, demo (e) tile only. install 2 new receptacles at living room. no structural work. no framing modifiation.Details
block/lot is 3740/075: unit 208: replace (e) laminated flooring on living room and bedrooms.rpelace (e) tub, demo (e) tile only. install 2 new receptacles at living room. no structural work. no framing modifiation. | $12,500 |
| Dec 10, 2020 | Completed final sign-off Dec 2021 | 59 Montana St | Rozen Home Builders Inc | revision to no plan pa# 202008272742. add 4 skylights at kitchen & living room. 1 window on living room.Details
revision to no plan pa# 202008272742. add 4 skylights at kitchen & living room. 1 window on living room. | $8,000 |
| Nov 23, 2020 | Never finaled issued Nov 2020, no final | 278 Thrift St | Rozen Home Builders Inc | replacement of 2 windows at front facade. similar kind. dry rot @ garage door. replameent of stone with similar kind - windows will be fiberglass in this case - 1960s residential building.Details
replacement of 2 windows at front facade. similar kind. dry rot @ garage door. replameent of stone with similar kind - windows will be fiberglass in this case - 1960s residential building. | $5,800 |
| Oct 17, 2020 | Completed final sign-off Oct 2022 | 156 Tiffany Av | Rozen Home Builders Inc | add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611).Details
add 6 dormers in compliance to zoning administrator bulletin no.3 and an interior remodel of the 4th floor. and kitchen renovation at the 3rd floor (sep permit 202009214611). | $110,000 |
| Oct 14, 2020 | Expired or cancelled expired Apr 2026 | 368 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unitDetails
remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit | $25,000 |
| Oct 5, 2020 | Completed final sign-off Aug 2021 | 126 Ashton Av | Rozen Home Builders Inc | replace (e) retaining wall with (n) retaining wall at rear property line, replace wood portion of south property line fence in kind.Details
replace (e) retaining wall with (n) retaining wall at rear property line, replace wood portion of south property line fence in kind. | $5,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2021 | 1046 Rhode Island St | Rozen Home Builders Inc | update bathroom, new tub, new fan, new tiles for walls. bathroom remodelDetails
update bathroom, new tub, new fan, new tiles for walls. bathroom remodel | $16,000 |
| Sep 21, 2020 | Completed final sign-off Oct 2021 | 156 Tiffany Av | Rozen Home Builders Inc | demolition of existing walls only. remove existing plaster walls replace with drywall. 3rd floor only kitchen remodelDetails
demolition of existing walls only. remove existing plaster walls replace with drywall. 3rd floor only kitchen remodel | $2,100 |
| Sep 10, 2020 | Never finaled issued May 2022, no final | 368 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements | mimic trim around 3/f bay window, 2/f bay window & above side gate. (n) garage door, escavation of south walkway for (n) door to garage. reconfigure (e) windows/doors @ 1/f. (n) window 3/f living area, replace all windows 45 min rated aluminum clad & aluminum clad double hung, double pane windows,Details
mimic trim around 3/f bay window, 2/f bay window & above side gate. (n) garage door, escavation of south walkway for (n) door to garage. reconfigure (e) windows/doors @ 1/f. (n) window 3/f living area, replace all windows 45 min rated aluminum clad & aluminum clad double hung, double pane windows, | $15,000 |
| Aug 27, 2020 | Completed final sign-off Dec 2021 | 59 Montana St | Rozen Home Builders Inc | remodel kitchen same locationDetails
remodel kitchen same location | $25,000 |
| Aug 15, 2020 | Completed final sign-off Feb 2021 | 347 28th Av | Rozen Home Builders Inc | (3) new flat skylightsDetails
(3) new flat skylights | $6,000 |
| Jun 2, 2020 | Completed final sign-off Aug 2021 | 278 Thrift St | Rozen Home Builders Inc | interior remodel, minor fill-in at covered entry porch, new deck, stair, & below grade patio at rear yard. remodel existing bathrooms, kitchen, stair, & foyer. new partition walls, cabinetry, mechanical, electrical, and plumbing throughtout.Details
