Helmina Kim
- Listed as
- architect
- Firm
- Helmina Kim Design
- Based in
- South San Francisco
- On San Francisco permits
- May 2008 to Oct 2021
8 permits since 2000 (architect on 8 permits): 3 completed, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2021 | Expired or cancelled cancelled Jan 2026 | 345 Rivera St | replace dry rot damaged wall at rear side with new wood and same size and new window opening.Details
replace dry rot damaged wall at rear side with new wood and same size and new window opening. | $2,000 | |
| Jul 23, 2019 | Never finaled issued Sep 2019, no final | 8 San Lorenzo Wy | Polytec Construction Company Inc | to comply w/ boa's decision # 19-021, dated 5/29/2019. the adjacent neighbor wanted a side fence between property lines shown on the landscaping site plan. ref 201612215604s (new bldg).Details
to comply w/ boa's decision # 19-021, dated 5/29/2019. the adjacent neighbor wanted a side fence between property lines shown on the landscaping site plan. ref 201612215604s (new bldg). | $1,000 |
| Aug 2, 2016 | Expired or cancelled expired May 2025 | 1324 Pacific Av | Yu Kwan Construction Co. | increase parking spaces in garage/basement from two space capacity to four spaces. demo existing storage rooms & infill portion of (2) lightwells. create (3) bicycle spaces.Details
increase parking spaces in garage/basement from two space capacity to four spaces. demo existing storage rooms & infill portion of (2) lightwells. create (3) bicycle spaces. | $10,000 |
| Sep 4, 2014 | Expired or cancelled withdrawn Mar 2019 | 2121 Judah St | new rear deck and stairs, infill lightwell onn 1st, 2nd & 3rd flr, 2 new full bath & one new half bath, reconfigure kitchen on 2nd & 3rd flr, reconfigure 1st flrDetails
new rear deck and stairs, infill lightwell onn 1st, 2nd & 3rd flr, 2 new full bath & one new half bath, reconfigure kitchen on 2nd & 3rd flr, reconfigure 1st flr | $70,000 | |
| Sep 21, 2010 | Completed final sign-off Dec 2010 | 1215 Hollister Av | Xanadu Construction Inc | to comply with his nov# 200989669, dated 2/5/2009. demolish unwarranted space ( 1st fl) incl. kitchen, bath, partition walls. new laundry, half bath and storage space on 1st flDetails
to comply with his nov# 200989669, dated 2/5/2009. demolish unwarranted space ( 1st fl) incl. kitchen, bath, partition walls. new laundry, half bath and storage space on 1st fl | $5,000 |
| May 6, 2010 | Completed final sign-off Jul 2010 | 1574 Underwood Av | Willie Tran Construction | revision to pa# 2010.03.10.7895. revised water heater location on 1st fl. revised laundry/storage rm lay out on 1st fl. mirrored bathrm plan on 1st fl. revised fau location on 3rd fl. all work shown on delta 1 set of 05.06.10Details
revision to pa# 2010.03.10.7895. revised water heater location on 1st fl. revised laundry/storage rm lay out on 1st fl. mirrored bathrm plan on 1st fl. revised fau location on 3rd fl. all work shown on delta 1 set of 05.06.10 | |
| Sep 21, 2009 | Completed final sign-off Dec 2009 | 242 Capp St | Milan Construction | work on 3rd floor only: kitchen remodel- demo non-structural partitions to create open space; re-route & upgrade plumbing & electric; add lights & outlets; structural wall: close 1 doorway from living room to dining room, widen doorway bet corridor & kitchen. install new supporting beam.Details
work on 3rd floor only: kitchen remodel- demo non-structural partitions to create open space; re-route & upgrade plumbing & electric; add lights & outlets; structural wall: close 1 doorway from living room to dining room, widen doorway bet corridor & kitchen. install new supporting beam. | $10,000 |
| May 14, 2008 | Expired or cancelled expired May 2023 | 1611 Broderick St | expansion of (e) habitable space to include (n) renovated basement, (n) stair connecting (e) ist floor and basement (n)furnace and (n) water heater to service basement only per plan.Details
expansion of (e) habitable space to include (n) renovated basement, (n) stair connecting (e) ist floor and basement (n)furnace and (n) water heater to service basement only per plan. | $145,000 |