Alex Rood
- Listed as
- architect, attorney, engineer
- Firm
- Pivot Structural Engineering
- Based in
- Berkeley
- On San Francisco permits
- Jul 2005 to Aug 2026
69 permits since 2000 (engineer on 65 permits, architect on 3 permits, attorney on 1 permit): 47 completed, 3 in progress, 7 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 2031 Bush St | rehab and voluntary strutural upgrade of kinmon gauken building with associated architectural, ada & mep upgrades, new elevator, heating sys, new trans switch & heating sys, plumbing fixt, mech rooms. f/s under sep permit.Details
rehab and voluntary strutural upgrade of kinmon gauken building with associated architectural, ada & mep upgrades, new elevator, heating sys, new trans switch & heating sys, plumbing fixt, mech rooms. f/s under sep permit. | $8,200,000 | |
| Jul 8, 2026 | In progress issued Jul 2026 | 325 Lawton St | Del Plata Builders Inc | rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding.Details
rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding. | $55,000 |
| Apr 17, 2026 | Completed final sign-off Jul 2026 | 530 Moraga St | Majestic Landscape | structural revision to pa# 202403288858: replace steel struts with level beams.Details
structural revision to pa# 202403288858: replace steel struts with level beams. | $8,000 |
| Mar 13, 2025 | Completed final sign-off Oct 2025 | 1600 Lake St | Reveal Partners | revision to pa#202109309605-structural only. existing dining room window to remain(not enlarge) extend 2nd fl. ftao shearwall. strengthen post in garage/1st fl. enlarge footing at post. revise 2nd fl. framing over kitchen, existing deficient, change wd bm to stl bm/kitchen.Details
revision to pa#202109309605-structural only. existing dining room window to remain(not enlarge) extend 2nd fl. ftao shearwall. strengthen post in garage/1st fl. enlarge footing at post. revise 2nd fl. framing over kitchen, existing deficient, change wd bm to stl bm/kitchen. | $10,000 |
| Jan 29, 2025 | Completed final sign-off Jul 2025 | 327 Linden St | revision to pa #202405222685 to change front entry door design.Details
revision to pa #202405222685 to change front entry door design. | ||
| Jan 9, 2025 | In progress issued Jun 2025 | 182 Eureka St | Top Line Remodeling Inc | basement: new reinforced foundation and slab to replace (e) brick foundation (84lf) and slab.(e) wood supporting beam replaced w/steel beam.(n) conditioned,non-habitable full bath within garage and (n) storage addition @ rear.build out corner so garage door can be widened.1/f:unconditioned...Details
basement: new reinforced foundation and slab to replace (e) brick foundation (84lf) and slab.(e) wood supporting beam replaced w/steel beam.(n) conditioned,non-habitable full bath within garage and (n) storage addition @ rear.build out corner so garage door can be widened.1/f:unconditioned... | $720,000 |
| May 22, 2024 | Completed final sign-off Jul 2025 | 327 Linden St | change in use- convert (e) garage into a (n) mercantile space. includes the replacment of (e) concrete floor with a (n) slab and the addition of a bathroom w/sink,toilet, (n) ceramic tile installed in mortar base. replace garage door w/double door. no structrual changes.Details
change in use- convert (e) garage into a (n) mercantile space. includes the replacment of (e) concrete floor with a (n) slab and the addition of a bathroom w/sink,toilet, (n) ceramic tile installed in mortar base. replace garage door w/double door. no structrual changes. | $50,000 | |
| Sep 1, 2023 | Expired or cancelled withdrawn Sep 2025 | 1600 Lake St | Reveal Partners | revision to pa# 202104239235 & 202306301275, install 3 new footings for steel post & header around door frame.Details
revision to pa# 202104239235 & 202306301275, install 3 new footings for steel post & header around door frame. | $20,000 |
| Jul 14, 2023 | Completed final sign-off Jan 2025 | 2566 Vallejo St | Lyons Building & Associates Inc. | remove/replace dysfunctional non-required fire escape in lightwell, not visible from street, off property. no other work on this permit.Details
remove/replace dysfunctional non-required fire escape in lightwell, not visible from street, off property. no other work on this permit. | $6,500 |
