Alex Kuznetsov
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- B-Side Inc.
- Based in
- Oakland
- On San Francisco permits
- Sep 2007 to Sep 2026
953 permits since 2000 (contractor on 951 permits, authorized agent-others on 41 permits, pmt consultant/expediter on 2 permits): 576 completed, 27 in progress, 298 never finaled, 52 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 953.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 555 Pacific Av | B-Side Inc. | core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitionsDetails
core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitions | $200,000 |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 2209 15th St | B-Side Inc. | basement: convert (e) storage/workshop on basement lievel into a 993sf unit with bedrooms, bathrooms, living room and kitchen. no stutural or exterior work.Details
basement: convert (e) storage/workshop on basement lievel into a 993sf unit with bedrooms, bathrooms, living room and kitchen. no stutural or exterior work. | $160,000 |
| Sep 14, 2026 | In progress issued Oct 2026 | 3401 Clay St | B-Side Inc. | kitchen (91sf) and bath (50sf) remodel. addition of washer and dryerDetails
kitchen (91sf) and bath (50sf) remodel. addition of washer and dryer | $65,000 |
| Sep 4, 2026 | In progress issued Sep 2026 | 691 Post St | B-Side Inc. | unit 205: to comply to nov 202538002: kitchen and bathroom remodel like for like. no tub to shower conversion.Details
unit 205: to comply to nov 202538002: kitchen and bathroom remodel like for like. no tub to shower conversion. | $12,500 |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1747 32nd Av | B-Side Inc. | new second floor deck and stair addition at the rear yard of the property.Details
new second floor deck and stair addition at the rear yard of the property. | $45,000 |
| Jun 12, 2026 | Completed final sign-off Jul 2026 | 1937 Page St | B-Side Inc. | unit 3: replace cabinets in kitchen and replace vanity in bathroom all like for like , full paint walls in bedrooms. update electrical and plumbing in kitchen and bathroom.Details
unit 3: replace cabinets in kitchen and replace vanity in bathroom all like for like , full paint walls in bedrooms. update electrical and plumbing in kitchen and bathroom. | $15,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 1747 32nd Av | B-Side Inc. | remodel of two story single family house, including conversion of unconditoned ground floor to habitable space and remodel of the 2nd fl. the scope does not purpose any structural changes. no changes to roof or skylight.Details
remodel of two story single family house, including conversion of unconditoned ground floor to habitable space and remodel of the 2nd fl. the scope does not purpose any structural changes. no changes to roof or skylight. | $45,000 |
| May 19, 2026 | Completed final sign-off Jun 2026 | 2211 Fillmore St | B-Side Inc. | install new motion sensor lights at back stairs, reinforce side steps, fix (2) siding below deck, reinforce all back stairs. repair in kind deck, <50% all work in back of bldg.Details
install new motion sensor lights at back stairs, reinforce side steps, fix (2) siding below deck, reinforce all back stairs. repair in kind deck, <50% all work in back of bldg. | $5,000 |
| May 4, 2026 | In progress issued Aug 2026 | 40 Gold St | B-Side Inc. | replacement of (e) front entry doors, and minor interior tenant improvement work on the ground floor.Details
replacement of (e) front entry doors, and minor interior tenant improvement work on the ground floor. | $48,300 |
| Apr 30, 2026 | Completed final sign-off Jun 2026 | 3864 California St | B-Side Inc. | unit #1: replace damaged kitchen cabinets and counter bathroom new fixtures like kindDetails
unit #1: replace damaged kitchen cabinets and counter bathroom new fixtures like kind | $15,000 |
| Apr 30, 2026 | Completed final sign-off Jun 2026 | 3864 California St | B-Side Inc. | unit #3: replace damaged kitchen cabinets and counter bathroom new fixtures like kindDetails
