Kevin Peng
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- S & K Consulting Eng.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Jun 2026
61 permits since 2000 (engineer on 54 permits, architect on 5 permits, authorized agent-others on 1 permit, designer on 1 permit): 35 completed, 3 in progress, 11 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Aug 2026 | 39 Cityview Wy | Golden State Marble And Construction Inc | 1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service.Details
1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service. | $150,000 |
| May 15, 2025 | Completed final sign-off Jul 2026 | 915 Garfield St | Golden State Marble And Construction Inc | remove interior stair, convert storage into 1 bedroom, and walkin closet for a total of 4 bedrooms. 2 bathrooms & wet bar at 1st flDetails
remove interior stair, convert storage into 1 bedroom, and walkin closet for a total of 4 bedrooms. 2 bathrooms & wet bar at 1st fl | $40,000 |
| May 10, 2024 | In progress issued Jul 2024 | 4156 20th St | Golden State Marble & Granite Inc. | replace partial deteriorated foundation for approx 15 ln ft along the west side. reinforce (e) footing for approx 35 ln ft along east side.Details
replace partial deteriorated foundation for approx 15 ln ft along the west side. reinforce (e) footing for approx 35 ln ft along east side. | $20,000 |
| Oct 11, 2023 | Expired or cancelled expired Apr 2026 | 4 Wright St | Allied Teamwork Construction Co | to comply with nov# 202313476. rebuild front entry stair in-kind. modify & strengthen rear stair stringers. add stair from 1st to 2nd fl. rebuild stair from 2nd to 3rd fl.Details
to comply with nov# 202313476. rebuild front entry stair in-kind. modify & strengthen rear stair stringers. add stair from 1st to 2nd fl. rebuild stair from 2nd to 3rd fl. | $15,000 |
| Sep 19, 2023 | Completed final sign-off Apr 2026 | 1125 Potrero Av | Allied Teamwork Construction Co | convert storage into office and game room at 1st flr. add 1-bathroom at 2nd flr.Details
convert storage into office and game room at 1st flr. add 1-bathroom at 2nd flr. | $30,000 |
| Sep 11, 2023 | Completed final sign-off Jan 2026 | 4156 20th St | Golden State Marble & Granite Inc. | unit 1: convert storage to office space at basement. 4158b: new interior stair from first floor to basement. remove chimney. remodel downstair bath. unit 2: remove chimney and provide electric fire place.Details
unit 1: convert storage to office space at basement. 4158b: new interior stair from first floor to basement. remove chimney. remodel downstair bath. unit 2: remove chimney and provide electric fire place. | $40,000 |
| Jul 13, 2023 | Never finaled issued Jul 2023, no final | 2140 15th Av | Kyle Wong Construction | revision to pa# 202209192683, update structural layout of front stairway per existing conditions.Details
revision to pa# 202209192683, update structural layout of front stairway per existing conditions. | |
| Jun 30, 2023 | Completed final sign-off Apr 2024 | 125 Majestic Av | Allied Teamwork Construction Co | add 1 bedroom, one study, one office, and one bathroom and closet @ 1st flDetails
add 1 bedroom, one study, one office, and one bathroom and closet @ 1st fl | $30,000 |
| May 10, 2023 | Expired or cancelled withdrawn Jun 2023 | 235 Arch St | revision to 2022 1114 6427: remove (e) dropbeam & 2 column at (e) study rm. dropbeam btw library & stairway remain unchangedDetails
revision to 2022 1114 6427: remove (e) dropbeam & 2 column at (e) study rm. dropbeam btw library & stairway remain unchanged | ||
| Apr 7, 2023 | Completed final sign-off Apr 2026 | 4 Wright St | Allied Teamwork Construction Co | add 1 bedroom, bathroom, wet bar and family room at 1st flr. 1-new window visible from street view. add half bath at 3/f.Details
add 1 bedroom, bathroom, wet bar and family room at 1st flr. 1-new window visible from street view. add half bath at 3/f. | $25,000 |
| Mar 3, 2023 | Completed final sign-off Apr 2023 | 1378 Portola Dr | revision to pa 2022-0524-4833 original plans did not show a strong wall where the support beam is placed but there was a strong wall found. revision to plans to include strong wallDetails
