Harry J. Wong
- Listed as
- architect, authorized agent-others, designer
- Firm
- Asian Neighborhood Design
- Based in
- Sf
- On San Francisco permits
- Jan 2000 to Jun 2018
56 permits since 2000 (architect on 51 permits, authorized agent-others on 5 permits, designer on 1 permit): 35 completed, 9 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 722 South Van Ness Av | Bill Wong Construction | alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room...Details
alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room... | $7,500 |
| Dec 4, 2014 | Completed final sign-off Nov 2015 | 1 Webster St | O Donoghue Construction Inc. | major street encroachment for a new infant play yard, sitting area, trellised entry and stroller parking at exsiting ground floor child care center. maher n/a.Details
major street encroachment for a new infant play yard, sitting area, trellised entry and stroller parking at exsiting ground floor child care center. maher n/a. | $93,340 |
| Sep 9, 2011 | Never finaled issued Feb 2012, no final | 72 06th St | change of use from (e) laundry to (n) office use at sfpd substation, includes new offices, new conference area, new kitchenette, new accessible bathrms, showers, entry and glazing.Details
change of use from (e) laundry to (n) office use at sfpd substation, includes new offices, new conference area, new kitchenette, new accessible bathrms, showers, entry and glazing. | $400,000 | |
| Jun 24, 2011 | Never finaled issued Jul 2011, no final | 910 Howard St | re-establish previous use and occupancy of office/workshop per planning department requirementsDetails
re-establish previous use and occupancy of office/workshop per planning department requirements | ||
| Jan 14, 2011 | Completed final sign-off Jun 2011 | 619 Divisadero St | Avalon Construction Co | erect 2 single faced wall signs. field verify that existing fire escape is not obstructed by signs.Details
erect 2 single faced wall signs. field verify that existing fire escape is not obstructed by signs. | $1,400 |
| Jan 14, 2011 | Completed final sign-off Jun 2011 | 621 Divisadero St | Avalon Construction Co | to erect 2 double-faced hung non electric signsDetails
to erect 2 double-faced hung non electric signs | $700 |
| Jan 6, 2011 | Expired or cancelled withdrawn Aug 2012 | 170 Leland Av | Utama Contruction Corp. | new interior security gates at storefronts, new exterior security gate at entry way, new stucco at base of storefronts, replace extg broken glazing,framing ,new decals on storefront, remove extg alarm box. new exterior paint, new oprable transom. replace extg tiles at entry landing in kind.Details
new interior security gates at storefronts, new exterior security gate at entry way, new stucco at base of storefronts, replace extg broken glazing,framing ,new decals on storefront, remove extg alarm box. new exterior paint, new oprable transom. replace extg tiles at entry landing in kind. | $7,000 |
| Dec 14, 2010 | Completed final sign-off Jul 2011 | 4508 03rd St | R & R Construction | removal of (e) security gate @ main entrance, (e) blade & wall hung signage, (n) enlarged window openings w/(n) framing & glazing, (n) roll-up grille at interior of window & at exterior entrance, (n) paint & replace (e) down lights. new awning.Details
removal of (e) security gate @ main entrance, (e) blade & wall hung signage, (n) enlarged window openings w/(n) framing & glazing, (n) roll-up grille at interior of window & at exterior entrance, (n) paint & replace (e) down lights. new awning. | $17,000 |
| Nov 30, 2010 | Completed final sign-off Sep 2011 | 80 Julian Av | River View Construction Inc | demolish 3 stories, 14 guest rooms, type 5 residential building.Details
demolish 3 stories, 14 guest rooms, type 5 residential building. | $10,000 |
| Nov 30, 2010 | Expired or cancelled cancelled Dec 2022 | 80 Julian Av | Oliver & Company Inc. | erect 4 stories, type 5, 7 bedrooms outpatient dental/medical & congregate residence building.Details
erect 4 stories, type 5, 7 bedrooms outpatient dental/medical & congregate residence building. | $2,000,000 |