| Jun 9, 2023 | Completed final sign-off Oct 2025 | 3340 Washington St | Welch Construction | build a residential elevator in existing light wellDetails
build a residential elevator in existing light well | $150,000 |
| Sep 12, 2022 | Completed final sign-off Jul 2023 | 35 17th Av | Reveal Partners | revision bpa#202205194654. remove deck/deck post. dry rot exceeds 50%.Details
revision bpa#202205194654. remove deck/deck post. dry rot exceeds 50%. | $20,000 |
| Aug 2, 2022 | Expired or cancelled expired Apr 2026 | 241 Liberty St | rev to pa202102124571: eliminate hand-dug piers based on geotech engineering site condition observation recommendations.Details
rev to pa202102124571: eliminate hand-dug piers based on geotech engineering site condition observation recommendations. | ||
| May 25, 2022 | Completed final sign-off Dec 2023 | 215 Middle Point Rd | Hbm Construction Inc | to comply with nov# 201961841. repair retaining wall in back yard.Details
to comply with nov# 201961841. repair retaining wall in back yard. | $60,000 |
| May 19, 2022 | Completed final sign-off Jul 2023 | 35 17th Av | Reveal Partners | dry rot repair at rear.Details
dry rot repair at rear. | $20,000 |
| Nov 24, 2021 | Completed final sign-off Mar 2024 | 1132 Sanchez St | Line Construction Llc | bay window addition in front facade. replace exterior stucco w/thin brick replace siding fnish w/stucco.Details
bay window addition in front facade. replace exterior stucco w/thin brick replace siding fnish w/stucco. | $25,000 |
| Sep 30, 2021 | Completed final sign-off Oct 2025 | 1600 Lake St | Reveal Partners | replace driveway gate, enlarge garage, replace lower level windows. replace windows in kitchen & dining w/ larger. replace 2nd level master bathroom windows.Details
replace driveway gate, enlarge garage, replace lower level windows. replace windows in kitchen & dining w/ larger. replace 2nd level master bathroom windows. | $250,000 |
| Jul 30, 2021 | Expired or cancelled expired Apr 2026 | 241 Liberty St | Prosper Construction Dev Inc. | permanent basement retaining walls to stabilize existing soil cuts at rear, south, west and east sides.Details
permanent basement retaining walls to stabilize existing soil cuts at rear, south, west and east sides. | $30,000 |
| Jul 20, 2021 | Expired or cancelled expired Mar 2023 | 1506 Willard St | Mcdp Dba Geothersun Construction | rev to pa#202106172704, 201911278308. revised driveway north prop. line wall such that (e) concrete wall remains w/new concrete wall added below, & optional 4" concrete facing at exposed rough concrete.Details
rev to pa#202106172704, 201911278308. revised driveway north prop. line wall such that (e) concrete wall remains w/new concrete wall added below, & optional 4" concrete facing at exposed rough concrete. | |
| May 3, 2021 | Completed final sign-off Dec 2021 | 2525 Gough St | Reveal Partners | rebuild existing exterior rear stair in kind.Details
rebuild existing exterior rear stair in kind. | $10,000 |
| Mar 9, 2021 | Completed final sign-off Oct 2024 | 15 Crescent Av | Angotti & Reilly Inc. | exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition.Details
exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition. | $217,351 |
| Feb 10, 2021 | Completed final sign-off Jan 2022 | 25 Bartlett St | Perfect Bldr. Inc/Dba: Bldg. Solutions | unit 3: revision to pa 202009023264. repair of (e) wood beams in level 5 floor above level 4 kitchen, replace with steel beams.Details
unit 3: revision to pa 202009023264. repair of (e) wood beams in level 5 floor above level 4 kitchen, replace with steel beams. | $15,000 |
| Dec 2, 2020 | Completed final sign-off Mar 2024 | 1132 Sanchez St | Line Construction Llc | rev to pa201605026342:interior layout change 1-3 floors,reconfigure windows on side,rear facades, skylights on roof, add heat pump system. electrical, pump fixt per plans, struct revision perplan, no envelope expansion.Details
rev to pa201605026342:interior layout change 1-3 floors,reconfigure windows on side,rear facades, skylights on roof, add heat pump system. electrical, pump fixt per plans, struct revision perplan, no envelope expansion. | $200,000 |
| Aug 22, 2020 | Expired or cancelled withdrawn Mar 2026 | 4404 18th St | Sf Hills Construction, Inc. | this project involves the renovation of an existing 3 story, single-family residence. the scope of work includes an interior renovation of the 2nd floor and 3rd floor including new windows, a new dormer, and an exterior rear stair replacement-in-kind. upgrades include a seismic retrofit.Details
