Block 3595, lot 041
431 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 3
- Rooms
- 8 bedrooms, 7 bathrooms
- Building
- 5,924 sq ft
- Lot
- 3,672 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2022 | Completed final sign-off Mar 2023 | 431 Capp St | Diaz Construction | demo (e) siding, waterproof exterior with tyvek paper. installation of fiber cement boards. work in common area.Details
demo (e) siding, waterproof exterior with tyvek paper. installation of fiber cement boards. work in common area. | $11,000 |
| May 1, 2019 | Never finaled issued May 2019, no final | 431 Capp St | San Francisco Fire Protection | sprinkler monitoring fire alarm installation, facp, manual pull, heat detector. aes radio and monitoring modulesDetails
sprinkler monitoring fire alarm installation, facp, manual pull, heat detector. aes radio and monitoring modules | $5,000 |
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 431 Capp St | Lingruen Associates | perform repairs as per lingruen associates termite report # 80929, item # 2a.Details
perform repairs as per lingruen associates termite report # 80929, item # 2a. | $3,200 |
| Dec 22, 2017 | Completed final sign-off Aug 2018 | 431 Capp St | Reliance Building & Maintanance | revsion to pa #201702149410. modify dormers at south side of building.Details
revsion to pa #201702149410. modify dormers at south side of building. | |
| Nov 3, 2017 | Completed final sign-off May 2019 | 431 Capp St | All Star Fire Protection Llc | fire sprinkler installation on 1st fl and garage. 12 ft underground 2" copper, #17 heads ref 201708306478Details
fire sprinkler installation on 1st fl and garage. 12 ft underground 2" copper, #17 heads ref 201708306478 | $6,500 |
| Oct 23, 2017 | Never finaled issued Oct 2017, no final | 431 Capp St | street spaceDetails
street space | ||
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 435 Capp St | per pa #201702149410, add address to leglize unit at ground floor as: 435 capp street at block 3595, lot 041.Details
per pa #201702149410, add address to leglize unit at ground floor as: 435 capp street at block 3595, lot 041. | ||
| Sep 14, 2017 | Completed final sign-off Jun 2019 | 435 Capp St | administration permit for change ddress at unit legalization from 431, 433 capp st to 435 capp st at block 3595, lot 041.Details
administration permit for change ddress at unit legalization from 431, 433 capp st to 435 capp st at block 3595, lot 041. | ||
| Aug 30, 2017 | Completed final sign-off Jun 2019 | 431 Capp St | Reliance Building & Maintanance | revision to 201702149410 and 201702149399, add 1 bath and 1 bedroom to new gr fl unit. full demolition and replace rear of building at rear structure and rear stair, rebuild in kind stair due to decayDetails
revision to 201702149410 and 201702149399, add 1 bath and 1 bedroom to new gr fl unit. full demolition and replace rear of building at rear structure and rear stair, rebuild in kind stair due to decay | $20,000 |
| Feb 14, 2017 | Completed final sign-off Oct 2018 | 431 Capp St | (n) roof deck @ rear of bldg @ 3rd story level. (e) roof, adding guardrails @ (e) roof to create roof deck-in req'd rear yard set backDetails
(n) roof deck @ rear of bldg @ 3rd story level. (e) roof, adding guardrails @ (e) roof to create roof deck-in req'd rear yard set back | $4,000 | |
| Feb 14, 2017 | Completed final sign-off Jun 2019 | 431 Capp St | Mission Bay Construction Services Inc. | existing: 2 unit residential bldg: add 3rd unit at ground floor. no new walls, new kitchen, bathroom, bed room, and living space. sprinklers at ground level under seperate permit. (nfpa 13r)Details
existing: 2 unit residential bldg: add 3rd unit at ground floor. no new walls, new kitchen, bathroom, bed room, and living space. sprinklers at ground level under seperate permit. (nfpa 13r) | $40,000 |
| Dec 8, 2016 | Completed final sign-off Oct 2018 | 431 Capp St | Mission Bay Construction Services Inc. | revision to pa 201608306316: remodel unit 1 at 2nd floor, remodel unit 2 at 3rd and 4th floor level. modify floor plans at 1st , 2nd, 3rd, & 4th floors. modify structural foundation/framing and add dormers.Details
revision to pa 201608306316: remodel unit 1 at 2nd floor, remodel unit 2 at 3rd and 4th floor level. modify floor plans at 1st , 2nd, 3rd, & 4th floors. modify structural foundation/framing and add dormers. | $40,000 |
| Nov 30, 2016 | Never finaled issued Nov 2016, no final | 431 Capp St | street spaceDetails
street space | ||
| Oct 11, 2016 | Expired or cancelled withdrawn Dec 2016 | 431 Capp St | install 3rd unit on ground floor with bathroom & kitchenDetails
install 3rd unit on ground floor with bathroom & kitchen | $75,000 | |
| Oct 11, 2016 | Expired or cancelled withdrawn Dec 2016 | 433 Capp St | remodel attic only- add a bathroom, legalize playroom and bedroomDetails
remodel attic only- add a bathroom, legalize playroom and bedroom | $50,000 | |
| Aug 30, 2016 | Completed final sign-off Oct 2018 | 431 Capp St | Asdm Services Ince | temporary shoring of wood structure to accommodate foundation installation. excavation sequence to accommodate foundation replacement. new foundationDetails
temporary shoring of wood structure to accommodate foundation installation. excavation sequence to accommodate foundation replacement. new foundation | $65,000 |
| Aug 19, 2016 | Never finaled issued Aug 2016, no final | 431 Capp St | street space permitDetails
street space permit | ||
| Jul 18, 2016 | Completed final sign-off Oct 2018 | 431 Capp St | remodel 2 units, remodel kitchen & bathroom, add bathroom in each unitDetails
remodel 2 units, remodel kitchen & bathroom, add bathroom in each unit | $65,000 | |
| Jun 6, 2016 | Completed final sign-off Oct 2018 | 431 Capp St | exterior paint & interior paint, all new flooring, install can lights, new sockets & switches.Details
exterior paint & interior paint, all new flooring, install can lights, new sockets & switches. | $25,000 | |
| Oct 29, 2003 | Expired or cancelled expired Feb 2005 | 431 Capp St | Westco Roofing Co. Inc. | reroofingDetails
reroofing | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.