Joyce Cheng
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- A & J Design Associates Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Apr 2025
193 permits since 2000 (engineer on 130 permits, architect on 33 permits, authorized agent-others on 19 permits, designer on 12 permits): 151 completed, 5 in progress, 16 never finaled, 21 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 193.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2025 | Expired or cancelled expired Oct 2026 | 444 Union St | Xteam Design Construction | revision to pa# 202408289649 and 202204111924, minor reconfiguration kitchen, bedroom & laundry area layout.Details
revision to pa# 202408289649 and 202204111924, minor reconfiguration kitchen, bedroom & laundry area layout. | |
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 1558 42nd Av | Zhizhao Liu Construction Co | proposed 2 bedrrooms & 1 bathroom at 1st flDetails
proposed 2 bedrrooms & 1 bathroom at 1st fl | $150,000 |
| Mar 25, 2025 | Completed final sign-off Oct 2025 | 5901 Geary Bl | Cal - Pacific Constr. Inc. | revision 202309297732- change back the bakery store to vacant stores. (e) install accessbible restrooms in store at 5901 and 5909. infill wall between stores. rebuild the removed floor slabs and install accessible entrance door for 5909.Details
revision 202309297732- change back the bakery store to vacant stores. (e) install accessbible restrooms in store at 5901 and 5909. infill wall between stores. rebuild the removed floor slabs and install accessible entrance door for 5909. | |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 3050 25th Av | Wynn L Builders Inc. | remodeling existing building. change existing dinning room to a bedroom, add 1 bath room in the garage area.Details
remodeling existing building. change existing dinning room to a bedroom, add 1 bath room in the garage area. | $128,000 |
| Dec 20, 2024 | Expired or cancelled cancelled Jan 2025 | 426 San Miguel St | comply w/ nov# 202294006 to legalize the unpermitted unit at 2nd floor. remove unpermitted enclosed structure on existing decks at 2nd and 3rd floors.Details
comply w/ nov# 202294006 to legalize the unpermitted unit at 2nd floor. remove unpermitted enclosed structure on existing decks at 2nd and 3rd floors. | $75,000 | |
| Nov 25, 2024 | Completed final sign-off Dec 2024 | 1000 Valencia St | Cal - Pacific Constr. Inc. | revision to pa # 2023-0726-3020 shown 1 interior layout changed. add washer/dryer. furnace relocatiomDetails
revision to pa # 2023-0726-3020 shown 1 interior layout changed. add washer/dryer. furnace relocatiom | |
| Aug 28, 2024 | Expired or cancelled expired Oct 2026 | 444 Union St | Xteam Design Construction | revision to pa# 202204111924. to delete approved bedroom, bathroom and stairs.Details
revision to pa# 202204111924. to delete approved bedroom, bathroom and stairs. | |
| Aug 21, 2024 | In progress issued Jan 2025 | 734 Jackson St | S M I Construction Inc. | proposed a new restaurant at 1st/f. new mech hood exhaust duct, make up air. new store front. change a use from retail to restaurant under 50 occupancy.Details
proposed a new restaurant at 1st/f. new mech hood exhaust duct, make up air. new store front. change a use from retail to restaurant under 50 occupancy. | $128,000 |
| May 28, 2024 | In progress issued Nov 2025 | 51 Riverton Dr | Lin Wang Construction | proposed adu at existing 1st floor. 2 bedrooms, 1 kitchen and 1 bathroom.Details
proposed adu at existing 1st floor. 2 bedrooms, 1 kitchen and 1 bathroom. | $120,000 |
| Apr 18, 2024 | Completed final sign-off May 2024 | 266 11th Av | Jimmy Wong | revise to 201910255572. to legalize windows at 2nd & 3rd fl. u is 0.3 maxDetails
revise to 201910255572. to legalize windows at 2nd & 3rd fl. u is 0.3 max | |
| Apr 18, 2024 | Completed final sign-off May 2024 | 268 11th Av | Jimmy Wong | revision to bpa# 201705307831: to legalize the window in the bathroom - 1st floor.Details
revision to bpa# 201705307831: to legalize the window in the bathroom - 1st floor. | |
| Mar 22, 2024 | Expired or cancelled cancelled Apr 2025 | 1100 Holloway Av | Bejarano Construction 9inc, Elux Construction Inc | rev to pa202308164523. add exterior windows- front & side. relocate adu entrance door. relocated (e) bathroom at adu unit.relocate washer and dryer. relocate entry door.Details
rev to pa202308164523. add exterior windows- front & side. relocate adu entrance door. relocated (e) bathroom at adu unit.relocate washer and dryer. relocate entry door. | $28,000 |
