Block 0256, lot 001
655 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 3
- Units
- 33
- Rooms
- 33 bathrooms
- Building
- 20,379 sq ft
- Lot
- 7,990 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 5, 2026 | Completed final sign-off Jun 2026 | 655 Stockton St | Brighter Bay Builders Inc | unit 304; remodel (e) 1 kitchen, remodel (e) bathroom, install washer/dryer.Details
unit 304; remodel (e) 1 kitchen, remodel (e) bathroom, install washer/dryer. | $38,000 |
| Nov 17, 2025 | Completed final sign-off Feb 2026 | 655 Stockton St | Halyard Inc | unit#111: bathroom remodel like for like.Details
unit#111: bathroom remodel like for like. | $10,000 |
| Oct 28, 2024 | Completed final sign-off Jul 2025 | 655 Stockton St | Halyard Inc | unit 305: new kitchen and bathroom remodeling. new washer and dryer. new dishwasher.Details
unit 305: new kitchen and bathroom remodeling. new washer and dryer. new dishwasher. | $30,000 |
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 655 Stockton St | B-Side Inc. | to comply with complaint # 202312321: unit #106: bathroom remodel. kitchen remodel. no moving walls. no exterior work.Details
to comply with complaint # 202312321: unit #106: bathroom remodel. kitchen remodel. no moving walls. no exterior work. | $20,000 |
| Mar 25, 2022 | Completed final sign-off Jul 2022 | 655 Stockton St | Axel8 Construction | unit 104: rehab (e) kitchen, (e) bahtroom, install washer/dryerDetails
unit 104: rehab (e) kitchen, (e) bahtroom, install washer/dryer | $40,000 |
| Nov 29, 2021 | Completed final sign-off May 2022 | 655 Stockton St | Axel8 Construction | apt #202: rehabilitate existing bathroom & kitchen. install washer & dryer.Details
apt #202: rehabilitate existing bathroom & kitchen. install washer & dryer. | $28,000 |
| Jun 15, 2021 | Never finaled issued Jun 2021, no final | 655 Stockton St | Caslez Construction Inc | #112: remodel existing kitchen. remodel existing bathroom.Details
#112: remodel existing kitchen. remodel existing bathroom. | $22,000 |
| Mar 12, 2021 | Completed final sign-off Jun 2022 | 655 Stockton St | Caslez Construction Inc | unit #308: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.Details
unit #308: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer. | $40,000 |
| Sep 11, 2020 | Completed final sign-off Jun 2021 | 655 Stockton St | Au Electric Corporation/Aec Alarms | this is an as-built fire plan revision to replace manurfacture cwsi(johnson controls) to notifirer (honeywell) please refer original approve fire plan #201910184911. upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa72.Details
this is an as-built fire plan revision to replace manurfacture cwsi(johnson controls) to notifirer (honeywell) please refer original approve fire plan #201910184911. upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa72. | |
| May 13, 2020 | Completed final sign-off Aug 2020 | 655 Stockton St | B-Side Inc. | apt 209: replce washer/dryer. upgrade line.Details
apt 209: replce washer/dryer. upgrade line. | $5,000 |
| Oct 18, 2019 | Completed final sign-off Jun 2021 | 655 Stockton St | Au Electric Corporation/Aec Alarms | upgrade e fire alarm to comply with sffc 1103.7.6.1 and nfpa 72.Details
upgrade e fire alarm to comply with sffc 1103.7.6.1 and nfpa 72. | $40,000 |
| Oct 11, 2017 | Never finaled issued Oct 2017, no final | 655 Stockton St | Hon's Construction Inc. | repair 2nd fl joist above lobby. n/a maher ordinanceDetails
repair 2nd fl joist above lobby. n/a maher ordinance | $10,000 |
| Dec 15, 2016 | Completed final sign-off Jun 2017 | 655 Stockton St | West Coast Premier Construction Inc | soft story retrofit of mulit unit aparment bld per sfbc soft story ord chapt 34b iebc 2012 maher naDetails
soft story retrofit of mulit unit aparment bld per sfbc soft story ord chapt 34b iebc 2012 maher na | $205,000 |
| Nov 9, 2016 | Completed final sign-off Mar 2017 | 655 Stockton St | J C Tan Builders | unit #310, 4th floor - remodel existing kitchen, remodel existing bathroom, add 2nd closet, add washer & dryer. n/a maher ordinanceDetails
unit #310, 4th floor - remodel existing kitchen, remodel existing bathroom, add 2nd closet, add washer & dryer. n/a maher ordinance | $30,000 |
| Oct 7, 2016 | Never finaled issued Oct 2016, no final | 655 Stockton St | street space | ||