interior remodel, minor fill-in at covered entry porch, new deck, stair, & below grade patio at rear yard. remodel existing bathrooms, kitchen, stair, & foyer. new partition walls, cabinetry, mechanical, electrical, and plumbing throughtout. | $120,000 |
| May 27, 2020 | Expired or cancelled cancelled Jan 2026 | 139 Dublin St | Rozen Home Builders Inc | replace existing rear exterior door and repair dry rot front and back of the houseDetails
replace existing rear exterior door and repair dry rot front and back of the house | $12,000 |
| Mar 16, 2020 | Never finaled issued Jul 2021, no final | 267 Richland Av | Rozen Home Builders Inc | addition of dwelling unit (adu) in garage under ord# 95-17. horizontal addition under separate pa# 2020-0316-7175.Details
addition of dwelling unit (adu) in garage under ord# 95-17. horizontal addition under separate pa# 2020-0316-7175. | $76,925 |
| Mar 16, 2020 | Completed final sign-off Jul 2024 | 267 Richland Av | Rozen Home Builders Inc | horizontal addition to main dwelling unit, including kitchen and bathroom remodel. add adu under separate pa# 2020-0316-7179.Details
horizontal addition to main dwelling unit, including kitchen and bathroom remodel. add adu under separate pa# 2020-0316-7179. | $100,000 |
| Mar 12, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | new foundation. repair water damage in laundry and storage room. reconfiguration of storage.Details
new foundation. repair water damage in laundry and storage room. reconfiguration of storage. | $25,000 |
| Mar 6, 2020 | Completed final sign-off May 2020 | 1350 Baker St | Rozen Home Builders Inc | legalization of playroom & bathroom construction w/out permit on lowerl evel of house. work is interior improvements with no changes to path of travel or existing or occupancy of the bldg.Details
legalization of playroom & bathroom construction w/out permit on lowerl evel of house. work is interior improvements with no changes to path of travel or existing or occupancy of the bldg. | $40,000 |
| Feb 24, 2020 | Completed final sign-off May 2020 | 1350 Baker St | Rozen Home Builders Inc | revision to 202002124317. bathroom new electrical outlet only. - kitchen. new countertops. new gfi's x 3. new lights, plumbing. new sink only - 12' linear feet. countertop. kitchen tile floor & backsplash.Details
revision to 202002124317. bathroom new electrical outlet only. - kitchen. new countertops. new gfi's x 3. new lights, plumbing. new sink only - 12' linear feet. countertop. kitchen tile floor & backsplash. | $7,000 |
| Feb 18, 2020 | Completed final sign-off Dec 2020 | 126 Ashton Av | Rozen Home Builders Inc | replace existing fence rear yard under 6'-0" all work in kind.Details
replace existing fence rear yard under 6'-0" all work in kind. | $2,000 |
| Feb 12, 2020 | Completed final sign-off May 2020 | 1350 Baker St | Rozen Home Builders Inc | bathroom remodel - partial - new mixing value for tub/shower [existing bathtub staying ] new toilet new vanity - new tile on walls & floors [no electrical] standard bathDetails
bathroom remodel - partial - new mixing value for tub/shower [existing bathtub staying ] new toilet new vanity - new tile on walls & floors [no electrical] standard bath | $5,000 |
| Feb 10, 2020 | Completed final sign-off Mar 2020 | 1471 19th Av | Rozen Home Builders Inc | #3: bathroom remodel in kind, adding 3 new recess ceiling lights, 2 circuits, shower stall with rain shower, shower head. new vanity & toilet.Details
#3: bathroom remodel in kind, adding 3 new recess ceiling lights, 2 circuits, shower stall with rain shower, shower head. new vanity & toilet. | $15,000 |
| Jan 22, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | Rozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes** | remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.Details
remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work. | $10,000 |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 2245 18th St | Rozen Home Builders Inc | add new subpanel on lower level. replace one existing water heater; new insulation r-19 for ceilings of open joist for (e) laundry area in lower level.Details
add new subpanel on lower level. replace one existing water heater; new insulation r-19 for ceilings of open joist for (e) laundry area in lower level. | $2,100 |
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 126 Ashton Av | Rozen Home Builders Inc | additional living space on lower level, family room, master bedroom, bath, laundry room, new 2nd fl closet at (e) bedroom.Details
additional living space on lower level, family room, master bedroom, bath, laundry room, new 2nd fl closet at (e) bedroom. | $102,000 |
| Dec 20, 2019 | Completed final sign-off Jan 2021 | 245 Brighton Av | Rozen Home Builders Inc | recommencement and completion of work approved under pa #201508124039.Details
recommencement and completion of work approved under pa #201508124039. | |
| Dec 6, 2019 | Completed final sign-off Dec 2020 | 156 Tiffany Av | Rozen Home Builders Inc | revision to app#201811276755 as built information including voluntary retrofit wall footing, interior bearing wall and shear walls. voluntary seismic upgrade in compliance with ab-094Details
revision to app#201811276755 as built information including voluntary retrofit wall footing, interior bearing wall and shear walls. voluntary seismic upgrade in compliance with ab-094 | |
| Nov 18, 2019 | Completed final sign-off Dec 2020 | 126 Ashton Av | Rozen Home Builders Inc | enlarge window at sink on e kitchen. add new skylight on bathroom ceilingDetails
enlarge window at sink on e kitchen. add new skylight on bathroom ceiling | $7,800 |
| Nov 5, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | Rozen Home Builders Inc, Level 8 Construction Inc | replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear.Details
replace a single back door. replace 3 windows, kitchen lower level and 2nd floor bathroom area. -- repair existing deck 40%. all work at rear. | $40,000 |
| Oct 30, 2019 | Completed final sign-off Dec 2020 | 126 Ashton Av | Rozen Home Builders Inc | 1 kitchen remodel, 1 bathroom remodel. no wall changes.Details
1 kitchen remodel, 1 bathroom remodel. no wall changes. | $35,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 2104 Divisadero St | Rozen Home Builders Inc, Level 8 Construction Inc | rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio,Details
rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio, | $200,000 |
| Oct 2, 2019 | Completed final sign-off Mar 2025 | 154 Tiffany Av | Rozen Home Builders Inc | addition of 1 adu at ground floor to 2-unit bldg per ord# 162-16 with one new bedroom, one new bath. new landscape/permeability improvements in required front yard setback.Details
addition of 1 adu at ground floor to 2-unit bldg per ord# 162-16 with one new bedroom, one new bath. new landscape/permeability improvements in required front yard setback. | $85,000 |
| Sep 30, 2019 | Completed final sign-off Oct 2021 | 2104 Divisadero St | Rozen Home Builders Inc, Level 8 Construction Inc | 2 bathrooms - remodel - master: new shower stall, new vanity, new plumbing fixtures, new tile & slab, adding ceiling fan, adding lights, gfi, new shower drain. guest bathroom: existing bathtub, only new tile & plumbing fixtures.Details
2 bathrooms - remodel - master: new shower stall, new vanity, new plumbing fixtures, new tile & slab, adding ceiling fan, adding lights, gfi, new shower drain. guest bathroom: existing bathtub, only new tile & plumbing fixtures. | $40,000 |
| Aug 28, 2019 | Completed final sign-off Mar 2020 | 154 Tiffany Av | Rozen Home Builders Inc | install furnace and relocate laundry.Details
install furnace and relocate laundry. | $6,500 |
| Aug 22, 2019 | Completed final sign-off Sep 2019 | 1582 Sanchez St | Rozen Home Builders Inc | permitted trash enclosure obstruction in front yard -- repair of retaining wall 8 ft in width. remove section os concrete planters of front of building to facilitate garbage. comply w/ nov #201884121 & 201977921Details
