Jingbo Yang
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Sja Development Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Sep 2026
104 permits since 2000 (engineer on 88 permits, architect on 11 permits, designer on 3 permits, authorized agent-others on 2 permits): 81 completed, 9 in progress, 5 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 104.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 126 Randolph St | Y&L Constructon And Remodeling | ground floor - add a new bedroom, family room, a full bath and a kitchennette. relocate (e) furnace and renew water heater. repair interior stair due to dryrot.Details
ground floor - add a new bedroom, family room, a full bath and a kitchennette. relocate (e) furnace and renew water heater. repair interior stair due to dryrot. | $100,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 95 South Hill Bl | Gao Wu Construction Inc | ground floor: add 2 new bedroom and 2 new full bathroom. add 1 media room. replace and renew furnace and water heater. 2/f: remodel (e) kitchen, bedroom#2 and 1 full bath. add 1 full bathroom. relocate internal stair to the ground floor.Details
ground floor: add 2 new bedroom and 2 new full bathroom. add 1 media room. replace and renew furnace and water heater. 2/f: remodel (e) kitchen, bedroom#2 and 1 full bath. add 1 full bathroom. relocate internal stair to the ground floor. | $120,000 |
| Jun 29, 2026 | In progress issued Aug 2026 | 548 Vienna St | Kevin Lin Construction Inc | 1/f: add 2 bedroom, 1 full bath and media room. 2/f: remodel kitchen and bathroom. relocate bedroom. add 1 office and 1 full bath. new deck at rear. replace front window with in-kind (vinyl). replace new garage door (wood)Details
1/f: add 2 bedroom, 1 full bath and media room. 2/f: remodel kitchen and bathroom. relocate bedroom. add 1 office and 1 full bath. new deck at rear. replace front window with in-kind (vinyl). replace new garage door (wood) | $180,000 |
| Jun 24, 2026 | In progress issued Aug 2026 | 463 Ramsell St | Two Z Inc | 1st fl: add family rm, 1 bedroom, 1 & 1/2 full bath. 2nd fl remodel kitchen and bathroom. add 1 full bath, add new deck at rear. replace front windows with in kind vinyl.Details
1st fl: add family rm, 1 bedroom, 1 & 1/2 full bath. 2nd fl remodel kitchen and bathroom. add 1 full bath, add new deck at rear. replace front windows with in kind vinyl. | $150,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 233 Sargent St | re-build rear yard site retaining wall. no change to (e) grade.Details
re-build rear yard site retaining wall. no change to (e) grade. | $5,000 | |
| May 11, 2026 | Completed final sign-off Jun 2026 | 1452 48th Av | rear bldg only: revision to 202209222992, 1st/f - change bedroom to office. 3rd/f - change 1 window size @ front. add 2 skylightsDetails
rear bldg only: revision to 202209222992, 1st/f - change bedroom to office. 3rd/f - change 1 window size @ front. add 2 skylights | $500 | |
| Apr 28, 2026 | In progress issued May 2026 | 1962 47th Av | Junda Construction Inc | 1/f: add home office, family room with wet bar, new bedroom and bathroom. remodel (e) bedroom and bathroom. relocate laundry. 2/f: total remodel. reconfigure (e) kitchen, bedrooms and bathrooms. reconfigure interior stair.Details
1/f: add home office, family room with wet bar, new bedroom and bathroom. remodel (e) bedroom and bathroom. relocate laundry. 2/f: total remodel. reconfigure (e) kitchen, bedrooms and bathrooms. reconfigure interior stair. | $200,000 |
| Mar 6, 2026 | In progress issued Mar 2026 | 2798 San Bruno Av | Star Light Construction Inc. | revision to bpa #202208090183 change window material from alum clad wood to vinyl.Details
revision to bpa #202208090183 change window material from alum clad wood to vinyl. | |
| Feb 26, 2026 | Completed final sign-off Jun 2026 | 852 Washington St | Y R C Construction | change of use from jewelry shop to hair salon. tenant improvement. prep & install new flooring. install ada auto accessible door openers. install lights & electric outlets. interior walls & doors. new mop sink and hot water heater.new shampoo sinks & hand sink. new ductless mini split ac & heat pumpDetails
change of use from jewelry shop to hair salon. tenant improvement. prep & install new flooring. install ada auto accessible door openers. install lights & electric outlets. interior walls & doors. new mop sink and hot water heater.new shampoo sinks & hand sink. new ductless mini split ac & heat pump | $40,000 |
| Feb 4, 2026 | In progress issued Jun 2026 | 667 02nd Av | Red House Construction | ground/f garage level interior remodeling, replace foundations & slab on grade per plan, add a bathroom to e) storage areaDetails