revision to pa 2022-0524-4833 original plans did not show a strong wall where the support beam is placed but there was a strong wall found. revision to plans to include strong wall | ||
| Nov 14, 2022 | Completed final sign-off Mar 2024 | 235 Arch St | Q & Qq Construction Inc | convert part of (e) garage into library and batroom w/ total of 392 sqft. remodel (e) study roomDetails
convert part of (e) garage into library and batroom w/ total of 392 sqft. remodel (e) study room | $80,000 |
| Sep 19, 2022 | Never finaled issued Dec 2022, no final | 2140 15th Av | Kyle Wong Construction | replace in-kind for (e) front staircase. (e) brick finish to be replaced in kind -brick veneerDetails
replace in-kind for (e) front staircase. (e) brick finish to be replaced in kind -brick veneer | $5,000 |
| May 24, 2022 | Completed final sign-off Apr 2023 | 1378 Portola Dr | Ly Construction | kitchen remodeling. relocate pantry door. remove wall in between kitchen & dining room. add new wine cellar. replace window at kitchen.Details
kitchen remodeling. relocate pantry door. remove wall in between kitchen & dining room. add new wine cellar. replace window at kitchen. | $20,000 |
| May 12, 2022 | Completed final sign-off Aug 2022 | 2140 15th Av | Kyle Wong Construction | interior swimming poop infill (205 sqft) at ground floor level.Details
interior swimming poop infill (205 sqft) at ground floor level. | $5,000 |
| Nov 12, 2021 | In progress issued Apr 2025 | 345 Rivera St | Polytec Construction Company Inc | foundation upgrade at the rear side with approved permit #201610241031. revision to bpa# 201610241031. to comply with nov# 202181445 for retaining wall design due to site safety issue.Details
foundation upgrade at the rear side with approved permit #201610241031. revision to bpa# 201610241031. to comply with nov# 202181445 for retaining wall design due to site safety issue. | $1,000 |
| Sep 29, 2021 | Completed final sign-off Jul 2022 | 35 Milton St | H & Bo Construction Inc. | revision to pa 2020-1103-8019 strong wall @ grid line 3 to 15/32 structural 1 shear wall with 10 d@4"o.c and cmstc strap t&b at 2nd flDetails
revision to pa 2020-1103-8019 strong wall @ grid line 3 to 15/32 structural 1 shear wall with 10 d@4"o.c and cmstc strap t&b at 2nd fl | |
| Aug 23, 2021 | Never finaled issued Aug 2021, no final | 1165 Francisco St | C B W Construction Inc. | unit 5: remodeling kitchen, demo dining doom and living room wall. add new recessed light in liv rm area. replace (e) closet new bathroom at (e) bedroom. add washer and dryer.Details
unit 5: remodeling kitchen, demo dining doom and living room wall. add new recessed light in liv rm area. replace (e) closet new bathroom at (e) bedroom. add washer and dryer. | $80,000 |
| Aug 23, 2021 | Expired or cancelled cancelled Jan 2026 | 345 Rivera St | site revision due to site condition with issued pa 201610241031 (s1). foundation upgrade at front side.Details
site revision due to site condition with issued pa 201610241031 (s1). foundation upgrade at front side. | ||
| Mar 22, 2021 | Never finaled issued May 2021, no final | 750 35th Av | unit 750: kitchen remodel on 2nd fl by removing a wall between (e) kitchen and living room. construct new single level wood deck connects 2nd fl and a stair going to rear yard. replace (2) existing beams and several footings in garageDetails
unit 750: kitchen remodel on 2nd fl by removing a wall between (e) kitchen and living room. construct new single level wood deck connects 2nd fl and a stair going to rear yard. replace (2) existing beams and several footings in garage | $60,000 | |
| Nov 3, 2020 | Completed final sign-off Jul 2022 | 35 Milton St | H & Bo Construction Inc. | interior remodel: 1) remodel (e) bath at 1/f 2) convert (e) bedroom #1 to (n) living room 3) remodel (e) kitchen at 2/f 4) convert (e) living room to (n) study room 5) replace (e) fireplace 6) work on ground level in separate permitDetails
interior remodel: 1) remodel (e) bath at 1/f 2) convert (e) bedroom #1 to (n) living room 3) remodel (e) kitchen at 2/f 4) convert (e) living room to (n) study room 5) replace (e) fireplace 6) work on ground level in separate permit | $20,000 |
