Permit GraphShortlistSan Francisco building permits since 2000

Alex Kuznetsov

License
821091
State contractor license record
Listed as
authorized agent-others, contractor, pmt consultant/expediter
Firm
B-Side Inc.
Based in
Oakland
On San Francisco permits
Sep 2007 to Sep 2026

953 permits since 2000 (contractor on 951 permits, authorized agent-others on 41 permits, pmt consultant/expediter on 2 permits): 576 completed, 27 in progress, 298 never finaled, 52 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

Showing the 100 most recent of 953.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 30, 2026In progress
filed Sep 2026, not yet issued
555 Pacific AvB-Side Inc.core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitions
Details
Permit
202609308797
Status
filed
Filed
Sep 30, 2026
Declared cost
$200,000
Address
555 Pacific Av

core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitions

Open the permit page

$200,000
Sep 17, 2026In progress
filed Sep 2026, not yet issued
2209 15th StB-Side Inc.basement: convert (e) storage/workshop on basement lievel into a 993sf unit with bedrooms, bathrooms, living room and kitchen. no stutural or exterior work.
Details
Permit
202609178286
Status
triage
Filed
Sep 17, 2026
Declared cost
$160,000
Address
2209 15th St

basement: convert (e) storage/workshop on basement lievel into a 993sf unit with bedrooms, bathrooms, living room and kitchen. no stutural or exterior work.

Open the permit page

$160,000
Sep 14, 2026In progress
issued Oct 2026
3401 Clay StB-Side Inc.kitchen (91sf) and bath (50sf) remodel. addition of washer and dryer
Details
Permit
202609148052
Status
issued
Filed
Sep 14, 2026
Permit issued
Oct 1, 2026
Declared cost
$65,000
Address
3401 Clay St

kitchen (91sf) and bath (50sf) remodel. addition of washer and dryer

Open the permit page

$65,000
Sep 4, 2026In progress
issued Sep 2026
691 Post StB-Side Inc.unit 205: to comply to nov 202538002: kitchen and bathroom remodel like for like. no tub to shower conversion.
Details
Permit
202609047711
Status
issued
Filed
Sep 4, 2026
Permit issued
Sep 4, 2026
Declared cost
$12,500
Address
691 Post St

unit 205: to comply to nov 202538002: kitchen and bathroom remodel like for like. no tub to shower conversion.

Open the permit page

$12,500
Aug 31, 2026In progress
filed Aug 2026, not yet issued
1747 32nd AvB-Side Inc.new second floor deck and stair addition at the rear yard of the property.
Details
Permit
202608317415
Status
filed
Filed
Aug 31, 2026
Declared cost
$45,000
Address
1747 32nd Av

new second floor deck and stair addition at the rear yard of the property.

Open the permit page

$45,000
Jun 12, 2026Completed
final sign-off Jul 2026
1937 Page StB-Side Inc.unit 3: replace cabinets in kitchen and replace vanity in bathroom all like for like , full paint walls in bedrooms. update electrical and plumbing in kitchen and bathroom.
Details
Permit
202606123095
Status
complete
Filed
Jun 12, 2026
Permit issued
Jun 12, 2026
Final sign-off
Jul 9, 2026
Declared cost
$15,000
Address
1937 Page St

unit 3: replace cabinets in kitchen and replace vanity in bathroom all like for like , full paint walls in bedrooms. update electrical and plumbing in kitchen and bathroom.

Open the permit page

$15,000
Jun 3, 2026In progress
issued Jun 2026
1747 32nd AvB-Side Inc.remodel of two story single family house, including conversion of unconditoned ground floor to habitable space and remodel of the 2nd fl. the scope does not purpose any structural changes. no changes to roof or skylight.
Details
Permit
202606032435
Status
issued
Filed
Jun 3, 2026
Permit issued
Jun 24, 2026
Declared cost
$45,000
Address
1747 32nd Av

remodel of two story single family house, including conversion of unconditoned ground floor to habitable space and remodel of the 2nd fl. the scope does not purpose any structural changes. no changes to roof or skylight.

Open the permit page

$45,000
May 19, 2026Completed
final sign-off Jun 2026
2211 Fillmore StB-Side Inc.install new motion sensor lights at back stairs, reinforce side steps, fix (2) siding below deck, reinforce all back stairs. repair in kind deck, <50% all work in back of bldg.
Details
Permit
202605191504
Status
complete
Filed
May 19, 2026
Permit issued
May 19, 2026
Final sign-off
Jun 16, 2026
Declared cost
$5,000
Address
2211 Fillmore St

install new motion sensor lights at back stairs, reinforce side steps, fix (2) siding below deck, reinforce all back stairs. repair in kind deck, <50% all work in back of bldg.

Open the permit page

$5,000
May 4, 2026In progress
issued Aug 2026
40 Gold StB-Side Inc.replacement of (e) front entry doors, and minor interior tenant improvement work on the ground floor.
Details
Permit
202605040623
Status
issued
Filed
May 4, 2026
Permit issued
Aug 14, 2026
Declared cost
$48,300
Address
40 Gold St

replacement of (e) front entry doors, and minor interior tenant improvement work on the ground floor.

Open the permit page

$48,300
Apr 30, 2026Completed
final sign-off Jun 2026
3864 California StB-Side Inc.unit #1: replace damaged kitchen cabinets and counter bathroom new fixtures like kind
Details
Permit
202604300378
Status
complete
Filed
Apr 30, 2026
Permit issued
Apr 30, 2026
Final sign-off
Jun 26, 2026
Declared cost
$15,000
Address
3864 California St

unit #1: replace damaged kitchen cabinets and counter bathroom new fixtures like kind

Open the permit page

$15,000
Apr 30, 2026Completed
final sign-off Jun 2026
3864 California StB-Side Inc.unit #3: replace damaged kitchen cabinets and counter bathroom new fixtures like kind
Details
Permit
202604300379
Status
complete
Filed
Apr 30, 2026
Permit issued
Apr 30, 2026
Final sign-off
Jun 26, 2026
Declared cost
$15,000
Address
3864 California St

unit #3: replace damaged kitchen cabinets and counter bathroom new fixtures like kind

Open the permit page

$15,000
Apr 27, 2026In progress
issued Apr 2026
1747 32nd AvB-Side Inc.demo of interior wall finishes in living room and bedrooms. replace sheet rock in kind with 5/8" type x. approx 1000 sq ft. no wall removal.
Details
Permit
202604270118
Status
issued
Filed
Apr 27, 2026
Permit issued
Apr 27, 2026
Declared cost
$10,000
Address
1747 32nd Av

demo of interior wall finishes in living room and bedrooms. replace sheet rock in kind with 5/8" type x. approx 1000 sq ft. no wall removal.

