David Baker

License
C012506
Look the license up with the state
Listed as
architect, authorized agent-others, engineer
Firm
David Baker Architects
Based in
San Francisco
On San Francisco permits
Apr 2005 to Nov 2019

43 permits since 2000 (architect on 40 permits, engineer on 2 permits, authorized agent-others on 1 permit): 38 completed, 3 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 12, 2019Completed
final sign-off Dec 2021
833 Bryant StCahill Contractors Llc.demolish 1-story, office building. maher n/a.
Details
Permit
201911127072
Status
complete
Filed
Nov 12, 2019
Permit issued
Dec 19, 2019
Final sign-off
Dec 27, 2021
Declared cost
$6,888
Address
833 Bryant St

demolish 1-story, office building. maher n/a.

Open the permit page

$6,888
Sep 5, 2019Completed
final sign-off Nov 2019
222 Taylor StCahill Contractors Increvision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair door
Details
Permit
201909050780
Status
complete
Filed
Sep 5, 2019
Permit issued
Sep 10, 2019
Final sign-off
Nov 14, 2019
Declared cost
$500
Address
222 Taylor St

revision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair door

Open the permit page

$500
Apr 30, 2019Never finaled
issued May 2019, no final
210 Taylor StCahill Contractors Increvisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2
Details
Permit
201904309327
Status
issued
Filed
Apr 30, 2019
Permit issued
May 28, 2019
Declared cost
$1,000
Address
210 Taylor St

revisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2

Open the permit page

$1,000
Mar 1, 2019Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Increvision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification
Details
Permit
201903014204
Status
complete
Filed
Mar 1, 2019
Permit issued
Apr 1, 2019
Final sign-off
Nov 14, 2019
Address
210 Taylor St

revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification

Open the permit page

Jun 6, 2018Completed
final sign-off Nov 2019
210 Taylor StCahill Contractors Llc.rev to pa# 201602179822 s2; revision of fire rattng to electric closet-sheet g602 to show 2-hr fire rating, to be consistent with the rest of approved set for s-2
Details
Permit
201806061154
Status
complete
Filed
Jun 6, 2018
Permit issued
Jun 12, 2018
Final sign-off
Nov 14, 2019
Address
210 Taylor St

rev to pa# 201602179822 s2; revision of fire rattng to electric closet-sheet g602 to show 2-hr fire rating, to be consistent with the rest of approved set for s-2

Open the permit page

May 23, 2018Completed
final sign-off Mar 2021
1601 Mariposa StLiberty West Construction Services Llcerect tower crane to aid wood frame construction - ref pa 2016-0303-1058. (1601 mariposa). n/a for maher.
Details
Permit
201805239955
Status
complete
Filed
May 23, 2018
Permit issued
Jun 8, 2018
Final sign-off
Mar 22, 2021
Declared cost
$200,000
Address
1601 Mariposa St

erect tower crane to aid wood frame construction - ref pa 2016-0303-1058. (1601 mariposa). n/a for maher.

Open the permit page

$200,000
May 23, 2018Completed
final sign-off Mar 2019
1001 Howard StCookline Construction Incref t.i. pa#201805048251: mechanical adjustments for limited use restaurant. maher n/a.
Details
Permit
201805239927
Status
complete
Filed
May 23, 2018
Permit issued
Jul 5, 2018
Final sign-off
Mar 6, 2019
Declared cost
$165,000
Address
1001 Howard St

ref t.i. pa#201805048251: mechanical adjustments for limited use restaurant. maher n/a.

Open the permit page

$165,000
May 4, 2018Completed
final sign-off Mar 2019
1001 Howard StCookline Construction Incbini's kitchen - ti of (e) restaurant space to become a restaurant with work including gyp board walls, finishes, commercial kitchen, millwork, lighting and painting
Details
Permit
201805048251
Status
complete
Filed
May 4, 2018
Permit issued
Jun 28, 2018
Final sign-off
Mar 6, 2019
Declared cost
$60,000
Address
1001 Howard St

bini's kitchen - ti of (e) restaurant space to become a restaurant with work including gyp board walls, finishes, commercial kitchen, millwork, lighting and painting