| Jul 23, 2019 | Never finaled issued Sep 2019, no final | 8 San Lorenzo Wy | Polytec Construction Company Inc | to comply w/ boa's decision # 19-021, dated 5/29/2019. the adjacent neighbor wanted a side fence between property lines shown on the landscaping site plan. ref 201612215604s (new bldg).Details
to comply w/ boa's decision # 19-021, dated 5/29/2019. the adjacent neighbor wanted a side fence between property lines shown on the landscaping site plan. ref 201612215604s (new bldg). | $1,000 |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 1266 17th Av | Lordan Construction | revision to 201709077231 soft story seismic upgrade per sfebc 34b, 2016 iebc appx a4 change 2 moment frames on grnd flrDetails
revision to 201709077231 soft story seismic upgrade per sfebc 34b, 2016 iebc appx a4 change 2 moment frames on grnd flr | $6,000 |
| Jun 14, 2019 | Completed final sign-off Dec 2019 | 1231 22nd Av | 2 Y Construction Inc. | revision to pa 201903296673. seismic upgrade. relocate shear wall on 1st flr. relocate strong walls on 2nd flr.Details
revision to pa 201903296673. seismic upgrade. relocate shear wall on 1st flr. relocate strong walls on 2nd flr. | |
| Apr 2, 2019 | Expired or cancelled withdrawn Feb 2025 | 357 Vallejo St | Polytec Construction Company Inc | to comply with complaint bid 201867091. demo wall at ground floor. reconfigure 3 (e) units #359-1, #359-3, #359-4. reconfigure for 1 bed, 2 bath layout unitDetails
to comply with complaint bid 201867091. demo wall at ground floor. reconfigure 3 (e) units #359-1, #359-3, #359-4. reconfigure for 1 bed, 2 bath layout unit | $200,000 |
| Mar 29, 2019 | Completed final sign-off Dec 2019 | 1231 22nd Av | 2 Y Construction Inc. | add master bath, relocate guest bath, remodel kitchen at 2nd floor, and add laundry at 2nd floor. full seismic upgradeDetails
add master bath, relocate guest bath, remodel kitchen at 2nd floor, and add laundry at 2nd floor. full seismic upgrade | $100,000 |
| Sep 13, 2017 | Completed final sign-off Sep 2019 | 568 Folsom St | C B W Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Aug 4, 2017 | Completed final sign-off Nov 2018 | 3433 Anza St | C B W Construction Inc. | mandatory soft story seismic upgrade per sfebc chapter 4d: iebc 2016 cebc appendix a-4Details
mandatory soft story seismic upgrade per sfebc chapter 4d: iebc 2016 cebc appendix a-4 | $66,000 |
| Apr 19, 2017 | Completed final sign-off Aug 2018 | 374 Valley St | Polytec Construction Company Inc | revision to app#2016-10-19-0684. to comply with complaint #201768181. replace (e) foundation & retaining wall on left front corner of building. replace in kind per 136c(13)Details
revision to app#2016-10-19-0684. to comply with complaint #201768181. replace (e) foundation & retaining wall on left front corner of building. replace in kind per 136c(13) | $5,000 |
| Dec 21, 2016 | Never finaled issued Mar 2019, no final | 8 San Lorenzo Wy | Polytec Construction Company Inc | construction (n) 2-story, 1 basement, type 5, single family residence building.Details
construction (n) 2-story, 1 basement, type 5, single family residence building. | $800,000 |
| Nov 14, 2016 | Completed final sign-off Jan 2017 | 350 San Carlos St | Cris Construction | revision to 201611021739, replace wall gas heater, add 2 electrical heaters to roomsDetails
revision to 201611021739, replace wall gas heater, add 2 electrical heaters to rooms | |
| Oct 24, 2016 | Never finaled issued Mar 2019, no final | 345 Rivera St | Polytec Construction Company Inc | vertical addition to an existing 2-story single family house with complete interior renovation. three new bathrooms, two new roof deck and one new bedroom.Details
vertical addition to an existing 2-story single family house with complete interior renovation. three new bathrooms, two new roof deck and one new bedroom. | $100,000 |
| Oct 19, 2016 | Completed final sign-off Aug 2018 | 374 Valley St | Polytec Construction Company Inc | 1st floor interior remodel - reconfigure bedrooms, relcoate kitchen, relocate living room. add new bath, infill the window.Details
1st floor interior remodel - reconfigure bedrooms, relcoate kitchen, relocate living room. add new bath, infill the window. | $50,000 |
| Aug 10, 2016 | Completed final sign-off Dec 2016 | 150 Landers St | Yu Kwan Construction Co. | revision to appl# 2015-1001-8553. change wood beam to steel angle & connection to hardy frame on 1st floor lobby area along grid area 3.Details