ground/f garage level interior remodeling, replace foundations & slab on grade per plan, add a bathroom to e) storage area | $10,000 |
| Nov 26, 2025 | Completed final sign-off Apr 2026 | 131 Wetmore St | Kevin Lin Construction Inc | 2/f unit 131: remodel kitchen and bathroom. add 1 full bath.Details
2/f unit 131: remodel kitchen and bathroom. add 1 full bath. | $50,000 |
| Nov 18, 2025 | Completed final sign-off Sep 2026 | 2737 22nd St | Gh Construction Inc. | revision to permit 202509024375 (ref. 202504094023). reconfigure 4 fixtures bathroom layout on 3/f.Details
revision to permit 202509024375 (ref. 202504094023). reconfigure 4 fixtures bathroom layout on 3/f. | |
| Sep 19, 2025 | Completed final sign-off Jul 2026 | 571 35th Av | Golden State Plumbing | revision to 202502059740: revise structural framing & foundation of rear yard deck only. no change to layout or dimensionDetails
revision to 202502059740: revise structural framing & foundation of rear yard deck only. no change to layout or dimension | |
| Sep 8, 2025 | Completed final sign-off Dec 2025 | 4040 Ortega St | All Homes And Construction Inc | revision to 202506128554: replace front windows & new facade. new deck at rearDetails
revision to 202506128554: replace front windows & new facade. new deck at rear | $6,500 |
| Sep 2, 2025 | Completed final sign-off Sep 2026 | 2737 22nd St | Gh Construction Inc., Jian Lou Construction Co. | comply with nov#: 202540372; revision 202504094023. reflecting the original condition of the 2nd flr, removing non-beaming wall at the foyer/stair and bearing wall at the rear to create an open layout, enlarging the slideing in the (n) dining room, replacing windows in the (n) kitchen and dining ofDetails
comply with nov#: 202540372; revision 202504094023. reflecting the original condition of the 2nd flr, removing non-beaming wall at the foyer/stair and bearing wall at the rear to create an open layout, enlarging the slideing in the (n) dining room, replacing windows in the (n) kitchen and dining of | $30,000 |
| Aug 20, 2025 | Completed final sign-off Mar 2026 | 554 18th Av | Junda Construction Inc | replace front stairs and enlarge garage size to 8'6"Details
replace front stairs and enlarge garage size to 8'6" | $5,000 |
| Aug 20, 2025 | Completed final sign-off Dec 2025 | 41 Pueblo St | Kevin Lin Construction Inc | revision to 202309217146: revise structural beam & foundation detail only. no change to layout. all interior workDetails
revision to 202309217146: revise structural beam & foundation detail only. no change to layout. all interior work | |
| Jul 25, 2025 | Completed final sign-off Aug 2026 | 263 Madison St | Sinh Electric Co. | g/f: new family room, office & a bathroom. new deck at rear yardDetails
g/f: new family room, office & a bathroom. new deck at rear yard | $90,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 2055 42nd Av | Hong's General Construction Inc | 2nd fl: change e) bedroom to new office. in fill light well & new sky lightDetails
2nd fl: change e) bedroom to new office. in fill light well & new sky light | $5,000 |
| Jun 4, 2025 | Completed final sign-off Dec 2025 | 2629 San Jose Av | All Homes And Construction Inc | 1/f: add 1 bedroom and 1 full bath. 2/f: remodel (e) kitchen, bathroom, and 2 bedrooms. new deck at rear.Details
1/f: add 1 bedroom and 1 full bath. 2/f: remodel (e) kitchen, bathroom, and 2 bedrooms. new deck at rear. | $120,000 |
| Apr 21, 2025 | Completed final sign-off Jun 2026 | 39 Seal Rock Dr | Bay Cities Construction** Check I.D.**** | 1st/f: resize e) playroom & powder rm, new wet bar in playroom, add bedroom w/ full bath. relocate laundry & utilities. 2nd/f: remodel e) bedrooms & bathroom, reconfigure kitchen, family & dining rm, add 1 full bath. new decks at rear, add skylights, infill lightwellDetails
1st/f: resize e) playroom & powder rm, new wet bar in playroom, add bedroom w/ full bath. relocate laundry & utilities. 2nd/f: remodel e) bedrooms & bathroom, reconfigure kitchen, family & dining rm, add 1 full bath. new decks at rear, add skylights, infill lightwell | $260,000 |
| Feb 25, 2025 | Completed final sign-off May 2026 | 795 Naples St | ref to permit 202308043805. add new deck at rear.Details
ref to permit 202308043805. add new deck at rear. | $7,500 | |
| Dec 31, 2024 | Completed final sign-off Apr 2025 | 1949 Hayes St | Brendan Waters Construction Inc | open wall between living room and parlor. remove (e) parlor door and frame in doorway. addition of transome window from parlor to hall way. interior work only.Details
open wall between living room and parlor. remove (e) parlor door and frame in doorway. addition of transome window from parlor to hall way. interior work only. | $8,000 |
