Block 8706, lot 001
255 King St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
139 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 255 King St | D M Builders | unit 1606 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5. no structural work.maher n/a.Details
unit 1606 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5. no structural work.maher n/a. | $32,000 |
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 255 King St | D M Builders | unit 427 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5. no structural work.maher n/a.Details
unit 427 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5. no structural work.maher n/a. | $32,000 |
| Oct 9, 2019 | Completed final sign-off Oct 2019 | 255 King St | D M Builders | apt #1504: 2 bath and 1 kitchen remodel in-kind, no changes to floorplan or occupancy. kitchen 70sf, bath 40sf. comply with 150.0 (k)3 & 150.0 (k)5Details
apt #1504: 2 bath and 1 kitchen remodel in-kind, no changes to floorplan or occupancy. kitchen 70sf, bath 40sf. comply with 150.0 (k)3 & 150.0 (k)5 | $32,000 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 255 King St | D M Builders | unit 1506: kitchen and bathroom remodel in unit #1506: remodel in-kind, no new wall and no existing wall relocation. all existing fixtures that will be replaced with new fixtures will be located at the same location. new lighting shall comply with cec 150.0 (k)3 and (k)5. kitchen 70sqft, bath 40sqftDetails
unit 1506: kitchen and bathroom remodel in unit #1506: remodel in-kind, no new wall and no existing wall relocation. all existing fixtures that will be replaced with new fixtures will be located at the same location. new lighting shall comply with cec 150.0 (k)3 and (k)5. kitchen 70sqft, bath 40sqft | $32,000 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 255 King St | D M Builders | kitchen 70sqft and bathroom 40sqft remodel in unit #1106: remodel in-kind. no new wall and no existing wall relocation. all existing fixtures that will be replaced by new fixtures will be located at the same location. all new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
kitchen 70sqft and bathroom 40sqft remodel in unit #1106: remodel in-kind. no new wall and no existing wall relocation. all existing fixtures that will be replaced by new fixtures will be located at the same location. all new lighting shall comply with cec 150.0 (k)3 and (k)5. | $32,000 |
| Sep 16, 2019 | Never finaled issued Sep 2019, no final | 255 King St | D M Builders | unit 1005 - 1 kitchen (70 sq. ft.) and 1 bath (40 sq.ft.) remodel in-kind. no change to floor plan.Details
unit 1005 - 1 kitchen (70 sq. ft.) and 1 bath (40 sq.ft.) remodel in-kind. no change to floor plan. | $32,000 |
| Sep 3, 2019 | Never finaled issued Sep 2019, no final | 255 King St | D M Builders | unit 706 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5Details
unit 706 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5 | $32,000 |
| Sep 3, 2019 | Completed final sign-off Sep 2019 | 255 King St | D M Builders | unit 704 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5Details
unit 704 - kitchen & bath remodel. no change of floor plan. comply w/ cec 150 (k) 3 & 150 (k) 5 | $48,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 255 King St | D M Builders | #432: kitchen & bath remodel in kind. no change of floor plansDetails
#432: kitchen & bath remodel in kind. no change of floor plans | $35,000 |
| Aug 20, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | #1406: kitchen & bath remodel in kind. no change of floor plansDetails
#1406: kitchen & bath remodel in kind. no change of floor plans | $35,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 255 King St | D M Builders | #1602: kitchen & bath remodel in kind. no change of floor plansDetails
#1602: kitchen & bath remodel in kind. no change of floor plans | $35,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 255 King St | D M Builders | #541: kitchen & bath remodel in kind. no change of floor plansDetails
#541: kitchen & bath remodel in kind. no change of floor plans | $35,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | unit 531: kitchen & bath remodel in kindDetails
unit 531: kitchen & bath remodel in kind | $32,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | unit 904: kitchen & 2 bath remodel in kindDetails
unit 904: kitchen & 2 bath remodel in kind | $48,000 |
| Aug 12, 2019 | Never finaled issued Oct 2019, no final | 255 King St | Signtech Electrical Advertising Inc. | install 2 illuminated wall signs onto (e) packer panel "chase"Details
install 2 illuminated wall signs onto (e) packer panel "chase" | $8,000 |
| Aug 12, 2019 | Never finaled issued Oct 2019, no final | 255 King St | Signtech Electrical Advertising Inc. | install 1 illuminated projecting sign "chase"Details
install 1 illuminated projecting sign "chase" | $3,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | unit 516. kitchen and bath remodel. no alterations to windows, doors, walls. kitchen and bath layout unchanged. no changes to occupancy, egress or modification of common areas.Details
unit 516. kitchen and bath remodel. no alterations to windows, doors, walls. kitchen and bath layout unchanged. no changes to occupancy, egress or modification of common areas. | $32,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | apt 709: kitchen and bath remodel. no alterations to windows/doors/walls/. kitchen bath layout remains unchanged. no changes to occupancy or egress and no modifications of common areas. kitchen 60 sq ft. bath 1: 30 sqft. bath 2: 30 sq ft.Details
apt 709: kitchen and bath remodel. no alterations to windows/doors/walls/. kitchen bath layout remains unchanged. no changes to occupancy or egress and no modifications of common areas. kitchen 60 sq ft. bath 1: 30 sqft. bath 2: 30 sq ft. | $48,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | unit # 1006: remodel kitchen and bathroom. no alteration to windows/doors, walls. layout to remain unchanged. no change to occupancy, egress and no modifacation to common area. kitchen 70sq ft, bathroom 40 sq ft.Details