revision to appl# 2015-1001-8553. change wood beam to steel angle & connection to hardy frame on 1st floor lobby area along grid area 3. | |
| Mar 2, 2016 | Completed final sign-off Jan 2020 | 667 Howard St | C B W Construction Inc. | core & shell interior improvement. replace (e) staircase at basement 1st & 2nd floor. remodel & add new ada bathrooms at basement & 2nd floor. and add service lounge at 1st floor. no change of use nor exterior change.Details
core & shell interior improvement. replace (e) staircase at basement 1st & 2nd floor. remodel & add new ada bathrooms at basement & 2nd floor. and add service lounge at 1st floor. no change of use nor exterior change. | $80,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2017 | 350 San Carlos St | Chubby Construction, Asdm Services Ince, Cris Construction | 1st floor: remodeling of kitchen & bathroomDetails
1st floor: remodeling of kitchen & bathroom | $25,000 |
| Oct 8, 2015 | Completed final sign-off Jan 2017 | 350 San Carlos St | Chubby Construction, Asdm Services Ince, Cris Construction | replace existing foundation to new reinforced concrete slab foundation, replace existing ground floor- floor framing to concrete slab on grade.Details
replace existing foundation to new reinforced concrete slab foundation, replace existing ground floor- floor framing to concrete slab on grade. | $30,000 |
| Oct 1, 2015 | Expired or cancelled withdrawn Jun 2016 | 2015 Stockton St | soft story seismic upgrade in referrence to iebc 2012, sfbc ch 34b apprendix a4Details
soft story seismic upgrade in referrence to iebc 2012, sfbc ch 34b apprendix a4 | $80,000 | |
| May 4, 2015 | Expired or cancelled cancelled May 2016 | 1763 Geneva Av | two story rear addition consisting of two bedrooms. two bedrooms, and three closetsDetails
two story rear addition consisting of two bedrooms. two bedrooms, and three closets | $80,000 | |
| Apr 28, 2015 | Completed final sign-off Aug 2016 | 161 Santa Rosa Av | Golden State Marble & Granite Inc. | convert storage at 1st fl into 1 bedroom , bath, and closet. reduce length of 2nd fl deck by appoximately 6'6Details
convert storage at 1st fl into 1 bedroom , bath, and closet. reduce length of 2nd fl deck by appoximately 6'6 | $40,000 |
| Apr 28, 2015 | Expired or cancelled withdrawn Jul 2015 | 224 Nueva Av | legalize in-law unit at 1st floor per ordinance 43-14. new 1 bedroom, new 1 bath, new 1 kitchen.Details
legalize in-law unit at 1st floor per ordinance 43-14. new 1 bedroom, new 1 bath, new 1 kitchen. | $7,000 | |
| Mar 16, 2015 | Expired or cancelled expired Mar 2021 | 427 Lisbon St | Michael Heavey Construction | legalize in-law unit on 1st floor as per ordinance 43-14. 1 bedroom, 1 bath & 1 kitchen. replace partial foundation.Details
legalize in-law unit on 1st floor as per ordinance 43-14. 1 bedroom, 1 bath & 1 kitchen. replace partial foundation. | $50,000 |
| Mar 9, 2015 | Completed final sign-off Dec 2016 | 2221 31st Av | B Power Construction Corp | legalize in-law unit as per ordinance 43-14. 2 new bedrooms, 1 new kitchen & 1 new bath.Details
legalize in-law unit as per ordinance 43-14. 2 new bedrooms, 1 new kitchen & 1 new bath. | $7,000 |
| Feb 2, 2015 | Completed final sign-off Mar 2016 | 1050 Clay St | Bel Construction Company | mandatory soft story seismic upgrade as per iebc 2012 iebc appendix a-4.Details
mandatory soft story seismic upgrade as per iebc 2012 iebc appendix a-4. | $50,000 |
| Jan 12, 2015 | Completed final sign-off May 2015 | 1408 Noe St | Golden State Marble & Granite Inc. | reference to pa#201411242338, relocate shearwall at back of bathroom wall at 1/fDetails
reference to pa#201411242338, relocate shearwall at back of bathroom wall at 1/f | $5,000 |
| Nov 21, 2014 | Expired or cancelled cancelled Apr 2021 | 1246 38th Av | legalize in-law unit at first floor per ordinance 43-14.Details
legalize in-law unit at first floor per ordinance 43-14. | $7,000 | |
| Nov 21, 2014 | Completed final sign-off Aug 2016 | 1477 26th Av | J P F Construction | legalize in-law unit at first floor per ordinance 43-14.Details
legalize in-law unit at first floor per ordinance 43-14. | $10,000 |