Open the permit page

$60,000
Jun 30, 2017Completed
final sign-off Apr 2019
210 Taylor StCahill Contractors Llc.shoring ref pa #201602179822
Details
Permit
201706300792
Status
complete
Filed
Jun 30, 2017
Permit issued
Sep 15, 2017
Final sign-off
Apr 25, 2019
Declared cost
$200,000
Address
210 Taylor St

shoring ref pa #201602179822

Open the permit page

$200,000
Apr 4, 2017Completed
final sign-off Aug 2018
388 Fulton StK Bali Constructionmep work for deffered submittal 201608185378 for ti- (e) retail space to become a limited bakery
Details
Permit
201704043120
Status
complete
Filed
Apr 4, 2017
Permit issued
Apr 20, 2017
Final sign-off
Aug 17, 2018
Declared cost
$60,000
Address
388 Fulton St

mep work for deffered submittal 201608185378 for ti- (e) retail space to become a limited bakery

Open the permit page

$60,000
Dec 22, 2016Completed
final sign-off Mar 2017
588 Mission Bay Blvd North BlNibbi Bros Assoc Inc.revision to 201404042522 s3 to revise the draft stopping in roof. crickets combustible concealed space - includes ab-005 maher na
Details
Permit
201612225706
Status
complete
Filed
Dec 22, 2016
Permit issued
Dec 22, 2016
Final sign-off
Mar 10, 2017
Declared cost
$10,000
Address
588 Mission Bay Blvd North Bl

revision to 201404042522 s3 to revise the draft stopping in roof. crickets combustible concealed space - includes ab-005 maher na

Open the permit page

$10,000
Dec 19, 2016Completed
final sign-off May 2017
140 Middle Point RdCahill-Nibbi Joint Venturerevision to 201308204720 addenda 2, add access panel and smoke detector to elevator shaft detail per fire alarm review requirements
Details
Permit
201612195303
Status
complete
Filed
Dec 19, 2016
Permit issued
Dec 19, 2016
Final sign-off
May 8, 2017
Address
140 Middle Point Rd

revision to 201308204720 addenda 2, add access panel and smoke detector to elevator shaft detail per fire alarm review requirements

Open the permit page

Sep 21, 2016Completed
final sign-off May 2021
1950 Mission Stmod. erect two type 1a buildings, one 9 story mixed use 93 unit residential building, and a 6 story mixed use 64 unit residential building with day care facilities, building function, offices, and commercial tenant spaces on the ground floor
Details
Permit
201609218371
Status
complete
Filed
Sep 21, 2016
Permit issued
Feb 16, 2018
Final sign-off
May 25, 2021
Declared cost
$60,000,000
Address
1950 Mission St

mod. erect two type 1a buildings, one 9 story mixed use 93 unit residential building, and a 6 story mixed use 64 unit residential building with day care facilities, building function, offices, and commercial tenant spaces on the ground floor

Open the permit page

$60,000,000
Aug 8, 2016Completed
final sign-off Aug 2017
801 Brannan StFerma Corporation, Balfour Beatty Construction Llcroof deck fire pit (ref. pa 201309045886); maher n/a
Details
Permit
201608084465
Status
complete
Filed
Aug 8, 2016
Permit issued
Aug 18, 2016
Final sign-off
Aug 17, 2017
Declared cost
$5,000
Address
801 Brannan St

roof deck fire pit (ref. pa 201309045886); maher n/a

Open the permit page

$5,000
Apr 5, 2016Completed
final sign-off May 2017
1380 07th StJames E Roberts-Obayashi Corporationcorrection notice from jeff barnes to indicate on drawings that storage loft is not a mezzanine. rev. to pa# 201112070234. n/a ordinance #155-13. n/a maher ord. # 155-13
Details
Permit
201604054019
Status
complete
Filed
Apr 5, 2016
Permit issued
Apr 6, 2016
Final sign-off
May 18, 2017
Address
1380 07th St

correction notice from jeff barnes to indicate on drawings that storage loft is not a mezzanine. rev. to pa# 201112070234. n/a ordinance #155-13. n/a maher ord. # 155-13

Open the permit page

Mar 3, 2016Completed
final sign-off Mar 2021
1601 Mariposa Stto erect 4 stories, no basement, 145 units residential & commercial building. ** maher: exempted; see approval letter from dph on the plans **
Details
Permit
201603031058
Status
complete
Filed
Mar 3, 2016
Permit issued
Sep 12, 2016
Final sign-off
Mar 23, 2021
Declared cost
$40,000,000
Address
1601 Mariposa St

to erect 4 stories, no basement, 145 units residential & commercial building. ** maher: exempted; see approval letter from dph on the plans **

Open the permit page

$40,000,000
Mar 1, 2016Completed
final sign-off Sep 2020
210 Arkansas StNibbi Bros Inc.to erect 4 stories, 1 basement, type va & ia, 154 units residential with commercial & parking.
Details
Permit
201603010904
Status
complete
Filed
Mar 1, 2016
Permit issued
Sep 19, 2016
Final sign-off
Sep 3, 2020
Declared cost
$50,000,000
Address
210 Arkansas St

to erect 4 stories, 1 basement, type va & ia, 154 units residential with commercial & parking.

