Grant Takahashi Lee
- Listed as
- architect, designer, engineer
- Firm
- Grant Takahashi Lee Architects
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Feb 2026
67 permits since 2000 (architect on 65 permits, designer on 1 permit, engineer on 1 permit): 40 completed, 6 in progress, 17 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Apr 2026 | 190 28th Av | Lcy Contruciton Inc | new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows.Details
new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows. | $313,000 |
| Jan 29, 2026 | In progress issued Apr 2026 | 3838 California St | Adam Lewis Construction Company | suite #505: interior t.i. to convert an existing office to an exam room & convert a protion of an existing open office area to a storage room.mechanical, electrical & fire related shall be design build under seperate permit. no exterior work.Details
suite #505: interior t.i. to convert an existing office to an exam room & convert a protion of an existing open office area to a storage room.mechanical, electrical & fire related shall be design build under seperate permit. no exterior work. | $25,000 |
| Sep 29, 2025 | Completed final sign-off Apr 2026 | 3490 California St | Adam Lewis Construction Company | unit 203; interior t.i. to add an admin office within (e) reception and enlarage the (e) large consult, break room and storage rooms. mechanical, electrical and fire related shall be design-build under separte permit. no exterior work.Details
unit 203; interior t.i. to add an admin office within (e) reception and enlarage the (e) large consult, break room and storage rooms. mechanical, electrical and fire related shall be design-build under separte permit. no exterior work. | $54,000 |
| Sep 8, 2025 | In progress issued Oct 2025 | 2175 Market St | Adam Lewis Construction Company | g/f t.i. to enlarge the e) consult & x-ray rooms. mep & fire related shall be design-build under separate permit. no exterior workDetails
g/f t.i. to enlarge the e) consult & x-ray rooms. mep & fire related shall be design-build under separate permit. no exterior work | $28,000 |
| Jul 29, 2025 | Completed final sign-off Jun 2026 | 180 16th Av | C H Burnham Inc | revision to pa #202410233527 to respond to site condition to include new stair from 1st to 2nd floors and changing select windows facing rear yard replace in kind.Details
revision to pa #202410233527 to respond to site condition to include new stair from 1st to 2nd floors and changing select windows facing rear yard replace in kind. | $6,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 1280 10th Av | Adam Lewis Construction Company | interior tenant improvement to add a new consultant room, new cabinets, and new baby changing station. mechanical and electrical shall be deferred. no exterior work.Details
interior tenant improvement to add a new consultant room, new cabinets, and new baby changing station. mechanical and electrical shall be deferred. no exterior work. | $16,756 |
| Feb 18, 2025 | In progress filed Feb 2025, not yet issued | 945 Greenwich St | project proposes voluntary egress upgrades with convesion of e tradesman corridor to a 1 hour exit passageway and extension of rear deck to provide egress access for e rear yard facing bedroom emergency egress window.Details
project proposes voluntary egress upgrades with convesion of e tradesman corridor to a 1 hour exit passageway and extension of rear deck to provide egress access for e rear yard facing bedroom emergency egress window. | $40,000 | |
| Oct 23, 2024 | Completed final sign-off Jun 2026 | 180 16th Av | C H Burnham Inc | project proposes a horizontal addition at the ground flr and converting a portion of the garage to conditioned space. the scope of work incldues a new 2f deck aboe the new addition below.Details
project proposes a horizontal addition at the ground flr and converting a portion of the garage to conditioned space. the scope of work incldues a new 2f deck aboe the new addition below. | $163,000 |