| Feb 7, 2024 | In progress filed Feb 2024, not yet issued | 1049 Stockton St | install (n) entrance door to replace damaged entrance door and to abate nov 202418833. food prep sink requires indirect dwv correction and install 3 compartment sink to connect to (e) grease trap.add (e)mezz. level room floor drain and hand sinks require dwv ventingDetails
install (n) entrance door to replace damaged entrance door and to abate nov 202418833. food prep sink requires indirect dwv correction and install 3 compartment sink to connect to (e) grease trap.add (e)mezz. level room floor drain and hand sinks require dwv venting | $8,000 | |
| Feb 7, 2024 | Completed final sign-off Jun 2024 | 252 Gold Mine Dr | Elux Construction Inc | install a kitchenett (2 burner), sink, cabinets in (e) playroom in basement. install bathroom in (e) playroom. playrooom not for sleeping purposes.Details
install a kitchenett (2 burner), sink, cabinets in (e) playroom in basement. install bathroom in (e) playroom. playrooom not for sleeping purposes. | $40,000 |
| Dec 20, 2023 | Completed final sign-off Mar 2024 | 1 Merced Av | add a full bathroom at 2/f. removal of dishwasher at 2/f.Details
add a full bathroom at 2/f. removal of dishwasher at 2/f. | $15,000 | |
| Oct 11, 2023 | In progress filed Oct 2023, not yet issued | 1826 San Jose Av | to comply w/ accessible entrance program ordinance 51-16. provide electrical power door. abe 202002262311Details
to comply w/ accessible entrance program ordinance 51-16. provide electrical power door. abe 202002262311 | $4,500 | |
| Oct 11, 2023 | In progress issued Oct 2023 | 464 Duncan St | Vk Construction | remodeling (e) kitchen and bathroom, add a full bathroom @ 2/f.Details
remodeling (e) kitchen and bathroom, add a full bathroom @ 2/f. | $80,000 |
| Oct 5, 2023 | Completed final sign-off Feb 2024 | 1044 Taraval St | Jimmy Wong | remodel/alteration (e) medical office. provide electrical power door, accessible ramp and stairs handrails, warning striping.Details
remodel/alteration (e) medical office. provide electrical power door, accessible ramp and stairs handrails, warning striping. | $50,000 |
| Sep 20, 2023 | Completed final sign-off Dec 2023 | 2365 Chestnut St | comply with accessible business entrance program ordinance 51-16. provide electric power door openers. abe# 201807201692Details
comply with accessible business entrance program ordinance 51-16. provide electric power door openers. abe# 201807201692 | $4,500 | |
| Sep 8, 2023 | Completed final sign-off Mar 2024 | 494 Flood Av | Elux Construction Inc | 2/f: remodeling (e) kitchen, bathrm, add toilet rm and interior stairs to 1/f; remove non-bearing wall; 1/f: add family rm, bedrm, bathrm and repair damaged foundation. (490 sf)Details
2/f: remodeling (e) kitchen, bathrm, add toilet rm and interior stairs to 1/f; remove non-bearing wall; 1/f: add family rm, bedrm, bathrm and repair damaged foundation. (490 sf) | $112,000 |
| Sep 5, 2023 | Completed final sign-off Feb 2024 | 1443 Hyde St | Jimmy Wong | work on 2f unit 1443 only. remodeling (e) kitchen area in-kind. change (e) bedroom closet dr to sliding dr.Details
work on 2f unit 1443 only. remodeling (e) kitchen area in-kind. change (e) bedroom closet dr to sliding dr. | $40,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2023 | 527 27th Av | Nai Chung Hsu | unit 527: remodel unit, relocate (e) kitchen area, convert kithcen area to bedroom, add bathroom, new beam to replace removed bearing wallDetails
unit 527: remodel unit, relocate (e) kitchen area, convert kithcen area to bedroom, add bathroom, new beam to replace removed bearing wall | $48,000 |
| Jul 25, 2023 | Completed final sign-off Sep 2026 | 1451 27th Av | Elux Construction Inc | 1st flr: proposed 1 bedroom, 1 office and 1 bathroom. remove rear shed storage area built without permit.Details
1st flr: proposed 1 bedroom, 1 office and 1 bathroom. remove rear shed storage area built without permit. | $100,000 |
| Jul 24, 2023 | Completed final sign-off Jul 2024 | 1425 Ocean Av | Clw Builders Inc | remodeling (e) vacant store. provide accessible entrance, restroom & stairs. rebuilt (e) damaged suspanded accoustical tile ceiling & lightingDetails
remodeling (e) vacant store. provide accessible entrance, restroom & stairs. rebuilt (e) damaged suspanded accoustical tile ceiling & lighting | $62,000 |
| Jun 12, 2023 | Completed final sign-off Jun 2023 | 1331 Vicente St | Wei Dang Builders Inc. | revision to bpa# 202210073974. replace furnace for 1/f with hydronic heat system for 1/f and 2/f. shown delta #2.Details