| Aug 30, 2024 | Completed final sign-off Sep 2025 | 2005 17th St | G Construction Service Inc | new open 1 window on east side. enlarge patio door. enlarge 2 windows on west side. remodel scope at (e) rear office only. not visible from street.Details
new open 1 window on east side. enlarge patio door. enlarge 2 windows on west side. remodel scope at (e) rear office only. not visible from street. | $10,000 |
| Jul 29, 2024 | Completed final sign-off Oct 2025 | 681 Brunswick St | All Homes And Construction Inc | 1st fl. add 1 bedroom, family, 2 full baths 2nd fl. remodel (e) kitchen and bathroom, add 1 bedroom, & 1 full bath replace front windows in-kind new sky lights. infill lightwell. add stairs at rear (e) deck.Details
1st fl. add 1 bedroom, family, 2 full baths 2nd fl. remodel (e) kitchen and bathroom, add 1 bedroom, & 1 full bath replace front windows in-kind new sky lights. infill lightwell. add stairs at rear (e) deck. | $170,000 |
| Jul 10, 2024 | Completed final sign-off Sep 2024 | 2728 San Bruno Av | revision to permit 202305198185. to remove installation of walk-in refrigerator and freezer. reduce scope of work.Details
revision to permit 202305198185. to remove installation of walk-in refrigerator and freezer. reduce scope of work. | ||
| Jun 4, 2024 | Expired or cancelled expired Apr 2026 | 1938 Ocean Av | D Construction Inc | revision to pa# 2022-0923-3088 1st fl: reduce scope of work, keep existing stairsDetails
revision to pa# 2022-0923-3088 1st fl: reduce scope of work, keep existing stairs | |
| Mar 22, 2024 | Completed final sign-off Apr 2025 | 505 29th Av | Cbs Construction Inc. | unit #505 remodel (e) kitchen & bathroom. add 1 bedroom, office & 1 full bath in (e) habitable spaceDetails
unit #505 remodel (e) kitchen & bathroom. add 1 bedroom, office & 1 full bath in (e) habitable space | $56,000 |
| Mar 22, 2024 | Expired or cancelled cancelled Aug 2024 | 795 Naples St | reference pa#202308043805 add new deck at rearDetails
reference pa#202308043805 add new deck at rear | $7,500 | |
| Mar 8, 2024 | Completed final sign-off Mar 2024 | 22 Fairfield Wy | revision to permit 202401194284. structural revision to clarify concrete strength = 2,500 psi per special inspection plan checker.Details
revision to permit 202401194284. structural revision to clarify concrete strength = 2,500 psi per special inspection plan checker. | ||
| Feb 9, 2024 | Completed final sign-off May 2025 | 2178 34th Av | 1 N 7 General Construction | 1/f: add 2 bedrooms, office, media and 1 full bath. 2/f: reconfigure (e) kitchen and bathroom and add 1 full bath. replace front windows in kind. infill lightwell, new sky lights, new deck at rear.Details
1/f: add 2 bedrooms, office, media and 1 full bath. 2/f: reconfigure (e) kitchen and bathroom and add 1 full bath. replace front windows in kind. infill lightwell, new sky lights, new deck at rear. | $12,000 |
| Jan 22, 2024 | Expired or cancelled expired Feb 2026 | 415 Colon Av | G Construction Service Inc | demo existing kitchen, install new kitchen, replace windows inkind (rear) , remove french doors, remodel full bath, remodel half bath, remove a section of bearing wall b/w kitchen and dining room, install new ceiling beams. new windows are aluminum clad wood.Details
demo existing kitchen, install new kitchen, replace windows inkind (rear) , remove french doors, remodel full bath, remodel half bath, remove a section of bearing wall b/w kitchen and dining room, install new ceiling beams. new windows are aluminum clad wood. | $45,000 |
| Aug 22, 2023 | Completed final sign-off Jul 2025 | 10 Curtis St | Hungto Co Incorporation | revision to 201905039676: 1st/f- new fl layout w/ relocation of 2 bedrooms & 2 bathrooms, new wet bar, remodel (e) stair. 2nd/f: change layout for new master bed suiteDetails
revision to 201905039676: 1st/f- new fl layout w/ relocation of 2 bedrooms & 2 bathrooms, new wet bar, remodel (e) stair. 2nd/f: change layout for new master bed suite | |
| Jul 28, 2023 | In progress issued Oct 2023 | 667 02nd Av | Red House Construction | replace/retrofit foundation 1st flr of existing rear portion of 3-story building. no change to existing footprint or exterior.Details
replace/retrofit foundation 1st flr of existing rear portion of 3-story building. no change to existing footprint or exterior. | $10,000 |
| Jul 27, 2023 | Completed final sign-off Dec 2023 | 940 Cayuga Av | G Construction Service Inc, Shek's Construction Co | reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing.Details
reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing. | $5,000 |
| Jul 13, 2023 | Completed final sign-off Mar 2024 | 22 Fairfield Wy | Skytec General Engineering | revise floor framing for interior stair support, ref 202306210560Details
revise floor framing for interior stair support, ref 202306210560 | $1,000 |