| Sep 5, 2024 | Completed final sign-off Sep 2024 | 2219 12th Av | revision to pa # 2021-0119-2887 to remove rear spiral stairs from previously approved plan setDetails
revision to pa # 2021-0119-2887 to remove rear spiral stairs from previously approved plan set | ||
| Jul 5, 2024 | Completed final sign-off Aug 2025 | 2437 23rd Av | John Woo Constructionllc | conversion of 305 sf of garage area to a new condition media room. excavation & configuration of ground fl rear to create two bedrooms. remodel 2 (e) bathrooms. new pantry island within (e) kitchen & radiant heating throughoutDetails
conversion of 305 sf of garage area to a new condition media room. excavation & configuration of ground fl rear to create two bedrooms. remodel 2 (e) bathrooms. new pantry island within (e) kitchen & radiant heating throughout | $285,000 |
| Jan 16, 2024 | Completed final sign-off Sep 2024 | 2258 26th Av | Lcy Contruciton Inc | remodel of (e) 2/f kitchen & (e) 3/f bathroom. relocate laundry to 1/f.Details
remodel of (e) 2/f kitchen & (e) 3/f bathroom. relocate laundry to 1/f. | $50,000 |
| Jul 3, 2023 | Never finaled filed Jul 2023, never issued | 767 Bush St | proposes change of use from dry cleaning to restaurant (take-out only) as a conditional use, scope includes new stair, servery, kitchen, storage & all-gender ada restroom. no exterior work.Details
proposes change of use from dry cleaning to restaurant (take-out only) as a conditional use, scope includes new stair, servery, kitchen, storage & all-gender ada restroom. no exterior work. | $120,000 | |
| Apr 13, 2023 | Never finaled issued Apr 2023, no final | 285 Seacliff Av | replace existing 2nd level rear door w/window, add two sliding doors at rear of 2nd level, and convert 1st level storage to media room, bathroom, and saunaDetails
replace existing 2nd level rear door w/window, add two sliding doors at rear of 2nd level, and convert 1st level storage to media room, bathroom, and sauna | $25,000 | |
| Oct 31, 2022 | Completed final sign-off May 2023 | 1555 38th Av | Hong's Custom Builders Pc | convert (e) ground floor unconditioned foyer to conditioned space with a new exterior door; 2 new skylights and new rear yard facing french door is proposed within (e) sliding door openingDetails
convert (e) ground floor unconditioned foyer to conditioned space with a new exterior door; 2 new skylights and new rear yard facing french door is proposed within (e) sliding door opening | $30,000 |
| May 24, 2022 | Never finaled issued Nov 2022, no final | 285 Seacliff Av | revision to pa# 202201276780. adding one 3rd floor deck, and one roof deck.Details
revision to pa# 202201276780. adding one 3rd floor deck, and one roof deck. | $75,000 | |
| Feb 11, 2022 | Completed final sign-off May 2023 | 507 Rockdale Dr | Lcy Contruciton Inc | project proposes: (e) 2/f kitchen and bath remodel. (e) 3/f bath remodel. new 1/f habitable space w/ new bedroom, office, mudroom, and bathroom. select replace-in-kind windows and 2 new skylights. new furnace serving 3/f.Details
project proposes: (e) 2/f kitchen and bath remodel. (e) 3/f bath remodel. new 1/f habitable space w/ new bedroom, office, mudroom, and bathroom. select replace-in-kind windows and 2 new skylights. new furnace serving 3/f. | $152,000 |
| Jan 21, 2022 | Completed final sign-off Oct 2022 | 2206 Polk St | Alsterlind Construction Inc. | existing interior restaurant tenant improvement. new bar counter in (e) dining room. no exterior work. mep shall be design-build under separate permit.Details
existing interior restaurant tenant improvement. new bar counter in (e) dining room. no exterior work. mep shall be design-build under separate permit. | $35,000 |
| Oct 20, 2021 | In progress issued Oct 2023 | 537 Geary St | Melo Willard Tabudlo Dba Dreamt Design | change of use from retail to limited restaurant, a take-out only cafe. scope includes new servery, storage room, ware-washing room & new all-gender ada restroom. no exterior work.Details