revision to bpa# 202210073974. replace furnace for 1/f with hydronic heat system for 1/f and 2/f. shown delta #2. | |
| Feb 27, 2023 | Completed final sign-off Oct 2024 | 2230 27th Av | The Passion Construction Inc | revision to pa#202205275152. revised the rear yard retaining wall shown on delta 1 2/16/23Details
revision to pa#202205275152. revised the rear yard retaining wall shown on delta 1 2/16/23 | |
| Nov 17, 2022 | Completed final sign-off Jun 2023 | 1331 Vicente St | revisiion to bpa#202210073974. rebuild (e) ground floor slabs, driveway, redesign (e) post footings, relayout 2/f roof deck, infill (e) window @ kitchen areaDetails
revisiion to bpa#202210073974. rebuild (e) ground floor slabs, driveway, redesign (e) post footings, relayout 2/f roof deck, infill (e) window @ kitchen area | $8,000 | |
| Aug 19, 2022 | Completed final sign-off Jun 2023 | 2265 33rd Av | Vi Tang Hinh | 1/f: convert (e) family room into bedroom. remodel (e) bathroom and add new bathroom. 2/f: remodel (e) ktichen and bathrooms. enclose (e) lght court. add 1 bathroom. 3 skylights on flat room. replace bearing wall with suppor beams / posts.Details
1/f: convert (e) family room into bedroom. remodel (e) bathroom and add new bathroom. 2/f: remodel (e) ktichen and bathrooms. enclose (e) lght court. add 1 bathroom. 3 skylights on flat room. replace bearing wall with suppor beams / posts. | $180,000 |
| Aug 1, 2022 | Never finaled issued Jan 2023, no final | 2268 17th Av | 1/f: convert (e) toilet room to full bathroom. enlarge (e) bedroom, install 2 burners, sink, reefer, and counter top. 2/f: convert (e) kitchen to bedroom, new bathroom, (e) toilet to be laundry room, (e) dining room to be kitchen. relocated interior stairs to 1/f.Details
1/f: convert (e) toilet room to full bathroom. enlarge (e) bedroom, install 2 burners, sink, reefer, and counter top. 2/f: convert (e) kitchen to bedroom, new bathroom, (e) toilet to be laundry room, (e) dining room to be kitchen. relocated interior stairs to 1/f. | $150,000 | |
| Aug 1, 2022 | Completed final sign-off Mar 2025 | 1851 35th Av | Elux Construction Inc | 1/f: horizontal addition @ rear building w/ family room, wet bar. relocated (e) bathroom, converted (e) family room to bedroom. 2/f: horizontal addition @ rear building w/ (n) bedroom, & bathroom. remodeled (e) kitchen. relocated (e) interior stairs to 1/f.Details
1/f: horizontal addition @ rear building w/ family room, wet bar. relocated (e) bathroom, converted (e) family room to bedroom. 2/f: horizontal addition @ rear building w/ (n) bedroom, & bathroom. remodeled (e) kitchen. relocated (e) interior stairs to 1/f. | $250,000 |
| Jul 11, 2022 | Completed final sign-off Oct 2022 | 1479 28th Av | remodel (e) kitchen @ 2nd fl. per plans. to comply with dcp 2022-003354enf.Details
remodel (e) kitchen @ 2nd fl. per plans. to comply with dcp 2022-003354enf. | $32,000 | |
| Jun 23, 2022 | Expired or cancelled cancelled Jan 2026 | 1616 08th Av | install a storage room and bathroom at 1st floor.Details
install a storage room and bathroom at 1st floor. | $38,000 | |
| May 11, 2022 | Completed final sign-off Mar 2023 | 1719 24th Av | add bathroom, counter top, sink and 2 burners to (e) 1/f. remodeling (e) living rm @ 2/fl. new deck/stairs at rear yard 2/fDetails
add bathroom, counter top, sink and 2 burners to (e) 1/f. remodeling (e) living rm @ 2/fl. new deck/stairs at rear yard 2/f | $45,000 | |
| Mar 11, 2022 | Expired or cancelled expired Nov 2024 | 1622 10th Av | C & K Housing Const Co *Ck Id* | comply with nov 202185673 and 202287504. 1)install family room, bedroom, and bathroom at 1st floor. 2) remodeling extg kitchen, change extg windows at lightwell to casement windows at 2nd floor only. 3)change front windows to double glass windows fiberglasframe at windows at 2nd floor and 3rd floor.Details
comply with nov 202185673 and 202287504. 1)install family room, bedroom, and bathroom at 1st floor. 2) remodeling extg kitchen, change extg windows at lightwell to casement windows at 2nd floor only. 3)change front windows to double glass windows fiberglasframe at windows at 2nd floor and 3rd floor. | $50,000 |
| Mar 11, 2022 | Never finaled issued Mar 2022, no final | 1114 Montgomery St | Sf Twin Boys Corp. Dba Master Builders | propose a new storage platform at existing basement. install a new toilet room in basementDetails
propose a new storage platform at existing basement. install a new toilet room in basement | $30,000 |