| Nov 16, 2010 | Completed final sign-off Apr 2011 | 1390 Market St | Ncr Construction Inc | office ti on the 2nd floor , suites 230, 249, 250. no change in occupancy use. new full height and low partitions, paint w/in offices. no struc. work. elec and mech under separate permit, no lighting and mechanocal approval forDetails
office ti on the 2nd floor , suites 230, 249, 250. no change in occupancy use. new full height and low partitions, paint w/in offices. no struc. work. elec and mech under separate permit, no lighting and mechanocal approval for | $60,000 |
| Oct 1, 2010 | Never finaled issued Mar 2011, no final | 391 Leavenworth St | Amone Corp | exterior improvements, including new accessible entry door at ground floor commercial space, misc. painting, close off one window, replace with new infill partially one window opening.Details
exterior improvements, including new accessible entry door at ground floor commercial space, misc. painting, close off one window, replace with new infill partially one window opening. | $25,000 |
| Sep 3, 2010 | Completed final sign-off Jun 2011 | 926 Howard St | Ncr Construction Inc | tenant improvements with new entry, ramp, restrooms, mezzanine framing and new partitions.Details
tenant improvements with new entry, ramp, restrooms, mezzanine framing and new partitions. | $180,000 |
| Aug 12, 2010 | Completed final sign-off Aug 2011 | 518 Valencia St | Karl Marcrae Consulting | renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room,Details
renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room, | $78,000 |
| May 24, 2010 | Completed final sign-off Jul 2010 | 4919 03rd St | Empire Engineering & Construction Inc | non-structural & painted sign on awning.Details
non-structural & painted sign on awning. | $500 |
| May 24, 2010 | Completed final sign-off Dec 2010 | 4820 03rd St | Avalon Construction Co | painted signage on awing.Details
painted signage on awing. | $500 |
| May 24, 2010 | Completed final sign-off Jul 2010 | 4921 03rd St | Empire Engineering & Construction Inc | non-structural & painted sign on awning.Details
non-structural & painted sign on awning. | $500 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 4921 03rd St | Empire Engineering & Construction Inc | new awning, remove (e) security bars, repair (e) borken tiles in kind, repaint (e) door, new paint at entryway landing, replace (e) broken glazingDetails
new awning, remove (e) security bars, repair (e) borken tiles in kind, repaint (e) door, new paint at entryway landing, replace (e) broken glazing | $9,100 |
| May 21, 2010 | Completed final sign-off Dec 2010 | 4820 03rd St | Avalon Construction Co | repaint e trim and surfaces, replace e awning with new awning, repaint e security gate, replace e broken glazingDetails
repaint e trim and surfaces, replace e awning with new awning, repaint e security gate, replace e broken glazing | $7,600 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 4919 03rd St | Empire Engineering & Construction Inc | new awning, remove (e) security bars, repair (e) broken tiles in kind, repaint (e) door, new paint at entryway landing. work @ #4919.Details
new awning, remove (e) security bars, repair (e) broken tiles in kind, repaint (e) door, new paint at entryway landing. work @ #4919. | $9,300 |
| Dec 14, 2009 | Completed final sign-off Jun 2010 | 5110 03rd St | Utama Contruction Corp. | removal of existing storefront system and installation of new storefront . install new accessible door and power door operator.Details
removal of existing storefront system and installation of new storefront . install new accessible door and power door operator. | $20,000 |
| Sep 15, 2009 | Expired or cancelled expired Aug 2011 | 729 Kirkwood Av | Rockaway Construction Inc. | revisio to 200703206741 by eliminating exterior trellis and therefore special inspection requirements for item 2 bolts installed in conc, 5al-single pass fillet welds and 7 structural masonry as noted on drawing.Details
revisio to 200703206741 by eliminating exterior trellis and therefore special inspection requirements for item 2 bolts installed in conc, 5al-single pass fillet welds and 7 structural masonry as noted on drawing. | |
| Apr 22, 2009 | Completed final sign-off Nov 2009 | 11 Grove St | Ncr Construction Inc | tenant improvement to exhibition arear, bike room, and lobby.Details