unit #3: replace damaged kitchen cabinets and counter bathroom new fixtures like kind | $15,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 1747 32nd Av | B-Side Inc. | demo of interior wall finishes in living room and bedrooms. replace sheet rock in kind with 5/8" type x. approx 1000 sq ft. no wall removal.Details
demo of interior wall finishes in living room and bedrooms. replace sheet rock in kind with 5/8" type x. approx 1000 sq ft. no wall removal. | $10,000 |
| Apr 21, 2026 | Completed final sign-off Aug 2026 | 2901 Folsom St | B-Side Inc. | to comply with bid nov #202649099 and his nov #201880271, item#2. replacement in-kind of the existing exterior staircase with a new reinforced concrete structure within the existing footprint.Details
to comply with bid nov #202649099 and his nov #201880271, item#2. replacement in-kind of the existing exterior staircase with a new reinforced concrete structure within the existing footprint. | $8,000 |
| Apr 20, 2026 | In progress issued Jul 2026 | 2459 Larkin St | B-Side Inc. | unit c: 1) rehabilitate existing kitchen, 2) rehabilitate existing bathroom, 3) install washer and dryer. 4) no removal of structural walls. 5. change out windows @ greenwich st to eero windows.Details
unit c: 1) rehabilitate existing kitchen, 2) rehabilitate existing bathroom, 3) install washer and dryer. 4) no removal of structural walls. 5. change out windows @ greenwich st to eero windows. | $69,000 |
| Mar 31, 2026 | In progress issued Mar 2026 | 150 32nd Av | B-Side Inc. | kitchen remodel in kind to address complaint #202541760.Details
kitchen remodel in kind to address complaint #202541760. | $15,000 |
| Jan 20, 2026 | Completed final sign-off Mar 2026 | 2514 Sacramento St | B-Side Inc. | unit d: remove molded drywall and replace drywall in bedroom closet. to comply with complaint # 202649257.Details
unit d: remove molded drywall and replace drywall in bedroom closet. to comply with complaint # 202649257. | $2,000 |
| Jan 12, 2026 | Expired or cancelled cancelled Feb 2026 | 2514 Sacramento St | B-Side Inc. | remove molded drywall and replace drywall in bedroom closet in unit# b only.Details
remove molded drywall and replace drywall in bedroom closet in unit# b only. | $2,500 |
| Jan 5, 2026 | Completed final sign-off Jan 2026 | 350 Judah St | B-Side Inc. | unit 402: replace 10 windows street facing, wood for wood, intergraded lugs at upper sash.Details
unit 402: replace 10 windows street facing, wood for wood, intergraded lugs at upper sash. | $13,500 |
| Dec 19, 2025 | In progress issued Dec 2025 | 891 28th Av | B-Side Inc. | open up drywall in the ceiling in the apartment to install a water line and gas line. repair in-kind. new water mater. new gas meter.Details
open up drywall in the ceiling in the apartment to install a water line and gas line. repair in-kind. new water mater. new gas meter. | $8,000 |
| Nov 20, 2025 | Completed final sign-off Dec 2025 | 1625 Leavenworth St | B-Side Inc. | unit #304: kitchen and bathroom remodel like for likeDetails
unit #304: kitchen and bathroom remodel like for like | $25,000 |
| Nov 20, 2025 | Completed final sign-off Dec 2025 | 2260 Market St | B-Side Inc. | install galvanized sheet metal in garbage room to comly with his nov 201804581 #2.Details
install galvanized sheet metal in garbage room to comly with his nov 201804581 #2. | $2,000 |
| Nov 10, 2025 | Completed final sign-off Aug 2026 | 3440 20th St | B-Side Inc. | common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910Details
common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910 | $5,000 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 900 Broderick St | B-Side Inc. | windows replacement in apts 2, 3, 4, 5, 6, 7 , 8, 9, 10, 11, & 14. total of 60 windows.Details
windows replacement in apts 2, 3, 4, 5, 6, 7 , 8, 9, 10, 11, & 14. total of 60 windows. | $50,000 |
| Oct 2, 2025 | Completed final sign-off Apr 2026 | 534 Pacific Av | B-Side Inc. | revision to 202412106465 1/f: interior t.i consisting of new interior partitions and finishes in a vacant bldg. 2/f: int. t.i consisting new interior partitions and finishes. addition of a new restrm and breakrm, utilizing (e) plumbing stubouts provided under 202412106465Details