| Sep 15, 2016 | Completed final sign-off Feb 2017 | 655 Stockton St | J C Tan Builders | remodel unit #206 at the third floor. remodel extg bathroom, remodel extg kitchen and add washer and dryerl. n/a for maher.Details
remodel unit #206 at the third floor. remodel extg bathroom, remodel extg kitchen and add washer and dryerl. n/a for maher. | $25,000 |
| Aug 31, 2016 | Expired or cancelled withdrawn Dec 2016 | 655 Stockton St | soft story seismic retrofit per sfbc chapter 34b. (n) pw shear walls w crawl space & (n) moment frame.per 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13Details
soft story seismic retrofit per sfbc chapter 34b. (n) pw shear walls w crawl space & (n) moment frame.per 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13 | $100,000 | |
| Aug 15, 2016 | Never finaled issued Aug 2016, no final | 655 Stockton St | street space permit | ||
| Jul 14, 2016 | Completed final sign-off Jan 2017 | 655 Stockton St | Liang's Remodeling Inc. | remodel unit 210, 3rd floor - remodel (e) bathroom, remodel (e) kitchen, add washer and dryer. n/a ordinance #155-13Details
remodel unit 210, 3rd floor - remodel (e) bathroom, remodel (e) kitchen, add washer and dryer. n/a ordinance #155-13 | $30,000 |
| Jul 1, 2016 | Never finaled issued Jul 2016, no final | 655 Stockton St | Build Group Inc. | supplemental steel framing to support floor slab and stairDetails
supplemental steel framing to support floor slab and stair | $23,000 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 655 Stockton St | street space | ||
| Oct 29, 2014 | Completed final sign-off Mar 2015 | 655 Stockton St | K G Builder | remodel unit #309: add laundry outlet, remove non-bearing wall, add new closet, remodel kitchen & remodel bathroom in kind; maher n/aDetails
remodel unit #309: add laundry outlet, remove non-bearing wall, add new closet, remodel kitchen & remodel bathroom in kind; maher n/a | $10,000 |
| Jun 21, 2013 | Never finaled issued Jun 2013, no final | 655 Stockton St | M M Bay Area Construction Inc | unit #109 remodel, add laundry outlet, remodel non-bearing partition walls, add on new closet, remodel of bathroom including new tiles, toilet and vanityDetails
unit #109 remodel, add laundry outlet, remodel non-bearing partition walls, add on new closet, remodel of bathroom including new tiles, toilet and vanity | $30,000 |
| Jun 21, 2013 | Completed final sign-off Apr 2014 | 655 Stockton St | M M Bay Area Construction Inc | unit #207: remodel unit, add laundry outlet, remove non bearing walls, relocating of kitchen fixtures and cabinets, remodeling of bathrm including new tiles, toilet & vanityDetails
unit #207: remodel unit, add laundry outlet, remove non bearing walls, relocating of kitchen fixtures and cabinets, remodeling of bathrm including new tiles, toilet & vanity | $30,000 |
| Mar 26, 2013 | Completed final sign-off Aug 2016 | 655 Stockton St | D3 Construction | remodel kitchen and bath, add washer and dryer, lighting to comply with cec 150(k) no change to windows, walls doors, work in unit 204 onlyDetails
remodel kitchen and bath, add washer and dryer, lighting to comply with cec 150(k) no change to windows, walls doors, work in unit 204 only | $18,000 |
| Dec 27, 2012 | Completed final sign-off Aug 2016 | 655 Stockton St | D3 Construction | work in unit 107: remodel kitchen and 1 bath. lighting to comply with cec 150(k). no change to window, walls and doors. electrical and plumbing work to be done under a separate permit.Details
work in unit 107: remodel kitchen and 1 bath. lighting to comply with cec 150(k). no change to window, walls and doors. electrical and plumbing work to be done under a separate permit. | $18,000 |
| Nov 13, 2012 | Completed final sign-off Aug 2016 | 655 Stockton St | D3 Construction | unit #306: remodel kitchen and bath, lighting to comply with cec 150(k); no change to window, walls and doors, replace in kind same location (elec & plumbing work to be done under a separate permitDetails
unit #306: remodel kitchen and bath, lighting to comply with cec 150(k); no change to window, walls and doors, replace in kind same location (elec & plumbing work to be done under a separate permit | $18,000 |