change of use from retail to limited restaurant, a take-out only cafe. scope includes new servery, storage room, ware-washing room & new all-gender ada restroom. no exterior work. | $82,000 |
| Oct 15, 2021 | Completed final sign-off Dec 2022 | 676 Peralta Av | new 287 sf roof deck w/connecting stair to (e) interior space below. new rear yard facing door & exterior stair to rear yard. (2) rear yard faving windows. new hose bib on roof deckDetails
new 287 sf roof deck w/connecting stair to (e) interior space below. new rear yard facing door & exterior stair to rear yard. (2) rear yard faving windows. new hose bib on roof deck | $50,000 | |
| Oct 1, 2021 | Never finaled issued Sep 2023, no final | 56 Toledo Wy | new vertical addition & roof deck on the 4/f. a new rooftop deck is also propsed above the 4/f. interior remodel of (e) 3 floors with new conditioned spaced on the g/f. building shall be equipped througout the nfpa 13r sprinkler system.Details
new vertical addition & roof deck on the 4/f. a new rooftop deck is also propsed above the 4/f. interior remodel of (e) 3 floors with new conditioned spaced on the g/f. building shall be equipped througout the nfpa 13r sprinkler system. | $630,000 | |
| Jul 8, 2021 | Completed final sign-off Dec 2022 | 548 Diamond St | S & K Construction | 2nd floor: (e) kitchen remodel and dining room remodel. relocate (e) 2nd fl powder room.Details
2nd floor: (e) kitchen remodel and dining room remodel. relocate (e) 2nd fl powder room. | $49,000 |
| Dec 18, 2020 | Never finaled issued Apr 2021, no final | 1234 Divisadero St | project proposes barrier removal within (2) (e) adult restroom & combining (2) children's restrooms into (1) children's restroom w/(n) fixtures & finishes & modifying (e) outdoor yard gate. mechanical, electrical & plumbing shall be design-build under separate permit.Details
project proposes barrier removal within (2) (e) adult restroom & combining (2) children's restrooms into (1) children's restroom w/(n) fixtures & finishes & modifying (e) outdoor yard gate. mechanical, electrical & plumbing shall be design-build under separate permit. | $100,000 | |
| Oct 17, 2020 | Never finaled issued Jul 2021, no final | 969 Hyde St | Dajani Construction | (e) restaurant (take out only) t.i.: scope includes renovation (e) kitchen & new ada all-gender resroom. no exterior work. mep shall be design build under sep permit.Details
(e) restaurant (take out only) t.i.: scope includes renovation (e) kitchen & new ada all-gender resroom. no exterior work. mep shall be design build under sep permit. | $71,155 |
| Oct 17, 2020 | Never finaled issued Dec 2020, no final | 3233 23rd St | remodel kitchen & bathroom. add 2 new closet, new stair guardrail, new lighting & outlets and repair (e) cracked plaster walls. convert space to office- not for sleepingDetails
remodel kitchen & bathroom. add 2 new closet, new stair guardrail, new lighting & outlets and repair (e) cracked plaster walls. convert space to office- not for sleeping | $43,222 | |
| Sep 15, 2020 | Completed final sign-off Sep 2022 | 1071 Portola Dr | revision to pa #201609299136: revise propose kitchen remodel to create an open kitchen with partial new cabinets & island w/ prep sink.Details
revision to pa #201609299136: revise propose kitchen remodel to create an open kitchen with partial new cabinets & island w/ prep sink. | $30,000 | |
| Dec 30, 2019 | Never finaled issued Aug 2023, no final | 365 12th St | Lcy Contruciton Inc | the project proposes an interior remodel with a partial horizontal addition on each floor, including new decks on floors 2 and 3. converting 2 dwelling units and one udu to 4 dwelling units, facade alterations minimal.Details
the project proposes an interior remodel with a partial horizontal addition on each floor, including new decks on floors 2 and 3. converting 2 dwelling units and one udu to 4 dwelling units, facade alterations minimal. | $350,000 |