revision to 202412106465 1/f: interior t.i consisting of new interior partitions and finishes in a vacant bldg. 2/f: int. t.i consisting new interior partitions and finishes. addition of a new restrm and breakrm, utilizing (e) plumbing stubouts provided under 202412106465 | $20,000 |
| Sep 26, 2025 | Completed final sign-off Oct 2025 | 2211 Fillmore St | B-Side Inc. | check, remove, and replace rotted wood under the deck and support post, back of building, non street visible, like for like repair. less than 50% repair.Details
check, remove, and replace rotted wood under the deck and support post, back of building, non street visible, like for like repair. less than 50% repair. | $2,000 |
| Sep 24, 2025 | Completed final sign-off Apr 2026 | 2955 Van Ness Av | B-Side Inc. | unit #8. 1. convert existing kitchen to study. 2. relocate kitchen. 3. rehab existing bathroom. 4. install washer and dryer.Details
unit #8. 1. convert existing kitchen to study. 2. relocate kitchen. 3. rehab existing bathroom. 4. install washer and dryer. | $63,000 |
| Sep 18, 2025 | Completed final sign-off Sep 2025 | 71 Manor Dr | B-Side Inc. | replace (19) windows in existing openings, u<=0.30. not visible from the street.Details
replace (19) windows in existing openings, u<=0.30. not visible from the street. | $15,000 |
| Sep 12, 2025 | Completed final sign-off Oct 2025 | 57 Hotaling Pl | B-Side Inc. | revise p/a 2025-0509-6177 to address field/construction conditions as requested by field inspector and associated with the structrual footing and detail at underside of door for support conect of beamstop at front of building.Details
revise p/a 2025-0509-6177 to address field/construction conditions as requested by field inspector and associated with the structrual footing and detail at underside of door for support conect of beamstop at front of building. | $15,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 1997 Oak St | B-Side Inc. | unit #4- revision to pa# 202507251681: remove "install washer and dryer" from the description. existing closet - not touching any walls.Details
unit #4- revision to pa# 202507251681: remove "install washer and dryer" from the description. existing closet - not touching any walls. | |
| Sep 3, 2025 | Completed final sign-off Sep 2025 | 2211 Fillmore St | B-Side Inc. | rear stairs, less than 50%: secure the loose board on the stairs. replace and properly fasten the affected riser. install additional screws where needed to ensure stability and safety.Details
rear stairs, less than 50%: secure the loose board on the stairs. replace and properly fasten the affected riser. install additional screws where needed to ensure stability and safety. | $2,000 |
| Aug 21, 2025 | In progress issued Aug 2025 | 2211 Fillmore St | B-Side Inc. | permit is needed to abate complaint #202534302 (#3) and 202535892 (#11, #12) repair lights/ door knob in kind. repair damaged walls and ceiling inside unit. all work is interior.Details
permit is needed to abate complaint #202534302 (#3) and 202535892 (#11, #12) repair lights/ door knob in kind. repair damaged walls and ceiling inside unit. all work is interior. | $3,000 |
| Jul 25, 2025 | Completed final sign-off Nov 2025 | 1997 Oak St | B-Side Inc. | unit 4. rehab existing kitchen. rehab existing bath. install washer and dryer. no structural work.Details
unit 4. rehab existing kitchen. rehab existing bath. install washer and dryer. no structural work. | $64,000 |
| Jul 17, 2025 | In progress issued Jul 2025 | 3868 California St | B-Side Inc. | revision to pa # 2025-0617-8839. update the address from 3864 to 3868 california st. same building, same block and lotDetails
revision to pa # 2025-0617-8839. update the address from 3864 to 3868 california st. same building, same block and lot | |
| Jul 9, 2025 | Completed final sign-off Jul 2025 | 350 Judah St | B-Side Inc. | #302: replace 10 windows in kind. street facing. wood for wood with egee lugs at upper sash. u factor is less than or equal to 0.3Details