| Jul 13, 2023 | Completed final sign-off Feb 2024 | 324 24th Av | Skytec General Engineering | 3rd fl: infill (e) light-well (72 sf). remodel (e) kitchen, dining, living rm. add new master bathroom @ master suite. new skylightDetails
3rd fl: infill (e) light-well (72 sf). remodel (e) kitchen, dining, living rm. add new master bathroom @ master suite. new skylight | $120,000 |
| Jun 29, 2023 | Completed final sign-off Dec 2023 | 3446 Balboa St | Seamus Collins Construction, Inc. | revision to pa# 202305177989 for accessible shower location. relocate ada shower.Details
revision to pa# 202305177989 for accessible shower location. relocate ada shower. | |
| Jun 21, 2023 | Completed final sign-off Oct 2024 | 1000 Prague St | Hung Construction | revision to permit 202210174510. 1/f: resize mudroom, bedrooms, and bathrooms. 2/f: relocate kitchen, dining and bathrooms per layout. add new office. new interior stairs.Details
revision to permit 202210174510. 1/f: resize mudroom, bedrooms, and bathrooms. 2/f: relocate kitchen, dining and bathrooms per layout. add new office. new interior stairs. | |
| Jun 9, 2023 | Completed final sign-off Apr 2024 | 571 Flood Av | Pacific Peninsula Construction Managemen | 1/f: add family room bedroom, 1 full bath, 1 half bath and gym room. relocate laundry and utilities. 2/f: add 1 full bath in master bedroom, reconfigure (e) bathroom and kitchen per layout. 3 new skylights and new deck at rear.Details
1/f: add family room bedroom, 1 full bath, 1 half bath and gym room. relocate laundry and utilities. 2/f: add 1 full bath in master bedroom, reconfigure (e) bathroom and kitchen per layout. 3 new skylights and new deck at rear. | $100,000 |
| Jun 6, 2023 | Completed final sign-off Nov 2023 | 880 Geneva Av | revision to 202212198616: nov unsercured metal component of metal roll up gate/doors replace w/ sliding gate. nov 202297932. ground fl restaurant exterior work onlyDetails
revision to 202212198616: nov unsercured metal component of metal roll up gate/doors replace w/ sliding gate. nov 202297932. ground fl restaurant exterior work only | $6,000 | |
| May 19, 2023 | Completed final sign-off Sep 2024 | 2728 San Bruno Av | kconvert existing garage to new storage room. install new wall and exterior door at garage opening. install new walk-in refrigerator and walk-in freezer. for sfdph (health dept.), change of ownership to new hong kong bbq restaurant.Details
kconvert existing garage to new storage room. install new wall and exterior door at garage opening. install new walk-in refrigerator and walk-in freezer. for sfdph (health dept.), change of ownership to new hong kong bbq restaurant. | $19,000 | |
| May 18, 2023 | Completed final sign-off Jun 2023 | 2248 Jerrold Av | rev to pa# 202002275657, revise existing field condition, revert as-built mezzanine back to original sizeDetails
rev to pa# 202002275657, revise existing field condition, revert as-built mezzanine back to original size | ||
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 2241 17th Av | Hong's General Construction Inc | 1/f: add 2 bedrooms, media, home office and 2 full bath. add new patio. 2/f: remodel kitchen, bathroom. add 1 full bath. 5 new skylights infill lightwellsDetails
1/f: add 2 bedrooms, media, home office and 2 full bath. add new patio. 2/f: remodel kitchen, bathroom. add 1 full bath. 5 new skylights infill lightwells | $150,000 |
| Feb 15, 2023 | Completed final sign-off Apr 2024 | 52 Fairfield Wy | Castle Construction | revision to 202212098031: foundation revision @ rear wallDetails
revision to 202212098031: foundation revision @ rear wall | $3,000 |
| Feb 2, 2023 | Completed final sign-off Apr 2024 | 670 26th Av | Castle Construction | revision to permit 202211186853. 2/f layout reconfiguration. 3/f: add 1 new window.Details
revision to permit 202211186853. 2/f layout reconfiguration. 3/f: add 1 new window. | $200 |
| Dec 20, 2022 | Completed final sign-off Dec 2023 | 2222 25th Av | Zhongwei Construction | 1st fl - add family, media, office and 1 full bath; 2nd fl - remodel kitchen, bathroom. add 1 full bath; replace posts; add 1 skylight on flat roofDetails
1st fl - add family, media, office and 1 full bath; 2nd fl - remodel kitchen, bathroom. add 1 full bath; replace posts; add 1 skylight on flat roof | $75,000 |
| Nov 18, 2022 | Completed final sign-off Apr 2024 | 670 26th Av | Castle Construction | 1/f: add 1 bedroom playroom, media dna 1.5 bath. 2/f: remodel kitchen, add 1 full bath and 1 bedroom. 3/f: remodel bedroom and bathroom, add 1 full bath and 2 bedrooms. add new dormer, new roof deck. repair front exterior wall (stucco with in-kind)Details