Open the permit page

$10,000
Apr 21, 2026Completed
final sign-off Aug 2026
2901 Folsom StB-Side Inc.to comply with bid nov #202649099 and his nov #201880271, item#2. replacement in-kind of the existing exterior staircase with a new reinforced concrete structure within the existing footprint.
Details
Permit
202604219771
Status
complete
Filed
Apr 21, 2026
Permit issued
May 19, 2026
Final sign-off
Aug 12, 2026
Declared cost
$8,000
Address
2901 Folsom St

to comply with bid nov #202649099 and his nov #201880271, item#2. replacement in-kind of the existing exterior staircase with a new reinforced concrete structure within the existing footprint.

Open the permit page

$8,000
Apr 20, 2026In progress
issued Jul 2026
2459 Larkin StB-Side Inc.unit c: 1) rehabilitate existing kitchen, 2) rehabilitate existing bathroom, 3) install washer and dryer. 4) no removal of structural walls. 5. change out windows @ greenwich st to eero windows.
Details
Permit
202604209738
Status
issued
Filed
Apr 20, 2026
Permit issued
Jul 14, 2026
Declared cost
$69,000
Address
2459 Larkin St

unit c: 1) rehabilitate existing kitchen, 2) rehabilitate existing bathroom, 3) install washer and dryer. 4) no removal of structural walls. 5. change out windows @ greenwich st to eero windows.

Open the permit page

$69,000
Mar 31, 2026In progress
issued Mar 2026
150 32nd AvB-Side Inc.kitchen remodel in kind to address complaint #202541760.
Details
Permit
202603318558
Status
issued
Filed
Mar 31, 2026
Permit issued
Mar 31, 2026
Declared cost
$15,000
Address
150 32nd Av

kitchen remodel in kind to address complaint #202541760.

Open the permit page

$15,000
Jan 20, 2026Completed
final sign-off Mar 2026
2514 Sacramento StB-Side Inc.unit d: remove molded drywall and replace drywall in bedroom closet. to comply with complaint # 202649257.
Details
Permit
202601204105
Status
complete
Filed
Jan 20, 2026
Permit issued
Jan 20, 2026
Final sign-off
Mar 3, 2026
Declared cost
$2,000
Address
2514 Sacramento St

unit d: remove molded drywall and replace drywall in bedroom closet. to comply with complaint # 202649257.

Open the permit page

$2,000
Jan 12, 2026Expired or cancelled
cancelled Feb 2026
2514 Sacramento StB-Side Inc.remove molded drywall and replace drywall in bedroom closet in unit# b only.
Details
Permit
202601123635
Status
cancelled
Filed
Jan 12, 2026
Permit issued
Jan 12, 2026
Declared cost
$2,500
Address
2514 Sacramento St

remove molded drywall and replace drywall in bedroom closet in unit# b only.

Open the permit page

$2,500
Jan 5, 2026Completed
final sign-off Jan 2026
350 Judah StB-Side Inc.unit 402: replace 10 windows street facing, wood for wood, intergraded lugs at upper sash.
Details
Permit
202601053249
Status
complete
Filed
Jan 5, 2026
Permit issued
Jan 5, 2026
Final sign-off
Jan 21, 2026
Declared cost
$13,500
Address
350 Judah St

unit 402: replace 10 windows street facing, wood for wood, intergraded lugs at upper sash.

Open the permit page

$13,500
Dec 19, 2025In progress
issued Dec 2025
891 28th AvB-Side Inc.open up drywall in the ceiling in the apartment to install a water line and gas line. repair in-kind. new water mater. new gas meter.
Details
Permit
202512192332
Status
issued
Filed
Dec 19, 2025
Permit issued
Dec 19, 2025
Declared cost
$8,000
Address
891 28th Av

open up drywall in the ceiling in the apartment to install a water line and gas line. repair in-kind. new water mater. new gas meter.

Open the permit page

$8,000
Nov 20, 2025Completed
final sign-off Dec 2025
1625 Leavenworth StB-Side Inc.unit #304: kitchen and bathroom remodel like for like
Details
Permit
202511200066
Status
complete
Filed
Nov 20, 2025
Permit issued
Nov 20, 2025
Final sign-off
Dec 23, 2025
Declared cost
$25,000
Address
1625 Leavenworth St

unit #304: kitchen and bathroom remodel like for like

Open the permit page

$25,000
Nov 20, 2025Completed
final sign-off Dec 2025
2260 Market StB-Side Inc.install galvanized sheet metal in garbage room to comly with his nov 201804581 #2.
Details
Permit
202511200099
Status
complete
Filed
Nov 20, 2025
Permit issued
Nov 20, 2025
Final sign-off
Dec 4, 2025
Declared cost
$2,000
Address
2260 Market St

install galvanized sheet metal in garbage room to comly with his nov 201804581 #2.

Open the permit page

$2,000
Nov 10, 2025Completed
final sign-off Aug 2026
3440 20th StB-Side Inc.common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910
Details
Permit
202511109275
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 10, 2025
Final sign-off
Aug 12, 2026
Declared cost
$5,000
Address
3440 20th St

common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910

Open the permit page

$5,000
Nov 10, 2025Completed
final sign-off Feb 2026
900 Broderick StB-Side Inc.windows replacement in apts 2, 3, 4, 5, 6, 7 , 8, 9, 10, 11, & 14. total of 60 windows.
Details
Permit
202511109317
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 12, 2025
Final sign-off
Feb 4, 2026
Declared cost
$50,000
Address
900 Broderick St

windows replacement in apts 2, 3, 4, 5, 6, 7 , 8, 9, 10, 11, & 14. total of 60 windows.

Open the permit page

$50,000
Oct 2, 2025Completed
final sign-off Apr 2026
534 Pacific AvB-Side Inc.revision to 202412106465 1/f: interior t.i consisting of new interior partitions and finishes in a vacant bldg. 2/f: int. t.i consisting new interior partitions and finishes. addition of a new restrm and breakrm, utilizing (e) plumbing stubouts provided under 202412106465
Details
Permit
202510026613
Status
complete
Filed
Oct 2, 2025
Permit issued
Oct 20, 2025
Final sign-off
Apr 7, 2026
Declared cost
$20,000
Address
534 Pacific Av

revision to 202412106465 1/f: interior t.i consisting of new interior partitions and finishes in a vacant bldg. 2/f: int. t.i consisting new interior partitions and finishes. addition of a new restrm and breakrm, utilizing (e) plumbing stubouts provided under 202412106465

Open the permit page

$20,000
Sep 26, 2025Completed
final sign-off Oct 2025
2211 Fillmore StB-Side Inc.check, remove, and replace rotted wood under the deck and support post, back of building, non street visible, like for like repair. less than 50% repair.
Details
Permit
202509266192
Status
complete
Filed
Sep 26, 2025
Permit issued
Sep 26, 2025
Final sign-off
Oct 7, 2025
Declared cost
$2,000
Address
2211 Fillmore St

check, remove, and replace rotted wood under the deck and support post, back of building, non street visible, like for like repair. less than 50% repair.