unit # 1006: remodel kitchen and bathroom. no alteration to windows/doors, walls. layout to remain unchanged. no change to occupancy, egress and no modifacation to common area. kitchen 70sq ft, bathroom 40 sq ft. | $32,000 |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 255 King St | D M Builders | unit # 1705: kitchen and bath remodel. no alterations to windows/doors/walls. kithcen and bath layout remain unchange. no changes to occupancy or egress or modifications to common area. kit 70 sq ft, bath 40 sq ftDetails
unit # 1705: kitchen and bath remodel. no alterations to windows/doors/walls. kithcen and bath layout remain unchange. no changes to occupancy or egress or modifications to common area. kit 70 sq ft, bath 40 sq ft | $32,000 |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 255 King St | D M Builders | unit #1502: kitchen and bath remodel. no alterations to windows/doors/walls. kithcen and bath layout remain unchange. no changes to occupancy or egress or modifications to common area. kit 70 sq ft, bath 40 sq ftDetails
unit #1502: kitchen and bath remodel. no alterations to windows/doors/walls. kithcen and bath layout remain unchange. no changes to occupancy or egress or modifications to common area. kit 70 sq ft, bath 40 sq ft | $32,000 |
| Jul 12, 2019 | Never finaled issued Jul 2019, no final | 255 King St | D M Builders | unit 1207: kitchen and bath remodel. no alterations to windows/doors/walls. kithcen and bath layout remain unchange. no changes to occupancy or egress or modifications to common area. kit 70 sq ft, bath 40 sq ftDetails
unit 1207: kitchen and bath remodel. no alterations to windows/doors/walls. kithcen and bath layout remain unchange. no changes to occupancy or egress or modifications to common area. kit 70 sq ft, bath 40 sq ft | $32,000 |
| Jul 3, 2019 | Never finaled issued Jul 2019, no final | 255 King St | D M Builders | unit# 1507; kitchen & bath remodel no alterations to windows,doors,walls kitchen & bath layout remains unchanged, no changes to occupancy or egress or modifications to common areas, no fire sprinkler or smoke detector work done. kitchen 70 sqft. bath 40 sqft. n/a maherDetails
unit# 1507; kitchen & bath remodel no alterations to windows,doors,walls kitchen & bath layout remains unchanged, no changes to occupancy or egress or modifications to common areas, no fire sprinkler or smoke detector work done. kitchen 70 sqft. bath 40 sqft. n/a maher | $32,000 |
| Jul 3, 2019 | Never finaled issued Jul 2019, no final | 255 King St | D M Builders | unit 801: kitchen and bath remodel, no alterations to any windows, doors, kitchen & bathroom layout, remains unchanged, no changes to occupancy or egress or modification to common areas no fire sprinkler or smoke detector work done, kitchen 70 sqft bath 40 sqft n/a maherDetails
unit 801: kitchen and bath remodel, no alterations to any windows, doors, kitchen & bathroom layout, remains unchanged, no changes to occupancy or egress or modification to common areas no fire sprinkler or smoke detector work done, kitchen 70 sqft bath 40 sqft n/a maher | $32,000 |
| Jun 21, 2019 | Completed final sign-off Oct 2019 | 255 King St | D M Builders | unit 1407: kitchen & bath upgrades, no alterations to walls/windows/doors. kitchen & bath layout to remain unchanged. no changes to occupancy or egress or modifications to common areas. no fire suppression or sprinkler work done. kitch: 70 sqft, bath 40 sqft.Details
unit 1407: kitchen & bath upgrades, no alterations to walls/windows/doors. kitchen & bath layout to remain unchanged. no changes to occupancy or egress or modifications to common areas. no fire suppression or sprinkler work done. kitch: 70 sqft, bath 40 sqft. | $32,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 255 King St | D M Builders | unit 1004: kitchen & bath upgrades, no alterations to walls/windows/doors, occupancy or egress or modifications to common areas. no fire suppression or sprinkler work done. kitch: 60 sqft, bath1: 30 sqft, bath2: 30 sqftDetails
unit 1004: kitchen & bath upgrades, no alterations to walls/windows/doors, occupancy or egress or modifications to common areas. no fire suppression or sprinkler work done. kitch: 60 sqft, bath1: 30 sqft, bath2: 30 sqft | $48,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 255 King St | D M Builders | unit 435: kitchen & bath upgrades, no alterations to walls/windows/doors. kitchen & bath layout to remain unchanged. no changes to occupancy or egress or modifications to common areas. no fire suppression or sprinkler work done. kitch: 70 sqft, bath 40 sqft.Details
unit 435: kitchen & bath upgrades, no alterations to walls/windows/doors. kitchen & bath layout to remain unchanged. no changes to occupancy or egress or modifications to common areas. no fire suppression or sprinkler work done. kitch: 70 sqft, bath 40 sqft. | $32,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 255 King St | D M Builders | apt 429: 1 kitchen & 2 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 60 sf bath 1: 30 sf bath 2: 30 sf no structural workDetails
apt 429: 1 kitchen & 2 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 60 sf bath 1: 30 sf bath 2: 30 sf no structural work | $32,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 255 King St | D M Builders | apt 108: 1 kitchen & 1 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 70 sf bath: 40 sf no structural work.Details
apt 108: 1 kitchen & 1 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 70 sf bath: 40 sf no structural work. | $32,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 255 King St | D M Builders | apt 521: 1 kitchen & 1 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 70 sf bath: 40 sf no structural workDetails