1/f: add 1 bedroom playroom, media dna 1.5 bath. 2/f: remodel kitchen, add 1 full bath and 1 bedroom. 3/f: remodel bedroom and bathroom, add 1 full bath and 2 bedrooms. add new dormer, new roof deck. repair front exterior wall (stucco with in-kind) | $98,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2024 | 358 Hearst Av | Junda Construction Inc | 2/f: remodel kitchen, bathroom, and add powder room. 3/f: remodel kitchen, bathroom, and add powder room and office. reconfigure interior stairs and exterior front stairs. replace new stucco at the front of the building.Details
2/f: remodel kitchen, bathroom, and add powder room. 3/f: remodel kitchen, bathroom, and add powder room and office. reconfigure interior stairs and exterior front stairs. replace new stucco at the front of the building. | $95,000 |
| Mar 15, 2022 | Completed final sign-off Dec 2022 | 1839 25th Av | Integrity General Construction Inc | revision to bpa 202112083957. 2/f: reconfigure bathroom layout. infill lightwell. add skylight.Details
revision to bpa 202112083957. 2/f: reconfigure bathroom layout. infill lightwell. add skylight. | $5,000 |
| Nov 16, 2021 | Never finaled issued Feb 2022, no final | 7 Maddux Av | R & D Construction Co Inc | comply w/ correction notice & complaint 202177226. revision to pa# 2019 0318 5540. volunary strenghtening (e) foundationDetails
comply w/ correction notice & complaint 202177226. revision to pa# 2019 0318 5540. volunary strenghtening (e) foundation | $7,000 |
| Nov 9, 2021 | Completed final sign-off Apr 2023 | 539 Athens St | S P Builder | revision to permit 202102235198. new half bath at 1st floor. 1 new skylight and new deck at rear.Details
revision to permit 202102235198. new half bath at 1st floor. 1 new skylight and new deck at rear. | $25,000 |
| Sep 22, 2021 | Completed final sign-off Jan 2023 | 3937 Sacramento St | Eternity Home Builders Inc | 1st floor reconfigure/remodel bathroom and laundry room. 2nd floor remodel kitchen area, remove a section of the wall.Details
1st floor reconfigure/remodel bathroom and laundry room. 2nd floor remodel kitchen area, remove a section of the wall. | $40,000 |
| Aug 19, 2021 | Never finaled issued Feb 2022, no final | 119 Otsego Av | Able T Construction Company | to comply w/complaint #'s 202052501 & 202177224. 1/f: reconfigure interior to become (2) new bedrooms, (2) bathrooms, family & laundry area; 2/f: reconfigure (2) bathrooms, add (1) bathroom, remodel kitchen, infll (e) stair, build new staircase to 1/fDetails
to comply w/complaint #'s 202052501 & 202177224. 1/f: reconfigure interior to become (2) new bedrooms, (2) bathrooms, family & laundry area; 2/f: reconfigure (2) bathrooms, add (1) bathroom, remodel kitchen, infll (e) stair, build new staircase to 1/f | $180,000 |
| Jun 14, 2021 | Completed final sign-off Mar 2022 | 351 Crescent Av | W H Construction Inc | 1st fl: add 2 bebrooms, 2 full baths & family room. 2nd fl: remodel kitchen & bath, add 1 full bath & laundry. add 4 skylightsDetails
1st fl: add 2 bebrooms, 2 full baths & family room. 2nd fl: remodel kitchen & bath, add 1 full bath & laundry. add 4 skylights | $100,000 |
| Apr 8, 2021 | Completed final sign-off Nov 2021 | 2219 39th Av | Junda Construction Inc | 1st fl: add 1 bedroom. 2nd fl: remodel kitchen, bathroom and bedrooms. add 1 full bath. add new deck.Details
1st fl: add 1 bedroom. 2nd fl: remodel kitchen, bathroom and bedrooms. add 1 full bath. add new deck. | $45,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2023 | 539 Athens St | S P Builder | 2nd fl: remodel kitchen, bedroom, and 2 full baths, bedroom. remove interior staircase.Details
2nd fl: remodel kitchen, bedroom, and 2 full baths, bedroom. remove interior staircase. | $45,000 |
| Oct 17, 2020 | Completed final sign-off Mar 2022 | 269 Gaven St | Tsl Construction & Consultant Inc | 1st floor: add 1 bedroom, 2 full bath, home office, and media room. 2nd floor: remodel kitchen, bedrooms, and bathroom. add 1 full bath & 1 bedroom. relocate interior staircase. remove shed.Details
1st floor: add 1 bedroom, 2 full bath, home office, and media room. 2nd floor: remodel kitchen, bedrooms, and bathroom. add 1 full bath & 1 bedroom. relocate interior staircase. remove shed. | $100,000 |
| Sep 4, 2020 | Completed final sign-off Nov 2021 | 4483 Mission St | Western City Construction Co | revision to pa# 202002104000. upstairs residential unit: add 1 bathroom, convert dining to bedroom. all interior work. no work on 1st fl commercial space.Details
revision to pa# 202002104000. upstairs residential unit: add 1 bathroom, convert dining to bedroom. all interior work. no work on 1st fl commercial space. | $20,000 |
| Aug 18, 2020 | Expired or cancelled withdrawn Sep 2020 | 67 Montana St | All Homes And Construction Inc | g/f; add 1 bedrm and 1 full bath, shift foyer wall forwa. 2nd fl; remodel kitchen and bedrm, 1 new skylight.Details