Open the permit page

$50,000,000
Jan 25, 2016Completed
final sign-off May 2017
801 Brannan StBalfour Beatty Construction Llccomply with correction notice and report per app#201309045886 regarding top plates detail. n/a for maher.
Details
Permit
201601257916
Status
complete
Filed
Jan 25, 2016
Permit issued
Jan 25, 2016
Final sign-off
May 8, 2017
Address
801 Brannan St

comply with correction notice and report per app#201309045886 regarding top plates detail. n/a for maher.

Open the permit page

Dec 17, 2015Completed
final sign-off Dec 2018
801 Brannan StFerma Corporation, Balfour Beatty Construction Llcrevision to pa# 2013/09/04/5886 s-2. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. ** maher: n/a **
Details
Permit
201512175338
Status
complete
Filed
Dec 17, 2015
Permit issued
Jul 27, 2016
Final sign-off
Dec 3, 2018
Declared cost
$5,700,000
Address
801 Brannan St

revision to pa# 2013/09/04/5886 s-2. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. ** maher: n/a **

Open the permit page

$5,700,000
Aug 26, 2015Completed
final sign-off Aug 2021
1174 Folsom StNorth Star Plumbing & Fire Protection, Transworld Constructionerect 6-story, 1 basement for 42 dwelling units, retail and office building. type 3-a construction. maher ordinance is comply.
Details
Permit
201508265383
Status
complete
Filed
Aug 26, 2015
Permit issued
Jul 18, 2016
Final sign-off
Aug 12, 2021
Declared cost
$6,300,000
Address
1174 Folsom St

erect 6-story, 1 basement for 42 dwelling units, retail and office building. type 3-a construction. maher ordinance is comply.

Open the permit page

$6,300,000
Oct 23, 2014Completed
final sign-off May 2020
150 Hooper StDpr Constructionconstruct (n) mercantile/retail/pdr building.
Details
Permit
201410239755
Status
complete
Filed
Oct 23, 2014
Permit issued
Dec 17, 2015
Final sign-off
May 22, 2020
Declared cost
$7,500,000
Address
150 Hooper St

construct (n) mercantile/retail/pdr building.

Open the permit page

$7,500,000
Sep 13, 2013Completed
final sign-off Jun 2014
401 Grove StCahill Contractors Incbase building revisions for future restaurant tenant. replace retail shaft 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated 3m fire barrier duct wrap 615+ and revise roof discharge of makeup air and general exhaust for
Details
Permit
201309136777
Status
complete
Filed
Sep 13, 2013
Permit issued
Nov 8, 2013
Final sign-off
Jun 25, 2014
Declared cost
$10,000
Address
401 Grove St

base building revisions for future restaurant tenant. replace retail shaft 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated 3m fire barrier duct wrap 615+ and revise roof discharge of makeup air and general exhaust for

Open the permit page

$10,000
Aug 14, 2013Completed
final sign-off Nov 2013
1075 Le Conte AvCahill Contractors Increvision to pa#201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration.
Details
Permit
201308144281
Status
complete
Filed
Aug 14, 2013
Permit issued
Aug 26, 2013
Final sign-off
Nov 18, 2013
Declared cost
$48,000
Address
1075 Le Conte Av

revision to pa#201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration.

Open the permit page

$48,000
Mar 27, 2013Completed
final sign-off Aug 2017
388 Fulton StOliver & Company Inc.erect 6 stories, no basement, 69 units residential apartments with ground floor retail.
Details
Permit
201303273113
Status
complete
Filed
Mar 27, 2013
Permit issued
Nov 26, 2013
Final sign-off
Aug 22, 2017
Declared cost
$12,500,000
Address
388 Fulton St

erect 6 stories, no basement, 69 units residential apartments with ground floor retail.