apt 521: 1 kitchen & 1 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 70 sf bath: 40 sf no structural work | $32,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 255 King St | D M Builders | apt 1008: 1 kitchen & 2 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 60 sf bath 1: 30 sf bath 2: 30 sf no structural workDetails
apt 1008: 1 kitchen & 2 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 60 sf bath 1: 30 sf bath 2: 30 sf no structural work | $32,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 255 King St | D M Builders | apt 110: 1 kitchen & 1 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 70 sf bath: 40 sf no structural workDetails
apt 110: 1 kitchen & 1 bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen: 70 sf bath: 40 sf no structural work | $32,000 |
| May 22, 2019 | Completed final sign-off Jun 2019 | 255 King St | D M Builders | unit 520. kitchen & bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen is 70 sq ft. bath is 40 sq ft.Details
unit 520. kitchen & bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen is 70 sq ft. bath is 40 sq ft. | $32,000 |
| May 22, 2019 | Completed final sign-off Jun 2019 | 255 King St | D M Builders | unit 109. kitchen & bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen is 70 sq ft. bath is 40 sq ft.Details
unit 109. kitchen & bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen is 70 sq ft. bath is 40 sq ft. | $32,000 |
| May 22, 2019 | Never finaled issued May 2019, no final | 255 King St | D M Builders | unit 103. kitchen & bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen is 70 sq ft. bath is 40 sq ft.Details
unit 103. kitchen & bath upgrades. no alterations to walls, windows or doors. kitchen & bath layout to remanin unchanged. no changes to occupancy or egress or modifications to common areas. no fire sprinkler system changes. kitchen is 70 sq ft. bath is 40 sq ft. | $32,000 |
| May 1, 2019 | Completed final sign-off May 2019 | 255 King St | D M Builders | unit 806: kitchen and bathroom upgrades. no alterations to walls/windows/doors. kitchen and bathroom layout to remain unchanged. no change to occupancy or egress or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen - 70 sq ft, bathroom - 40 sq ftDetails
unit 806: kitchen and bathroom upgrades. no alterations to walls/windows/doors. kitchen and bathroom layout to remain unchanged. no change to occupancy or egress or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen - 70 sq ft, bathroom - 40 sq ft | $32,000 |
| May 1, 2019 | Completed final sign-off Aug 2019 | 255 King St | D M Builders | unit 512: kitchen and bathroom upgrades. no alterations to walls/windows/doors. kitchen and bathroom layout to remain unchanged. no change to occupancy or egress or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen - 70 sq ft, bathroom - 40 sq ftDetails
unit 512: kitchen and bathroom upgrades. no alterations to walls/windows/doors. kitchen and bathroom layout to remain unchanged. no change to occupancy or egress or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen - 70 sq ft, bathroom - 40 sq ft | $32,000 |
| Apr 25, 2019 | Completed final sign-off May 2019 | 255 King St | D M Builders | unit 708: kitchen & bath upgrades, no alterations to walls/windows/doors, (e) layout to remain unchanged, no changes to occupancy, egress or modification to commona area; no fire alarm or fire sprinkler work done, kitchen 60 sq. ft., bath #1 30 sq. ft., bath #2 30 sq. ft.Details
unit 708: kitchen & bath upgrades, no alterations to walls/windows/doors, (e) layout to remain unchanged, no changes to occupancy, egress or modification to commona area; no fire alarm or fire sprinkler work done, kitchen 60 sq. ft., bath #1 30 sq. ft., bath #2 30 sq. ft. | $48,000 |
| Apr 25, 2019 | Completed final sign-off May 2019 | 255 King St | D M Builders | unit 420: kitchen & bath upgrades, no alterations to walls/windows/doors, (e) layout to remain unchanged, no changes to occupancy, egress or modification to commona area; no fire alarm or fire sprinkler work done, kitchen 70 sq. ft., bath 40 sq. ft.Details
unit 420: kitchen & bath upgrades, no alterations to walls/windows/doors, (e) layout to remain unchanged, no changes to occupancy, egress or modification to commona area; no fire alarm or fire sprinkler work done, kitchen 70 sq. ft., bath 40 sq. ft. | $32,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 255 King St | D M Builders | #525: kitchen and bath upgrades. no alterations to walls, windows or doors. kitchen and bath layout to remain unchange. no change to occupancy, egress or modification to common areas no fire alarm or fire sprinker work done. kitchen 60 sq ft. bath 30 sq ft. bath 2 30 sq ft.Details
#525: kitchen and bath upgrades. no alterations to walls, windows or doors. kitchen and bath layout to remain unchange. no change to occupancy, egress or modification to common areas no fire alarm or fire sprinker work done. kitchen 60 sq ft. bath 30 sq ft. bath 2 30 sq ft. | $48,000 |
| Apr 18, 2019 | Completed final sign-off May 2019 | 255 King St | D M Builders | #1003: kitchen and bath upgrades. no alterations to walls, windows or doors. kitchen and bath layout to remain unchange. no change to occupancy, egress or modification to common areas no fire alarm or fire sprinker work done. kitchen 60 sq ft. bath 30 sq ft. bath 2 30 sq ftDetails
#1003: kitchen and bath upgrades. no alterations to walls, windows or doors. kitchen and bath layout to remain unchange. no change to occupancy, egress or modification to common areas no fire alarm or fire sprinker work done. kitchen 60 sq ft. bath 30 sq ft. bath 2 30 sq ft | $48,000 |
| Apr 18, 2019 | Completed final sign-off May 2019 | 255 King St | D M Builders | #1205: kitchen and bath upgrades. no alterations to walls, windows or doors. kitchen and bath layout to remain unchange. no change to occupancy, egress or modification to common areas no fire alarm or fire sprinker work done. kitchen 70 sq ft. bath 40 sq ft.Details