tenant improvement to exhibition arear, bike room, and lobby. | $15,000 |
| Apr 13, 2009 | Completed final sign-off Feb 2010 | 124 Turk St | S V Builders | renovation to comply with housign complaint #200866873/his - renovate (e) wc room to be new trash room @ floors 2 to 6.Details
renovation to comply with housign complaint #200866873/his - renovate (e) wc room to be new trash room @ floors 2 to 6. | $55,400 |
| Apr 1, 2009 | Never finaled issued Apr 2009, no final | 2012 Pine St | Amone Corp | revision to appl #200511228828 to add accessibility details and notation. reduced number of interior widndows @ offices to be within (e) removed bay window opening.Details
revision to appl #200511228828 to add accessibility details and notation. reduced number of interior widndows @ offices to be within (e) removed bay window opening. | |
| Jan 13, 2009 | Completed final sign-off Jul 2009 | 1119 Mission St | ground only - revision to 200704249562. existing pg&e drip loop termination can to remain. this impacts main entry door-relocating over by 1'0" from original permit location to accomodate (e) pg&e can. no changes to accessibility.Details
ground only - revision to 200704249562. existing pg&e drip loop termination can to remain. this impacts main entry door-relocating over by 1'0" from original permit location to accomodate (e) pg&e can. no changes to accessibility. | ||
| Oct 31, 2008 | Completed final sign-off Jun 2009 | 988 Howard St | Cccs, Inc | revision to appl #200709122502 to relocate atm machine to be at the exteropr wall setback 3'-0" from the property line. also mechanical electrical & plumbing tenant improvements are included.Details
revision to appl #200709122502 to relocate atm machine to be at the exteropr wall setback 3'-0" from the property line. also mechanical electrical & plumbing tenant improvements are included. | $20,000 |
| Oct 23, 2008 | Expired or cancelled cancelled Mar 2011 | 711 Pacific Av | proposed elevator addition adjacent to (e) bldg.structurally independent, hoistway structure, bridging to (e) balconies at 6 locations. new lighting, electrical and mechanical, included for function of machine-room- less elevator type.Details
proposed elevator addition adjacent to (e) bldg.structurally independent, hoistway structure, bridging to (e) balconies at 6 locations. new lighting, electrical and mechanical, included for function of machine-room- less elevator type. | $350,000 | |
| Jul 25, 2008 | Completed final sign-off Mar 2009 | 52 Dore St | (e) exterior front area: proposed disabled parking space shown in pa# 2008-0410-9342 to be deleted from scope of work and new disabled accessible ramp to be constructedDetails
(e) exterior front area: proposed disabled parking space shown in pa# 2008-0410-9342 to be deleted from scope of work and new disabled accessible ramp to be constructed | ||
| Jul 21, 2008 | Completed final sign-off Jun 2009 | 49 Columbus Av | revision to approved app #200803036114/revised configuration of interior ramp at lobby to accomodate extg beam location/ no exterior workDetails
revision to approved app #200803036114/revised configuration of interior ramp at lobby to accomodate extg beam location/ no exterior work | $850 | |
| Jul 7, 2008 | Completed final sign-off Sep 2008 | 1973 Ocean Av | 16-91 Construction | build new wall base and change new door and glass for store front. replace awning cover only.Details
build new wall base and change new door and glass for store front. replace awning cover only. | $30,000 |
| Jun 18, 2008 | Completed final sign-off May 2009 | 52 Dore St | tenant improvements at north portion of ground floor plan and entire second floor for a residential care. treatment including 7 sleeping rooms, meeting space, offices, dining, kitchen and dry room.Details
tenant improvements at north portion of ground floor plan and entire second floor for a residential care. treatment including 7 sleeping rooms, meeting space, offices, dining, kitchen and dry room. | $350,000 | |
| May 20, 2008 | Expired or cancelled expired Sep 2009 | 169 06th St | erect 2 non-electric, double faced, projecting, sign.Details
erect 2 non-electric, double faced, projecting, sign. | ||