Open the permit page

$2,000
Sep 24, 2025Completed
final sign-off Apr 2026
2955 Van Ness AvB-Side Inc.unit #8. 1. convert existing kitchen to study. 2. relocate kitchen. 3. rehab existing bathroom. 4. install washer and dryer.
Details
Permit
202509246016
Status
complete
Filed
Sep 24, 2025
Permit issued
Oct 17, 2025
Final sign-off
Apr 15, 2026
Declared cost
$63,000
Address
2955 Van Ness Av

unit #8. 1. convert existing kitchen to study. 2. relocate kitchen. 3. rehab existing bathroom. 4. install washer and dryer.

Open the permit page

$63,000
Sep 18, 2025Completed
final sign-off Sep 2025
71 Manor DrB-Side Inc.replace (19) windows in existing openings, u<=0.30. not visible from the street.
Details
Permit
202509185592
Status
complete
Filed
Sep 18, 2025
Permit issued
Sep 18, 2025
Final sign-off
Sep 26, 2025
Declared cost
$15,000
Address
71 Manor Dr

replace (19) windows in existing openings, u<=0.30. not visible from the street.

Open the permit page

$15,000
Sep 12, 2025Completed
final sign-off Oct 2025
57 Hotaling PlB-Side Inc.revise p/a 2025-0509-6177 to address field/construction conditions as requested by field inspector and associated with the structrual footing and detail at underside of door for support conect of beamstop at front of building.
Details
Permit
202509125241
Status
complete
Filed
Sep 12, 2025
Permit issued
Sep 16, 2025
Final sign-off
Oct 28, 2025
Declared cost
$15,000
Address
57 Hotaling Pl

revise p/a 2025-0509-6177 to address field/construction conditions as requested by field inspector and associated with the structrual footing and detail at underside of door for support conect of beamstop at front of building.

Open the permit page

$15,000
Sep 11, 2025In progress
issued Sep 2025
1997 Oak StB-Side Inc.unit #4- revision to pa# 202507251681: remove "install washer and dryer" from the description. existing closet - not touching any walls.
Details
Permit
202509115101
Status
issued
Filed
Sep 11, 2025
Permit issued
Sep 11, 2025
Address
1997 Oak St

unit #4- revision to pa# 202507251681: remove "install washer and dryer" from the description. existing closet - not touching any walls.

Open the permit page

Sep 3, 2025Completed
final sign-off Sep 2025
2211 Fillmore StB-Side Inc.rear stairs, less than 50%: secure the loose board on the stairs. replace and properly fasten the affected riser. install additional screws where needed to ensure stability and safety.
Details
Permit
202509034440
Status
complete
Filed
Sep 3, 2025
Permit issued
Sep 3, 2025
Final sign-off
Sep 11, 2025
Declared cost
$2,000
Address
2211 Fillmore St

rear stairs, less than 50%: secure the loose board on the stairs. replace and properly fasten the affected riser. install additional screws where needed to ensure stability and safety.

Open the permit page

$2,000
Aug 21, 2025In progress
issued Aug 2025
2211 Fillmore StB-Side Inc.permit is needed to abate complaint #202534302 (#3) and 202535892 (#11, #12) repair lights/ door knob in kind. repair damaged walls and ceiling inside unit. all work is interior.
Details
Permit
202508213613
Status
issued
Filed
Aug 21, 2025
Permit issued
Aug 21, 2025
Declared cost
$3,000
Address
2211 Fillmore St

permit is needed to abate complaint #202534302 (#3) and 202535892 (#11, #12) repair lights/ door knob in kind. repair damaged walls and ceiling inside unit. all work is interior.

Open the permit page

$3,000
Jul 25, 2025Completed
final sign-off Nov 2025
1997 Oak StB-Side Inc.unit 4. rehab existing kitchen. rehab existing bath. install washer and dryer. no structural work.
Details
Permit
202507251681
Status
complete
Filed
Jul 25, 2025
Permit issued
Sep 9, 2025
Final sign-off
Nov 20, 2025
Declared cost
$64,000
Address
1997 Oak St

unit 4. rehab existing kitchen. rehab existing bath. install washer and dryer. no structural work.

Open the permit page

$64,000
Jul 17, 2025In progress
issued Jul 2025
3868 California StB-Side Inc.revision to pa # 2025-0617-8839. update the address from 3864 to 3868 california st. same building, same block and lot
Details
Permit
202507171014
Status
issued
Filed
Jul 17, 2025
Permit issued
Jul 17, 2025
Address
3868 California St

revision to pa # 2025-0617-8839. update the address from 3864 to 3868 california st. same building, same block and lot

Open the permit page

Jul 9, 2025Completed
final sign-off Jul 2025
350 Judah StB-Side Inc.#302: replace 10 windows in kind. street facing. wood for wood with egee lugs at upper sash. u factor is less than or equal to 0.3
Details
Permit
202507090462
Status
complete
Filed
Jul 9, 2025
Permit issued
Jul 9, 2025
Final sign-off
Jul 17, 2025
Declared cost
$8,000
Address
350 Judah St

#302: replace 10 windows in kind. street facing. wood for wood with egee lugs at upper sash. u factor is less than or equal to 0.3

Open the permit page

$8,000
Jul 7, 2025Expired or cancelled
cancelled Jul 2025
350 Judah StB-Side Inc.replace 10 windows in kind.
Details
Permit
202507070237
Status
cancelled
Filed
Jul 7, 2025
Permit issued
Jul 7, 2025
Final sign-off
Jul 11, 2025
Declared cost
$10,000
Address
350 Judah St

replace 10 windows in kind.

Open the permit page

$10,000
Jul 7, 2025Completed
final sign-off Jul 2025
555 Buena Vista West AvB-Side Inc.close small parts of wall--30 sq. ft. over about 2 locations
Details
Permit
202507070282
Status
complete
Filed
Jul 7, 2025
Permit issued
Jul 7, 2025
Final sign-off
Jul 15, 2025
Declared cost
$2,000
Address
555 Buena Vista West Av

close small parts of wall--30 sq. ft. over about 2 locations

Open the permit page

$2,000
Jul 2, 2025In progress
issued Jul 2025
900 Marin StB-Side Inc.revision to pa#: 2025-0225-1012 to document revisions to structural steel framing revisions (wbx to wgx girder beams) and minor modifications to concrete footings supporting hss columns to accommodate existing field conditions.
Details
Permit
202507029985
Status
issued
Filed
Jul 2, 2025
Permit issued
Jul 2, 2025
Address
900 Marin St

revision to pa#: 2025-0225-1012 to document revisions to structural steel framing revisions (wbx to wgx girder beams) and minor modifications to concrete footings supporting hss columns to accommodate existing field conditions.