| Jan 20, 2022 | Completed final sign-off Aug 2022 | 2709 43rd Av | Kyle Wong Construction | comply with nov #202183969 work in 1st floor only: adu 1)seperate entrance created to 1st floor. 2) installing kitchen sink, cabinets, counter stove with hood. 3) convert home office to new bed room.Details
comply with nov #202183969 work in 1st floor only: adu 1)seperate entrance created to 1st floor. 2) installing kitchen sink, cabinets, counter stove with hood. 3) convert home office to new bed room. | $5,000 |
| Oct 27, 2021 | Never finaled filed Oct 2021, never issued | 423 15th Av | proposed a new pergola at extg rear yardDetails
proposed a new pergola at extg rear yard | $28,000 | |
| Oct 13, 2021 | Completed final sign-off Feb 2023 | 431 San Miguel St | C & K Housing Const Co *Ck Id* | proposed 2 bedroom, 1 full bathroom, and a hall way at extg 1st floor.Details
proposed 2 bedroom, 1 full bathroom, and a hall way at extg 1st floor. | $56,000 |
| Oct 7, 2021 | Completed final sign-off Oct 2023 | 2174 42nd Av | Winwin Construction Inc | ist floor installed by apn: 962205 (bedroom, family rm and bathroom). legalize dwelling unit at 1st fl per ordinance #43-14 (2-bedrooms, 1-bath rm and 1-kitchen at 1/f). install a rear deck/stairs from 2/f to rear yard.Details
ist floor installed by apn: 962205 (bedroom, family rm and bathroom). legalize dwelling unit at 1st fl per ordinance #43-14 (2-bedrooms, 1-bath rm and 1-kitchen at 1/f). install a rear deck/stairs from 2/f to rear yard. | $12,000 |
| Aug 23, 2021 | Never finaled issued Aug 2021, no final | 2198 Filbert St | Vk Construction | replace/repair dry rot posts and beams in front of the building. provide electrical powered door at main entrance.Details
replace/repair dry rot posts and beams in front of the building. provide electrical powered door at main entrance. | $38,000 |
| Aug 3, 2021 | Completed final sign-off Dec 2021 | 1346 27th Av | proposed (n) rear deck and stairs @ 2/fDetails
proposed (n) rear deck and stairs @ 2/f | $18,000 | |
| Aug 3, 2021 | Completed final sign-off Feb 2022 | 2432 42nd Av | C & K Housing Const Co *Ck Id* | the proposed horizontal addition and adu is under pa #2016 0127 8150. this permit is for title-24 energy design req by inspector only.Details
the proposed horizontal addition and adu is under pa #2016 0127 8150. this permit is for title-24 energy design req by inspector only. | |
| Dec 7, 2020 | Completed final sign-off Mar 2021 | 5211 Mission St | unit #4: new one bedroom in existing living room areaDetails
unit #4: new one bedroom in existing living room area | $6,000 | |
| Mar 16, 2020 | Completed final sign-off Jul 2021 | 1986 42nd Av | H & Bo Construction Inc. | add a new unit at existing 1st floor. per ordinance 162-16Details
add a new unit at existing 1st floor. per ordinance 162-16 | $50,000 |
| Feb 7, 2020 | Completed final sign-off Sep 2021 | 581 16th Av | Prime Builders | remodel e building, 3rd fl new elec, 2nd fl, relocate kitchen and interior stairs to 1st fl, add 1 full bath. 1st fl infill under 2nd fl breakfast rm. install bath rm, family rm, bedroomDetails
remodel e building, 3rd fl new elec, 2nd fl, relocate kitchen and interior stairs to 1st fl, add 1 full bath. 1st fl infill under 2nd fl breakfast rm. install bath rm, family rm, bedroom | $150,000 |
| Feb 7, 2020 | Completed final sign-off Sep 2020 | 2270 21st Av | revised pa#201903276342, on 2/f only: change existing 1/2 toilet to full bathroom, change existing living room to home office and living room, add 3 skylights.Details
revised pa#201903276342, on 2/f only: change existing 1/2 toilet to full bathroom, change existing living room to home office and living room, add 3 skylights. | $8,000 | |
| Dec 30, 2019 | Expired or cancelled expired Jun 2024 | 266 11th Av | Jimmy Wong | rev to pa# 201910255572; move bearing wall at 3rd fl. installing a new steel beamDetails
rev to pa# 201910255572; move bearing wall at 3rd fl. installing a new steel beam | $8,000 |
| Dec 3, 2019 | Never finaled issued Dec 2019, no final | 3745 Noriega St | add 3745 noriega st (commercial) to 2081/028.Details
add 3745 noriega st (commercial) to 2081/028. | ||
| Nov 21, 2019 | Never finaled issued Nov 2019, no final | 1628 Noriega St | remove 1628 noriega st from 2026/026.Details
remove 1628 noriega st from 2026/026. | ||
| Nov 12, 2019 | Completed final sign-off Jan 2021 | 2587 35th Av | Coit Construction | remodeling extg kitchen and bath room (change tile and fixtures at 2nd floor. install 2 bedrooms and 1 full bathroom at 1st floor.Details
remodeling extg kitchen and bath room (change tile and fixtures at 2nd floor. install 2 bedrooms and 1 full bathroom at 1st floor. | $68,000 |