#1205: kitchen and bath upgrades. no alterations to walls, windows or doors. kitchen and bath layout to remain unchange. no change to occupancy, egress or modification to common areas no fire alarm or fire sprinker work done. kitchen 70 sq ft. bath 40 sq ft. | $32,000 |
| Mar 18, 2019 | Completed final sign-off May 2019 | 255 King St | D M Builders | unit # 908: kitchen and bathroom upgrade. no alteration to walls, windows or doors. existin layout to remain unchanged, no change to occupnacy egress or modification to common area. no fire alarm or fire sprinkler work done. kitchen 60 sq ft. bathroom 30 sq ft. bathroom 2 30 sq ft.Details
unit # 908: kitchen and bathroom upgrade. no alteration to walls, windows or doors. existin layout to remain unchanged, no change to occupnacy egress or modification to common area. no fire alarm or fire sprinkler work done. kitchen 60 sq ft. bathroom 30 sq ft. bathroom 2 30 sq ft. | $48,000 |
| Mar 18, 2019 | Completed final sign-off Apr 2019 | 255 King St | D M Builders | unit # 905: kitchen and bathroom upgrade. no alteration to walls, windows or doors. existin layout to remain unchanged, no change to occupnacy egress or modification to common area. no fire alarm or fire sprinkler work done. kitchen 70 sq ft. bathroom 40 sq ft.Details
unit # 905: kitchen and bathroom upgrade. no alteration to walls, windows or doors. existin layout to remain unchanged, no change to occupnacy egress or modification to common area. no fire alarm or fire sprinkler work done. kitchen 70 sq ft. bathroom 40 sq ft. | $32,000 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 255 King St | unit #411: kitchen & bath upgrades. no alterations to walls, windows, doors. (e) layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarms or fire sprinkler work done. kitchen 70 sq ft, bath 40 sq ftDetails
unit #411: kitchen & bath upgrades. no alterations to walls, windows, doors. (e) layout to remain unchanged. no change to occupancy, egress or modification to common areas. no fire alarms or fire sprinkler work done. kitchen 70 sq ft, bath 40 sq ft | $32,000 | |
| Feb 28, 2019 | Completed final sign-off Mar 2019 | 255 King St | D M Builders | unit 1204: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress, or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen: 60 sq ft. bathroom 1: 30 sq ft. bathroom 2: 30 sq ft.Details
unit 1204: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress, or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen: 60 sq ft. bathroom 1: 30 sq ft. bathroom 2: 30 sq ft. | $48,000 |
| Feb 28, 2019 | Completed final sign-off Mar 2019 | 255 King St | D M Builders | unit 1001: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress, or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen: 70 sq ft. bathroom: 40 sq ft.Details
unit 1001: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress, or modifications to common areas. no fire alarm or fire sprinkler work done. kitchen: 70 sq ft. bathroom: 40 sq ft. | $32,000 |
| Feb 20, 2019 | Completed final sign-off Mar 2019 | 255 King St | D M Builders | unit # 902-kitchen & bath rupgrades, no alterations to walls, windows & doors, (e) layout to remain unchanged no change to occupancy egress or modifications to common areas no fire alarms or fire sprinklers work done, kitchne 70sq ft, bath 40 sq ftDetails
unit # 902-kitchen & bath rupgrades, no alterations to walls, windows & doors, (e) layout to remain unchanged no change to occupancy egress or modifications to common areas no fire alarms or fire sprinklers work done, kitchne 70sq ft, bath 40 sq ft | $32,000 |
| Feb 20, 2019 | Completed final sign-off Mar 2019 | 255 King St | D M Builders | unit # 1208 kitchen & bath upgrades no alterations to walls windows, & doors, (e) layout to remain unchanged no change to occupancey egress or modifications to coomon areas no fire alarm or fire sprinklers work done kitchen 60 sq ft bath 30 sq ftDetails
unit # 1208 kitchen & bath upgrades no alterations to walls windows, & doors, (e) layout to remain unchanged no change to occupancey egress or modifications to coomon areas no fire alarm or fire sprinklers work done kitchen 60 sq ft bath 30 sq ft | $48,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | # p101 kitchen( 70 sq ft) & 2 bath (40 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work doneDetails
# p101 kitchen( 70 sq ft) & 2 bath (40 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work done | $32,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | # 702 kitchen( 70 sq ft) & 2 bath (40 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work doneDetails
# 702 kitchen( 70 sq ft) & 2 bath (40 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work done | $32,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | # p107 kitchen( 70 sq ft) & 2 bath (40 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work doneDetails
# p107 kitchen( 70 sq ft) & 2 bath (40 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work done | $32,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | # 1103 kitchen( 60 sq ft) & 2 bath (30 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work doneDetails
# 1103 kitchen( 60 sq ft) & 2 bath (30 sq ft) upgrades no alternation to walls , windows & doors, (e) layout to remain unchanged no change to occupancy , egress or modification to common area no fire alarm or fire sprinkler work done | $48,000 |
| Jan 31, 2019 | Never finaled issued Jan 2019, no final | 255 King St | D M Builders | unit 1501: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress or modifications to common areas. no fire alarm or fire spinrklers work done. kitchen: 70 sqft. bathroom: 40 sqft.Details
unit 1501: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress or modifications to common areas. no fire alarm or fire spinrklers work done. kitchen: 70 sqft. bathroom: 40 sqft. | $32,000 |