g/f; add 1 bedrm and 1 full bath, shift foyer wall forwa. 2nd fl; remodel kitchen and bedrm, 1 new skylight. | $60,000 |
| Aug 4, 2020 | Completed final sign-off Nov 2021 | 242 Baltimore Wy | Yefa Construction Inc | 1st floor: add 2 bedroom,2 full bath & media room. 2nd floor: remodel living rm, kitchen & bath. add 1 full bath & office. infill at rear, add patio @ rear. infill lightwell, add skylight. install nfpa 13d sprinklers throughout, under separate permit. (horizontal addition)Details
1st floor: add 2 bedroom,2 full bath & media room. 2nd floor: remodel living rm, kitchen & bath. add 1 full bath & office. infill at rear, add patio @ rear. infill lightwell, add skylight. install nfpa 13d sprinklers throughout, under separate permit. (horizontal addition) | $78,000 |
| Feb 20, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | Hing Wah Construction Inc | revise pa# 202001091542; revise structural framing to previous permitDetails
revise pa# 202001091542; revise structural framing to previous permit | |
| Feb 4, 2020 | Completed final sign-off Feb 2020 | 21 Bishop St | S And L Tec Construction Co Inc | new rear yard deck and stair per planDetails
new rear yard deck and stair per plan | $4,000 |
| Jan 13, 2020 | Completed final sign-off May 2021 | 1667 26th Av | Transbay Builders Inc. | 1st fl - add 2 bedrooms, 2 full bath & family; 2nd fl - remodel kitchen, bedrooms & bath. add office relocate interior staircase. infill lightwell. replace windows in-kind with aluminum-clad windows. 3 lites for left window.Details
1st fl - add 2 bedrooms, 2 full bath & family; 2nd fl - remodel kitchen, bedrooms & bath. add office relocate interior staircase. infill lightwell. replace windows in-kind with aluminum-clad windows. 3 lites for left window. | $60,000 |
| Jan 9, 2020 | Completed final sign-off Oct 2020 | 508 29th Av | Hing Wah Construction Inc | 2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroomDetails
2nd fl - unit 508 remodel bedrooms, kitchen and bathroom. add 1 bedroom | $50,000 |
| Oct 17, 2019 | Completed final sign-off Jun 2020 | 2062 34th Av | Tw Wanda Construction Inc., Junda Construction Inc | 1st fl - add 2 bedrooms, 2 full baths, media and laundry; 2nd fl - total remodel, add 1 full bath & home office; new deck and patio @ rear. new windows @ front in-kind with aluminum-clad woodDetails
1st fl - add 2 bedrooms, 2 full baths, media and laundry; 2nd fl - total remodel, add 1 full bath & home office; new deck and patio @ rear. new windows @ front in-kind with aluminum-clad wood | $90,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2020 | 123 Westwood Dr | Cej Construction Llc | 1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kindDetails
1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kind | $60,000 |
| Jul 11, 2019 | Expired or cancelled cancelled Jan 2026 | 85 Idora Av | 1st fl - add 2 bedrooms, 1.5 baths, family room and laundry room; 2nd fl - remodel kitchen and bathrooms; reconfigure the interior stairsDetails
1st fl - add 2 bedrooms, 1.5 baths, family room and laundry room; 2nd fl - remodel kitchen and bathrooms; reconfigure the interior stairs | $60,000 | |
| May 2, 2019 | Never finaled issued May 2019, no final | 1040 Leavenworth St | Kenny J M Yu | revision to previous soft story retrofit pa 2017-1017-1440 (change to plywood shearwall locations)Details
revision to previous soft story retrofit pa 2017-1017-1440 (change to plywood shearwall locations) | |
| Jan 29, 2019 | Completed final sign-off Jun 2020 | 1426 14th Av | Palmera Construction Co | revision to pa 2018-0816-7547 - new foundation/retaining wall for existing rear 2 story portion of buildingDetails
revision to pa 2018-0816-7547 - new foundation/retaining wall for existing rear 2 story portion of building | $7,000 |
| Mar 21, 2018 | Completed final sign-off Oct 2018 | 151 Banks St | Brendan Waters Construction Inc | remodel kitchen and bathroom, add half bath, legalize full bath @ 1st floorDetails
remodel kitchen and bathroom, add half bath, legalize full bath @ 1st floor | $26,000 |
| Aug 30, 2017 | Completed final sign-off Sep 2018 | 380 07th St | ti for existing automotive repair shop. update accessibility/restrooms. removal of non bearing walls. install/repair exterior and interior windows. new counter for break room and sink at 2nd fl for breakroom, removal of lightwell. replace brick foundation per planDetails
ti for existing automotive repair shop. update accessibility/restrooms. removal of non bearing walls. install/repair exterior and interior windows. new counter for break room and sink at 2nd fl for breakroom, removal of lightwell. replace brick foundation per plan | $15,000 | |
| Jan 18, 2017 | Completed final sign-off Mar 2019 | 3661 16th St | B Power Construction Corp | revision to pa #201608155046 - revise footing, shearwall for soft story retrofit.Details
