Block 0853, lot 017A
146 Rose St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 3,150 sq ft
- Lot
- 1,498 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2026 | Completed final sign-off Mar 2026 | 146 Rose St | Roofworx Inc. | re-roofing: remove (e) roofing matieral. install new modified bitumen membrane. hot works needed.Details
re-roofing: remove (e) roofing matieral. install new modified bitumen membrane. hot works needed. | $17,380 |
| Dec 22, 2025 | Completed final sign-off May 2026 | 146 Rose St | Bail Construction | replace (18) front wood windows in-kind at the front of the building. (max. u-factor=0.30)Details
replace (18) front wood windows in-kind at the front of the building. (max. u-factor=0.30) | $10,500 |
| Dec 8, 2025 | Completed final sign-off Mar 2026 | 146 Rose St | Bail Construction | unit 148- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. not movement of walls. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint.Details
unit 148- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. not movement of walls. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint. | $70,000 |
| Aug 28, 2025 | Completed final sign-off Jan 2026 | 146 Rose St | Bail Construction | unit 146- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint.Details
unit 146- remodel kitchen and bathroom in kind, remove all plaster from ceiling and walls due to smell and dryrot. rewire the entire unit. install 6 vinyl windows in kind at the rear and lightwell. install (n) insulation, drywall, flooring and paint. | $65,000 |
| Feb 12, 2025 | Completed final sign-off Jul 2025 | 146 Rose St | Bail Construction | unit #152 - kitchen remodel in kind, rewire the entire unit. install 10 vinyl windows, new flooring and paint. unit #156 - remodel one kitchen and one bathroom in kind. rewire the entire unit. install 10 vinyl windows in kind. new flooring and paint. uf<=0.3Details
unit #152 - kitchen remodel in kind, rewire the entire unit. install 10 vinyl windows, new flooring and paint. unit #156 - remodel one kitchen and one bathroom in kind. rewire the entire unit. install 10 vinyl windows in kind. new flooring and paint. uf<=0.3 | $80,000 |
| Feb 12, 2025 | Completed final sign-off Jul 2025 | 146 Rose St | Bail Construction | unit#154: remodel one kitchen & one bathroom in kind. remove all ceiling & walls. plaster cover due to smell of dryrot. re-wire the entire unit. install 10 vinyl windows in kind (windows: 3-front of house, lightwell,left side of bldg). install new insulation, drywall, new flooring and paint. uf<=0.3Details
unit#154: remodel one kitchen & one bathroom in kind. remove all ceiling & walls. plaster cover due to smell of dryrot. re-wire the entire unit. install 10 vinyl windows in kind (windows: 3-front of house, lightwell,left side of bldg). install new insulation, drywall, new flooring and paint. uf<=0.3 | $50,000 |
| Nov 15, 2023 | In progress issued Nov 2023 | 156 Rose St | Rozen Home Builders Inc | (2) bathrooms and (2) kitchen restoration, new electrical wiring. work to be done in unit(s) #152 & 156. to comply with violation(s) #201525453 and 201893291, and 201896741Details
(2) bathrooms and (2) kitchen restoration, new electrical wiring. work to be done in unit(s) #152 & 156. to comply with violation(s) #201525453 and 201893291, and 201896741 | $10,000 |
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 146 Rose St | street spaceDetails
street space | ||
| May 3, 2018 | Completed final sign-off Jun 2020 | 146 Rose St | Tom Can Construction, Seismic Retrofitters Inc. | soft story upgrade of basement floor only. per city of sf soft story requirement. does not include seismic upgrades of upper floor structureDetails
soft story upgrade of basement floor only. per city of sf soft story requirement. does not include seismic upgrades of upper floor structure | $50,000 |
| Jul 29, 2009 | Completed final sign-off Nov 2009 | 146 Rose St | The Birmingham Group | replace rear stairway in-kind acting as second means of egress for each of 6 units to comply with nov# 200231420Details
replace rear stairway in-kind acting as second means of egress for each of 6 units to comply with nov# 200231420 | $14,000 |
| Oct 4, 2007 | Expired or cancelled expired Oct 2009 | 146 Rose St | renew pa#200209166545 for final inspection.Details
renew pa#200209166545 for final inspection. | ||
| Sep 16, 2002 | Expired or cancelled expired Jan 2007 | 146 Rose St | repair rear stairs per cpmplaint #200231420Details
repair rear stairs per cpmplaint #200231420 | $4,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.