Open the permit page

$12,500,000
Nov 7, 2012Completed
final sign-off May 2016
1751 Carroll AvNibbi Bros Assoc Inc.erect 4-story, type 5, 121 dwelling units building.
Details
Permit
201211073775
Status
complete
Filed
Nov 7, 2012
Permit issued
Dec 13, 2013
Final sign-off
May 24, 2016
Declared cost
$32,000,000
Address
1751 Carroll Av

erect 4-story, type 5, 121 dwelling units building.

Open the permit page

$32,000,000
Dec 7, 2011Completed
final sign-off May 2017
1380 07th Sterect 6 story 393 units residential & commercial building.
Details
Permit
201112070234
Status
complete
Filed
Dec 7, 2011
Permit issued
Sep 7, 2012
Final sign-off
May 18, 2017
Declared cost
$55,000,000
Address
1380 07th St

erect 6 story 393 units residential & commercial building.

Open the permit page

$55,000,000
Dec 7, 2011Completed
final sign-off May 2017
1400 07th Sterect 6 story 65 units residential & commercial building.
Details
Permit
201112070227
Status
complete
Filed
Dec 7, 2011
Permit issued
Sep 7, 2012
Final sign-off
May 15, 2017
Declared cost
$25,000,000
Address
1400 07th St

erect 6 story 65 units residential & commercial building.

Open the permit page

$25,000,000
Jun 30, 2011Expired or cancelled
cancelled Jan 2026
222 Sutter StPlant Construction Co, Lp9th floor #900 -renovation of an existing office , to remain an office, including non-structural demolition, gyp board partitions, glass aprtitions, refinish floor, casework, & painting.
Details
Permit
201106309252
Status
cancelled
Filed
Jun 30, 2011
Declared cost
$300,000
Address
222 Sutter St

9th floor #900 -renovation of an existing office , to remain an office, including non-structural demolition, gyp board partitions, glass aprtitions, refinish floor, casework, & painting.

Open the permit page

$300,000
Sep 1, 2010Completed
final sign-off Oct 2010
5688 03rd StNibbi Bros Assoc Inc.suite d -tenant improvement build out for leasing office from retail space, new interior metal stud walls, sheetrock, decorative wood system, carpet, new lighting, hvac, duct work.
Details
Permit
201009010066
Status
complete
Filed
Sep 1, 2010
Permit issued
Sep 2, 2010
Final sign-off
Oct 14, 2010
Declared cost
$50,000
Address
5688 03rd St

suite d -tenant improvement build out for leasing office from retail space, new interior metal stud walls, sheetrock, decorative wood system, carpet, new lighting, hvac, duct work.

Open the permit page

$50,000
Apr 7, 2010Completed
final sign-off Sep 2011
365 Fulton StCahill Contractors Incbuilding of foundation for tower crane to be used during construction of new bldg (pa #200807116520-s).
Details
Permit
201004079779
Status
complete
Filed
Apr 7, 2010
Permit issued
May 4, 2010
Final sign-off
Sep 7, 2011
Declared cost
$4,500
Address
365 Fulton St

building of foundation for tower crane to be used during construction of new bldg (pa #200807116520-s).

Open the permit page

$4,500
Oct 3, 2008Expired or cancelled
expired Aug 2010
5600 03rd Stinstall of 8 precast, prestressed 14" square indicator piles on vacant lot, ref new #200703136088s.
Details
Permit
200810033329
Status
expired
Filed
Oct 3, 2008
Permit issued
Oct 3, 2008
Declared cost
$45,000
Address
5600 03rd St

install of 8 precast, prestressed 14" square indicator piles on vacant lot, ref new #200703136088s.

Open the permit page

$45,000
Jul 11, 2008Completed
final sign-off Sep 2011
365 Fulton StCahill Contractors Incerect 5 stories ,120 residential units & commercial.
Details
Permit
200807116520
Status
complete
Filed
Jul 11, 2008
Permit issued
Dec 1, 2008
Final sign-off
Sep 6, 2011
Declared cost
$20,000,000
Address
365 Fulton St

erect 5 stories ,120 residential units & commercial.

Open the permit page

$20,000,000
Mar 13, 2007Completed
final sign-off Oct 2010
5600 03rd Stbldg #3 - erect a 5 stories, 116 residential with daycare, retail and parking building.
Details
Permit
200703136088
Status
complete
Filed
Mar 13, 2007
Permit issued
Apr 11, 2008
Final sign-off
Oct 14, 2010
Declared cost
$18,000,000
Address
5600 03rd St

bldg #3 - erect a 5 stories, 116 residential with daycare, retail and parking building.

