Jerry Gabriel
- License
- C7110
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C7110 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Rmw Architecture & Interiors
- On San Francisco permits
- Nov 2004 to Apr 2012
15 permits since 2000 (architect on 14 permits, engineer on 1 permit): 13 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Field Construction Inc. (3), City Building Inc. (2), Plant Construction Company Lp (2), Hathaway Dinwiddie Co., Novo Construction Inc, Richlen Construction, Skyline Construction, Source Planning And Construction Inc, Team Commercial Construction Inc., Truebeck Construction
- Engineers
- James Paskington
- Authorized agents
- Karen Carlene Letteney
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 15
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2012 | Completed final sign-off Jul 2012 | 505 Montgomery St | Hathaway Dinwiddie Co. | demo new partitions, millwork, break area, new finishes throughout suite 1200. mech, elec, fire sprinkler and life safety under separate permit.Details
demo new partitions, millwork, break area, new finishes throughout suite 1200. mech, elec, fire sprinkler and life safety under separate permit. | $200,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 505 Montgomery St | Field Construction Inc. | 12th floor:revision to app#201112080322. delete single door exit at open office 1230. add double door exit with new soffit at open office 1230. relocate fire extinguisher cabinet and south wall at corridor 12bDetails
12th floor:revision to app#201112080322. delete single door exit at open office 1230. add double door exit with new soffit at open office 1230. relocate fire extinguisher cabinet and south wall at corridor 12b | |
| Mar 26, 2012 | Never finaled issued Aug 2012, no final | 1455 Market St | City Building Inc. | 3rd & 7th floors - t.i. for sfmta. interior demolition floors 3 & 7. new partitions & doors, windows, millwork & finishes, lighting plan & power, floor 7. new shower rooms with new finishes & ceiling plan and new bike storage cage with new lighting, floor 3. (no exterior work).Details
3rd & 7th floors - t.i. for sfmta. interior demolition floors 3 & 7. new partitions & doors, windows, millwork & finishes, lighting plan & power, floor 7. new shower rooms with new finishes & ceiling plan and new bike storage cage with new lighting, floor 3. (no exterior work). | $5,706,690 |
| Mar 19, 2012 | Completed final sign-off May 2014 | 1455 Market St | City Building Inc. | 3rd flr accessibility upgrades to path of travel & restrooms. 7th fl accessibility upgrades & new finishes in restrooms. new ceiling grid, lighting & finishes in corridor & elevator lobbies. mep & fire life safety under seperate permit. (no exterior work).Details
3rd flr accessibility upgrades to path of travel & restrooms. 7th fl accessibility upgrades & new finishes in restrooms. new ceiling grid, lighting & finishes in corridor & elevator lobbies. mep & fire life safety under seperate permit. (no exterior work). | $260,000 |
| Feb 23, 2012 | Completed final sign-off Jun 2012 | 475 Sansome St | Source Planning And Construction Inc | ti suite 840, minor interior demolition, construct new demising wall, new door & glazing at conference room & office, new millwork & new finishes. mep & fire life safety under separate permit.Details
ti suite 840, minor interior demolition, construct new demising wall, new door & glazing at conference room & office, new millwork & new finishes. mep & fire life safety under separate permit. | $50,000 |
| Feb 8, 2012 | Completed final sign-off May 2012 | 201 03rd St | Field Construction Inc. | tenant remodel of extg space on 6th floor: remove gyp.bd. partitions, provide (n) gyp.bd. partitions. relocate doors, frames, hardware & glazing. relocate light fixtures & electrical per (n) partition layout. mep under separate permit.Details
tenant remodel of extg space on 6th floor: remove gyp.bd. partitions, provide (n) gyp.bd. partitions. relocate doors, frames, hardware & glazing. relocate light fixtures & electrical per (n) partition layout. mep under separate permit. | $150,000 |
| Jan 12, 2012 | Completed final sign-off Jan 2012 | 201 03rd St | Team Commercial Construction Inc. | 6th floor #610 - demolish (1) wall, build full height non-rated partition, minor electrical to be on separate permit.Details
6th floor #610 - demolish (1) wall, build full height non-rated partition, minor electrical to be on separate permit. | $20,343 |
| Nov 22, 2011 | Completed final sign-off Oct 2013 | 1355 Market St | Truebeck Construction | demolition of western portion of 9th floorDetails
demolition of western portion of 9th floor | $125,000 |
| Oct 11, 2011 | Completed final sign-off Mar 2012 | 160 Pine St | Field Construction Inc. | 4th floor tenant improvements - convert office & meeting room to library. demolish coat closet & shelving. mep & fire life safety under separate permits.Details
4th floor tenant improvements - convert office & meeting room to library. demolish coat closet & shelving. mep & fire life safety under separate permits. | $9,800 |
| Jun 20, 2011 | Completed final sign-off Nov 2011 | 101 Spear St | Novo Construction Inc | 2nd floor #200 ti renovation including: demo work, new breakroom/sink, new lighting throughout, finishes upgrades, convert 2 small rooms to conference, replace stair to (e) mezzanine, new power/data where noted.Details
2nd floor #200 ti renovation including: demo work, new breakroom/sink, new lighting throughout, finishes upgrades, convert 2 small rooms to conference, replace stair to (e) mezzanine, new power/data where noted. | $420,000 |
| Jun 12, 2009 | Completed final sign-off Sep 2009 | 1 California St | Richlen Construction | 10th floor office tenant improvement: building & demolition of interior demising partitions. minor mep modification per new layout. mep & life safety will be filed under separate permit.Details
10th floor office tenant improvement: building & demolition of interior demising partitions. minor mep modification per new layout. mep & life safety will be filed under separate permit. | $22,600 |
| Jul 29, 2005 | Completed final sign-off Dec 2005 | 999 Brannan St | Plant Construction Company Lp | t.i.to 3 rooms on 2/f.existing rooms to have new stud wall,ceiling,finishes.no exterior work.Details
t.i.to 3 rooms on 2/f.existing rooms to have new stud wall,ceiling,finishes.no exterior work. | $121,000 |
| May 25, 2005 | Completed final sign-off Oct 2005 | 1 California St | Skyline Construction | oti-1, 21st floor, el, ls.Details
oti-1, 21st floor, el, ls. | $10,000 |
| May 24, 2005 | Completed final sign-off May 2006 | 999 Brannan St | Plant Construction Company Lp | install generator in basement, construct vents & exhaust though 4 floors penetrating at roof. fuel poit located at ground floor. new partitions throughout.Details
install generator in basement, construct vents & exhaust though 4 floors penetrating at roof. fuel poit located at ground floor. new partitions throughout. | $180,000 |
| Nov 23, 2004 | Expired or cancelled expired Sep 2006 | 1 California St | oti-1 30/f el, me, sp | $30,000 |