| Nov 19, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | Maan Global Development | legalization of attic space, addition of (n) stairs from 2/f to attic space, two (n) skylights @ attic.Details
legalization of attic space, addition of (n) stairs from 2/f to attic space, two (n) skylights @ attic. | $50,000 |
| Oct 28, 2014 | Expired or cancelled cancelled Nov 2022 | 1167 Palou Av | legalize in law unit at 1st floor per orinance 43-14. (1 bedroom, 1 bathroom, kitchen, living, and office)Details
legalize in law unit at 1st floor per orinance 43-14. (1 bedroom, 1 bathroom, kitchen, living, and office) | $20,000 | |
| Oct 28, 2014 | Expired or cancelled cancelled Aug 2021 | 33 Leo St | legalize in law unit at 1st floor per orinance 43-14Details
legalize in law unit at 1st floor per orinance 43-14 | $4,000 | |
| Oct 7, 2014 | Completed final sign-off May 2015 | 630 30th St | O'shaughnessy Construction | install new header beam at garage door opening. revision to app#201408295045Details
install new header beam at garage door opening. revision to app#201408295045 | |
| Sep 4, 2014 | Expired or cancelled withdrawn Mar 2019 | 2121 Judah St | new rear deck and stairs, infill lightwell onn 1st, 2nd & 3rd flr, 2 new full bath & one new half bath, reconfigure kitchen on 2nd & 3rd flr, reconfigure 1st flrDetails
new rear deck and stairs, infill lightwell onn 1st, 2nd & 3rd flr, 2 new full bath & one new half bath, reconfigure kitchen on 2nd & 3rd flr, reconfigure 1st flr | $70,000 | |
| Sep 3, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | Maan Global Development | new dormer windows as per drawingsDetails
new dormer windows as per drawings | $20,000 |
| Jul 24, 2014 | Completed final sign-off Jan 2016 | 1911 San Jose Av | Able Construction Dba: De Zhi Jiang | legalization in- law unit at first floor per ordinance 43-14.Details
legalization in- law unit at first floor per ordinance 43-14. | $6,500 |
| Jun 13, 2014 | Never finaled issued Aug 2014, no final | 1308 Hawes St | legalize in-law unit at 1st flr. per ordiance 43-14.Details
legalize in-law unit at 1st flr. per ordiance 43-14. | $10,500 | |
| May 22, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | Maan Global Development | replace (e) perimeter foundation at all 4 sides.Details
replace (e) perimeter foundation at all 4 sides. | $15,000 |
| May 16, 2014 | Never finaled issued Jun 2014, no final | 1462 Haight St | Sincere Construction Company Inc | revised of approved pa# 201401085806 field condition revision. bath a.d.a. relocation, shear walls length revised. soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
revised of approved pa# 201401085806 field condition revision. bath a.d.a. relocation, shear walls length revised. soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | |
| Apr 18, 2014 | Completed final sign-off Oct 2014 | 167 Mangels Av | Golden State Marble & Granite Inc. | convert den and game room at 1/f into bedrooms, relocate bathroom at 1/f, install new half bath at 1/f, remodel bathroom at 2/f.Details
convert den and game room at 1/f into bedrooms, relocate bathroom at 1/f, install new half bath at 1/f, remodel bathroom at 2/f. | $25,000 |
| Apr 7, 2014 | Completed final sign-off Jul 2014 | 235 Madrid St | Golden State Marble & Granite Inc. | convert existing storage into 2 bedrooms at 1/f and one home office.Details
convert existing storage into 2 bedrooms at 1/f and one home office. | $10,000 |
| Jan 8, 2014 | Never finaled issued Apr 2014, no final | 1462 Haight St | Sincere Construction Company Inc | manatory soft story upgrade per s.f. bldg code 34b iebc 2012 appendix a-4. maintain egress at all times.Details
manatory soft story upgrade per s.f. bldg code 34b iebc 2012 appendix a-4. maintain egress at all times. | $80,000 |
| Oct 21, 2013 | Completed final sign-off Jul 2015 | 2827 California St | Galaxy Building Construction | convert vacant commercial space to new full service japanese restaurant. tenant improvement work only. including commercial kitchen dining and bar. ** maher: compliance with ordinance no# 155-13 not required **Details
convert vacant commercial space to new full service japanese restaurant. tenant improvement work only. including commercial kitchen dining and bar. ** maher: compliance with ordinance no# 155-13 not required ** | $120,000 |