16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2021 | Never finaled issued Jul 2021, no final | 2800 Arelious Walker Dr | errcs upgrade - revision to pa #2016-0829-6272-s8 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffdDetails
errcs upgrade - revision to pa #2016-0829-6272-s8 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffd | ||
| Oct 29, 2018 | Completed final sign-off Nov 2018 | 2800 Arelious Walker Dr | Red Hawk Fire & Security Ca Llc | fire alarm t.i. errcs monitoring - add (3) dual monitoring modules for irrcs, add (1) annunciator for errcs pointsDetails
fire alarm t.i. errcs monitoring - add (3) dual monitoring modules for irrcs, add (1) annunciator for errcs points | $2,000 |
| Oct 23, 2018 | Never finaled issued Oct 2018, no final | 2800 Arelious Walker Dr | Baines - Nibbi J V | as built revision to pa 2016-0829-6272 s8 remove antennas from floors 2 & 3rd; floors passed coverage testDetails
as built revision to pa 2016-0829-6272 s8 remove antennas from floors 2 & 3rd; floors passed coverage test | |
| Sep 10, 2018 | Expired or cancelled withdrawn Sep 2018 | 2800 Arelious Walker Dr | Solarix Systems | installation of a solar hot water heating system. ground mounted storage tank and roof-mounted collector maher naDetails
installation of a solar hot water heating system. ground mounted storage tank and roof-mounted collector maher na | $54,000 |
| Aug 8, 2018 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | Nibbi Bros Assoc Inc. | revision to 201608296272 s2 for mod revisions to play structure and indicate accessible path of travel to play structure transfer platformDetails
revision to 201608296272 s2 for mod revisions to play structure and indicate accessible path of travel to play structure transfer platform | |
| Aug 6, 2018 | Completed final sign-off Nov 2018 | 2800 Arelious Walker Dr | Priority Architectural Graphics Dba Prio | 9 evac maps for sffd review only floor 1,2,3. maher n/a.Details
9 evac maps for sffd review only floor 1,2,3. maher n/a. | $3,600 |
| May 23, 2018 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | Baines - Nibbi J V | rev pa# 201608296272 s1 & s2; structural revision to trash room to match approved architecturals, revision included removal of closet from foot print, extdede walkway roof, extended cmu wall, & extended trash room slab at mail box area.Details
rev pa# 201608296272 s1 & s2; structural revision to trash room to match approved architecturals, revision included removal of closet from foot print, extdede walkway roof, extended cmu wall, & extended trash room slab at mail box area. | |
| Jan 9, 2018 | Never finaled issued Apr 2018, no final | 2800 Arelious Walker Dr | Nibbi Bros Assoc Inc. | plumbing review of storm water control systems and reclaimed water for toilets (alternate water sytems)Details
plumbing review of storm water control systems and reclaimed water for toilets (alternate water sytems) | |
| Oct 10, 2017 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | rev to pa#2016.08.29.6272 s1 & 2017.07.20.2515 for mod comments (hinge slab) & stair strap design.Details
rev to pa#2016.08.29.6272 s1 & 2017.07.20.2515 for mod comments (hinge slab) & stair strap design. | ||
| Jul 20, 2017 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | Baines - Nibbi J V | revision to foudation and superstructura addendum for so property line planter wall, exterior walkway and center walls as 2 stair locations. ref 201608296272, s1Details
revision to foudation and superstructura addendum for so property line planter wall, exterior walkway and center walls as 2 stair locations. ref 201608296272, s1 | $10,000 |
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 921 Fitzgerald Av | per pa #201608296272s, add addresses to block 4884, lot 026 as; 921,923,925,927 fitgerald ave, and 2802 arelious walker ave.Details
per pa #201608296272s, add addresses to block 4884, lot 026 as; 921,923,925,927 fitgerald ave, and 2802 arelious walker ave. | ||
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 901 Fitzgerald Av | per pa #201608296272s, add addresses to block 4884, lot 026 as; 901,903,905,907,909 fitgerald ave.Details
per pa #201608296272s, add addresses to block 4884, lot 026 as; 901,903,905,907,909 fitgerald ave. | ||
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 911 Fitzgerald Av | per pa #201608296272s, add addresses to block 4884, lot 026 as; 911,913,915,917,919 fitgerald ave.Details
per pa #201608296272s, add addresses to block 4884, lot 026 as; 911,913,915,917,919 fitgerald ave. | ||
| Jun 20, 2017 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | Baines - Nibbi J V | private driveway for parking access of residential apartment complex @ 2800 arelious waller dr. ref 201608296272 sDetails
private driveway for parking access of residential apartment complex @ 2800 arelious waller dr. ref 201608296272 s | $50,000 |
| Jun 14, 2017 | Completed final sign-off Oct 2018 | 2800 Arelious Walker Dr | H & M Fire Protection, Inc. | install fire sprinkler underground per nfpa-24Details
install fire sprinkler underground per nfpa-24 | $8,600 |
| Aug 29, 2016 | Completed final sign-off May 2019 | 2800 Arelious Walker Dr | Solarix Systems, Baines - Nibbi J V | to erect 3 stories, no basement, type vb, 31 units apartments with parking. ** maher: n/a **Details
to erect 3 stories, no basement, type vb, 31 units apartments with parking. ** maher: n/a ** | $14,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Baines - Nibbi J V (5), Nibbi Bros Assoc Inc. (2), Solarix Systems (2), H & M Fire Protection, Inc., Priority Architectural Graphics Dba Prio, Red Hawk Fire & Security Ca Llc
- Architects
- Mennor Chan, Richard Caldwell
- Engineers
- Gregory Miller
Find contractors for work like this