| May 2, 2008 | Never finaled issued May 2008, no final | 52 Dore St | Ncr Construction Inc | remove walls, ceiling floors and equipment at north partition of ground floor and at entire 2nd floor. no ti work under this permit, no da required per ab-017Details
remove walls, ceiling floors and equipment at north partition of ground floor and at entire 2nd floor. no ti work under this permit, no da required per ab-017 | $14,000 |
| Jan 23, 2008 | Never finaled issued Jan 2008, no final | 123 Eddy St | erect two signs: one single-faced electric, wall-mounted sign; and one double-faced, electric, wall-mounted, projecting sign.Details
erect two signs: one single-faced electric, wall-mounted sign; and one double-faced, electric, wall-mounted, projecting sign. | ||
| Dec 18, 2007 | Completed final sign-off Dec 2007 | 520 South Van Ness Av | Amone Corp | renew pa# 200705171578 for final inspection only.Details
renew pa# 200705171578 for final inspection only. | |
| Dec 12, 2007 | Never finaled issued Dec 2007, no final | 101 06th St | replace existing entry door & storefront w/new one.Details
replace existing entry door & storefront w/new one. | $5,000 | |
| Oct 1, 2007 | Completed final sign-off May 2008 | 71 06th St | t. i. and facade improvement from (e) vacant office space into (n) optometry office. (e) non-conforming stair to be removed and build (n) conforming stair as shown. lighting and plumbing under separate permit.Details
t. i. and facade improvement from (e) vacant office space into (n) optometry office. (e) non-conforming stair to be removed and build (n) conforming stair as shown. lighting and plumbing under separate permit. | $20,000 | |
| Sep 12, 2007 | Never finaled issued Sep 2007, no final | 988 Howard St | t.i. of ground floor space, to create new bank, offices, storage. 1st time tenant. sprinkler & fire alarm under seperate permit. storefront envelope & mechanical hvac seperate permit.Details
t.i. of ground floor space, to create new bank, offices, storage. 1st time tenant. sprinkler & fire alarm under seperate permit. storefront envelope & mechanical hvac seperate permit. | $75,000 | |
| May 17, 2007 | Expired or cancelled expired Dec 2007 | 520 South Van Ness Av | Amone Corp | administrative revision of 200504281159Details
administrative revision of 200504281159 | |
| Apr 13, 2007 | Expired or cancelled expired Feb 2011 | 1001 Polk St | Ncr Construction Inc | renovation of (e) respite space at 2nd floor to provide 2 additional offices, reconfiguration of bed area for men and women. addition of accessible sink at hall for staff use. no change in # of beds/capacity. mechanical and electrical under seperate permit.Details
renovation of (e) respite space at 2nd floor to provide 2 additional offices, reconfiguration of bed area for men and women. addition of accessible sink at hall for staff use. no change in # of beds/capacity. mechanical and electrical under seperate permit. | $82,000 |
| Mar 29, 2007 | Expired or cancelled expired Jul 2010 | 729 Kirkwood Av | Priority Roofing Solutions Inc. | reroofingDetails
reroofing | $120,000 |
| Mar 20, 2007 | Expired or cancelled expired Aug 2011 | 729 Kirkwood Av | interior & exterior improvements to (e) boys & girls club facility. exterior parking, disabled access-path of travel, siding improvements. interior non-bearing partitions, restrooms, classrooms, offices, finishes. mechanical, plumbing, electrical improvements.Details
interior & exterior improvements to (e) boys & girls club facility. exterior parking, disabled access-path of travel, siding improvements. interior non-bearing partitions, restrooms, classrooms, offices, finishes. mechanical, plumbing, electrical improvements. | $450,000 | |
| Oct 30, 2006 | Completed final sign-off Apr 2007 | 230 Eddy St | Ncr Construction Inc | tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups.Details
tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups. | $75,000 |
| Oct 12, 2006 | Completed final sign-off Jun 2007 | 1271 Mission St | C D X Builders | renew pa# 200403017411 for final.Details
renew pa# 200403017411 for final. | |
| Oct 4, 2006 | Completed final sign-off Dec 2007 | 610 Tompkins Av | Alde Construction | conversion/tenant. improvement at one (e) ground floor classrm to children's preschool room. includes children's restroom, kitchen storage and staff toilet. improvements for exterior path of travel for accessibility.Details