permitted trash enclosure obstruction in front yard -- repair of retaining wall 8 ft in width. remove section os concrete planters of front of building to facilitate garbage. comply w/ nov #201884121 & 201977921 | $2,500 |
| Jul 30, 2019 | Completed final sign-off Mar 2020 | 154 Tiffany Av | Rozen Home Builders Inc | revision to 201905160902: work at living romm & two bedrooms. replace plaster walls and ceiling areas. add new insulation and dry wall 5/8"gb exterior walls only. replace a new tankless water heaterDetails
revision to 201905160902: work at living romm & two bedrooms. replace plaster walls and ceiling areas. add new insulation and dry wall 5/8"gb exterior walls only. replace a new tankless water heater | $8,500 |
| Jul 26, 2019 | Completed final sign-off Feb 2021 | 347 28th Av | Rozen Home Builders Inc | frame interior walls as per specifications with plan, install new interior stair to convert to 2nd fl. new bathroom, convert rear section to family room, retain (e) garage with 2 car parking spaces, relocate kitchen on 2nd fl & 3rd fl.Details
frame interior walls as per specifications with plan, install new interior stair to convert to 2nd fl. new bathroom, convert rear section to family room, retain (e) garage with 2 car parking spaces, relocate kitchen on 2nd fl & 3rd fl. | $181,000 |
| Jul 22, 2019 | Completed final sign-off Jan 2025 | 156 Tiffany Av | Rozen Home Builders Inc | install new deck over the existing 2/f roof. install new sliding door at the loft.Details
install new deck over the existing 2/f roof. install new sliding door at the loft. | $4,700 |
| Jul 9, 2019 | Completed final sign-off Jun 2020 | 347 28th Av | Rozen Home Builders Inc | Details
| $12,500 |
| Jun 21, 2019 | Completed final sign-off Jul 2019 | 255 Downey St | Rozen Home Builders Inc | bathroom remodel. new plumbing fixtures & tub. new tile on walls & floor. new light fixtures & fan. one gfi. new vanity.Details
bathroom remodel. new plumbing fixtures & tub. new tile on walls & floor. new light fixtures & fan. one gfi. new vanity. | $15,000 |
| May 22, 2019 | Completed final sign-off Jun 2019 | 1582 Sanchez St | Rozen Home Builders Inc | replace water heater boiler with tankless water heater. add (1) circuit breaker for water heater. to comply with complaint # 201884121. reconnect combustion and flue vent to roofDetails
replace water heater boiler with tankless water heater. add (1) circuit breaker for water heater. to comply with complaint # 201884121. reconnect combustion and flue vent to roof | $3,600 |
| May 16, 2019 | Completed final sign-off Mar 2020 | 154 Tiffany Av | Rozen Home Builders Inc | add new bathroomDetails
add new bathroom | $3,500 |
| Apr 30, 2019 | Completed final sign-off May 2019 | 1682 Kirkwood Av | Rozen Home Builders Inc | to obtain a final inspection for work approved under previous pa#201702028502. all work is complete.Details
to obtain a final inspection for work approved under previous pa#201702028502. all work is complete. | |
| Apr 11, 2019 | Completed final sign-off Jun 2020 | 347 28th Av | Rozen Home Builders Inc | demo plaster throughout entire house on all level. no wall removal or new framing. no structural work under this permit.Details
demo plaster throughout entire house on all level. no wall removal or new framing. no structural work under this permit. | $12,000 |
| Apr 4, 2019 | Completed final sign-off Jun 2019 | 255 Downey St | Rozen Home Builders Inc | master batrhoom renovation demo (e) bathroom new plumbing fixture vanity ,bathtub shower toilet new lights (5) & outlets, new tile new showerpan new shower drainDetails
master batrhoom renovation demo (e) bathroom new plumbing fixture vanity ,bathtub shower toilet new lights (5) & outlets, new tile new showerpan new shower drain | $35,000 |
| Mar 19, 2019 | Completed final sign-off Sep 2019 | 3990 Folsom St | Rozen Home Builders Inc | minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched.Details
minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched. | $15,000 |
| Mar 19, 2019 | Completed final sign-off May 2019 | 155 Ames St | Rozen Home Builders Inc | minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched.Details
minor bathroom remodel: new ceiling lights, new wall & shower tiles, keeping (e) plumbing fixturs, new shower pan. (e) lavy not to be touched. | $28,000 |
| Feb 25, 2019 | Completed final sign-off May 2019 | 98 Ina Ct | Rozen Home Builders Inc | remodel bathroom: add shower pan, install new tub, relocate tub, new fixtures.Details
remodel bathroom: add shower pan, install new tub, relocate tub, new fixtures. | $14,000 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 2919 California St | Rozen Home Builders Inc | recommencement and completion of work approved under pa# 201706018182Details
recommencement and completion of work approved under pa# 201706018182 | $40,000 |
| Dec 19, 2018 | Completed final sign-off Jul 2020 | 736 Anderson St | Rozen Home Builders Inc | revision to appln #201512155184. replace foundation @ north property line.Details
revision to appln #201512155184. replace foundation @ north property line. | $3,000 |
| Oct 30, 2018 | Completed final sign-off Dec 2018 | 920 Baker St | Rozen Home Builders Inc | remodel 1 bathroom on 2/f. remove old fixtures & tile and isntall new fixtures & tile. everything in same location.Details
remodel 1 bathroom on 2/f. remove old fixtures & tile and isntall new fixtures & tile. everything in same location. | $20,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2018 | 563 29th Av | Rozen Home Builders Inc | bathroom remodel, removed tub/fixtures, install new bath/plumbing fixtures, new vanity, wall mounted toilet, heated towel rack, linear shower drain.Details
bathroom remodel, removed tub/fixtures, install new bath/plumbing fixtures, new vanity, wall mounted toilet, heated towel rack, linear shower drain. | $20,000 |
| Sep 4, 2018 | Completed final sign-off Nov 2018 | 856 Green St | Rozen Home Builders Inc | kitchen upgrade new tile backsplash, new counter tops, new tile floor, new outlets, new appliances. bathroom upgrade, new vanity countertop, new shower pan. new tile on walls of shower+ floor new plumbing fixtures.Details
kitchen upgrade new tile backsplash, new counter tops, new tile floor, new outlets, new appliances. bathroom upgrade, new vanity countertop, new shower pan. new tile on walls of shower+ floor new plumbing fixtures. | $35,000 |
| Jul 16, 2018 | Completed final sign-off Aug 2018 | 1958 Bush St | Rozen Home Builders Inc | replace existing deck 10" above groundDetails
replace existing deck 10" above ground | $12,000 |
| Jun 28, 2018 | Completed final sign-off Nov 2018 | 100 Bosworth St | Rozen Home Builders Inc | bathroom renovation in kind replacement in same location on 2nd floor. no exterior work.Details
bathroom renovation in kind replacement in same location on 2nd floor. no exterior work. | $8,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2018 | 33 21st Av | Rozen Home Builders Inc | 3/f: add a master bathroom & closet.Details
3/f: add a master bathroom & closet. | $25,000 |
| Aug 14, 2017 | Expired or cancelled expired Jun 2025 | 323 Country Club Dr | Rozen Home Builders Inc | legalize 1 dwelling unit as per ordinance 43-14 including (2) bedrooms, 1 full bath, living, dining & kitchen.Details
legalize 1 dwelling unit as per ordinance 43-14 including (2) bedrooms, 1 full bath, living, dining & kitchen. | |
| Dec 15, 2015 | Completed final sign-off Jul 2020 | 736 Anderson St | Rozen Home Builders Inc | interior remodel on all 3 levels. horizontal extension @ 1st & 2nd floors. new dormer @ 3rd floor (new new bathroom). 1st floor extension is for laundry & bedroom. 2nd floor extension is for kitchen & exterior deck.Details
interior remodel on all 3 levels. horizontal extension @ 1st & 2nd floors. new dormer @ 3rd floor (new new bathroom). 1st floor extension is for laundry & bedroom. 2nd floor extension is for kitchen & exterior deck. | $200,000 |