| Jan 31, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 1210: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress or modifications to common areas. no fire alarm or fire spinrklers work done. kitchen: 70 sqft. bathroom: 40 sqft.Details
unit 1210: kitchen and bathroom upgrades. no alterations to walls, windows, and doors. existing layout to remain unchanged. no change to occupancy, egress or modifications to common areas. no fire alarm or fire spinrklers work done. kitchen: 70 sqft. bathroom: 40 sqft. | $32,000 |
| Jan 23, 2019 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 1201: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqftDetails
unit 1201: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqft | $32,000 |
| Jan 23, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 1002: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqftDetails
unit 1002: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqft | $32,000 |
| Jan 23, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 532: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqftDetails
unit 532: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqft | $32,000 |
| Jan 23, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 522: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqftDetails
unit 522: kitchen and bathroom upgrades. no alterations to walls, windows, abd doors. existing layout to remain unchanged. no change to occupancy, egress, or modification to common areas. no fire alarm or fire sprinkler work done. kitchen = 70 sqft. bathroom - 40 sqft | $32,000 |
| Jan 15, 2019 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 1102: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 40 sq ftDetails
unit 1102: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 40 sq ft | $32,000 |
| Jan 15, 2019 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 1509: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 30 sq ft, bath + 30 sq ft.Details
unit 1509: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 30 sq ft, bath + 30 sq ft. | $45,000 |
| Jan 15, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 710: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 40 sq ftDetails
unit 710: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 40 sq ft | $32,000 |
| Jan 15, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 441: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 40 sq ftDetails
unit 441: kitchen & bath upgrade - no alteration to walls, windows & doors existing layout to remain unchanged. no change to occupancy, egress of modification to common areas. no fire alarm or fire alarm or fire sprinkler work done. kitchen. 70 sqft, bath 40 sq ft | $32,000 |
| Jan 4, 2019 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 909: kitchen & bath upgrades, (1) kitchen 70 sq ft, (2) baths remodel (bath 1 30 sq ft, bath 2 30 sq ft, w.out chanign the floor plan in unit 909Details
unit 909: kitchen & bath upgrades, (1) kitchen 70 sq ft, (2) baths remodel (bath 1 30 sq ft, bath 2 30 sq ft, w.out chanign the floor plan in unit 909 | $45,000 |
| Jan 4, 2019 | Completed final sign-off Feb 2019 | 255 King St | D M Builders | unit 1010: kitchen & bath upgrades (1) kitchen (1) bath remodel w/out changing floor plan @ unit 1010 kitchne 70x50 bath 40x50Details
unit 1010: kitchen & bath upgrades (1) kitchen (1) bath remodel w/out changing floor plan @ unit 1010 kitchne 70x50 bath 40x50 | $32,000 |
| Dec 18, 2018 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 428: kitchen and bath remodel (1) kitchen (1) bath remodel w/out changing the floor plan in unit 428. kitchen 70 sq ft, bath 40 sq stDetails
unit 428: kitchen and bath remodel (1) kitchen (1) bath remodel w/out changing the floor plan in unit 428. kitchen 70 sq ft, bath 40 sq st | $32,000 |
| Dec 18, 2018 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 1203: kitchen and bath remodel (1) kitchen (2) bath remodel w/out changing the floor plan in unit 1203. kitchen 60 sq ft bath, 1 (30 sq ft), bath 2 (30 sq ft)Details
unit 1203: kitchen and bath remodel (1) kitchen (2) bath remodel w/out changing the floor plan in unit 1203. kitchen 60 sq ft bath, 1 (30 sq ft), bath 2 (30 sq ft) | $32,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 417: kitchen and bath upgrades (2) bath (1) kitchen remodel without changing floor plan. bath 1 40 sqft bath 2 30 sq ft. kitchen 80 sq ftDetails
unit 417: kitchen and bath upgrades (2) bath (1) kitchen remodel without changing floor plan. bath 1 40 sqft bath 2 30 sq ft. kitchen 80 sq ft | $32,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 1105: remodel 1 kitchen and 1 bathroom. no change to floor plans. all work in unit 1105. 40sq feet bathroom and 70sq feet kitchen.Details
unit 1105: remodel 1 kitchen and 1 bathroom. no change to floor plans. all work in unit 1105. 40sq feet bathroom and 70sq feet kitchen. | $32,000 |
| Nov 27, 2018 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | kitchen and bath upgrades 1 bath, 1 kitchen remodel without changing floor plan for unit 906. 40 sq ft bath, 70 sq ft kitchen.Details
kitchen and bath upgrades 1 bath, 1 kitchen remodel without changing floor plan for unit 906. 40 sq ft bath, 70 sq ft kitchen. | $32,000 |
| Nov 7, 2018 | Completed final sign-off Jan 2019 | 255 King St | D M Builders | unit 439: kitchen and abth upgrades (1) both & (1) kitchen remodel without changing on floor plan. 40 sqft bath 70 sqft kitchenDetails
unit 439: kitchen and abth upgrades (1) both & (1) kitchen remodel without changing on floor plan. 40 sqft bath 70 sqft kitchen | $32,000 |
| May 23, 2018 | Completed final sign-off Jan 2019 | 255 King St | L P G Fire Protection Inc | 1st flr - replacing 3 heads, to chrome & re locating heads on 19th flr to be in line with new lights maher naDetails