#302: replace 10 windows in kind. street facing. wood for wood with egee lugs at upper sash. u factor is less than or equal to 0.3 | $8,000 |
| Jul 7, 2025 | Expired or cancelled cancelled Jul 2025 | 350 Judah St | B-Side Inc. | replace 10 windows in kind.Details
replace 10 windows in kind. | $10,000 |
| Jul 7, 2025 | Completed final sign-off Jul 2025 | 555 Buena Vista West Av | B-Side Inc. | close small parts of wall--30 sq. ft. over about 2 locationsDetails
close small parts of wall--30 sq. ft. over about 2 locations | $2,000 |
| Jul 2, 2025 | In progress issued Jul 2025 | 900 Marin St | B-Side Inc. | revision to pa#: 2025-0225-1012 to document revisions to structural steel framing revisions (wbx to wgx girder beams) and minor modifications to concrete footings supporting hss columns to accommodate existing field conditions.Details
revision to pa#: 2025-0225-1012 to document revisions to structural steel framing revisions (wbx to wgx girder beams) and minor modifications to concrete footings supporting hss columns to accommodate existing field conditions. | |
| Jun 17, 2025 | In progress issued Jun 2025 | 2859 Octavia St | B-Side Inc. | unit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedroomsDetails
unit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedrooms | $20,000 |
| Jun 17, 2025 | In progress issued Jun 2025 | 3864 California St | B-Side Inc. | unit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parkingDetails
unit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking | $20,000 |
| Jun 12, 2025 | Completed final sign-off Feb 2026 | 2211 Fillmore St | B-Side Inc. | revision to pa# 202506058064, re-route downspout to complaince of nov #202534302.Details
revision to pa# 202506058064, re-route downspout to complaince of nov #202534302. | $2,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 2211 Fillmore St | B-Side Inc. | complaint #202534302 and 202535892. locate source of water intrussion, repair damaged wall and ceiling, repair deck/stairs, repair fence/gateDetails
complaint #202534302 and 202535892. locate source of water intrussion, repair damaged wall and ceiling, repair deck/stairs, repair fence/gate | $12,000 |
| May 27, 2025 | In progress issued Sep 2025 | 900 Marin St | B-Side Inc. | add 3215 sq ft of viewing (1677 sqft gfa) mezzanine inside concert venue. provide (3) egress stair & accessible lift. sprinkler over mezz under separate permit # 2025-0225-1012 for steel/foundation support.Details
add 3215 sq ft of viewing (1677 sqft gfa) mezzanine inside concert venue. provide (3) egress stair & accessible lift. sprinkler over mezz under separate permit # 2025-0225-1012 for steel/foundation support. | $126,000 |
| May 21, 2025 | In progress issued Mar 2026 | 765 Bay St | B-Side Inc. | repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade.Details
repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade. | $300,000 |
| May 15, 2025 | In progress issued May 2025 | 3868 California St | B-Side Inc. | unit 5- exploratory for soft demo to remove drywall in bathroom and kitchen no wall removal or layout change. separate remodel permit to come in future.Details
unit 5- exploratory for soft demo to remove drywall in bathroom and kitchen no wall removal or layout change. separate remodel permit to come in future. | $4,000 |
| May 15, 2025 | In progress issued May 2025 | 2859 Octavia St | B-Side Inc. | (front building) demo non bearing walls per ab-017 space to remain vacant until plans and ti in future.Details
(front building) demo non bearing walls per ab-017 space to remain vacant until plans and ti in future. | $8,000 |
| May 9, 2025 | Completed final sign-off Oct 2025 | 57 Hotaling Pl | B-Side Inc. | alterations to existing entry door and addition of an ada ramp for accessible entry to the retail floor. an acoa approval record 2025-002600coa.Details
alterations to existing entry door and addition of an ada ramp for accessible entry to the retail floor. an acoa approval record 2025-002600coa. | $15,000 |