| Oct 8, 2019 | Expired or cancelled cancelled Dec 2022 | 252 Divisadero St | response to sf planning notice of enforcement (dated 8/21/19) - facade alterations complaint #2019-004634enf.Details
response to sf planning notice of enforcement (dated 8/21/19) - facade alterations complaint #2019-004634enf. | $3,000 | |
| Aug 22, 2019 | Never finaled issued Sep 2019, no final | 4 Divisadero St | rev to 201608124850 change window type. gf-add lanrm, rear adu stair, revise tkless w/h closet. 1/f revise 4 div lanrm, bath & kit revise 1030-14th st lanrm, bath, bedrm, kit. 2/f revise 6 div bath, lanrm, kit, revise 1032 14th st lanrm. 3/f flr - revise 6 div stair landrm closet.Details
rev to 201608124850 change window type. gf-add lanrm, rear adu stair, revise tkless w/h closet. 1/f revise 4 div lanrm, bath & kit revise 1030-14th st lanrm, bath, bedrm, kit. 2/f revise 6 div bath, lanrm, kit, revise 1032 14th st lanrm. 3/f flr - revise 6 div stair landrm closet. | $25,000 | |
| Jun 28, 2019 | Never finaled filed Jun 2019, never issued | 945 Greenwich St | new sidewalk stair to access front of building on greenwich stDetails
new sidewalk stair to access front of building on greenwich st | $10,000 | |
| May 23, 2019 | Never finaled filed May 2019, never issued | 945 Greenwich St | erect (n) 5-story, type 3a, residential building w/ two dwelling units.Details
erect (n) 5-story, type 3a, residential building w/ two dwelling units. | $900,000 | |
| May 21, 2019 | Completed final sign-off Aug 2020 | 115 Brighton Av | Lcy Contruciton Inc | new adu per ordinance# 95-17, (1 bedroom & 1 bath) in existing accessory garage per ordinance 95-17, structure shall undergo mandatory seismic upgrade per sfebc 403.4 & be raised three feetDetails
new adu per ordinance# 95-17, (1 bedroom & 1 bath) in existing accessory garage per ordinance 95-17, structure shall undergo mandatory seismic upgrade per sfebc 403.4 & be raised three feet | $70,000 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 917 Bush St | Upcycle Builders Inc. | revision to approved pa# 2018-0831-8898: document existing skylight to remain, add new interior roof hatchl, change back of house ceiling to painted drywall. no work in kitchen or food prep area under this permit. mep shall be under deferred submittal.Details
revision to approved pa# 2018-0831-8898: document existing skylight to remain, add new interior roof hatchl, change back of house ceiling to painted drywall. no work in kitchen or food prep area under this permit. mep shall be under deferred submittal. | $2,500 |
| Feb 19, 2019 | Completed final sign-off Dec 2019 | 905 Capp St | Gech Inc. | rev to pa# 201606109680; relocate toters location to within garage. remove (e) garage door&infill w(n)door&brick wall.Details
rev to pa# 201606109680; relocate toters location to within garage. remove (e) garage door&infill w(n)door&brick wall. | $7,000 |
| Jan 28, 2019 | Completed final sign-off Sep 2022 | 1071 Portola Dr | alter site-administrative permit to revise permit application #2016-0929-9136(s) change story count from 3 to 2. change number of bathrooms 6 to 5.Details
alter site-administrative permit to revise permit application #2016-0929-9136(s) change story count from 3 to 2. change number of bathrooms 6 to 5. | ||
| Aug 31, 2018 | Expired or cancelled expired Mar 2026 | 917 Bush St | Upcycle Builders Inc. | interior restaurant t.i. scope includes new seating, new kitchen, new all gender ada bathroom. no exterior work. mep shall be design build under separate permit.Details
interior restaurant t.i. scope includes new seating, new kitchen, new all gender ada bathroom. no exterior work. mep shall be design build under separate permit. | $101,650 |
| Aug 1, 2018 | Completed final sign-off Apr 2019 | 47 Rudden Av | Lcy Contruciton Inc | project proposes new conditioned ground floor space with a new half bath & new laundry closet, new family room and new media room. new 2nd floor full bath & new skylightDetails