this project involves the renovation of an existing 3 story, single-family residence. the scope of work includes an interior renovation of the 2nd floor and 3rd floor including new windows, a new dormer, and an exterior rear stair replacement-in-kind. upgrades include a seismic retrofit. | $300,000 |
| Aug 21, 2020 | Completed final sign-off Mar 2023 | 962 Capp St | Hon's Construction Inc. | interior remodel and small rear addition of existing 2nd flr apt unit.Details
interior remodel and small rear addition of existing 2nd flr apt unit. | $115,000 |
| Jan 14, 2020 | Completed final sign-off Aug 2023 | 694 Valencia St | Faith N Jason Construction Llc | revision to app#201603081452. interior remodel of ground floor extg restaurant. includes new bathroom layout, new kitchen equipment plan and new lighting.Details
revision to app#201603081452. interior remodel of ground floor extg restaurant. includes new bathroom layout, new kitchen equipment plan and new lighting. | |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 814 27th Av | R A Burrous Construction | remove facade, foundation work, structural, stucco, and roofDetails
remove facade, foundation work, structural, stucco, and roof | $60,000 |
| Nov 27, 2019 | Expired or cancelled expired Mar 2023 | 1506 Willard St | Mcdp Dba Geothersun Construction, Rod Heisler Construction | revision to 201402289547 foundation and framing details revised per exposed conditions. interior stair escalator shaft framing revised. dropped floor framing incorporartedDetails
revision to 201402289547 foundation and framing details revised per exposed conditions. interior stair escalator shaft framing revised. dropped floor framing incorporarted | |
| Sep 3, 2019 | Completed final sign-off Feb 2022 | 54 Macondray Ln | Sing Wong | work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace.Details
work @ 54 macondray lane only. horizontal addition & interior renovation: 3rd floor: demolish & replace (e) kitchen, remove wall between living & kitchen. add washer/dryer. relocate br closet. 4th floor: demo (e) roof structure & rear yard. add new master, lounge, demo (e) bath & replace. | $165,000 |
| Mar 15, 2019 | Never finaled filed Mar 2019, never issued | 425 Mission St | tjpa, 1st t.i. for a-a fitness use in 34,875 sf on 2nd floor of (e) bldg suite 208/212, new demising walls for studis, lockers, lockers, reception & juic bar, new ceiling & locker rm, laundry rm, hot water system, (n) distribution of hvac system, exhaust fans, lighting modifications & extension of.Details
tjpa, 1st t.i. for a-a fitness use in 34,875 sf on 2nd floor of (e) bldg suite 208/212, new demising walls for studis, lockers, lockers, reception & juic bar, new ceiling & locker rm, laundry rm, hot water system, (n) distribution of hvac system, exhaust fans, lighting modifications & extension of. | $2,500,000 | |
| Mar 15, 2019 | Never finaled filed Mar 2019, never issued | 425 Mission St | tjpa, shell bldg improvement for 34,875 sf of tenant space on 2nd floor for suites 208 & 212, demo of (e) walls, doors, storfronts& equipments, new concrete topping slab, new hvac system, new eect panels, new plumb poc for tenant work tie-in, (n) walls & doors for elelct rms. no sfusd.Details
tjpa, shell bldg improvement for 34,875 sf of tenant space on 2nd floor for suites 208 & 212, demo of (e) walls, doors, storfronts& equipments, new concrete topping slab, new hvac system, new eect panels, new plumb poc for tenant work tie-in, (n) walls & doors for elelct rms. no sfusd. | $650,000 | |
| Jan 29, 2019 | Completed final sign-off Feb 2019 | 1225 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | revision to 2018-1003-2162 and 2018-0130-9848 permit scope reduced to eleiminate connection of lower roof diaphragm to north wall. diaphragm alternate fasters. plaster anchor minor revisions. roof ledger bolt alternative thru bolting and detail, e conditionDetails
revision to 2018-1003-2162 and 2018-0130-9848 permit scope reduced to eleiminate connection of lower roof diaphragm to north wall. diaphragm alternate fasters. plaster anchor minor revisions. roof ledger bolt alternative thru bolting and detail, e condition | |