Open the permit page

$18,000,000
Nov 2, 2006Completed
final sign-off Feb 2010
5600 03rd Stto erect 3 stories 2 dwelling units bldg.
Details
Permit
200611026689
Status
complete
Filed
Nov 2, 2006
Permit issued
Sep 21, 2007
Final sign-off
Feb 10, 2010
Declared cost
$250,000
Address
5600 03rd St

to erect 3 stories 2 dwelling units bldg.

Open the permit page

$250,000
Nov 2, 2006Completed
final sign-off Feb 2010
5600 03rd Stto erect 3 stories 2 dwelling units bldg.
Details
Permit
200611026688
Status
complete
Filed
Nov 2, 2006
Permit issued
Sep 21, 2007
Final sign-off
Feb 10, 2010
Declared cost
$250,000
Address
5600 03rd St

to erect 3 stories 2 dwelling units bldg.

Open the permit page

$250,000
Nov 2, 2006Completed
final sign-off Feb 2010
5600 03rd Stto erect 3 stories 2 dwelling units bldg.
Details
Permit
200611026678
Status
complete
Filed
Nov 2, 2006
Permit issued
Sep 21, 2007
Final sign-off
Feb 10, 2010
Declared cost
$250,000
Address
5600 03rd St

to erect 3 stories 2 dwelling units bldg.

Open the permit page

$250,000
Nov 2, 2006Completed
final sign-off Feb 2010
5600 03rd Stto erect 3 stories 2 dwelling units bldg.
Details
Permit
200611026690
Status
complete
Filed
Nov 2, 2006
Permit issued
Sep 21, 2007
Final sign-off
Feb 10, 2010
Declared cost
$250,000
Address
5600 03rd St

to erect 3 stories 2 dwelling units bldg.

Open the permit page

$250,000
Nov 2, 2006Completed
final sign-off Feb 2010
5600 03rd Stto erect 3 stories 2 dwelling units bldg.
Details
Permit
200611026687
Status
complete
Filed
Nov 2, 2006
Permit issued
Sep 21, 2007
Final sign-off
Feb 10, 2010
Declared cost
$250,000
Address
5600 03rd St

to erect 3 stories 2 dwelling units bldg.

Open the permit page

$250,000
Sep 29, 2005Completed
final sign-off Feb 2010
5600 03rd Stbldg. 2- erect 5 stories 67 multi family dwelling/office bldg.
Details
Permit
200509294322
Status
complete
Filed
Sep 29, 2005
Permit issued
Sep 20, 2007
Final sign-off
Feb 2, 2010
Declared cost
$16,500,000
Address
5600 03rd St

bldg. 2- erect 5 stories 67 multi family dwelling/office bldg.

Open the permit page

$16,500,000
Jul 27, 2005Never finaled
issued Jan 2006, no final
5600 03rd StSwinerton Buildersbldg #5 - demolish industrial manufacturing, 1 story building.
Details
Permit
200507278749
Status
issued
Filed
Jul 27, 2005
Permit issued
Jan 20, 2006
Address
5600 03rd St

bldg #5 - demolish industrial manufacturing, 1 story building.

Open the permit page

Jul 13, 2005Completed
final sign-off Nov 2005
145 Taylor StCahill Contractors Inccorrect drawing to show sprinkler protection at all property line windows
Details
Permit
200507137521
Status
complete
Filed
Jul 13, 2005
Permit issued
Jul 13, 2005
Final sign-off
Nov 14, 2005
Address
145 Taylor St

correct drawing to show sprinkler protection at all property line windows

Open the permit page

May 11, 2005Completed
final sign-off Oct 2007
420 Berry Sterect 4 stories 236 dwelling residential/fitness room/common room.
Details
Permit
200505112108
Status
complete
Filed
May 11, 2005
Permit issued
Nov 28, 2005
Final sign-off
Oct 30, 2007
Declared cost
$5,000,000
Address
420 Berry St

erect 4 stories 236 dwelling residential/fitness room/common room.

Open the permit page

$5,000,000
Apr 11, 2005Never finaled
filed Apr 2005, never issued
339 Shotwell Stto erect 3 stories, 1 dwelling single family. at rear of 339 shotwell st.
Details
Permit
200504119688
Status
filed
Filed
Apr 11, 2005
Declared cost
$100,000
Address
339 Shotwell St

to erect 3 stories, 1 dwelling single family. at rear of 339 shotwell st.

Open the permit page

$100,000