project proposes new conditioned ground floor space with a new half bath & new laundry closet, new family room and new media room. new 2nd floor full bath & new skylight | $90,000 |
| Apr 5, 2018 | Completed final sign-off Sep 2018 | 200 Grafton Av | Lcy Contruciton Inc | bathroom remodel and new laundry room and wall removal between kitchen & living rmDetails
bathroom remodel and new laundry room and wall removal between kitchen & living rm | $18,000 |
| Mar 16, 2018 | Expired or cancelled withdrawn Jan 2024 | 2595 Folsom St | project proposes converting (e) 2f single dwelling unit to (3) dwelling units. work includes structural upgrade & new sprinklers throughout.Details
project proposes converting (e) 2f single dwelling unit to (3) dwelling units. work includes structural upgrade & new sprinklers throughout. | $200,000 | |
| Oct 2, 2017 | Expired or cancelled cancelled Jan 2026 | 150 Greenwich St | interior t.i. at g/f with new commercial kitchen into (e) gym & servery (cafe). mep shall be design-build under sep permit.Details
interior t.i. at g/f with new commercial kitchen into (e) gym & servery (cafe). mep shall be design-build under sep permit. | $50,000 | |
| Jul 31, 2017 | Completed final sign-off Jun 2018 | 150 Greenwich St | Ducheney Construction Inc | interior t.i. to add a limited use/ limited application elevator & machine room. mep. shall be design build under seperate permit. n/a ordinance #155-13Details
interior t.i. to add a limited use/ limited application elevator & machine room. mep. shall be design build under seperate permit. n/a ordinance #155-13 | $6,250 |
| Jul 26, 2017 | Completed final sign-off Jan 2020 | 643 38th Av | Ht Construction Company | project proposed an existing kitchen remodel & enlarging a lightwell facing window (not visivle form st).Details
project proposed an existing kitchen remodel & enlarging a lightwell facing window (not visivle form st). | $25,000 |
| Jul 19, 2017 | Completed final sign-off Jun 2018 | 150 Greenwich St | Ducheney Construction Inc | interio ti to relocate existing laundry room and convert e laundry room to storage. mep design buildDetails
interio ti to relocate existing laundry room and convert e laundry room to storage. mep design build | $70,000 |
| Oct 19, 2016 | Completed final sign-off Oct 2022 | 136 Fillmore St | soft story retrofit per sfbc chapter 34b engineering criteria: fema p- 807 (residential portion)Details
soft story retrofit per sfbc chapter 34b engineering criteria: fema p- 807 (residential portion) | $50,000 | |
| Oct 19, 2016 | Completed final sign-off Jan 2018 | 136 Fillmore St | soft story retrofit per sfbc chapter 34b engineering criteria: fema p- 807 (commercial portion)Details
soft story retrofit per sfbc chapter 34b engineering criteria: fema p- 807 (commercial portion) | $25,000 | |
| Oct 19, 2016 | Completed final sign-off Mar 2017 | 3172 24th St | Trim Fit Constr. - O'reilly Engineering | soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807 (residential portion)Details
soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807 (residential portion) | $50,000 |
| Oct 19, 2016 | Completed final sign-off Mar 2017 | 3172 24th St | Trim Fit Constr. - O'reilly Engineering | soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807 (commercial portion)Details
soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807 (commercial portion) | $25,000 |
| Oct 18, 2016 | Completed final sign-off Aug 2017 | 1234 Divisadero St | Chiang C M Construction Inc. | project proposes new non structural wall and door within e officeDetails
project proposes new non structural wall and door within e office | $30,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2022 | 1071 Portola Dr | horizontal addition on all floors. project will include a vertical addition for a new 3rd floor. total 5 bedrooms, 6 bathrooms.Details
horizontal addition on all floors. project will include a vertical addition for a new 3rd floor. total 5 bedrooms, 6 bathrooms. | $150,000 | |