| Aug 21, 2018 | Never finaled issued Aug 2018, no final | 125 Beaumont Av | Cpb Construction Corporation | upgrade kitchen/install cabinets/new electrical & plumbing. remove wall between kitchen & closet to extend kitchen.Details
upgrade kitchen/install cabinets/new electrical & plumbing. remove wall between kitchen & closet to extend kitchen. | $35,000 |
| Jun 26, 2017 | Never finaled issued Jun 2017, no final | 4082 Cesar Chavez St | Reveal Partners | revision to pa #201704184287 - cap existing footings/concrete. replace structural framing as per plans. finish to match existing.Details
revision to pa #201704184287 - cap existing footings/concrete. replace structural framing as per plans. finish to match existing. | $30,000 |
| Dec 21, 2016 | Expired or cancelled expired Dec 2017 | 1733 Lake St | Mulhall Construction Inc. | revision to 2016-1115-2749: move shear wall from grid line 1 to grid line 2, 2 ndw footing,Details
revision to 2016-1115-2749: move shear wall from grid line 1 to grid line 2, 2 ndw footing, | |
| Nov 15, 2016 | Completed final sign-off Apr 2017 | 1733 Lake St | Mulhall Construction Inc. | revision to 201605127304 reinforce beam in rear of building.Details
revision to 201605127304 reinforce beam in rear of building. | $2,000 |
| Sep 13, 2016 | Completed final sign-off Feb 2018 | 122 28th St | Joseph Francis Lockary | remodel of lower unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating.Details
remodel of lower unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating. | $80,000 |
| Sep 13, 2016 | Completed final sign-off Apr 2018 | 120 28th St | Joseph Francis Lockary | remodel of upper unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating.Details
remodel of upper unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating. | $120,000 |
| Sep 13, 2016 | Completed final sign-off Apr 2018 | 120 28th St | Joseph Francis Lockary | addition of (n) deck and stairs.Details
addition of (n) deck and stairs. | $30,000 |
| Aug 24, 2016 | Completed final sign-off Mar 2017 | 67 Crags Ct | Reveal Partners | ref pa 201607081932: remove wing walls and install new beam for support of (e) skylight framingDetails
ref pa 201607081932: remove wing walls and install new beam for support of (e) skylight framing | $10,000 |
| Jun 27, 2016 | Expired or cancelled expired Apr 2019 | 1110 Green St | Forsythe General Contractors | renovation of an existing single family residence rearrange bathroom fixture(s), enlarge window(s) at the front & rear.Details
renovation of an existing single family residence rearrange bathroom fixture(s), enlarge window(s) at the front & rear. | $30,000 |
| May 12, 2016 | Completed final sign-off Apr 2017 | 1733 Lake St | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. | $80,000 | |
| Feb 17, 2016 | Completed final sign-off Feb 2018 | 2616 Union St | Stroub Construction | replace (e) upward acting garage door w/new upward acting door. replace (e) window @ west yard with new wood window. replace (e) header & window with n header, end posts & connections and add new vent fam @roof & motion sensor on light switch,Details
replace (e) upward acting garage door w/new upward acting door. replace (e) window @ west yard with new wood window. replace (e) header & window with n header, end posts & connections and add new vent fam @roof & motion sensor on light switch, | $16,500 |
| Feb 12, 2016 | Completed final sign-off Feb 2018 | 2616 Union St | Stroub Construction | replace existing dormer in new pre-engineers dormer that is smaller than originalDetails
replace existing dormer in new pre-engineers dormer that is smaller than original | $150,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2018 | 2616 Union St | Stroub Construction | replace 5 windows in rear. replace sash in 2 windows east side house and replace 1 window and 1 set french doors @ east side, replace 1 window @ west side, same size. remove brick chimney @ west/rear. structural reinforce dormer.Details
replace 5 windows in rear. replace sash in 2 windows east side house and replace 1 window and 1 set french doors @ east side, replace 1 window @ west side, same size. remove brick chimney @ west/rear. structural reinforce dormer. | $25,000 |