Open the permit page

Jun 17, 2025In progress
issued Jun 2025
2859 Octavia StB-Side Inc.unit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedrooms
Details
Permit
202506178860
Status
issued
Filed
Jun 17, 2025
Permit issued
Jun 17, 2025
Declared cost
$20,000
Address
2859 Octavia St

unit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedrooms

Open the permit page

$20,000
Jun 17, 2025In progress
issued Jun 2025
3864 California StB-Side Inc.unit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking
Details
Permit
202506178839
Status
issued
Filed
Jun 17, 2025
Permit issued
Jun 20, 2025
Declared cost
$20,000
Address
3864 California St

unit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking

Open the permit page

$20,000
Jun 12, 2025Completed
final sign-off Feb 2026
2211 Fillmore StB-Side Inc.revision to pa# 202506058064, re-route downspout to complaince of nov #202534302.
Details
Permit
202506128604
Status
complete
Filed
Jun 12, 2025
Permit issued
Jun 12, 2025
Final sign-off
Feb 9, 2026
Declared cost
$2,000
Address
2211 Fillmore St

revision to pa# 202506058064, re-route downspout to complaince of nov #202534302.

Open the permit page

$2,000
Jun 5, 2025Completed
final sign-off Jun 2025
2211 Fillmore StB-Side Inc.complaint #202534302 and 202535892. locate source of water intrussion, repair damaged wall and ceiling, repair deck/stairs, repair fence/gate
Details
Permit
202506058064
Status
complete
Filed
Jun 5, 2025
Permit issued
Jun 5, 2025
Final sign-off
Jun 16, 2025
Declared cost
$12,000
Address
2211 Fillmore St

complaint #202534302 and 202535892. locate source of water intrussion, repair damaged wall and ceiling, repair deck/stairs, repair fence/gate

Open the permit page

$12,000
May 27, 2025In progress
issued Sep 2025
900 Marin StB-Side Inc.add 3215 sq ft of viewing (1677 sqft gfa) mezzanine inside concert venue. provide (3) egress stair & accessible lift. sprinkler over mezz under separate permit # 2025-0225-1012 for steel/foundation support.
Details
Permit
202505277240
Status
issued
Filed
May 27, 2025
Permit issued
Sep 18, 2025
Declared cost
$126,000
Address
900 Marin St

add 3215 sq ft of viewing (1677 sqft gfa) mezzanine inside concert venue. provide (3) egress stair & accessible lift. sprinkler over mezz under separate permit # 2025-0225-1012 for steel/foundation support.

Open the permit page

$126,000
May 21, 2025In progress
issued Mar 2026
765 Bay StB-Side Inc.repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade.
Details
Permit
202503313401
Status
issued
Filed
May 21, 2025
Permit issued
Mar 2, 2026
Declared cost
$300,000
Address
765 Bay St

repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade.

Open the permit page

$300,000
May 15, 2025In progress
issued May 2025
3868 California StB-Side Inc.unit 5- exploratory for soft demo to remove drywall in bathroom and kitchen no wall removal or layout change. separate remodel permit to come in future.
Details
Permit
202505156586
Status
issued
Filed
May 15, 2025
Permit issued
May 15, 2025
Declared cost
$4,000
Address
3868 California St

unit 5- exploratory for soft demo to remove drywall in bathroom and kitchen no wall removal or layout change. separate remodel permit to come in future.

Open the permit page

$4,000
May 15, 2025In progress
issued May 2025
2859 Octavia StB-Side Inc.(front building) demo non bearing walls per ab-017 space to remain vacant until plans and ti in future.
Details
Permit
202505156529
Status
issued
Filed
May 15, 2025
Permit issued
May 15, 2025
Declared cost
$8,000
Address
2859 Octavia St

(front building) demo non bearing walls per ab-017 space to remain vacant until plans and ti in future.

Open the permit page

$8,000
May 9, 2025Completed
final sign-off Oct 2025
57 Hotaling PlB-Side Inc.alterations to existing entry door and addition of an ada ramp for accessible entry to the retail floor. an acoa approval record 2025-002600coa.
Details
Permit
202505096177
Status
complete
Filed
May 9, 2025
Permit issued
Aug 22, 2025
Final sign-off
Oct 28, 2025
Declared cost
$15,000
Address
57 Hotaling Pl

alterations to existing entry door and addition of an ada ramp for accessible entry to the retail floor. an acoa approval record 2025-002600coa.

Open the permit page

$15,000
Apr 17, 2025Completed
final sign-off May 2025
814 Bay StB-Side Inc.kitchen and bathroom remodel like for like/. no exterior work.
Details
Permit
202504174687
Status
complete
Filed
Apr 17, 2025
Permit issued
Apr 17, 2025
Final sign-off
May 29, 2025
Declared cost
$20,000
Address
814 Bay St

kitchen and bathroom remodel like for like/. no exterior work.

Open the permit page

$20,000
Apr 4, 2025Completed
final sign-off Sep 2025
71 Manor DrB-Side Inc.replace (1) window, windows at front stay existing, not visible from the street. u is 0.3
Details
Permit
202504043772
Status
complete
Filed
Apr 4, 2025
Permit issued
Apr 4, 2025
Final sign-off
Sep 17, 2025
Declared cost
$5,000
Address
71 Manor Dr

replace (1) window, windows at front stay existing, not visible from the street. u is 0.3

Open the permit page

$5,000
Apr 2, 2025Completed
final sign-off Mar 2026
534 Pacific AvB-Side Inc.tenant improvement mechanical sheets for pa 2024-1210-6465
Details
Permit
202504023523
Status
complete
Filed
Apr 2, 2025
Permit issued
Apr 4, 2025
Final sign-off
Mar 18, 2026
Declared cost
$15,000
Address
534 Pacific Av

tenant improvement mechanical sheets for pa 2024-1210-6465

Open the permit page

$15,000
Apr 1, 2025Completed
final sign-off Oct 2025
71 Manor DrB-Side Inc.revision to pa# 202410213358. interior remodel of basement and 1/f story. add new bathroom and 1 bedroom at 1/f
Details
Permit
202504013446
Status
complete
Filed
Apr 1, 2025
Permit issued
Apr 7, 2025
Final sign-off
Oct 3, 2025
Declared cost
$10,000
Address
71 Manor Dr

revision to pa# 202410213358. interior remodel of basement and 1/f story. add new bathroom and 1 bedroom at 1/f