| Apr 17, 2025 | Completed final sign-off May 2025 | 814 Bay St | B-Side Inc. | kitchen and bathroom remodel like for like/. no exterior work.Details
kitchen and bathroom remodel like for like/. no exterior work. | $20,000 |
| Apr 4, 2025 | Completed final sign-off Sep 2025 | 71 Manor Dr | B-Side Inc. | replace (1) window, windows at front stay existing, not visible from the street. u is 0.3Details
replace (1) window, windows at front stay existing, not visible from the street. u is 0.3 | $5,000 |
| Apr 2, 2025 | Completed final sign-off Mar 2026 | 534 Pacific Av | B-Side Inc. | tenant improvement mechanical sheets for pa 2024-1210-6465Details
tenant improvement mechanical sheets for pa 2024-1210-6465 | $15,000 |
| Apr 1, 2025 | Completed final sign-off Oct 2025 | 71 Manor Dr | B-Side Inc. | revision to pa# 202410213358. interior remodel of basement and 1/f story. add new bathroom and 1 bedroom at 1/fDetails
revision to pa# 202410213358. interior remodel of basement and 1/f story. add new bathroom and 1 bedroom at 1/f | $10,000 |
| Apr 1, 2025 | Completed final sign-off Feb 2026 | 825 Post St | B-Side Inc. | unit# 116, #216 & #316 abate nov #20240756. rehabilitate and repair in kind fire damages at each unit. replace floor framing at unit #316 living roomDetails
unit# 116, #216 & #316 abate nov #20240756. rehabilitate and repair in kind fire damages at each unit. replace floor framing at unit #316 living room | $400,000 |
| Mar 18, 2025 | In progress issued Mar 2025 | 401 Haight St | B-Side Inc. | demo pony wall and cleaning for soft demo per ab-017. space to remain vacant prior to t.i. permit in future. no exterior workDetails
demo pony wall and cleaning for soft demo per ab-017. space to remain vacant prior to t.i. permit in future. no exterior work | $5,000 |
| Feb 25, 2025 | In progress issued Apr 2025 | 900 Marin St | B-Side Inc. | new steel beams and columns and associated concrete footings associated with a future mezzanine awaiting dcp approval. no intermediate floor framing nor flooring proposed. no change in occupancy. architectural and floor framing under separate permit.Details
new steel beams and columns and associated concrete footings associated with a future mezzanine awaiting dcp approval. no intermediate floor framing nor flooring proposed. no change in occupancy. architectural and floor framing under separate permit. | $89,000 |
| Feb 10, 2025 | Completed final sign-off May 2025 | 2023 Folsom St | B-Side Inc. | unit #7: upgrade kitchen cabinets no moving/demo walls no exterior work. no change to appliances and fixtures.Details
unit #7: upgrade kitchen cabinets no moving/demo walls no exterior work. no change to appliances and fixtures. | $10,000 |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 605 Jones St | B-Side Inc. | unit 33: rehabilitate e) kitchen & e) bathroom. no exterior workDetails
unit 33: rehabilitate e) kitchen & e) bathroom. no exterior work | $66,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2026 | 536 Pacific Av | B-Side Inc. | g/f (536 pacific) non structural demo of interior walls restrooms & breakroom. remove barriers in e) vacant bldg for ada accessible entry & ada compliant restroom & accessible walkway to breakroom. 2nd/f (534 pacific) demo interior walls & stairs provide compliants stairs restrooms for future tenantDetails
g/f (536 pacific) non structural demo of interior walls restrooms & breakroom. remove barriers in e) vacant bldg for ada accessible entry & ada compliant restroom & accessible walkway to breakroom. 2nd/f (534 pacific) demo interior walls & stairs provide compliants stairs restrooms for future tenant | $145,000 |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 324 Waller St | B-Side Inc. | increase the scope of p/a 2024-1119-5312 to include a non-structural kitchen replacement project including cabinets and countertop like for like.Details
increase the scope of p/a 2024-1119-5312 to include a non-structural kitchen replacement project including cabinets and countertop like for like. | $20,000 |
