Asdm Services Ince
- Based in
- Lathrop
- On San Francisco permits
- Oct 2015 to Aug 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2016 | Completed final sign-off Oct 2018 | 431 Capp St | temporary shoring of wood structure to accommodate foundation installation. excavation sequence to accommodate foundation replacement. new foundationDetails
temporary shoring of wood structure to accommodate foundation installation. excavation sequence to accommodate foundation replacement. new foundation | $65,000 |
| Aug 26, 2016 | Completed final sign-off Sep 2016 | 1879 Funston Av | revision to permit applicaton #201604255609 to remove existing roof and install double-layer torch welded roof systemDetails
revision to permit applicaton #201604255609 to remove existing roof and install double-layer torch welded roof system | $7,500 |
| Jul 15, 2016 | Completed final sign-off Nov 2016 | 350 San Carlos St | temporary shoring of wood structure to accommodate foundation installation, excavation sequence to accommodate foundation replacement.Details
temporary shoring of wood structure to accommodate foundation installation, excavation sequence to accommodate foundation replacement. | $5,000 |
| Mar 3, 2016 | Completed final sign-off Mar 2017 | 1078 York St | on 1st flr - replace dryrot in front stairs. 4p grade (e) 100a elect panel to 200 a panel,run new 1"0 gas line to new (two) tankless water heaters in newly converted (e) utility/stor into laundry rms. 2nd & 3rd flrs interior alterations to (e) baths & kitchens, add bath @ 2nd & 3rd floors.n/a maherDetails
on 1st flr - replace dryrot in front stairs. 4p grade (e) 100a elect panel to 200 a panel,run new 1"0 gas line to new (two) tankless water heaters in newly converted (e) utility/stor into laundry rms. 2nd & 3rd flrs interior alterations to (e) baths & kitchens, add bath @ 2nd & 3rd floors.n/a maher | $21,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2017 | 350 San Carlos St | 1st floor: remodeling of kitchen & bathroomDetails
1st floor: remodeling of kitchen & bathroom | $25,000 |
| Oct 8, 2015 | Completed final sign-off Jan 2017 | 350 San Carlos St | replace existing foundation to new reinforced concrete slab foundation, replace existing ground floor- floor framing to concrete slab on grade.Details
replace existing foundation to new reinforced concrete slab foundation, replace existing ground floor- floor framing to concrete slab on grade. | $30,000 |