| Oct 25, 2019 | Completed final sign-off Jun 2024 | 266 11th Av | Jimmy Wong | remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor.Details
remodel 2nd, 3rd and attic. 2nd & 3rd fl - add new bathroom, relocate kitchen and convert kitchen/breakfast room to bedroom. attic - add bedroom and build 3 dormers windows. rebuilding (e) front stairs in kind with terrazzo. no work on 1st floor. | $28,000 |
| Apr 29, 2019 | Completed final sign-off Jun 2019 | 2417 Webster St | Vk Construction | repair existing wall foundation and dry rot studsDetails
repair existing wall foundation and dry rot studs | $15,000 |
| Apr 29, 2019 | Completed final sign-off Oct 2021 | 1150 Holloway Av | Cnt Construction Inc | remodel e 2nd fl. remodel e bath, add 1/2 bath. remodel kitchen. remove interior lath plaster 2nd flDetails
remodel e 2nd fl. remodel e bath, add 1/2 bath. remodel kitchen. remove interior lath plaster 2nd fl | $28,000 |
| Apr 29, 2019 | Completed final sign-off Oct 2019 | 822 Arkansas St | Cal - Pacific Constr. Inc. | remodel attic and 2nd fl. attic fl add new bath, build 2 dormer windows, 2nd fl add 2 bdrm, rebuild int stairs, relocate bath and kitchenadd bath. unit legalization on a sep permitDetails
remodel attic and 2nd fl. attic fl add new bath, build 2 dormer windows, 2nd fl add 2 bdrm, rebuild int stairs, relocate bath and kitchenadd bath. unit legalization on a sep permit | $81,700 |
| Mar 27, 2019 | Completed final sign-off Sep 2020 | 2270 21st Av | remodel (e) 2nd fl. remove interior stairs. change existing 1 bathroom to 2.5 bathroom. remove interior wall to enlarge existing kitchen. change (e) dining to bedroom. - 1/f - unit legalization ord 43-14 pa 2019-0327-6340Details
remodel (e) 2nd fl. remove interior stairs. change existing 1 bathroom to 2.5 bathroom. remove interior wall to enlarge existing kitchen. change (e) dining to bedroom. - 1/f - unit legalization ord 43-14 pa 2019-0327-6340 | $45,000 | |
| Dec 21, 2018 | Completed final sign-off Jun 2019 | 22 Littlefield Tr | Vk Construction | new bath room at 2nd floor, relocated water heaterDetails
new bath room at 2nd floor, relocated water heater | $20,000 |
| Dec 21, 2018 | Completed final sign-off Apr 2019 | 1 Madera St | Cal - Pacific Constr. Inc. | install a new bathroom at 2nd & 3rd fl. comply w/ nov's 201206601 & 201206621Details
install a new bathroom at 2nd & 3rd fl. comply w/ nov's 201206601 & 201206621 | $23,800 |
| Sep 13, 2018 | Completed final sign-off Jan 2026 | 1763 37th Av | C & K Housing Const Co *Ck Id* | proposed alteration and horizontal addition at rear bldg. 2nd flr add a master bedroom & bathroom @ rear. 1st flr add a new unit with 1 bedroom, 1 bathroom and kitchen/living room.Details
proposed alteration and horizontal addition at rear bldg. 2nd flr add a master bedroom & bathroom @ rear. 1st flr add a new unit with 1 bedroom, 1 bathroom and kitchen/living room. | $180,000 |
| Jul 17, 2018 | Completed final sign-off Jun 2025 | 2245 Rivera St | 2/f: remodel kitchen, convert (e) 1 bath to 2 bath. 1/f: install 2 bedrooms, family rm. new electrical for whole bldg. change (e) windows non street facing to double glaze windows in kind. install new anchor bolts in (e) wall ftg.Details
2/f: remodel kitchen, convert (e) 1 bath to 2 bath. 1/f: install 2 bedrooms, family rm. new electrical for whole bldg. change (e) windows non street facing to double glaze windows in kind. install new anchor bolts in (e) wall ftg. | $80,000 | |
| May 16, 2018 | Completed final sign-off Jul 2019 | 2591 San Bruno Av | Alpha Construction Company | proposed a new tea & coffee shop to existing vacant commercial store.Details
proposed a new tea & coffee shop to existing vacant commercial store. | $80,000 |
| Mar 8, 2018 | Expired or cancelled expired Jan 2021 | 1258 42nd Av | remodel kitchen and bath. add 1 bath rm and relocate laundry area. replace all windows, new electrical. relocate w/h and furn at 1st flr. new sheetrock at 1st flr. repair the front dry rot - exteriorDetails
remodel kitchen and bath. add 1 bath rm and relocate laundry area. replace all windows, new electrical. relocate w/h and furn at 1st flr. new sheetrock at 1st flr. repair the front dry rot - exterior | $50,000 | |
| Mar 8, 2018 | Completed final sign-off Sep 2021 | 4542 Cabrillo St | Peter Liu Construction Inc | proposed to legalized dwelling unit at 1st fl comply with ordinance 43-14Details
proposed to legalized dwelling unit at 1st fl comply with ordinance 43-14 | $80,000 |