| Nov 19, 2024 | Completed final sign-off Sep 2025 | 324 Waller St | B-Side Inc. | remove non structural wall at kitchen 2nd fl unit,floor above the garageDetails
remove non structural wall at kitchen 2nd fl unit,floor above the garage | $20,000 |
| Nov 19, 2024 | Completed final sign-off May 2025 | 3864 California St | B-Side Inc. | unit 4; remove non structural wall. relocate the kitchen. to comply with nov# 202429274Details
unit 4; remove non structural wall. relocate the kitchen. to comply with nov# 202429274 | $30,000 |
| Oct 21, 2024 | Completed final sign-off Oct 2025 | 71 Manor Dr | B-Side Inc. | interior remodel of basement and 1st story of a house with upgrades to master bathroom, laundry room, and kitchen. no change to use or parkingDetails
interior remodel of basement and 1st story of a house with upgrades to master bathroom, laundry room, and kitchen. no change to use or parking | $25,000 |
| Oct 16, 2024 | Completed final sign-off Dec 2024 | 2222 Leavenworth St | B-Side Inc. | unit #601: install one new clothes washer and dryer. no wall demo.Details
unit #601: install one new clothes washer and dryer. no wall demo. | $5,000 |
| Oct 2, 2024 | Completed final sign-off Mar 2025 | 691 Post St | B-Side Inc. | unit# 503 - bathroom remodeling: kitchen remodeling: no movign walls. no exterior work, no w/dDetails
unit# 503 - bathroom remodeling: kitchen remodeling: no movign walls. no exterior work, no w/d | $64,315 |
| Sep 13, 2024 | Completed final sign-off May 2025 | 3864 California St | B-Side Inc. | unit #4: kitchen remodeling no moving walls no exterior work.Details
unit #4: kitchen remodeling no moving walls no exterior work. | $18,000 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 1578 Indiana St | B-Side Inc. | 24 window replacement in kind including stucco repair.Details
24 window replacement in kind including stucco repair. | $45,000 |
| Jun 18, 2024 | Completed final sign-off Mar 2026 | 534 Pacific Av | B-Side Inc. | demo interior none load bearing partitions. ab-017 appliesDetails
demo interior none load bearing partitions. ab-017 applies | $10,000 |
| Jun 13, 2024 | Completed final sign-off Dec 2024 | 2219 15th St | B-Side Inc. | one kitchen and 2 bathroom remodeling. non strutural.Details
one kitchen and 2 bathroom remodeling. non strutural. | $20,000 |
| Jun 4, 2024 | Completed final sign-off Oct 2024 | 2240 Larkin St | B-Side Inc. | #203: rehabilitate existing bathroom & kitchen. install washer & dryerDetails
#203: rehabilitate existing bathroom & kitchen. install washer & dryer | $60,000 |
| Apr 19, 2024 | In progress issued May 2024 | 900 Marin St | B-Side Inc. | revision to pa 202001162079 provide horizontal roll-up stair enclosure for roof deck. correctly identify (4) exterior doors (for egress) at illinois st exit. ref pa 202209222916Details
revision to pa 202001162079 provide horizontal roll-up stair enclosure for roof deck. correctly identify (4) exterior doors (for egress) at illinois st exit. ref pa 202209222916 | |
| Apr 18, 2024 | Completed final sign-off Jun 2025 | 66 Cleary Ct | B-Side Inc. | remodeling 2 bathrooms, no moving walls, no exterior work.Details
remodeling 2 bathrooms, no moving walls, no exterior work. | $10,000 |
| Apr 1, 2024 | In progress issued Apr 2024 | 2209 15th St | B-Side Inc. | 2209-2211 15th street: exterior deck repair and exterior stair repair/ replacement. less than 50% in kind replacement.Details
2209-2211 15th street: exterior deck repair and exterior stair repair/ replacement. less than 50% in kind replacement. | $10,000 |
| Apr 1, 2024 | In progress filed Apr 2024, not yet issued | 2209 15th St | B-Side Inc. | removal of enclosed walls. in kind restoration and repair of rear deckDetails
removal of enclosed walls. in kind restoration and repair of rear deck | $10,000 |
| Mar 13, 2024 | Completed final sign-off Mar 2024 | 2207 Fillmore St | B-Side Inc. | to comply with complaint 202319404 for dry rot repair and replacement of (e) rear exterior stairs & landings. less than 50%.Details
to comply with complaint 202319404 for dry rot repair and replacement of (e) rear exterior stairs & landings. less than 50%. | $20,000 |
