Mennor Chan
- Listed as
- architect, engineer
- Firm
- Telamon Engr
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Sep 2021
17 permits since 2000 (engineer on 14 permits, architect on 3 permits): 14 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2021 | Never finaled issued Nov 2022, no final | 375 Laguna Honda Bl | S J Amoroso Construction | priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door framesDetails
priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames | $33,250,000 |
| Dec 21, 2017 | Completed final sign-off Jan 2022 | 1995 Evans Av | Clark Construction Group Ca Lp | to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2)Details
to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2) | $76,500,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 1111 Carroll Av | Baines - Nibbi J V | revision to private laneway to accomodate 100-year storm requirements. reference pa #201602290825.Details
revision to private laneway to accomodate 100-year storm requirements. reference pa #201602290825. | |
| Jun 20, 2017 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | Baines - Nibbi J V | private driveway for parking access of residential apartment complex @ 2800 arelious waller dr. ref 201608296272 sDetails
private driveway for parking access of residential apartment complex @ 2800 arelious waller dr. ref 201608296272 s | $50,000 |
| Jun 7, 2017 | Completed final sign-off Jul 2017 | 425 Folsom St | Alpha Pacific Engineering & Contr. Inc. | installation of new 6" fire sprinkler supply line from curb to new building under pa#201401136157 deferred submittal. ref sprinkler permit #201506249787.Details
installation of new 6" fire sprinkler supply line from curb to new building under pa#201401136157 deferred submittal. ref sprinkler permit #201506249787. | |
| Mar 27, 2017 | Completed final sign-off Sep 2017 | 490 Jamestown Av | De Silva Gates Construction | revision to 201411252500 & 201512185482 & 201605268480: revisions to surcharge limits and heights to accomodate future land use plans for mini-wedge park & fall out #2, stage 1. per eas. lot 001 is now lot 002Details
revision to 201411252500 & 201512185482 & 201605268480: revisions to surcharge limits and heights to accomodate future land use plans for mini-wedge park & fall out #2, stage 1. per eas. lot 001 is now lot 002 | |
| May 26, 2016 | Completed final sign-off Sep 2017 | 490 Jamestown Av | revision to pa #201411252500 - revision to surcharge limits & heights to accomodate future land use plans include stockpile, settlemonitoring & erosion control plans & detail. maher ordinanceDetails
revision to pa #201411252500 - revision to surcharge limits & heights to accomodate future land use plans include stockpile, settlemonitoring & erosion control plans & detail. maher ordinance | ||
| Dec 18, 2015 | Completed final sign-off Sep 2017 | 490 Jamestown Av | revision to 201411252500. revision to surcharge limits and heights to accomodate future land use plansDetails
revision to 201411252500. revision to surcharge limits and heights to accomodate future land use plans | ||
| Nov 25, 2014 | Completed final sign-off Sep 2017 | 490 Jamestown Av | grade permit at candlestick stadium park of will be surcharged with fill material in preparation for the new street utilities. work will include demolition of pavements & existing utilities, grading & placement of surcharge material. ** maher: ordinance no# 155-13 required; route to dph **Details
grade permit at candlestick stadium park of will be surcharged with fill material in preparation for the new street utilities. work will include demolition of pavements & existing utilities, grading & placement of surcharge material. ** maher: ordinance no# 155-13 required; route to dph ** | $6,000,000 | |
| Jul 1, 2014 | Completed final sign-off Sep 2020 | 1201 Illinois St | C. Overaa & Co | demo & grading: remove ac pavement + subbase, concrete slabs, fencing, concrete walls, concrete pad & utilities. ground improvements: consist of concrete, ac paving, fencing & improving the density, strength & stifness of wet & loose soil. n/a ordinance #155-13Details
demo & grading: remove ac pavement + subbase, concrete slabs, fencing, concrete walls, concrete pad & utilities. ground improvements: consist of concrete, ac paving, fencing & improving the density, strength & stifness of wet & loose soil. n/a ordinance #155-13 | $140,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2018 | 1 Newhall St | Clark Construction Group Ca Lp, Johnson Controls Fire | interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $28,000,000 |
| Jan 28, 2014 | Completed final sign-off Oct 2014 | 2700 Arelious Walker Dr | Evans Brothers Inc | grading permit. compliance w/ ordinance no. 155-13 exempted per dph approval letter.Details
grading permit. compliance w/ ordinance no. 155-13 exempted per dph approval letter. | $670,000 |
| Apr 21, 2008 | Never finaled issued May 2008, no final | 1550 Owens St | revision to pa 2007.10.01.4150. increase scope of work for temporary slab on grade parking lot.Details
revision to pa 2007.10.01.4150. increase scope of work for temporary slab on grade parking lot. | $20,000 | |
| Feb 5, 2008 | Completed final sign-off Nov 2011 | 1601 03rd St | revision to pa# 200712170641, to clarify location of pedestrian walkway within subject property. no work in public right of way.Details
revision to pa# 200712170641, to clarify location of pedestrian walkway within subject property. no work in public right of way. | ||
| Oct 1, 2007 | Expired or cancelled expired Jul 2009 | 1550 Owens St | temporary slab on grade parking lot for private use. no work in public right of way (private property).Details
temporary slab on grade parking lot for private use. no work in public right of way (private property). | $16,500 | |
| Apr 5, 2007 | Completed final sign-off Jun 2010 | 1298 Ocean Av | erect 1 story, type 5, library building.Details
erect 1 story, type 5, library building. | ||
| Dec 19, 2005 | Completed final sign-off Apr 2009 | 300 Berry St | grading. site preperation for new foundation slab. grade & fill to level existing site.Details
grading. site preperation for new foundation slab. grade & fill to level existing site. | $125,000 |