Open the permit page

$10,000
Apr 1, 2025Completed
final sign-off Feb 2026
825 Post StB-Side Inc.unit# 116, #216 & #316 abate nov #20240756. rehabilitate and repair in kind fire damages at each unit. replace floor framing at unit #316 living room
Details
Permit
202504013499
Status
complete
Filed
Apr 1, 2025
Permit issued
Jun 3, 2025
Final sign-off
Feb 3, 2026
Declared cost
$400,000
Address
825 Post St

unit# 116, #216 & #316 abate nov #20240756. rehabilitate and repair in kind fire damages at each unit. replace floor framing at unit #316 living room

Open the permit page

$400,000
Mar 18, 2025In progress
issued Mar 2025
401 Haight StB-Side Inc.demo pony wall and cleaning for soft demo per ab-017. space to remain vacant prior to t.i. permit in future. no exterior work
Details
Permit
202503182465
Status
issued
Filed
Mar 18, 2025
Permit issued
Mar 18, 2025
Declared cost
$5,000
Address
401 Haight St

demo pony wall and cleaning for soft demo per ab-017. space to remain vacant prior to t.i. permit in future. no exterior work

Open the permit page

$5,000
Feb 25, 2025In progress
issued Apr 2025
900 Marin StB-Side Inc.new steel beams and columns and associated concrete footings associated with a future mezzanine awaiting dcp approval. no intermediate floor framing nor flooring proposed. no change in occupancy. architectural and floor framing under separate permit.
Details
Permit
202502251012
Status
issued
Filed
Feb 25, 2025
Permit issued
Apr 17, 2025
Declared cost
$89,000
Address
900 Marin St

new steel beams and columns and associated concrete footings associated with a future mezzanine awaiting dcp approval. no intermediate floor framing nor flooring proposed. no change in occupancy. architectural and floor framing under separate permit.

Open the permit page

$89,000
Feb 10, 2025Completed
final sign-off May 2025
2023 Folsom StB-Side Inc.unit #7: upgrade kitchen cabinets no moving/demo walls no exterior work. no change to appliances and fixtures.
Details
Permit
202502100019
Status
complete
Filed
Feb 10, 2025
Permit issued
Feb 10, 2025
Final sign-off
May 9, 2025
Declared cost
$10,000
Address
2023 Folsom St

unit #7: upgrade kitchen cabinets no moving/demo walls no exterior work. no change to appliances and fixtures.

Open the permit page

$10,000
Dec 11, 2024Completed
final sign-off Apr 2025
605 Jones StB-Side Inc.unit 33: rehabilitate e) kitchen & e) bathroom. no exterior work
Details
Permit
202412116602
Status
complete
Filed
Dec 11, 2024
Permit issued
Dec 17, 2024
Final sign-off
Apr 18, 2025
Declared cost
$66,000
Address
605 Jones St

unit 33: rehabilitate e) kitchen & e) bathroom. no exterior work

Open the permit page

$66,000
Dec 10, 2024Completed
final sign-off Mar 2026
536 Pacific AvB-Side Inc.g/f (536 pacific) non structural demo of interior walls restrooms & breakroom. remove barriers in e) vacant bldg for ada accessible entry & ada compliant restroom & accessible walkway to breakroom. 2nd/f (534 pacific) demo interior walls & stairs provide compliants stairs restrooms for future tenant
Details
Permit
202412106465
Status
complete
Filed
Dec 10, 2024
Permit issued
Jan 22, 2025
Final sign-off
Mar 18, 2026
Declared cost
$145,000
Address
536 Pacific Av

g/f (536 pacific) non structural demo of interior walls restrooms & breakroom. remove barriers in e) vacant bldg for ada accessible entry & ada compliant restroom & accessible walkway to breakroom. 2nd/f (534 pacific) demo interior walls & stairs provide compliants stairs restrooms for future tenant

Open the permit page

$145,000
Dec 2, 2024Completed
final sign-off Mar 2025
324 Waller StB-Side Inc.increase the scope of p/a 2024-1119-5312 to include a non-structural kitchen replacement project including cabinets and countertop like for like.
Details
Permit
202412025917
Status
complete
Filed
Dec 2, 2024
Permit issued
Dec 2, 2024
Final sign-off
Mar 10, 2025
Declared cost
$20,000
Address
324 Waller St

increase the scope of p/a 2024-1119-5312 to include a non-structural kitchen replacement project including cabinets and countertop like for like.

Open the permit page

$20,000
Nov 19, 2024Completed
final sign-off Sep 2025
324 Waller StB-Side Inc.remove non structural wall at kitchen 2nd fl unit,floor above the garage
Details
Permit
202411195312
Status
complete
Filed
Nov 19, 2024
Permit issued
Nov 19, 2024
Final sign-off
Sep 2, 2025
Declared cost
$20,000
Address
324 Waller St

remove non structural wall at kitchen 2nd fl unit,floor above the garage

Open the permit page

$20,000
Nov 19, 2024Completed
final sign-off May 2025
3864 California StB-Side Inc.unit 4; remove non structural wall. relocate the kitchen. to comply with nov# 202429274
Details
Permit
202411195281
Status
complete
Filed
Nov 19, 2024
Permit issued
Dec 10, 2024
Final sign-off
May 2, 2025
Declared cost
$30,000
Address
3864 California St

unit 4; remove non structural wall. relocate the kitchen. to comply with nov# 202429274

Open the permit page

$30,000
Oct 21, 2024Completed
final sign-off Oct 2025
71 Manor DrB-Side Inc.interior remodel of basement and 1st story of a house with upgrades to master bathroom, laundry room, and kitchen. no change to use or parking
Details
Permit
202410213358
Status
complete
Filed
Oct 21, 2024
Permit issued
Oct 31, 2024
Final sign-off
Oct 3, 2025
Declared cost
$25,000
Address
71 Manor Dr

interior remodel of basement and 1st story of a house with upgrades to master bathroom, laundry room, and kitchen. no change to use or parking

Open the permit page

$25,000
Oct 16, 2024Completed
final sign-off Dec 2024
2222 Leavenworth StB-Side Inc.unit #601: install one new clothes washer and dryer. no wall demo.
Details
Permit
202410163030
Status
complete
Filed
Oct 16, 2024
Permit issued
Oct 28, 2024
Final sign-off
Dec 10, 2024
Declared cost
$5,000
Address
2222 Leavenworth St

unit #601: install one new clothes washer and dryer. no wall demo.