| Nov 3, 2015 | Completed final sign-off Oct 2016 | 246 28th St | Mulhall Construction Inc. | seismic soft story retrofit per mandated program design criteria carried out in accordance with 2012 iebc appendix a-4Details
seismic soft story retrofit per mandated program design criteria carried out in accordance with 2012 iebc appendix a-4 | $20,000 |
| Oct 5, 2015 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | revision to app#201504214149. soft story seismic retrofit at garage/parking. n/a for maher.Details
revision to app#201504214149. soft story seismic retrofit at garage/parking. n/a for maher. | |
| Jul 31, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | R C Construction | common area- revise pa#201503171134, revise guard and structural revisionDetails
common area- revise pa#201503171134, revise guard and structural revision | |
| Apr 21, 2015 | Completed final sign-off Nov 2016 | 1227 Hampshire St | Nibbi Bros Assoc Inc. | soft story retrofit and wall repair. asce 41-06. n/a for the maher.Details
soft story retrofit and wall repair. asce 41-06. n/a for the maher. | $200,000 |
| Feb 12, 2015 | Expired or cancelled expired Apr 2019 | 1110 Green St | Marr B Olsen Inc, Forsythe General Contractors | inerior remodel of extg single family residence. new windows/ no expansion of envelopeDetails
inerior remodel of extg single family residence. new windows/ no expansion of envelope | $370,000 |
| Nov 12, 2014 | Completed final sign-off Jul 2016 | 171 26th Av | Jeff King And Company Inc | new interior communicating stair to new stair penhouse @ roof. new roof deck.Details
new interior communicating stair to new stair penhouse @ roof. new roof deck. | $175,000 |
| Oct 22, 2014 | Completed final sign-off Sep 2015 | 170 Cypress St | K & M Construction | revision to permit 201312053449; addition of a stair from second floor to ground.Details
revision to permit 201312053449; addition of a stair from second floor to ground. | $2,000 |
| Apr 16, 2014 | Expired or cancelled cancelled Jan 2026 | 3235 Gough St | to build a 481 sf roof deck.Details
to build a 481 sf roof deck. | $20,000 | |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 3855 25th St | Travis General Contractors | revision to pa# 201206112310 2/f kitchen shearwall. removed and substitued with (e) lath & plaster wall lateral support, misc change in joist, beam & (e) framing information and sizes. minor foundation revision: include shear wall leftout in advertenly.Details
revision to pa# 201206112310 2/f kitchen shearwall. removed and substitued with (e) lath & plaster wall lateral support, misc change in joist, beam & (e) framing information and sizes. minor foundation revision: include shear wall leftout in advertenly. | |
| Nov 13, 2013 | Completed final sign-off Jul 2014 | 1451 Montgomery St | Duffin Construction | #8- repair existing deck to include new guardrail & deck tile, new glass door in existing location location at rear of building.Details
#8- repair existing deck to include new guardrail & deck tile, new glass door in existing location location at rear of building. | $9,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2015 | 948 Hampshire St | Maven Maintenance Inc | revision to 2005.0329.8688 & 2013.0301.1337. new roof deck. new interior floor plan. change to proposed rear stair.Details
revision to 2005.0329.8688 & 2013.0301.1337. new roof deck. new interior floor plan. change to proposed rear stair. | $280,000 |
| Apr 10, 2013 | Completed final sign-off Sep 2013 | 81 Shore View Av | Super Home Painting & Construction Co | replace 2 exterior decks in kind, over 10ft @ rear.Details
replace 2 exterior decks in kind, over 10ft @ rear. | $12,000 |
| Mar 29, 2013 | Expired or cancelled expired Jan 2017 | 3325 Folsom St | Thomas Building Group | new work added to previously issued app#201212115979. concrete foundation work only. new footing and stem wall. extg conditions are unsafe.Details
new work added to previously issued app#201212115979. concrete foundation work only. new footing and stem wall. extg conditions are unsafe. | $10,000 |
| Mar 12, 2013 | Completed final sign-off Aug 2014 | 2506 Filbert St | revision to pa#2012-03-20-6407 field modifications to previously approved plans. structural changes only.Details