| Mar 11, 2024 | In progress filed Mar 2024, not yet issued | 2209 15th St | B-Side Inc. | remodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroomDetails
remodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroom | $30,000 |
| Feb 22, 2024 | Completed final sign-off Jul 2024 | 2209 15th St | B-Side Inc. | kitchen and bathroom remodeling. no moving walls and no exterior work.Details
kitchen and bathroom remodeling. no moving walls and no exterior work. | $20,000 |
| Feb 22, 2024 | Completed final sign-off Jul 2024 | 2211 15th St | B-Side Inc. | kitchen and bathroom remodeling. no moving walls and no exterior work.Details
kitchen and bathroom remodeling. no moving walls and no exterior work. | $20,000 |
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 655 Stockton St | B-Side Inc. | to comply with complaint # 202312321: unit #106: bathroom remodel. kitchen remodel. no moving walls. no exterior work.Details
to comply with complaint # 202312321: unit #106: bathroom remodel. kitchen remodel. no moving walls. no exterior work. | $20,000 |
| Sep 13, 2023 | Completed final sign-off Dec 2024 | 342 Edna St | B-Side Inc. | convert the basement into habitable space, approx. 400 sq.ft. add new office room, full bathroom and interior stairs. replace damaged concrete foundation in kind at the south elevation. add new posts and beams.Details
convert the basement into habitable space, approx. 400 sq.ft. add new office room, full bathroom and interior stairs. replace damaged concrete foundation in kind at the south elevation. add new posts and beams. | $125,000 |
| Sep 7, 2023 | Expired or cancelled cancelled May 2024 | 781 Ofarrell St | B-Side Inc. | unit #304: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #304: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $77,000 |
| Sep 5, 2023 | Completed final sign-off Sep 2023 | 346 Leavenworth St | B-Side Inc. | #202: bathroom remodel. drain line repair including tub and shower, mixing valve in relation to nov #202303945 item #2.work at tile and shower surround only.Details
#202: bathroom remodel. drain line repair including tub and shower, mixing valve in relation to nov #202303945 item #2.work at tile and shower surround only. | $5,000 |
| Aug 2, 2023 | Completed final sign-off Dec 2023 | 990 Fulton St | B-Side Inc. | unit 502: covert (e) kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 502: covert (e) kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $60,000 |
| Aug 1, 2023 | Completed final sign-off Mar 2024 | 2275 Broadway | B-Side Inc. | unit 701: remodel (e) office, rehbilitate (e) kitchen, rehbilitate (e) 3 bathrooms, install washer/dryerDetails
unit 701: remodel (e) office, rehbilitate (e) kitchen, rehbilitate (e) 3 bathrooms, install washer/dryer | $60,000 |
| Jun 21, 2023 | Completed final sign-off Oct 2023 | 57 Taylor St | B-Side Inc. | unit# 120: remodeling (e) one kitchen. remodeling (e) one bathroom. no moving walls. no exterior work.Details
unit# 120: remodeling (e) one kitchen. remodeling (e) one bathroom. no moving walls. no exterior work. | $15,000 |
| Apr 26, 2023 | Expired or cancelled withdrawn May 2024 | 1355 Lombard St | B-Side Inc. | 2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units.Details
2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units. | $2,000 |
| Apr 25, 2023 | Completed final sign-off Aug 2023 | 1050 Post St | B-Side Inc. | unit 26: remodel one (e) kitchen and one (e) bathroom. no demo wallsDetails
unit 26: remodel one (e) kitchen and one (e) bathroom. no demo walls | $15,000 |
| Feb 7, 2023 | Completed final sign-off May 2023 | 60 Cumberland St | B-Side Inc. | bathroom renovation. no moving walls. approx 56 sqftDetails
bathroom renovation. no moving walls. approx 56 sqft | $15,000 |
| Jan 23, 2023 | Completed final sign-off Aug 2023 | 650 Ellis St | B-Side Inc. | unit 5 - convert (e) living room to bedroom; rehab (e) kitchen and bathroom; install washer and dryerDetails
unit 5 - convert (e) living room to bedroom; rehab (e) kitchen and bathroom; install washer and dryer | $35,000 |
