Permit GraphShortlistSan Francisco building permits since 2000

Y&L Constructon And Remodeling

Contractor license
1108725
State license record
Based in
San Leandro
On San Francisco permits
Oct 2023 to Sep 2026
Last 24 months
2 permits filed

3 permits since 2000: 1 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllStairs 1Kitchen remodel 3Bathroom remodel 3
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 3, 2026In progress
issued Sep 2026
126 Randolph Stground floor - add a new bedroom, family room, a full bath and a kitchennette. relocate (e) furnace and renew water heater. repair interior stair due to dryrot.
Details
Permit
202609037652
Status
issued
Filed
Sep 3, 2026
Permit issued
Sep 22, 2026
Declared cost
$100,000
Address
126 Randolph St

ground floor - add a new bedroom, family room, a full bath and a kitchennette. relocate (e) furnace and renew water heater. repair interior stair due to dryrot.

Open the permit page

$100,000
May 28, 2026In progress
issued Jun 2026
248 Niagara Av1. conversion of (e) ground-floor storage/garage into 2 bedrooms 3-fixture bath, a kitchenette, utility room and laundry. 2) relocate and replace w/h. 3) relocate furnace.
Details
Permit
202605282050
Status
issued
Filed
May 28, 2026
Permit issued
Jun 15, 2026
Declared cost
$50,000
Address
248 Niagara Av

1. conversion of (e) ground-floor storage/garage into 2 bedrooms 3-fixture bath, a kitchenette, utility room and laundry. 2) relocate and replace w/h. 3) relocate furnace.

Open the permit page

$50,000
Oct 23, 2023Completed
final sign-off Jan 2025
783 06th Avfirst flr remodel (e) half bath to full bath, remodel (e) laundry area to wet bar, replace (e) playroom with (n) doors, add two (n) windows at back of building. adding a secondary kitchen at the ground floor for an existing two family dwelling unit. ground floor is common.
Details
Permit
202310239238
Status
complete
Filed
Oct 23, 2023
Permit issued
Mar 26, 2024
Final sign-off
Jan 7, 2025
Declared cost
$25,000
Address
783 06th Av

first flr remodel (e) half bath to full bath, remodel (e) laundry area to wet bar, replace (e) playroom with (n) doors, add two (n) windows at back of building. adding a secondary kitchen at the ground floor for an existing two family dwelling unit. ground floor is common.

Open the permit page

$25,000