revision to pa #201608155046 - revise footing, shearwall for soft story retrofit. | $5,000 |
| Jan 13, 2017 | Expired or cancelled expired Apr 2024 | 949 Capp St | Kenny J M Yu | revision to 201610210930. revise frame layout for soft story retrofitDetails
revision to 201610210930. revise frame layout for soft story retrofit | |
| Dec 30, 2016 | Completed final sign-off Jun 2017 | 721 Delano Av | Michael Liang | revision to 201610170483 new floor beams, post and footingsDetails
revision to 201610170483 new floor beams, post and footings | $5,000 |
| Oct 26, 2016 | Completed final sign-off Jan 2019 | 39 Avila St | Brendan Waters Construction Inc | remove wall in garage. install new beam and footings, remodel garage areaDetails
remove wall in garage. install new beam and footings, remodel garage area | $20,000 |
| May 16, 2016 | Completed final sign-off Sep 2016 | 2262 43rd Av | Brendan Waters Construction Inc | remodel 2nd floor kitchen and remove wall between living room and kitchen. add dishwasherDetails
remodel 2nd floor kitchen and remove wall between living room and kitchen. add dishwasher | $30,000 |
| Apr 26, 2016 | Expired or cancelled withdrawn Mar 2017 | 2558 Balboa St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $30,000 | |
| Mar 7, 2016 | Completed final sign-off Dec 2016 | 1711 Lake St | Ed Neale Construction Inc | soft story retrofit per sfbc chapter 34b: 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b: 2012 iebc appendix a-4 | $60,000 |
| Feb 2, 2016 | Completed final sign-off May 2016 | 2182 14th Av | L & Q Construction Inc. | 3/f: convert family room into bedroom and full bath.Details
3/f: convert family room into bedroom and full bath. | $10,000 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 24 Fair Av | E - Builders Inc | 1/f- infill at rear, add 1 bedroom, 1 full bath and interior staircase to connect 2/f. 2/f- remodel kitchen and add 1/2 bath, 3/f- relocate bathroom.Details
1/f- infill at rear, add 1 bedroom, 1 full bath and interior staircase to connect 2/f. 2/f- remodel kitchen and add 1/2 bath, 3/f- relocate bathroom. | $60,000 |
| May 13, 2015 | Completed final sign-off Mar 2016 | 46 Bruce Av | Spk General Construction Inc. | 1st floor: add 1 family room, 2 bathrooms, 1 office, 1 bedroom and new patio at rear. 2nd floor: remodel kitchen and bathroom and add 1 full bath.Details
1st floor: add 1 family room, 2 bathrooms, 1 office, 1 bedroom and new patio at rear. 2nd floor: remodel kitchen and bathroom and add 1 full bath. | $110,000 |
| May 8, 2015 | Completed final sign-off Mar 2019 | 567 44th Av | Db2 Contractors Inc 8 Dba Re Renovations | 1st flr: infill at rear, add 2 baths, 2 bedrooms and a family room. 2nd floor: remodel kitchen and 2 bath, and add 1 full bathDetails
1st flr: infill at rear, add 2 baths, 2 bedrooms and a family room. 2nd floor: remodel kitchen and 2 bath, and add 1 full bath | $100,000 |
| Apr 23, 2015 | Completed final sign-off Feb 2016 | 1032 Treat Av | K G Company | add roof deck to top floor unit.Details
add roof deck to top floor unit. | $6,000 |
| Feb 25, 2015 | Completed final sign-off Oct 2015 | 12 Somerset St | 1/f: add 3 bedrooms, 1 full bath, 0.5 bath, 1 office, 1 media room. add interior staircase to connect 1/f to 2/f.Details
1/f: add 3 bedrooms, 1 full bath, 0.5 bath, 1 office, 1 media room. add interior staircase to connect 1/f to 2/f. | $50,000 | |
| Feb 9, 2015 | Completed final sign-off Apr 2016 | 176 Yerba Buena Av | Wah Wong Construction Co. | 1/f- add 1 family room, 1 gym, sauna room, laundry room, media room and full bath. 2/f- remodel kitchen and 1/2 bath. 3/f- remodel 2 bathroom and add 1 full bath. replace all windows with fiberglass casement windows in (e) openings. no expansion of existing building foot print.Details
1/f- add 1 family room, 1 gym, sauna room, laundry room, media room and full bath. 2/f- remodel kitchen and 1/2 bath. 3/f- remodel 2 bathroom and add 1 full bath. replace all windows with fiberglass casement windows in (e) openings. no expansion of existing building foot print. | $130,000 |
| Nov 17, 2014 | Completed final sign-off Apr 2016 | 744 Potrero Av | Hing Wah Construction Inc | 1st floor: convert garage space to 1family room, 1 bedroom, i full bath and 1 laundry room. new deck 4-feet from grade - 8 x 15. 2nd floor: remodel kitchen and add 1/2 bath. 3rd floor: add 1 master bath room.Details
1st floor: convert garage space to 1family room, 1 bedroom, i full bath and 1 laundry room. new deck 4-feet from grade - 8 x 15. 2nd floor: remodel kitchen and add 1/2 bath. 3rd floor: add 1 master bath room. | $90,000 |
| Sep 3, 2014 | Completed final sign-off Jan 2016 | 2806 36th Av | V N G Constr. Inc - Dba All Type Remodl | 1st flr: add habitable space including full bath, 2nd flr: remodel kitchen & bath, add a bathroom, re-build interior stair connecting 1st flrDetails