Open the permit page

$5,000
Oct 2, 2024Completed
final sign-off Mar 2025
691 Post StB-Side Inc.unit# 503 - bathroom remodeling: kitchen remodeling: no movign walls. no exterior work, no w/d
Details
Permit
202410022152
Status
complete
Filed
Oct 2, 2024
Permit issued
Oct 2, 2024
Final sign-off
Mar 4, 2025
Declared cost
$64,315
Address
691 Post St

unit# 503 - bathroom remodeling: kitchen remodeling: no movign walls. no exterior work, no w/d

Open the permit page

$64,315
Sep 13, 2024Completed
final sign-off May 2025
3864 California StB-Side Inc.unit #4: kitchen remodeling no moving walls no exterior work.
Details
Permit
202409130756
Status
complete
Filed
Sep 13, 2024
Permit issued
Sep 13, 2024
Final sign-off
May 15, 2025
Declared cost
$18,000
Address
3864 California St

unit #4: kitchen remodeling no moving walls no exterior work.

Open the permit page

$18,000
Aug 1, 2024Completed
final sign-off Dec 2024
1578 Indiana StB-Side Inc.24 window replacement in kind including stucco repair.
Details
Permit
202408017735
Status
complete
Filed
Aug 1, 2024
Permit issued
Aug 1, 2024
Final sign-off
Dec 9, 2024
Declared cost
$45,000
Address
1578 Indiana St

24 window replacement in kind including stucco repair.

Open the permit page

$45,000
Jun 18, 2024Completed
final sign-off Mar 2026
534 Pacific AvB-Side Inc.demo interior none load bearing partitions. ab-017 applies
Details
Permit
202406184718
Status
complete
Filed
Jun 18, 2024
Permit issued
Jun 24, 2024
Final sign-off
Mar 18, 2026
Declared cost
$10,000
Address
534 Pacific Av

demo interior none load bearing partitions. ab-017 applies

Open the permit page

$10,000
Jun 13, 2024Completed
final sign-off Dec 2024
2219 15th StB-Side Inc.one kitchen and 2 bathroom remodeling. non strutural.
Details
Permit
202406134358
Status
complete
Filed
Jun 13, 2024
Permit issued
Jun 13, 2024
Final sign-off
Dec 10, 2024
Declared cost
$20,000
Address
2219 15th St

one kitchen and 2 bathroom remodeling. non strutural.

Open the permit page

$20,000
Jun 4, 2024Completed
final sign-off Oct 2024
2240 Larkin StB-Side Inc.#203: rehabilitate existing bathroom & kitchen. install washer & dryer
Details
Permit
202406043686
Status
complete
Filed
Jun 4, 2024
Permit issued
Jun 27, 2024
Final sign-off
Oct 23, 2024
Declared cost
$60,000
Address
2240 Larkin St

#203: rehabilitate existing bathroom & kitchen. install washer & dryer

Open the permit page

$60,000
Apr 19, 2024In progress
issued May 2024
900 Marin StB-Side Inc.revision to pa 202001162079 provide horizontal roll-up stair enclosure for roof deck. correctly identify (4) exterior doors (for egress) at illinois st exit. ref pa 202209222916
Details
Permit
202404190342
Status
issued
Filed
Apr 19, 2024
Permit issued
May 24, 2024
Address
900 Marin St

revision to pa 202001162079 provide horizontal roll-up stair enclosure for roof deck. correctly identify (4) exterior doors (for egress) at illinois st exit. ref pa 202209222916

Open the permit page

Apr 18, 2024Completed
final sign-off Jun 2025
66 Cleary CtB-Side Inc.remodeling 2 bathrooms, no moving walls, no exterior work.
Details
Permit
202404180204
Status
complete
Filed
Apr 18, 2024
Permit issued
Jun 18, 2024
Final sign-off
Jun 20, 2025
Declared cost
$10,000
Address
66 Cleary Ct

remodeling 2 bathrooms, no moving walls, no exterior work.

Open the permit page

$10,000
Apr 1, 2024In progress
issued Apr 2024
2209 15th StB-Side Inc.2209-2211 15th street: exterior deck repair and exterior stair repair/ replacement. less than 50% in kind replacement.
Details
Permit
202404019031
Status
issued
Filed
Apr 1, 2024
Permit issued
Apr 1, 2024
Declared cost
$10,000
Address
2209 15th St

2209-2211 15th street: exterior deck repair and exterior stair repair/ replacement. less than 50% in kind replacement.

Open the permit page

$10,000
Apr 1, 2024In progress
filed Apr 2024, not yet issued
2209 15th StB-Side Inc.removal of enclosed walls. in kind restoration and repair of rear deck
Details
Permit
202404019016
Status
filed
Filed
Apr 1, 2024
Declared cost
$10,000
Address
2209 15th St

removal of enclosed walls. in kind restoration and repair of rear deck

Open the permit page

$10,000
Mar 13, 2024Completed
final sign-off Mar 2024
2207 Fillmore StB-Side Inc.to comply with complaint 202319404 for dry rot repair and replacement of (e) rear exterior stairs & landings. less than 50%.
Details
Permit
202403137699
Status
complete
Filed
Mar 13, 2024
Permit issued
Mar 13, 2024
Final sign-off
Mar 28, 2024
Declared cost
$20,000
Address
2207 Fillmore St

to comply with complaint 202319404 for dry rot repair and replacement of (e) rear exterior stairs & landings. less than 50%.

Open the permit page

$20,000
Mar 11, 2024In progress
filed Mar 2024, not yet issued
2209 15th StB-Side Inc.remodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroom
Details
Permit
202403117516
Status
filed
Filed
Mar 11, 2024
Declared cost
$30,000
Address
2209 15th St

remodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroom

Open the permit page

$30,000
Feb 22, 2024Completed
final sign-off Jul 2024
2209 15th StB-Side Inc.kitchen and bathroom remodeling. no moving walls and no exterior work.
Details
Permit
202402226373
Status
complete
Filed
Feb 22, 2024
Permit issued
Feb 22, 2024
Final sign-off
Jul 24, 2024
Declared cost
$20,000
Address
2209 15th St

kitchen and bathroom remodeling. no moving walls and no exterior work.

Open the permit page

$20,000
Feb 22, 2024Completed
final sign-off Jul 2024
2211 15th StB-Side Inc.kitchen and bathroom remodeling. no moving walls and no exterior work.
Details
Permit
202402226375
Status
complete
Filed
Feb 22, 2024
Permit issued
Feb 22, 2024
Final sign-off
Jul 24, 2024
Declared cost
$20,000
Address
2211 15th St

kitchen and bathroom remodeling. no moving walls and no exterior work.