revision to pa#2012-03-20-6407 field modifications to previously approved plans. structural changes only. | ||
| Nov 16, 2012 | Completed final sign-off Oct 2013 | 3228 Sacramento St | Alsterlind Construction Inc. | ti-new restaurant.incl interior & exterior to grd fl commercial space with no expansion of exist bldg envelope. kitchen, office space & storage spaces also incl. change of occupancy from m to a-2Details
ti-new restaurant.incl interior & exterior to grd fl commercial space with no expansion of exist bldg envelope. kitchen, office space & storage spaces also incl. change of occupancy from m to a-2 | $625,000 |
| Jul 25, 2012 | Never finaled issued Aug 2012, no final | 836 Montgomery St | Johnstone - Mc Auliffe Const. Inc. | revision to appl #2012.07.05.4148 to include additoinal structural work for new equipment platform & brace/moment frames.Details
revision to appl #2012.07.05.4148 to include additoinal structural work for new equipment platform & brace/moment frames. | $111,000 |
| Dec 22, 2011 | Completed final sign-off Feb 2012 | 84 Anderson St | revision to 200907162817. revision to foundation work at south and west walls.Details
revision to 200907162817. revision to foundation work at south and west walls. | $6,000 | |
| Apr 25, 2011 | Completed final sign-off Jul 2011 | 186 Granville Wy | Stingray Builders Inc. | repair detached garage per strucutral drawings. add concrete buttresses to e retaining wall, add plywood shear reinforcement to west end of garge and roof. replace e roll up door,minor repairs to siding. add door and stairs to access garage from rear yardDetails
repair detached garage per strucutral drawings. add concrete buttresses to e retaining wall, add plywood shear reinforcement to west end of garge and roof. replace e roll up door,minor repairs to siding. add door and stairs to access garage from rear yard | $18,000 |
| Feb 9, 2011 | Completed final sign-off Aug 2011 | 1519 11th Av | J P Builders Inc | remodel/relocate existing kitchen and bath on 2nd floor. removal of indicated interior walls. add fixed window on north rear elevation, not visible from street.Details
remodel/relocate existing kitchen and bath on 2nd floor. removal of indicated interior walls. add fixed window on north rear elevation, not visible from street. | $80,000 |
| Jun 24, 2010 | Completed final sign-off Jul 2012 | 238 Corbett Av | Monarch Design Build | revision to pa# 2010-0422-0801-foundation repair, new footing & repair of shear wall at center of houseDetails
revision to pa# 2010-0422-0801-foundation repair, new footing & repair of shear wall at center of house | $1,200 |
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 1784 Union St | Aspen Contractors Inc | revision to 200904247004, single hhdq14's with calcs, titen hd's, omittig hd (glo 1/b)Details
revision to 200904247004, single hhdq14's with calcs, titen hd's, omittig hd (glo 1/b) | |
| Sep 23, 2008 | Completed final sign-off Sep 2009 | 336 Munich St | Amone Corp | revision to orig. permit 200406045620. structural ing. replacement of hod downs with strap type hold down at various locations(also post connetion). roof system is changed from tradtional joist system to sip panel constructionDetails
revision to orig. permit 200406045620. structural ing. replacement of hod downs with strap type hold down at various locations(also post connetion). roof system is changed from tradtional joist system to sip panel construction | |
| Feb 14, 2008 | Completed final sign-off May 2008 | 660 03rd St | Bcci Construction Company | 4th floor - structural work associated with appl. # 200712049588. installation of overhead support for sliding door system.Details
4th floor - structural work associated with appl. # 200712049588. installation of overhead support for sliding door system. | $2,500 |
| Oct 26, 2005 | Completed final sign-off Dec 2005 | 2918 Baker St | demolishing non-conforming stairway to attic floor. clear abatement # 157,592 - demolish bedroom in attic.Details
demolishing non-conforming stairway to attic floor. clear abatement # 157,592 - demolish bedroom in attic. | $5,000 | |
| Jul 6, 2005 | Expired or cancelled expired Mar 2006 | 2918 Baker St | replace portion of east foundation add 2 hardy frames to strengthen cornerDetails
replace portion of east foundation add 2 hardy frames to strengthen corner | $3,500 |