1st flr: add habitable space including full bath, 2nd flr: remodel kitchen & bath, add a bathroom, re-build interior stair connecting 1st flr | $90,000 |
| Aug 21, 2014 | Completed final sign-off Oct 2015 | 1725 Beach St | Liang's Construction Co | upper unit: remodel kitchen, bathrooms, add a full bathroom. lower unit: convert 1/f rear portion to habitable space, remodel kitchen, bathrooms, add half bath, new stair to 1/f space. n/a ordinance #155-13.Details
upper unit: remodel kitchen, bathrooms, add a full bathroom. lower unit: convert 1/f rear portion to habitable space, remodel kitchen, bathrooms, add half bath, new stair to 1/f space. n/a ordinance #155-13. | $80,000 |
| Aug 13, 2014 | Expired or cancelled expired Sep 2018 | 4369 21st St | Kanler | 1/f: infill rear space, add habitable space, new stair to 2/f., 2/f: remodel kitchen & bathroom. attic: add a full bathroom, add roof deck, add dormer.Details
1/f: infill rear space, add habitable space, new stair to 2/f., 2/f: remodel kitchen & bathroom. attic: add a full bathroom, add roof deck, add dormer. | $100,000 |
| Jan 21, 2014 | Never finaled issued Jan 2014, no final | 950 Darien Wy | Brendan Waters Construction Inc | kitchen remodel, add new window @ south wall, add an office.Details
kitchen remodel, add new window @ south wall, add an office. | $25,000 |
| Jan 14, 2014 | Completed final sign-off Jun 2014 | 1439 Mcallister St | Brendan Waters Construction Inc | unit #3: kitchen remodel in same location. interior non bearing wall to be removed with plan and calculations.Details
unit #3: kitchen remodel in same location. interior non bearing wall to be removed with plan and calculations. | $18,000 |
| Dec 26, 2013 | Completed final sign-off Jan 2015 | 835 Cole St | revision to app#201311010926. remove partition, sill plate retrofit at extg foundation.Details
revision to app#201311010926. remove partition, sill plate retrofit at extg foundation. | $2,000 | |
| Nov 1, 2013 | Completed final sign-off Jan 2015 | 835 Cole St | 1st fl, relplace concrete retaining wall at front, remodel kitchen and bathroom. add 1 bathroom, a 1 laundry rm. and 1 bdrm 2nd fl: remodel 2 kitchens, 2 baths, add 1/2 bath. 3rd fl. remodel 2 kitchens and 2 baths. comply with nov 200850075 (retaining wall) comply with nov 201032127Details
1st fl, relplace concrete retaining wall at front, remodel kitchen and bathroom. add 1 bathroom, a 1 laundry rm. and 1 bdrm 2nd fl: remodel 2 kitchens, 2 baths, add 1/2 bath. 3rd fl. remodel 2 kitchens and 2 baths. comply with nov 200850075 (retaining wall) comply with nov 201032127 | $85,000 | |
| Oct 10, 2013 | Completed final sign-off Apr 2014 | 695 27th Av | Hing Wah Construction Inc | 1st floor: add 2 baths, 3 bedrooms and laundry. 2nd floor:new interior stair, remodel kitchen, bath, add 2 baths. replace stucco front and south side. replace window in kind.Details
1st floor: add 2 baths, 3 bedrooms and laundry. 2nd floor:new interior stair, remodel kitchen, bath, add 2 baths. replace stucco front and south side. replace window in kind. | $80,000 |
| Sep 25, 2013 | Completed final sign-off Jan 2014 | 2371 27th Av | Hing Wah Construction Inc | 1st floor:add 2 bedrooms, 2.5 bathrooms and storage. 2nd floor: add 2 bathrooms, remodel extg bath and kitchen, infill center light well, new skylite.Details
1st floor:add 2 bedrooms, 2.5 bathrooms and storage. 2nd floor: add 2 bathrooms, remodel extg bath and kitchen, infill center light well, new skylite. | $50,000 |
| Aug 29, 2013 | Expired or cancelled cancelled May 2017 | 1083 Mississippi St | convert (e) 2nd floor vacant light industrial space into residential unitDetails
convert (e) 2nd floor vacant light industrial space into residential unit | $80,000 | |
| Jun 21, 2013 | Completed final sign-off Jan 2014 | 1550 33rd Av | Mz Construction Company | infill rear portion at ground floor. add family, bedroom, bath and laundry room on ground floor. new interior stair to 2nd floor.Details
infill rear portion at ground floor. add family, bedroom, bath and laundry room on ground floor. new interior stair to 2nd floor. | $60,000 |
| Apr 30, 2013 | Completed final sign-off Sep 2013 | 634 Baker St | L & Q Construction Inc. | #2 - 3rd floor - remodel kitchen & bath & add full bath, one window replacement.Details
#2 - 3rd floor - remodel kitchen & bath & add full bath, one window replacement. | $22,000 |
| Feb 1, 2013 | Completed final sign-off Jun 2013 | 1727 07th Av | Jin Qing Construction Co. | remodel 2nd floor kitchen, relocate cabinets & appliance layout. add 1/2 bathroomDetails
remodel 2nd floor kitchen, relocate cabinets & appliance layout. add 1/2 bathroom | $20,000 |