Block 1642, lot 017
667 02nd Ave
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,884 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2026 | In progress issued Jun 2026 | 667 02nd Av | Red House Construction | ground/f garage level interior remodeling, replace foundations & slab on grade per plan, add a bathroom to e) storage areaDetails
ground/f garage level interior remodeling, replace foundations & slab on grade per plan, add a bathroom to e) storage area | $10,000 |
| Aug 22, 2025 | In progress issued Aug 2025 | 667 02nd Av | Red House Construction | replace (9) front windows double hung aluminum clad wood.Details
replace (9) front windows double hung aluminum clad wood. | $9,500 |
| Jun 20, 2024 | Completed final sign-off Aug 2024 | 667 02nd Av | to comply with nov#202298661 replace new garage door and door jamb, in kind-same opening due to vehicle struck into (e) garage door, includes repair work for mechanical ducting inside garageDetails
to comply with nov#202298661 replace new garage door and door jamb, in kind-same opening due to vehicle struck into (e) garage door, includes repair work for mechanical ducting inside garage | $10,000 | |
| Dec 22, 2023 | In progress issued Apr 2024 | 667 02nd Av | Red House Construction | reconfigure extg bathroom and add a half bath in both unit floors. 2 remodel bath and 2 new half bath. total 4.Details
reconfigure extg bathroom and add a half bath in both unit floors. 2 remodel bath and 2 new half bath. total 4. | $20,000 |
| Jul 28, 2023 | In progress issued Oct 2023 | 667 02nd Av | Red House Construction | replace/retrofit foundation 1st flr of existing rear portion of 3-story building. no change to existing footprint or exterior.Details
replace/retrofit foundation 1st flr of existing rear portion of 3-story building. no change to existing footprint or exterior. | $10,000 |
| Jun 5, 2023 | Never finaled issued Jun 2023, no final | 669 02nd Av | Red House Construction | remodel bathroom kitchen and update electric siding repair on both units (light well) and windows (8) replace no front facing of buiding. install new drywall 5/8 like for like. no structural, no framing modificationDetails
remodel bathroom kitchen and update electric siding repair on both units (light well) and windows (8) replace no front facing of buiding. install new drywall 5/8 like for like. no structural, no framing modification | $65,000 |
| Dec 16, 2022 | Never finaled issued Dec 2022, no final | 667 02nd Av | Red House Construction | remodel kitchen, bathroom, update electric new panel and add subpanel. replace garage door, and replace all windows at rear facade, and comply with with nov# 202298661.Details
remodel kitchen, bathroom, update electric new panel and add subpanel. replace garage door, and replace all windows at rear facade, and comply with with nov# 202298661. | $150,000 |
| Mar 29, 2012 | Completed final sign-off Apr 2012 | 667 02nd Av | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $20,000 |
| Nov 18, 2011 | Completed final sign-off Dec 2011 | 667 02nd Av | replace all existing ducts with 26 gage r-6 insulated ridgid ducting. ducting in grage.Details
replace all existing ducts with 26 gage r-6 insulated ridgid ducting. ducting in grage. | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Red House Construction (6), Tom Lee Roofing Inc.
- Architects
- Jingbo Yang
- Engineers
- Jingbo Yang, Jingbo Yang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.