| Sep 6, 2016 | Never finaled issued Jun 2017, no final | 2595 Folsom St | change of use. from retail to restaurant. new seating, commercial kitchen, uni-sex ada restroom. replace all ground floor exterior windows & relocating northwest exterior door for egress separation.Details
change of use. from retail to restaurant. new seating, commercial kitchen, uni-sex ada restroom. replace all ground floor exterior windows & relocating northwest exterior door for egress separation. | $100,000 | |
| Aug 12, 2016 | Completed final sign-off Dec 2020 | 4 Divisadero St | Bay Pros Construction | vertical addition for (n) 3rd floor & roof deck, accessory dwelling unit within building envelope on the basement floor, select interior remodel.Details
vertical addition for (n) 3rd floor & roof deck, accessory dwelling unit within building envelope on the basement floor, select interior remodel. | $300,000 |
| Aug 12, 2016 | Completed final sign-off Feb 2017 | 145 Gardenside Dr | Beyond The Horizon Construction | project proposes bathroom remodel, new laundry closert and new bedroom closet, to 155 gardenside unit 22Details
project proposes bathroom remodel, new laundry closert and new bedroom closet, to 155 gardenside unit 22 | $21,500 |
| Jul 5, 2016 | Never finaled issued Jul 2016, no final | 55 Francisco St | Adam Lewis Construction Company | selective ti on 5th floor witn new non-bearing partitions & new millwork. no exterior work. maher na arch only - all else deferred submittal (mep, fire)Details
selective ti on 5th floor witn new non-bearing partitions & new millwork. no exterior work. maher na arch only - all else deferred submittal (mep, fire) | $116,400 |
| Jun 28, 2016 | Never finaled issued Jul 2016, no final | 2595 Folsom St | Swanson Construction | removal of interior non-structural walls, plumbing, and floor finishes @ ground floor, no exterior work.Details
removal of interior non-structural walls, plumbing, and floor finishes @ ground floor, no exterior work. | $7,700 |
| Jun 10, 2016 | Completed final sign-off Oct 2017 | 4587 Mission St | change of use. proposes from "personal services" to "limited restaurant" scope includes new seating, new kitchen, and new uni-sex ada restroom. no exterior work.Details
change of use. proposes from "personal services" to "limited restaurant" scope includes new seating, new kitchen, and new uni-sex ada restroom. no exterior work. | $72,000 | |
| Mar 28, 2016 | Completed final sign-off Sep 2016 | 905 Capp St | Trim Fit Constr. - O'reilly Engineering | (retail) sfbc ch 34 b seismic upgrade. ada improvements to sidewalk. commercial portion bldg.Details
(retail) sfbc ch 34 b seismic upgrade. ada improvements to sidewalk. commercial portion bldg. | $65,000 |
| Mar 9, 2016 | Completed final sign-off Oct 2016 | 823 Castro St | Sasso Construction Inc. | project proposes extg kitchen and bathroom renovation. relocation of laundry closet. scope includes a new master closet and bathroom.Details
project proposes extg kitchen and bathroom renovation. relocation of laundry closet. scope includes a new master closet and bathroom. | $53,000 |
| Jan 12, 2016 | Completed final sign-off Jan 2021 | 578 44th Av | Jian Lou Construction Co. | horiontal addition on all floors. vertical addition for a new 3rd floor. new home shall have 4 bedrooms & 3.5 baths.Details
horiontal addition on all floors. vertical addition for a new 3rd floor. new home shall have 4 bedrooms & 3.5 baths. | $290,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2016 | 727 Duboce Av | B. Uniacke Construction | project proposes 90 sq ft extg family room into extg storage scope includes new closet, new doors, and new bar sink. mep shall be design-build under separate permit.Details
project proposes 90 sq ft extg family room into extg storage scope includes new closet, new doors, and new bar sink. mep shall be design-build under separate permit. | $9,300 |