Open the permit page

$20,000
Nov 6, 2023Completed
final sign-off Feb 2024
655 Stockton StB-Side Inc.to comply with complaint # 202312321: unit #106: bathroom remodel. kitchen remodel. no moving walls. no exterior work.
Details
Permit
202311060206
Status
complete
Filed
Nov 6, 2023
Permit issued
Nov 6, 2023
Final sign-off
Feb 13, 2024
Declared cost
$20,000
Address
655 Stockton St

to comply with complaint # 202312321: unit #106: bathroom remodel. kitchen remodel. no moving walls. no exterior work.

Open the permit page

$20,000
Sep 13, 2023Completed
final sign-off Dec 2024
342 Edna StB-Side Inc.convert the basement into habitable space, approx. 400 sq.ft. add new office room, full bathroom and interior stairs. replace damaged concrete foundation in kind at the south elevation. add new posts and beams.
Details
Permit
202309136528
Status
complete
Filed
Sep 13, 2023
Permit issued
Dec 15, 2023
Final sign-off
Dec 4, 2024
Declared cost
$125,000
Address
342 Edna St

convert the basement into habitable space, approx. 400 sq.ft. add new office room, full bathroom and interior stairs. replace damaged concrete foundation in kind at the south elevation. add new posts and beams.

Open the permit page

$125,000
Sep 7, 2023Expired or cancelled
cancelled May 2024
781 Ofarrell StB-Side Inc.unit #304: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.
Details
Permit
202309076133
Status
cancelled
Filed
Sep 7, 2023
Permit issued
Oct 2, 2023
Declared cost
$77,000
Address
781 Ofarrell St

unit #304: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.

Open the permit page

$77,000
Sep 5, 2023Completed
final sign-off Sep 2023
346 Leavenworth StB-Side Inc.#202: bathroom remodel. drain line repair including tub and shower, mixing valve in relation to nov #202303945 item #2.work at tile and shower surround only.
Details
Permit
202309055914
Status
complete
Filed
Sep 5, 2023
Permit issued
Sep 5, 2023
Final sign-off
Sep 25, 2023
Declared cost
$5,000
Address
346 Leavenworth St

#202: bathroom remodel. drain line repair including tub and shower, mixing valve in relation to nov #202303945 item #2.work at tile and shower surround only.

Open the permit page

$5,000
Aug 2, 2023Completed
final sign-off Dec 2023
990 Fulton StB-Side Inc.unit 502: covert (e) kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.
Details
Permit
202308023582
Status
complete
Filed
Aug 2, 2023
Permit issued
Aug 15, 2023
Final sign-off
Dec 4, 2023
Declared cost
$60,000
Address
990 Fulton St

unit 502: covert (e) kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.

Open the permit page

$60,000
Aug 1, 2023Completed
final sign-off Mar 2024
2275 BroadwayB-Side Inc.unit 701: remodel (e) office, rehbilitate (e) kitchen, rehbilitate (e) 3 bathrooms, install washer/dryer
Details
Permit
202308013492
Status
complete
Filed
Aug 1, 2023
Permit issued
Aug 25, 2023
Final sign-off
Mar 15, 2024
Declared cost
$60,000
Address
2275 Broadway

unit 701: remodel (e) office, rehbilitate (e) kitchen, rehbilitate (e) 3 bathrooms, install washer/dryer

Open the permit page

$60,000
Jun 21, 2023Completed
final sign-off Oct 2023
57 Taylor StB-Side Inc.unit# 120: remodeling (e) one kitchen. remodeling (e) one bathroom. no moving walls. no exterior work.
Details
Permit
202306210534
Status
complete
Filed
Jun 21, 2023
Permit issued
Jun 21, 2023
Final sign-off
Oct 17, 2023
Declared cost
$15,000
Address
57 Taylor St

unit# 120: remodeling (e) one kitchen. remodeling (e) one bathroom. no moving walls. no exterior work.

Open the permit page

$15,000
Apr 26, 2023Expired or cancelled
withdrawn May 2024
1355 Lombard StB-Side Inc.2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units.
Details
Permit
202304266543
Status
withdrawn
Filed
Apr 26, 2023
Declared cost
$2,000
Address
1355 Lombard St

2/f unit #202:to comply w/ complaint #202304786, install electrical heaters in two bedrooms and living room. no demo of wood stud/ structure, only sheet rock removal at units.

Open the permit page

$2,000
Apr 25, 2023Completed
final sign-off Aug 2023
1050 Post StB-Side Inc.unit 26: remodel one (e) kitchen and one (e) bathroom. no demo walls
Details
Permit
202304256391
Status
complete
Filed
Apr 25, 2023
Permit issued
Apr 25, 2023
Final sign-off
Aug 7, 2023
Declared cost
$15,000
Address
1050 Post St

unit 26: remodel one (e) kitchen and one (e) bathroom. no demo walls

Open the permit page

$15,000
Feb 7, 2023Completed
final sign-off May 2023
60 Cumberland StB-Side Inc.bathroom renovation. no moving walls. approx 56 sqft
Details
Permit
202302071512
Status
complete
Filed
Feb 7, 2023
Permit issued
Feb 7, 2023
Final sign-off
May 4, 2023
Declared cost
$15,000
Address
60 Cumberland St

bathroom renovation. no moving walls. approx 56 sqft

Open the permit page

$15,000
Jan 23, 2023Completed
final sign-off Aug 2023
650 Ellis StB-Side Inc.unit 5 - convert (e) living room to bedroom; rehab (e) kitchen and bathroom; install washer and dryer
Details
Permit
202301230567
Status
complete
Filed
Jan 23, 2023
Permit issued
Jan 30, 2023
Final sign-off
Aug 8, 2023
Declared cost
$35,000
Address
650 Ellis St

unit 5 - convert (e) living room to bedroom; rehab (e) kitchen and bathroom; install washer and dryer

Open the permit page

$35,000
Jan 23, 2023Completed
final sign-off Nov 2023
1495 07th AvB-Side Inc.unit 7: convert existing kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer.
Details
Permit
202301230571
Status
complete
Filed
Jan 23, 2023
Permit issued
Mar 13, 2023
Final sign-off
Nov 16, 2023
Declared cost
$35,000
Address
1495 07th Av

unit 7: convert existing kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer.