1st flr - replacing 3 heads, to chrome & re locating heads on 19th flr to be in line with new lights maher na | $3,500 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 255 King St | street spaceDetails
street space | ||
| Feb 26, 2018 | Never finaled issued Jul 2018, no final | 255 King St | Fluoresco Services Llc/Everbrite West Ll | suite d,e,f - r&r interior lighting, t-24 maher naDetails
suite d,e,f - r&r interior lighting, t-24 maher na | $9,000 |
| Jul 13, 2017 | Completed final sign-off Jul 2019 | 255 King St | interior alterations to an existing 19-story apartment building, including lobby, leasing, fitness, and lounge. fire alarm and sprinklers under seperate permit. maher n/aDetails
interior alterations to an existing 19-story apartment building, including lobby, leasing, fitness, and lounge. fire alarm and sprinklers under seperate permit. maher n/a | $859,332 | |
| Dec 16, 2016 | Never finaled issued Dec 2016, no final | 255 King St | D M Builders | #401 - remodel kitchen & bathroom, tile in shower enclosure, new cabinets, counter tops & liht fixtures. paintDetails
#401 - remodel kitchen & bathroom, tile in shower enclosure, new cabinets, counter tops & liht fixtures. paint | $20,000 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 255 King St | street spaceDetails
street space | ||
| May 5, 2016 | Never finaled issued May 2016, no final | 255 King St | street space w/mtaDetails
street space w/mta | ||
| Aug 12, 2015 | Completed final sign-off Dec 2016 | 255 King St | existing outdoor area over podium: convert extg fountain to bbq area. add heaters, string lights, tile paving, gas line water to sink. 500 square feet approximate area.Details
existing outdoor area over podium: convert extg fountain to bbq area. add heaters, string lights, tile paving, gas line water to sink. 500 square feet approximate area. | $200,000 | |
| Nov 21, 2014 | Completed final sign-off Jun 2015 | 255 King St | Jericho Project | revison 201410279930. change letter attachement from welding to screw mounting. no change to visual of signDetails
revison 201410279930. change letter attachement from welding to screw mounting. no change to visual of sign | |
| Oct 27, 2014 | Completed final sign-off Jun 2015 | 255 King St | Jericho Project | new non electric signDetails
new non electric sign | $4,000 |
| Oct 27, 2014 | Completed final sign-off Jun 2015 | 255 King St | Jericho Project | reface 2 signsDetails
reface 2 signs | $2,400 |
| Nov 14, 2013 | Completed final sign-off Apr 2021 | 255 King St | Pacific Auxiliary Fire Alarm | entire bldg.- voluntaray facu replacement. no ref construction permit 100% testing is required per approved pa # 2002-03-29-2666 of all new systems' functions and devices.Details
entire bldg.- voluntaray facu replacement. no ref construction permit 100% testing is required per approved pa # 2002-03-29-2666 of all new systems' functions and devices. | $35,000 |
| Sep 27, 2010 | Completed final sign-off Jan 2011 | 255 King St | Avalon Bay Communities | build one storage roomin thegarage. (n) storage room will have double door. relocate one light fixture and add one fixture to new room. additional work tp pa# 2009.09.10.6558Details
build one storage roomin thegarage. (n) storage room will have double door. relocate one light fixture and add one fixture to new room. additional work tp pa# 2009.09.10.6558 | $3,500 |
| Jul 19, 2010 | Completed final sign-off Aug 2010 | 255 King St | revision to pa# 2009.09.10.6571. renovation to fitness center restrooms only.Details
revision to pa# 2009.09.10.6571. renovation to fitness center restrooms only. | ||
| Jan 20, 2010 | Completed final sign-off Apr 2010 | 255 King St | relocate existing sprinkler heads (10 total).Details
relocate existing sprinkler heads (10 total). | $5,800 | |
| Jan 14, 2010 | Expired or cancelled cancelled Jan 2026 | 255 King St | Golden Gate Sign Company Inc. | erect 3 illuminated, electric single faced interior wall signs & 3 light boxes.Details
erect 3 illuminated, electric single faced interior wall signs & 3 light boxes. | $10,000 |
| Nov 6, 2009 | Completed final sign-off Apr 2010 | 255 King St | Dbsi Inc Dba Design Build Solutions & In | suite #d,e,f-chase bank. revision to pa# 2009.06.08.9950. includes revised furniture lay out. minor elec. and mech. revision to accomodate furniture lay out. add one work stationDetails
suite #d,e,f-chase bank. revision to pa# 2009.06.08.9950. includes revised furniture lay out. minor elec. and mech. revision to accomodate furniture lay out. add one work station | $2,600 |
| Sep 17, 2009 | Completed final sign-off May 2010 | 255 King St | Golden Gate Sign Company Inc. | erect a non-electric, single faced wall sign.Details
erect a non-electric, single faced wall sign. | $10,000 |
| Sep 10, 2009 | Completed final sign-off Aug 2010 | 255 King St | 4th fl - renovation to fitness center-area of work is approx. 4600 sq.ft. scope includes replacing bathroom fixt. light fixt. flooring, wall & clg. finish, (n) slider doors. all work interior, no structural.Details
4th fl - renovation to fitness center-area of work is approx. 4600 sq.ft. scope includes replacing bathroom fixt. light fixt. flooring, wall & clg. finish, (n) slider doors. all work interior, no structural. | $90,000 | |
| Sep 10, 2009 | Completed final sign-off Jan 2011 | 255 King St | Avalon Bay Communities | 1st fl - renovation of lobby including (n)suspended clg. light fixt. furn. fixt. equipt. wall clg. finish & millwork,removation of garage entry vestibules, renovation of leasing off.(n)suspended clg. light fixt., furn., fixt. equipt. wall & clg. finish, millwork. mep,sprinkler &fire alarms separate.Details
1st fl - renovation of lobby including (n)suspended clg. light fixt. furn. fixt. equipt. wall clg. finish & millwork,removation of garage entry vestibules, renovation of leasing off.(n)suspended clg. light fixt., furn., fixt. equipt. wall & clg. finish, millwork. mep,sprinkler &fire alarms separate. | $190,000 |