| May 6, 2015 | Completed final sign-off Jan 2017 | 2206 Polk St | Finbarr Collins Construction Inc. | revision to 201410249863 revise dining layout, add walk-in cooler & structural reinforcement of floor & ceiling, mep & life safety shall be design-built on separate permit.Details
revision to 201410249863 revise dining layout, add walk-in cooler & structural reinforcement of floor & ceiling, mep & life safety shall be design-built on separate permit. | |
| Mar 31, 2015 | Never finaled issued Apr 2015, no final | 577 Alvarado St | Luke Gilligan Inc. | revision to pa# 2014 0205 7899; revise skylights, deck & infill (e) windows.Details
revision to pa# 2014 0205 7899; revise skylights, deck & infill (e) windows. | |
| Feb 24, 2015 | Completed final sign-off Jan 2016 | 266 18th Av | Shameless Design | interior remodel to 2nd flr and garage level - relocate (e) bathroom, add 2 (ne) bathrooms, new exterior sliding door and relocation of(e) partitions - new conditioned space from garage level storage space.Details
interior remodel to 2nd flr and garage level - relocate (e) bathroom, add 2 (ne) bathrooms, new exterior sliding door and relocation of(e) partitions - new conditioned space from garage level storage space. | $50,000 |
| Nov 26, 2014 | Completed final sign-off Jan 2016 | 266 18th Av | Shameless Design | move bathroom, powder room, remodel existing kitchen, provide new opening in existing wall @ first floor.Details
move bathroom, powder room, remodel existing kitchen, provide new opening in existing wall @ first floor. | $30,000 |
| Oct 24, 2014 | Completed final sign-off Jan 2017 | 2206 Polk St | S H K Construction Inc | change of use from retail to restaurant; interior tenant improvement for new full service restaurant, space shall include new dining area, new kitchen, & ada restroom. mech, elec, plmbg & life safety design build on separate permit.Details
change of use from retail to restaurant; interior tenant improvement for new full service restaurant, space shall include new dining area, new kitchen, & ada restroom. mech, elec, plmbg & life safety design build on separate permit. | $133,749 |
| Oct 8, 2014 | Completed final sign-off Mar 2015 | 577 Alvarado St | Steven Yeung Inc Dba Chung Wah Plbg&Fire | installation of 2" combo fire sprinkler system throughout single family house per nfpa 13. 56 total sprinkler heads. underground work included. ref pa#201402057899.Details
installation of 2" combo fire sprinkler system throughout single family house per nfpa 13. 56 total sprinkler heads. underground work included. ref pa#201402057899. | $20,000 |
| Oct 7, 2013 | Never finaled issued Oct 2014, no final | 525 07th St | change of use from "restaurant" to "catering" and tenant improvement work. no exterior work. n/a w/maher ordinance no.155-13.Details
change of use from "restaurant" to "catering" and tenant improvement work. no exterior work. n/a w/maher ordinance no.155-13. | $6,000 | |
| Apr 3, 2013 | Completed final sign-off Dec 2014 | 2543 35th Av | P K N Development | comply w/complaint #201392711 - single non-structural wall & door demolition, legalize unpermitted family room, full bathroom, 2 storage rooms, new 1-hr construction with jnew self closing & self latching 1-3/8" solid wood door to create garage separation. no work @ 2nd floor.Details
comply w/complaint #201392711 - single non-structural wall & door demolition, legalize unpermitted family room, full bathroom, 2 storage rooms, new 1-hr construction with jnew self closing & self latching 1-3/8" solid wood door to create garage separation. no work @ 2nd floor. | $40,000 |
| Dec 10, 2012 | Completed final sign-off Oct 2013 | 1516 Broadway | An Dun Construction | interior remodel of (e) restaurant, remodel including new kitchen & (e) kitchen w/food service equipment. mechanical, electrical, plumbing & life safety on separate permit.Details
interior remodel of (e) restaurant, remodel including new kitchen & (e) kitchen w/food service equipment. mechanical, electrical, plumbing & life safety on separate permit. | $125,000 |