| Jan 23, 2023 | Completed final sign-off Nov 2023 | 1495 07th Av | B-Side Inc. | unit 7: convert existing kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer.Details
unit 7: convert existing kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. | $35,000 |
| Jan 23, 2023 | Completed final sign-off Aug 2023 | 990 Geary St | B-Side Inc. | unit #103. 1) convert existing office to bedroom. 2) rehab existing kitchen. 3) rehab existing bathroom. 3) replace existing washer & dryer.Details
unit #103. 1) convert existing office to bedroom. 2) rehab existing kitchen. 3) rehab existing bathroom. 3) replace existing washer & dryer. | $40,000 |
| Jan 17, 2023 | Completed final sign-off Jul 2023 | 1700 Bush St | B-Side Inc. | unit #16: install one washer dryer in kitchen. no moving walls no exterior work. (ventless dryer)Details
unit #16: install one washer dryer in kitchen. no moving walls no exterior work. (ventless dryer) | $7,000 |
| Dec 30, 2022 | Completed final sign-off Nov 2023 | 812 32nd Av | B-Side Inc., Great Ocean Construction Inc | 1) unit 812 only: new staircase to connect garage/2/f.upgrade (e) electrical by adding led recesesed lights to 1/f-2/f. add ev charger.Details
1) unit 812 only: new staircase to connect garage/2/f.upgrade (e) electrical by adding led recesesed lights to 1/f-2/f. add ev charger. | $60,000 |
| Dec 29, 2022 | Completed final sign-off Apr 2023 | 1130 Larkin St | B-Side Inc. | unit #4: install one new clothes washer & dryer. no wall demo.Details
unit #4: install one new clothes washer & dryer. no wall demo. | $4,000 |
| Dec 29, 2022 | Completed final sign-off Jul 2023 | 605 Jones St | B-Side Inc. | 4th flr - unit #31: rehabilitate existing kitchen and bathroom. install washer/gas dryer. partially sprinklered building.Details
4th flr - unit #31: rehabilitate existing kitchen and bathroom. install washer/gas dryer. partially sprinklered building. | $22,000 |
| Dec 19, 2022 | Completed final sign-off Feb 2023 | 57 Taylor St | B-Side Inc. | unit 200: remodeling existing: (1) kitchen in kind, (1) bathroom in kind. no moving walls no exterior workDetails
unit 200: remodeling existing: (1) kitchen in kind, (1) bathroom in kind. no moving walls no exterior work | $15,000 |
| Dec 12, 2022 | Completed final sign-off Aug 2025 | 87 Warren Dr | B-Side Inc. | to comply w/nov # 202296663. kitchen and bathroom rehab in kind.Details
to comply w/nov # 202296663. kitchen and bathroom rehab in kind. | $25,000 |
| Dec 8, 2022 | Expired or cancelled cancelled May 2023 | 350 Judah St | B-Side Inc. | unit #106: remodeling existing (1) kitchen. remodeling existing (1) bathroom. install washer/dryer. no mvoing walls, no exterior work.Details
unit #106: remodeling existing (1) kitchen. remodeling existing (1) bathroom. install washer/dryer. no mvoing walls, no exterior work. | $15,000 |
| Dec 6, 2022 | Never finaled issued Dec 2022, no final | 57 Taylor St | B-Side Inc. | unit# 138: remodeling (e) kitchen and bathroom. no removing walls. no exterior work.Details
unit# 138: remodeling (e) kitchen and bathroom. no removing walls. no exterior work. | $15,000 |
| Dec 5, 2022 | Completed final sign-off Dec 2022 | 208 Noe St | B-Side Inc. | add 2 skylights to roof. ref pa 201801118370.Details
add 2 skylights to roof. ref pa 201801118370. | |
| Dec 5, 2022 | Completed final sign-off May 2023 | 684 08th Av | B-Side Inc. | remove "new juliet balacony" from the scope of work. ref pa 202111233000.Details
remove "new juliet balacony" from the scope of work. ref pa 202111233000. | |
| Nov 30, 2022 | Completed final sign-off May 2023 | 916 Pacific Av | B-Side Inc. | unit 2: rehabilitate (e) kitchen and bathroom. install washer and dryer.Details
unit 2: rehabilitate (e) kitchen and bathroom. install washer and dryer. | $24,000 |
| Nov 29, 2022 | Never finaled issued Sep 2023, no final | 5285 Diamond Heights Bl | B-Side Inc. | add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposedDetails
add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposed | $30,000 |