| Sep 10, 2009 | Completed final sign-off Jan 2011 | 255 King St | Avalon Bay Communities | renovation to 19th. flr. lounge approx. 2,510 sq.ft. (n) suspended clg. decorative light fixt. flooring, wall & clg. finish, (n) built-in millwork, (n) furn. fixt. & quipt. all work interior, no structural.Details
renovation to 19th. flr. lounge approx. 2,510 sq.ft. (n) suspended clg. decorative light fixt. flooring, wall & clg. finish, (n) built-in millwork, (n) furn. fixt. & quipt. all work interior, no structural. | $120,000 |
| Jun 8, 2009 | Completed final sign-off Apr 2010 | 255 King St | Dbsi Inc Dba Design Build Solutions & In | remodel of (e) bank which includes demolition of non-structural partitions, finishes & millwork; (n) work includes (n) non-structural walls, finishes, millwork & minor electrical & mechanical. no exterior work. sprinkler & fire alarm under separate permit.Details
remodel of (e) bank which includes demolition of non-structural partitions, finishes & millwork; (n) work includes (n) non-structural walls, finishes, millwork & minor electrical & mechanical. no exterior work. sprinkler & fire alarm under separate permit. | $116,313 |
| Aug 20, 2007 | Completed final sign-off Aug 2007 | 255 King St | Arrow Sign Company | to renew for final inspection only pa#200612290775Details
to renew for final inspection only pa#200612290775 | |
| Apr 9, 2007 | Expired or cancelled expired Jan 2008 | 255 King St | Thomas Swan Sign Co Inc | revision to appl#200612089530: erect single faced non-electric sign.Details
revision to appl#200612089530: erect single faced non-electric sign. | |
| Feb 16, 2007 | Never finaled issued Feb 2007, no final | 255 King St | Aeco Systems, Inc | relocate one speaker/strobe to new wall. ground floorDetails
relocate one speaker/strobe to new wall. ground floor | $1,800 |
| Jan 9, 2007 | Completed final sign-off Apr 2007 | 255 King St | Geo M Robinson & Co | altheration to existing fire sprinkler system for fury tales at 225 king stDetails
altheration to existing fire sprinkler system for fury tales at 225 king st | $3,000 |
| Dec 29, 2006 | Expired or cancelled expired Aug 2007 | 255 King St | Arrow Sign Company | to erect electrical signDetails
to erect electrical sign | |
| Dec 20, 2006 | Never finaled issued Dec 2006, no final | 255 King St | street space permit for 255 king st.4th st.Details
street space permit for 255 king st.4th st. | ||
| Dec 20, 2006 | Completed final sign-off Apr 2007 | 255 King St | Jay - Phares Corporation | unit b: set utilities, finish concrete flr, install plumbing for ada bathrm and dog bathtub, construct 1 ada bathrm w/ 6 gallon water heater located above bathroom ceiling, suspended acoustical ceiling, install hvac, install wall mount display fixtures, dry wall, electrical lighting/outlets, paint &Details
unit b: set utilities, finish concrete flr, install plumbing for ada bathrm and dog bathtub, construct 1 ada bathrm w/ 6 gallon water heater located above bathroom ceiling, suspended acoustical ceiling, install hvac, install wall mount display fixtures, dry wall, electrical lighting/outlets, paint & | $90,000 |
| Dec 8, 2006 | Never finaled issued Feb 2007, no final | 255 King St | Thomas Swan Sign Co Inc | to erect non electrical sign. install hanging letters at extg canopy structure as new main i.d. signageDetails
to erect non electrical sign. install hanging letters at extg canopy structure as new main i.d. signage | $8,000 |
| Dec 19, 2005 | Completed final sign-off Apr 2009 | 300 Berry St | grading. site preperation for new foundation slab. grade & fill to level existing site.Details
grading. site preperation for new foundation slab. grade & fill to level existing site. | $125,000 | |
| Jul 27, 2005 | Completed final sign-off Jan 2006 | 255 King St | Cosco Fire Protection Inc. | relocated 1 speaker strobe from wall to ceiling.Details
relocated 1 speaker strobe from wall to ceiling. | $1,200 |
| Jun 13, 2005 | Completed final sign-off Jan 2006 | 255 King St | Draeger Construction Inc. | install new hvac system for tanning salonDetails
install new hvac system for tanning salon | $35,000 |
| May 25, 2005 | Completed final sign-off Jan 2006 | 255 King St | Cosco Fire Protection Inc. | add 8 fire sprinkler to accomodate t.i.Details
add 8 fire sprinkler to accomodate t.i. | $3,500 |
| May 19, 2005 | Completed final sign-off Jan 2006 | 255 King St | Field Construction Inc. | tenant improvement - 1st floor commercial space, no change to structure, interior non bearingDetails
tenant improvement - 1st floor commercial space, no change to structure, interior non bearing | $43,000 |
| Mar 25, 2005 | Completed final sign-off Jan 2006 | 255 King St | Draeger Construction Inc. | plumbing waste & supply, ada bathroom, hvac, electrical, drywall, metal framing, acoustic ceiling.Details
plumbing waste & supply, ada bathroom, hvac, electrical, drywall, metal framing, acoustic ceiling. | $34,000 |
| Oct 29, 2004 | Never finaled issued Oct 2004, no final | 255 King St | Rossi Builders Inc. | plumbing work for space improvement - deferred drawwings under pa#2004/09/24/5090, permit #1037066Details
plumbing work for space improvement - deferred drawwings under pa#2004/09/24/5090, permit #1037066 | $20,000 |
| Oct 26, 2004 | Never finaled issued Nov 2004, no final | 255 King St | Mc Millan Electric | provide a complete design build life safety system. install 3 speaker strobes & 1 strobe circuit.Details
provide a complete design build life safety system. install 3 speaker strobes & 1 strobe circuit. | $6,905 |
| Oct 25, 2004 | Completed final sign-off Feb 2005 | 255 King St | Rossi Builders Inc. | this app for mech work only as required by app 200409245090 for architectural tenant improvment workDetails
this app for mech work only as required by app 200409245090 for architectural tenant improvment work | $20,000 |
