Block 0317, lot 027
535 Geary St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 10
- Units
- 63
- Rooms
- 71 bathrooms
- Building
- 48,340 sq ft
- Lot
- 4,896 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2026 | Completed final sign-off Jun 2026 | 535 Geary St | Red Light Fire Alarms | installation of a remote central station fire alarm system to comply with 2025 sffl sec. 1103.7.6.1 and 2025 nfpa 72 sec 18.4.6 sleeping area requirements. (2016 sf ordinance 165-16; 2021 sf ordinance 07721). upgrade existing fire alarm system lot compliance.Details
installation of a remote central station fire alarm system to comply with 2025 sffl sec. 1103.7.6.1 and 2025 nfpa 72 sec 18.4.6 sleeping area requirements. (2016 sf ordinance 165-16; 2021 sf ordinance 07721). upgrade existing fire alarm system lot compliance. | $155,000 |
| Oct 20, 2021 | In progress issued Oct 2023 | 537 Geary St | Melo Willard Tabudlo Dba Dreamt Design | change of use from retail to limited restaurant, a take-out only cafe. scope includes new servery, storage room, ware-washing room & new all-gender ada restroom. no exterior work.Details
change of use from retail to limited restaurant, a take-out only cafe. scope includes new servery, storage room, ware-washing room & new all-gender ada restroom. no exterior work. | $82,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 535 Geary St | B B J Electric, Inc | replace e conventional fa system on a one for one basis to accomodate the necessary recall fnctions needed for newly installed elevator. 1 facu, 11 pulls, 24 strobes, 9 horns, 6 relaysDetails
replace e conventional fa system on a one for one basis to accomodate the necessary recall fnctions needed for newly installed elevator. 1 facu, 11 pulls, 24 strobes, 9 horns, 6 relays | $22,000 |
| Feb 26, 2019 | Expired or cancelled cancelled Jan 2026 | 535 Geary St | Weckworth Electric Group Inc | service upgrade from 100/240 volt single phase to a 120/208 volt 3 phase service weck worth electric group will install (1) new pg & e tap box (1) new switch board, new meter sections, new feeders to fire pump, new subpanels on tenant floors, and new feedsDetails
service upgrade from 100/240 volt single phase to a 120/208 volt 3 phase service weck worth electric group will install (1) new pg & e tap box (1) new switch board, new meter sections, new feeders to fire pump, new subpanels on tenant floors, and new feeds | $50,000 |
| Oct 23, 2018 | Expired or cancelled cancelled Jul 2023 | 535 Geary St | B B J Electric, Inc | replace (e) facu to accomodate elevator recall with new elevators. (1) facu, 11 pulls 24 smokes, 9 horns, 6 relays.Details
replace (e) facu to accomodate elevator recall with new elevators. (1) facu, 11 pulls 24 smokes, 9 horns, 6 relays. | $22,000 |
| Mar 20, 2018 | Completed final sign-off Aug 2018 | 535 Geary St | Maven Maintenance Inc | remodel kitcehn in-kind. new cabinets, kitchen floor tiles, quartz countertop and new appliances. all work in unit 202. no structural work under this permit. everything is same location.Details
remodel kitcehn in-kind. new cabinets, kitchen floor tiles, quartz countertop and new appliances. all work in unit 202. no structural work under this permit. everything is same location. | $35,000 |
| Jun 30, 2011 | Completed final sign-off Jul 2011 | 535 Geary St | response to nov 20114204 for unpermitted work of replacing cabinet with countertop, toilet, and bathroom tiles at house keeper unit. unit b. no windows, walls, doors under this permitDetails
response to nov 20114204 for unpermitted work of replacing cabinet with countertop, toilet, and bathroom tiles at house keeper unit. unit b. no windows, walls, doors under this permit | $3,000 | |
| Jul 7, 2009 | Never finaled issued Jul 2009, no final | 535 Geary St | street space permit only.Details
street space permit only. | ||
| Jun 5, 2009 | Never finaled issued Jun 2009, no final | 535 Geary St | street space permit only.Details
street space permit only. | ||
| Jun 3, 2009 | Never finaled issued Jun 2009, no final | 535 Geary St | street space permit only.Details
street space permit only. | ||
| Sep 3, 2004 | Completed final sign-off Nov 2004 | 531 Geary St | barrier removal: reconfigure entry at hair salon (b occupancy) to provide a 36" doorwayDetails
barrier removal: reconfigure entry at hair salon (b occupancy) to provide a 36" doorway | $7,000 | |
| May 10, 2004 | Completed final sign-off Apr 2005 | 535 Geary St | remove existing canvas awning and replace with metaulic steel.Details
remove existing canvas awning and replace with metaulic steel. | $500 | |
| Mar 7, 2002 | Expired or cancelled expired Jul 2002 | 535 Geary St | sidewalk repairDetails
sidewalk repair | ||
| Apr 26, 2000 | Expired or cancelled expired Aug 2000 | 537 Geary St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B B J Electric, Inc (2), Maven Maintenance Inc, Melo Willard Tabudlo Dba Dreamt Design, Red Light Fire Alarms, Weckworth Electric Group Inc
- Architects
- Grant Takahashi Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.