| Feb 21, 2018 | Completed final sign-off Nov 2020 | 1318 18th Av | C & K Housing Const Co *Ck Id* | unit legalization per ordinance 43-14 at 1st flr front building, building a.Details
unit legalization per ordinance 43-14 at 1st flr front building, building a. | $53,000 |
| Jan 30, 2018 | Never finaled issued Nov 2020, no final | 450 Plymouth Av | Peter Liu Construction Inc | add a new unit with 3 bedrooms & 2 bath at 1st flr area to comply with ordinance 162-16.Details
add a new unit with 3 bedrooms & 2 bath at 1st flr area to comply with ordinance 162-16. | $80,000 |
| Jan 30, 2018 | Completed final sign-off Dec 2018 | 2366 31st Av | Quality Painting Construction | remodel existing kitchen and bathroom. enclosed a lightwell, rebuild existing interior staircase, new skylightsDetails
remodel existing kitchen and bathroom. enclosed a lightwell, rebuild existing interior staircase, new skylights | $80,000 |
| Dec 8, 2017 | Completed final sign-off Oct 2018 | 141 Wawona St | Hakewill Construction Co. Inc. | 2st floor: remodel kitchen, relocate powder room and laundry, enlarge back patio door, add back window, fill side window. enlarge dining/family opening. replace stair railing, update electrical & lighting. 3rd floor: remodel master bathroom.Details
2st floor: remodel kitchen, relocate powder room and laundry, enlarge back patio door, add back window, fill side window. enlarge dining/family opening. replace stair railing, update electrical & lighting. 3rd floor: remodel master bathroom. | $70,000 |
| Oct 30, 2017 | Completed final sign-off Sep 2020 | 718 Geneva Av | Via Us Construction Inc | to comply with violation #201796701. unit legalization per ordinance 43-14 at 1st flr.Details
to comply with violation #201796701. unit legalization per ordinance 43-14 at 1st flr. | $5,000 |
| Oct 30, 2017 | Expired or cancelled cancelled Nov 2022 | 1250 21st Av | unit legalization per ord 43-14 at 1st flrDetails
unit legalization per ord 43-14 at 1st flr | $25,000 | |
| Oct 2, 2017 | Completed final sign-off Apr 2021 | 30 Rausch St | Jian Construction Company | addition of unit @ 1st flr (add unit #8) from 7 units to 8 units. reference legalization under pa #2017-0922-9307 from 6 units to 7 units. maher n/a.Details
addition of unit @ 1st flr (add unit #8) from 7 units to 8 units. reference legalization under pa #2017-0922-9307 from 6 units to 7 units. maher n/a. | $35,000 |
| Aug 10, 2017 | Completed final sign-off Feb 2018 | 249 10th Av | Skyy Builders Inc | add full bathroom at 1st floor.Details
add full bathroom at 1st floor. | $12,000 |
| Jul 19, 2017 | Completed final sign-off Jun 2018 | 121 Riverton Dr | unit legalization per ordinance# 43-14 @ 1st floor. 2 bedrooms, 1 bath, 1 kitchen & living room.Details
unit legalization per ordinance# 43-14 @ 1st floor. 2 bedrooms, 1 bath, 1 kitchen & living room. | $5,000 | |
| May 30, 2017 | Completed final sign-off Jun 2024 | 268 11th Av | Jimmy Wong | proposed a new unit @ existing 1/f under ord# 162-16.Details
proposed a new unit @ existing 1/f under ord# 162-16. | $128,000 |
| May 30, 2017 | Completed final sign-off Dec 2018 | 2214 36th Av | Design Max Construction | per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f.Details
per unit legalization ordinance 43-14. at 1/f the (e) bed rm, bath rm. laundry area and storage rm @ 1/f compled under apn#9821717 & #9902527.under the permit: change storage rm to a kitchen are @ 1/f. | $5,000 |
| May 30, 2017 | Completed final sign-off Jan 2018 | 806 44th Av | C & K Housing Const Co *Ck Id* | install2 bedrooms, 1 bath, hall & laundry at 1st flDetails
install2 bedrooms, 1 bath, hall & laundry at 1st fl | $48,000 |
| Jan 25, 2017 | Completed final sign-off Mar 2017 | 3108 Fillmore St | Vk Construction | revision to 201701137143- structural work. repair dryrot sub floor joists. replace unsafe wall, wall foundation. maher naDetails
revision to 201701137143- structural work. repair dryrot sub floor joists. replace unsafe wall, wall foundation. maher na | $8,000 |
| Jan 13, 2017 | Never finaled issued Jan 2017, no final | 3108 Fillmore St | Vk Construction | barrier removal only -provide electric power door at main entrance. relocate and provide accessible restroom, level (e) retail area, lighting under sep permit.Details
barrier removal only -provide electric power door at main entrance. relocate and provide accessible restroom, level (e) retail area, lighting under sep permit. | $36,000 |
| Dec 16, 2016 | Completed final sign-off Mar 2017 | 723 Capp St | remove brick chimney @ 1/f, 2/f & 3/f. relocate (e) furnace and water heater. remodeling kitchen, convert (e) pantry room to bathroom on 2/f. no exterior work.Details