| Sep 24, 2004 | Completed final sign-off Jan 2005 | 255 King St | interior tenant improvement -- includes new partition walls, doors, counters, new electrical outletDetails
interior tenant improvement -- includes new partition walls, doors, counters, new electrical outlet | $250,000 | |
| Sep 23, 2004 | Never finaled issued Sep 2004, no final | 255 King St | R L H Fire Protection Inc | fire sprinkler t/i from shell building add 26 pendent spklers.Details
fire sprinkler t/i from shell building add 26 pendent spklers. | $4,100 |
| Sep 17, 2004 | Completed final sign-off Sep 2004 | 255 King St | renew pa 200209065837 & 200208063319 for final inspectionDetails
renew pa 200209065837 & 200208063319 for final inspection | ||
| Sep 17, 2004 | Completed final sign-off Sep 2004 | 255 King St | renew pa 200203292666 & 200202280256 for final inspectionDetails
renew pa 200203292666 & 200202280256 for final inspection | ||
| Jul 1, 2004 | Never finaled issued Jul 2004, no final | 255 King St | Scott Architectual Graphics, Inc | renew:200303190078f for final inpsection only no work under this permitDetails
renew:200303190078f for final inpsection only no work under this permit | |
| Jun 16, 2004 | Completed final sign-off Sep 2004 | 255 King St | renew appl#200008309214 & 200203141438 for finalDetails
renew appl#200008309214 & 200203141438 for final | ||
| Jun 16, 2004 | Completed final sign-off Sep 2004 | 255 King St | renew appl#200206219644 & 200101300866 for finalDetails
renew appl#200206219644 & 200101300866 for final | ||
| Mar 15, 2004 | Completed final sign-off Apr 2004 | 255 King St | California Sign Installation | install 1 frontage electric single face signDetails
install 1 frontage electric single face sign | $1,350 |
| Mar 15, 2004 | Completed final sign-off Apr 2004 | 255 King St | California Sign Installation | erect non-electric single face signDetails
erect non-electric single face sign | $1,000 |
| Mar 5, 2004 | Expired or cancelled expired Mar 2010 | 255 King St | Simplex Grinnell | adding 1 new nac panel, 1 new control module, 1 new monitor module, 1 new smoke det, 1 new duct det,Details
adding 1 new nac panel, 1 new control module, 1 new monitor module, 1 new smoke det, 1 new duct det, | $6,300 |
| Jan 16, 2004 | Never finaled issued Jan 2004, no final | 255 King St | street spaceDetails
street space | ||
| Dec 17, 2003 | Never finaled issued Dec 2003, no final | 255 King St | street spaceDetails
street space | ||
| Nov 4, 2003 | Expired or cancelled expired Jun 2005 | 255 King St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work ground levelDetails
provide tenant fire protection work ground level | $8,570 |
| Aug 21, 2003 | Completed final sign-off Apr 2004 | 255 King St | Dpr Construction Inc | interior tenant improvement, work to include new non-structural partition walls, accssble restrms,Details
interior tenant improvement, work to include new non-structural partition walls, accssble restrms, | $200,000 |
| Apr 4, 2003 | Completed final sign-off May 2003 | 255 King St | Scott Architectual Graphics, Inc | sign permitDetails
sign permit | $12,000 |
| Mar 19, 2003 | Never finaled issued Jul 2003, no final | 255 King St | Scott Architectual Graphics, Inc | erect a double-faced projecting electrical signDetails
erect a double-faced projecting electrical sign | $8,000 |
| Mar 19, 2003 | Completed final sign-off May 2003 | 255 King St | Scott Architectual Graphics, Inc | seven vinyl graphic stick ons on windowsDetails
seven vinyl graphic stick ons on windows | $1,000 |
| Sep 6, 2002 | Completed final sign-off Sep 2004 | 255 King St | landscaping of open space including earthwork excavating drainage irrigation new trees concreteDetails
landscaping of open space including earthwork excavating drainage irrigation new trees concrete | $25,000 | |
| Aug 6, 2002 | Completed final sign-off Sep 2004 | 255 King St | Granite Const Co | install 6" fire service lateral frm curb to property line for 255 king stDetails
install 6" fire service lateral frm curb to property line for 255 king st | $1,500 |
| Jun 24, 2002 | Expired or cancelled cancelled Feb 2003 | 255 King St | no ext. envelope work, 1st time t.i. for retail showroom on gr/flDetails
no ext. envelope work, 1st time t.i. for retail showroom on gr/fl | $100,000 | |
| Jun 21, 2002 | Completed final sign-off Sep 2004 | 255 King St | Acco Engineered Systems Inc. Dba Acco En | install boiler interlock, interlock boiler start up with fire smoke damperDetails
install boiler interlock, interlock boiler start up with fire smoke damper | |
| Mar 29, 2002 | Completed final sign-off Sep 2004 | 255 King St | life safety permit for entire bldg fire alarm shop plans to be reviewed ref app #200007155245sDetails
life safety permit for entire bldg fire alarm shop plans to be reviewed ref app #200007155245s | ||
| Mar 14, 2002 | Completed final sign-off Sep 2004 | 255 King St | submit of roof truss details ref app 200007155245Details
submit of roof truss details ref app 200007155245 | ||
| Feb 28, 2002 | Completed final sign-off Sep 2004 | 255 King St | install generatorDetails
install generator | $20,000 | |
| Jan 30, 2001 | Expired or cancelled withdrawn Dec 2001 | 255 King St | provide fire alarm system per planDetails
provide fire alarm system per plan | ||
| Jan 30, 2001 | Completed final sign-off Sep 2004 | 255 King St | provide fire sprinklers per plansDetails
provide fire sprinklers per plans | ||
| Nov 7, 2000 | Expired or cancelled expired Jan 2002 | 300 Berry St | excavate existing site in preparation of site developmentDetails
excavate existing site in preparation of site development | $60,000 | |
| Aug 30, 2000 | Completed final sign-off Sep 2004 | 255 King St | provide shoring per planDetails
provide shoring per plan | $50,000 | |
| Jul 15, 2000 | Completed final sign-off Sep 2004 | 255 King St | to erect apt parking retailDetails
to erect apt parking retail | $12,000,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.