Block 0252, lot 016
1040 Leavenworth St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 40
- Rooms
- 38 bedrooms, 40 bathrooms
- Building
- 26,886 sq ft
- Lot
- 9,334 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jun 2026 | 1040 Leavenworth St | Kenny J M Yu | #101: comply w/ nov #202651630: obtain permit for fire damage restoration. remodel kitchen, bathroom & bedroom. remove/replace w? 5/8 "type x" gyp bd. replace all window in-kind.Details
#101: comply w/ nov #202651630: obtain permit for fire damage restoration. remodel kitchen, bathroom & bedroom. remove/replace w? 5/8 "type x" gyp bd. replace all window in-kind. | $60,000 |
| May 2, 2019 | Never finaled issued May 2019, no final | 1040 Leavenworth St | Kenny J M Yu | revision to previous soft story retrofit pa 2017-1017-1440 (change to plywood shearwall locations)Details
revision to previous soft story retrofit pa 2017-1017-1440 (change to plywood shearwall locations) | |
| Oct 17, 2017 | Never finaled issued Dec 2017, no final | 1040 Leavenworth St | Kenny J M Yu | to comply with compaint #201641873. soft story retrofit per sfebc chapter 4d. maher naDetails
to comply with compaint #201641873. soft story retrofit per sfebc chapter 4d. maher na | $60,000 |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 1040 Leavenworth St | Kenny J M Yu | apt 2: replace bathrom tile and replace bathroom tile & replace hardwood floor at bedroom & family.Details
apt 2: replace bathrom tile and replace bathroom tile & replace hardwood floor at bedroom & family. | $5,000 |
| Feb 13, 2015 | Completed final sign-off Mar 2015 | 1040 Leavenworth St | Kenny J M Yu | #110: dry rot repair, comply with his complaint 201521981; bathroom remodel at unit #110- replace floor tile, damaged wood & window at existing location in kind.Details
#110: dry rot repair, comply with his complaint 201521981; bathroom remodel at unit #110- replace floor tile, damaged wood & window at existing location in kind. | $4,500 |
| Aug 21, 2014 | Completed final sign-off Dec 2014 | 1040 Leavenworth St | Kenny J M Yu | comply with his nov #201484271 dated 7/23/2014. replace dry rot and loose siding at front and new exterior paint.Details
comply with his nov #201484271 dated 7/23/2014. replace dry rot and loose siding at front and new exterior paint. | $18,000 |
| May 6, 2013 | Never finaled issued May 2013, no final | 1040 Leavenworth St | Kenny J M Yu | repair dry rot siding at rear light well, approx 12'x12' totalDetails
repair dry rot siding at rear light well, approx 12'x12' total | $4,600 |
| May 24, 2007 | Never finaled issued May 2007, no final | 1040 Leavenworth St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kenny J M Yu (7)
- Engineers
- Jingbo Yang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.