remove brick chimney @ 1/f, 2/f & 3/f. relocate (e) furnace and water heater. remodeling kitchen, convert (e) pantry room to bathroom on 2/f. no exterior work. | $30,000 | |
| Aug 16, 2016 | Completed final sign-off May 2017 | 1555 23rd Av | Module Construction Inc. | alteration extg bath room and add 1 bathroom at 2nd floor.Details
alteration extg bath room and add 1 bathroom at 2nd floor. | $20,000 |
| Aug 5, 2016 | Completed final sign-off Aug 2017 | 1133 Bacon St | C & K Housing Const Co *Ck Id* | install 2 bedrooms and 1 bathroom at 1st floor.Details
install 2 bedrooms and 1 bathroom at 1st floor. | $45,000 |
| Jul 21, 2016 | Completed final sign-off Sep 2017 | 2757 43rd Av | Bill Wong Construction | remove all interior gyp bd/lath plaster. replace w/ 5/8" gyp bd type x - walls & ceilings. provide r-13 insulation in walls. r-19 in floor and r-30 in ceiling/roof. rebuild int stairs. new skylights, new ele & plumb. 2/f - relocate (e) bedrooms, kitchen add 1 bathrm, 1/f - add family room & bathrmDetails
remove all interior gyp bd/lath plaster. replace w/ 5/8" gyp bd type x - walls & ceilings. provide r-13 insulation in walls. r-19 in floor and r-30 in ceiling/roof. rebuild int stairs. new skylights, new ele & plumb. 2/f - relocate (e) bedrooms, kitchen add 1 bathrm, 1/f - add family room & bathrm | $80,000 |
| Jul 5, 2016 | Completed final sign-off Jan 2019 | 280 11th Av | Jimmy Wong | unit legalization ordinance no. 43-14. change of occupancy from r-3 to r-2. excavation of the ground floor for floor to ceiling height requirement. complete new foundation for the excavation.Details
unit legalization ordinance no. 43-14. change of occupancy from r-3 to r-2. excavation of the ground floor for floor to ceiling height requirement. complete new foundation for the excavation. | $61,000 |
| Jun 24, 2016 | Completed final sign-off May 2017 | 2709 43rd Av | T T K Construction Inc | remove kitchen at 1/f. remove non-loading wall at 1/f; rebuild (n)family room, home office and bath room at 1/f; add a rear deck & stair at 2/f.Details
remove kitchen at 1/f. remove non-loading wall at 1/f; rebuild (n)family room, home office and bath room at 1/f; add a rear deck & stair at 2/f. | $36,000 |
| Jun 20, 2016 | Expired or cancelled withdrawn Jul 2016 | 2709 43rd Av | removed non-bearing walls at 1st floor. rebuild (n) family room, bedroom and bathroom @ 1st floor. add a rear deck and stairs @ 2nd floorDetails
removed non-bearing walls at 1st floor. rebuild (n) family room, bedroom and bathroom @ 1st floor. add a rear deck and stairs @ 2nd floor | $45,000 | |
| May 12, 2016 | Completed final sign-off Aug 2016 | 3173 21st St | Kwok Pun Leung Const. Co ***Check I D** | apt 3: work on 3rd floor only. remodeling extg kitchen. change extg toilet to bathroom and enlarge extg bedroom at front of bldg. new furnace.Details
apt 3: work on 3rd floor only. remodeling extg kitchen. change extg toilet to bathroom and enlarge extg bedroom at front of bldg. new furnace. | $30,000 |
| May 12, 2016 | Completed final sign-off Aug 2017 | 507 Divisadero St | C & K Housing Const Co *Ck Id* | remodeling extg unit "a" at 2nd floor. remodeling kitchen, add 1 bath room, change extg bedroom to 2 bedroom. new furnace.Details
remodeling extg unit "a" at 2nd floor. remodeling kitchen, add 1 bath room, change extg bedroom to 2 bedroom. new furnace. | $35,000 |
| Jan 28, 2016 | Completed final sign-off Oct 2017 | 522 Moscow St | Lao's Construction | interior floor plans revisions to approved application 201407020310.Details
interior floor plans revisions to approved application 201407020310. | $20,000 |
| Nov 23, 2015 | Completed final sign-off Aug 2016 | 2169 Green St | Vk Construction | rebuild (e) dryrot entrance stairs in kind. work in common area. n/a maher ordinance.Details
rebuild (e) dryrot entrance stairs in kind. work in common area. n/a maher ordinance. | $12,000 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 4502 Anza St | Lao's Construction | apt 2 - interior remodel. remodel existing unit at 2 fl. remodel e kitchen, bath, bedrooms. change living rm, bedroom, change e furnace. add skylight, change rear windows to casement windowsDetails
apt 2 - interior remodel. remodel existing unit at 2 fl. remodel e kitchen, bath, bedrooms. change living rm, bedroom, change e furnace. add skylight, change rear windows to casement windows | $28,000 |