conversion/tenant. improvement at one (e) ground floor classrm to children's preschool room. includes children's restroom, kitchen storage and staff toilet. improvements for exterior path of travel for accessibility. | $115,000 |
| May 8, 2006 | Completed final sign-off May 2008 | 516 Ofarrell St | Peacock Construction Inc | ground floor - demo walls, add 1 new kitchen, 1 new ada restroom, new reception area & community room on ground level & new storefront to match existing. change of use from retail to community room.Details
ground floor - demo walls, add 1 new kitchen, 1 new ada restroom, new reception area & community room on ground level & new storefront to match existing. change of use from retail to community room. | $127,000 |
| Mar 23, 2006 | Never finaled issued Mar 2006, no final | 64 Turk St | Occidental Express | modifying ground floor front of hotel including replacing (2) windows (1) door and tile with marble revision to approved plans building permit appln #2005/08/25/1284 for changingDetails
modifying ground floor front of hotel including replacing (2) windows (1) door and tile with marble revision to approved plans building permit appln #2005/08/25/1284 for changing | $12,000 |
| Dec 12, 2005 | Completed final sign-off Jun 2006 | 1206 Connecticut St | re-striping extg accessible parking space and passanger zone and walk way to extg accessible residential unit/new curb ramp at southwest corner of connecticut and 26th streetDetails
re-striping extg accessible parking space and passanger zone and walk way to extg accessible residential unit/new curb ramp at southwest corner of connecticut and 26th street | $3,000 | |
| Dec 7, 2005 | Expired or cancelled expired Apr 2008 | 41 Jones St | Occidental Express | creating of counselors rm and accessible bathrm at g/f level for hotel residents opening non bearing wall between hotel lobby and created spaceDetails
creating of counselors rm and accessible bathrm at g/f level for hotel residents opening non bearing wall between hotel lobby and created space | $16,000 |
| Sep 9, 2005 | Completed final sign-off May 2012 | 1049 Howard St | comply with bid nov#200558014 for permanent increase in occupant loud of (e) homeless shelter originally approved under pa#9421315s.prevs occupant load 30 on 2nd floor, proposal occupant load 25 at 1st floor, retaining 30 at 2nd floor for total occupant land of 55. no work proposed. see sf.ab-029.Details
comply with bid nov#200558014 for permanent increase in occupant loud of (e) homeless shelter originally approved under pa#9421315s.prevs occupant load 30 on 2nd floor, proposal occupant load 25 at 1st floor, retaining 30 at 2nd floor for total occupant land of 55. no work proposed. see sf.ab-029. | ||
| Apr 28, 2005 | Expired or cancelled expired Dec 2007 | 520 South Van Ness Av | accessibility improvements at entry: renovation work for new men's & women's restrms @ ground fl.Details
accessibility improvements at entry: renovation work for new men's & women's restrms @ ground fl. | $150,000 | |
| Apr 14, 2005 | Completed final sign-off Jan 2006 | 3048 16th St | to comply nov from disabled access section #200451767.install a power operated door @front entrance,Details
to comply nov from disabled access section #200451767.install a power operated door @front entrance, | $8,000 | |
| Oct 25, 2004 | Expired or cancelled expired Jun 2005 | 56 Julian Av | revision to 200108105778 for new closet at office 408 and new door between counseling 1 & 2 offices.Details
revision to 200108105778 for new closet at office 408 and new door between counseling 1 & 2 offices. | $850 | |
| Feb 17, 2004 | Completed final sign-off Apr 2006 | 685 Natoma St | tenant improvements for a new child care facilityDetails
tenant improvements for a new child care facility | $480,000 | |
| Jan 18, 2000 | Completed final sign-off Jun 2000 | 831 Broadway | alt to (e) g/f childcare space modifications to play areas children's toilets kitchen plumbing ventiDetails
alt to (e) g/f childcare space modifications to play areas children's toilets kitchen plumbing venti | $95,000 |