Open the permit page

$35,000
Jan 23, 2023Completed
final sign-off Aug 2023
990 Geary StB-Side Inc.unit #103. 1) convert existing office to bedroom. 2) rehab existing kitchen. 3) rehab existing bathroom. 3) replace existing washer & dryer.
Details
Permit
202301230570
Status
complete
Filed
Jan 23, 2023
Permit issued
Jan 30, 2023
Final sign-off
Aug 2, 2023
Declared cost
$40,000
Address
990 Geary St

unit #103. 1) convert existing office to bedroom. 2) rehab existing kitchen. 3) rehab existing bathroom. 3) replace existing washer & dryer.

Open the permit page

$40,000
Jan 17, 2023Completed
final sign-off Jul 2023
1700 Bush StB-Side Inc.unit #16: install one washer dryer in kitchen. no moving walls no exterior work. (ventless dryer)
Details
Permit
202301170245
Status
complete
Filed
Jan 17, 2023
Permit issued
Jan 17, 2023
Final sign-off
Jul 11, 2023
Declared cost
$7,000
Address
1700 Bush St

unit #16: install one washer dryer in kitchen. no moving walls no exterior work. (ventless dryer)

Open the permit page

$7,000
Dec 30, 2022Completed
final sign-off Nov 2023
812 32nd AvB-Side Inc., Great Ocean Construction Inc1) unit 812 only: new staircase to connect garage/2/f.upgrade (e) electrical by adding led recesesed lights to 1/f-2/f. add ev charger.
Details
Permit
202212309532
Status
complete
Filed
Dec 30, 2022
Permit issued
Apr 27, 2023
Final sign-off
Nov 22, 2023
Declared cost
$60,000
Address
812 32nd Av

1) unit 812 only: new staircase to connect garage/2/f.upgrade (e) electrical by adding led recesesed lights to 1/f-2/f. add ev charger.

Open the permit page

$60,000
Dec 29, 2022Completed
final sign-off Apr 2023
1130 Larkin StB-Side Inc.unit #4: install one new clothes washer & dryer. no wall demo.
Details
Permit
202212299408
Status
complete
Filed
Dec 29, 2022
Permit issued
Jan 18, 2023
Final sign-off
Apr 5, 2023
Declared cost
$4,000
Address
1130 Larkin St

unit #4: install one new clothes washer & dryer. no wall demo.

Open the permit page

$4,000
Dec 29, 2022Completed
final sign-off Jul 2023
605 Jones StB-Side Inc.4th flr - unit #31: rehabilitate existing kitchen and bathroom. install washer/gas dryer. partially sprinklered building.
Details
Permit
202212299393
Status
complete
Filed
Dec 29, 2022
Permit issued
Jan 30, 2023
Final sign-off
Jul 6, 2023
Declared cost
$22,000
Address
605 Jones St

4th flr - unit #31: rehabilitate existing kitchen and bathroom. install washer/gas dryer. partially sprinklered building.

Open the permit page

$22,000
Dec 19, 2022Completed
final sign-off Feb 2023
57 Taylor StB-Side Inc.unit 200: remodeling existing: (1) kitchen in kind, (1) bathroom in kind. no moving walls no exterior work
Details
Permit
202212198639
Status
complete
Filed
Dec 19, 2022
Permit issued
Dec 19, 2022
Final sign-off
Feb 23, 2023
Declared cost
$15,000
Address
57 Taylor St

unit 200: remodeling existing: (1) kitchen in kind, (1) bathroom in kind. no moving walls no exterior work

Open the permit page

$15,000
Dec 12, 2022Completed
final sign-off Aug 2025
87 Warren DrB-Side Inc.to comply w/nov # 202296663. kitchen and bathroom rehab in kind.
Details
Permit
202212128081
Status
complete
Filed
Dec 12, 2022
Permit issued
Dec 12, 2022
Final sign-off
Aug 7, 2025
Declared cost
$25,000
Address
87 Warren Dr

to comply w/nov # 202296663. kitchen and bathroom rehab in kind.

Open the permit page

$25,000
Dec 8, 2022Expired or cancelled
cancelled May 2023
350 Judah StB-Side Inc.unit #106: remodeling existing (1) kitchen. remodeling existing (1) bathroom. install washer/dryer. no mvoing walls, no exterior work.
Details
Permit
202212087899
Status
cancelled
Filed
Dec 8, 2022
Permit issued
Dec 8, 2022
Declared cost
$15,000
Address
350 Judah St

unit #106: remodeling existing (1) kitchen. remodeling existing (1) bathroom. install washer/dryer. no mvoing walls, no exterior work.

Open the permit page

$15,000
Dec 6, 2022Never finaled
issued Dec 2022, no final
57 Taylor StB-Side Inc.unit# 138: remodeling (e) kitchen and bathroom. no removing walls. no exterior work.
Details
Permit
202212067768
Status
issued
Filed
Dec 6, 2022
Permit issued
Dec 6, 2022
Declared cost
$15,000
Address
57 Taylor St

unit# 138: remodeling (e) kitchen and bathroom. no removing walls. no exterior work.

Open the permit page

$15,000
Dec 5, 2022Completed
final sign-off Dec 2022
208 Noe StB-Side Inc.add 2 skylights to roof. ref pa 201801118370.
Details
Permit
202212057679
Status
complete
Filed
Dec 5, 2022
Permit issued
Dec 6, 2022
Final sign-off
Dec 30, 2022
Address
208 Noe St

add 2 skylights to roof. ref pa 201801118370.

Open the permit page

Dec 5, 2022Completed
final sign-off May 2023
684 08th AvB-Side Inc.remove "new juliet balacony" from the scope of work. ref pa 202111233000.
Details
Permit
202212057677
Status
complete
Filed
Dec 5, 2022
Permit issued
Feb 10, 2023
Final sign-off
May 3, 2023
Address
684 08th Av

remove "new juliet balacony" from the scope of work. ref pa 202111233000.

Open the permit page

Nov 30, 2022Completed
final sign-off May 2023
916 Pacific AvB-Side Inc.unit 2: rehabilitate (e) kitchen and bathroom. install washer and dryer.
Details
Permit
202211307417
Status
complete
Filed
Nov 30, 2022
Permit issued
Jan 11, 2023
Final sign-off
May 18, 2023
Declared cost
$24,000
Address
916 Pacific Av

unit 2: rehabilitate (e) kitchen and bathroom. install washer and dryer.

Open the permit page

$24,000
Nov 29, 2022Never finaled
issued Sep 2023, no final
5285 Diamond Heights BlB-Side Inc.add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposed
Details
Permit
202211297298
Status
issued
Filed
Nov 29, 2022
Permit issued
Sep 15, 2023
Declared cost
$30,000
Address
5285 Diamond Heights Bl

add exterior ada lift adjacent to diamond heights blvd sidewalk. no changes to sidewalk or public way proposed

Open the permit page

$30,000