| Jul 16, 2015 | Completed final sign-off Jun 2016 | 1836 Noriega St | Kwok Pun Leung Const. Co ***Check I D** | convert existing vacant store, parking garage area, utility room, interior stair area to new pharmacy store. rebuild existing entrance stairs to 2nd flDetails
convert existing vacant store, parking garage area, utility room, interior stair area to new pharmacy store. rebuild existing entrance stairs to 2nd fl | $120,000 |
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 3131 Quintara St | Jimmy Wong | 2/f: remove the dividing wall (built w/o bldg permit) @(e)rear room, add wall & door between bedrm & study rm. 1/f: create 2 bedrms at (e) rear 1/f , family room (comply with complaint 201523111).Details
2/f: remove the dividing wall (built w/o bldg permit) @(e)rear room, add wall & door between bedrm & study rm. 1/f: create 2 bedrms at (e) rear 1/f , family room (comply with complaint 201523111). | $1,000 |
| Jun 19, 2015 | Expired or cancelled cancelled Jul 2016 | 515 Garfield St | proposed a storage room and bath room at 1st floor.Details
proposed a storage room and bath room at 1st floor. | $28,000 | |
| Jun 12, 2015 | Completed final sign-off Feb 2017 | 2851 Turk Bl | Jimmy Wong | alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood.Details
alteration to existing bldg. relocate ((e) stairs, kitchens, bathrooms, change the lower roof to roof deck at rear at 3/f. new home office, family room and 2 toilets at 1/f. new electrical, plumbing, heating system and tankless water heaters. replace all windows in kind w/ solid wood. | $250,000 |
| May 14, 2015 | Completed final sign-off Jun 2017 | 1555 23rd Av | Module Construction Inc. | unit legalization per ordinance no# 43-14. one bedroom, living room, one kitchen & one bathroom @ 1st floor.Details
unit legalization per ordinance no# 43-14. one bedroom, living room, one kitchen & one bathroom @ 1st floor. | $38,000 |
| May 4, 2015 | Completed final sign-off Sep 2015 | 1574 43rd Av | Kwok Pun Leung Const. Co ***Check I D** | proposed work at 2nd floor only. remodeling existing kitchen and line up wall at interior light court in the kitchen side.Details
proposed work at 2nd floor only. remodeling existing kitchen and line up wall at interior light court in the kitchen side. | $20,000 |
| Apr 21, 2015 | Completed final sign-off May 2016 | 1315 Silliman St | Udream Construction | unit legalization per ordinance 43-14 (existing 1/f family room, bedroom and bathroom, storage room under appln #200806124246)Details
unit legalization per ordinance 43-14 (existing 1/f family room, bedroom and bathroom, storage room under appln #200806124246) | $8,000 |
| Mar 9, 2015 | Expired or cancelled cancelled Jan 2026 | 1447 Newcomb Av | remodeling (e) bld and new rear deck with stairs. remove bearing wall. remodeling (e) kitchen and bathroom. add 1-new kitchen with (n) skylight, (n) bedrooms and 1-bathroom. remove kitche that was built without bld permit.Details
remodeling (e) bld and new rear deck with stairs. remove bearing wall. remodeling (e) kitchen and bathroom. add 1-new kitchen with (n) skylight, (n) bedrooms and 1-bathroom. remove kitche that was built without bld permit. | $80,000 | |
| Mar 3, 2015 | Completed final sign-off Jan 2017 | 468 Victoria St | Jva Management Corp | (unit legalization ordin. 43-14) legalization of (e) unauthorized "in law" dwelling unit at 1/f add a rear deck.(legalized the kitchen) (the existing living space @ 1/f is under app #200206088162,200208053168 & 200802265555)Details
(unit legalization ordin. 43-14) legalization of (e) unauthorized "in law" dwelling unit at 1/f add a rear deck.(legalized the kitchen) (the existing living space @ 1/f is under app #200206088162,200208053168 & 200802265555) | $8,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 112 Westwood Dr | Vk Construction | first flr: repair existing foundation, second floor: remodeling existing bathroom.Details
first flr: repair existing foundation, second floor: remodeling existing bathroom. | $28,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 60 De Long St | Cbs Construction Inc. | install 2-bedrooms, 1 bathroom at first floorDetails
install 2-bedrooms, 1 bathroom at first floor | $38,000 |
| Nov 13, 2014 | Completed final sign-off Feb 2015 | 220 Morningside Dr | Landmark Construction & Development Inc | remove a bearing wall (e) breakfast room & laundry rm, relocated (n) laundry rm at garage level, relocated water heater at garage area.Details
remove a bearing wall (e) breakfast room & laundry rm, relocated (n) laundry rm at garage level, relocated water heater at garage area. | $15,000 |