| Jun 5, 2012 | Completed final sign-off Jul 2012 | 655 Stockton St | D3 Construction | unit #311- remodel kitchen and bath, lighting to comply with cec150(k), no change to window, walls and doors.Details
unit #311- remodel kitchen and bath, lighting to comply with cec150(k), no change to window, walls and doors. | $18,000 |
| Apr 5, 2012 | Completed final sign-off Jun 2012 | 655 Stockton St | Universal Sign Company Inc | remove second of 2 existing 6x4 panel signs.Details
remove second of 2 existing 6x4 panel signs. | $600 |
| Apr 5, 2012 | Completed final sign-off Jun 2012 | 655 Stockton St | Universal Sign Company Inc | remove first of 2 existing 6x4 panel signs.Details
remove first of 2 existing 6x4 panel signs. | $600 |
| Jan 6, 2012 | Completed final sign-off Feb 2012 | 655 Stockton St | D3 Construction | remodel 1 kitchen & 1 bath. lighting to comply with cec 150(k). no changes to window, doors, walls. work in unit #110 only.Details
remodel 1 kitchen & 1 bath. lighting to comply with cec 150(k). no changes to window, doors, walls. work in unit #110 only. | $18,000 |
| Nov 28, 2011 | Completed final sign-off Jan 2012 | 655 Stockton St | D3 Construction | remodel kitchen and bath, lighting to comply with cec 150(k); no change to exhaust system, no change to windows, doors, walls, work in unit #201 onlyDetails
remodel kitchen and bath, lighting to comply with cec 150(k); no change to exhaust system, no change to windows, doors, walls, work in unit #201 only | $18,000 |
| Nov 8, 2011 | Completed final sign-off Jan 2012 | 655 Stockton St | D3 Construction | remodel kitchen & bath. lighting to comply w/ cec 150 (k). no change to exhaust system. no change to doors, windows, wall. work in unit#205 only. replace cabinet and counter top, re-tile kitchen, replace bath floor, replace toilet and fan. rerplace wall tile around bath tub.Details
remodel kitchen & bath. lighting to comply w/ cec 150 (k). no change to exhaust system. no change to doors, windows, wall. work in unit#205 only. replace cabinet and counter top, re-tile kitchen, replace bath floor, replace toilet and fan. rerplace wall tile around bath tub. | $18,000 |
| Aug 24, 2011 | Completed final sign-off Feb 2012 | 655 Stockton St | C Green Consulting Dba Anchway Property | unit # 101: bathroom / kitchen remodel unit # 101Details
unit # 101: bathroom / kitchen remodel unit # 101 | $18,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 655 Stockton St | D3 Construction | #108, #208 - remodel kitchen and bath. lighting to comply with cec150(k). no change to windows, walls & doors. no change to exhaust system. bath area is approx 5'x7'. kitchen is approx 6'x9'.Details
#108, #208 - remodel kitchen and bath. lighting to comply with cec150(k). no change to windows, walls & doors. no change to exhaust system. bath area is approx 5'x7'. kitchen is approx 6'x9'. | $25,000 |
| Jul 27, 2011 | Never finaled issued Aug 2011, no final | 655 Stockton St | C Green Consulting Dba Anchway Property | to comply with nov 200712880. removed (two) illegal bill boards.Details
to comply with nov 200712880. removed (two) illegal bill boards. | $2,000 |
| Jul 19, 2011 | Completed final sign-off Nov 2011 | 655 Stockton St | D3 Construction | remodel kitchen and bath unit 203, 301,303. repair dryrot damage and lighting to comply with cec 150 k. no change to windows, walls, and doors. no change to exhaust system.Details
remodel kitchen and bath unit 203, 301,303. repair dryrot damage and lighting to comply with cec 150 k. no change to windows, walls, and doors. no change to exhaust system. | $40,000 |
| Sep 18, 2007 | Never finaled issued Sep 2007, no final | 655 Stockton St | Sassoon Construction | #105- change cabinets tile in kitchen floors, change plumbing fixtures, tile in bathroom floor. no structural work. lighting to be fluorescent or on occupant sensor. 50% of wattage of kitchen lighting to be fluorescent.Details
#105- change cabinets tile in kitchen floors, change plumbing fixtures, tile in bathroom floor. no structural work. lighting to be fluorescent or on occupant sensor. 50% of wattage of kitchen lighting to be fluorescent. | $17,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D3 Construction (9), Au Electric Corporation/Aec Alarms (2), Axel8 Construction (2), B-Side Inc. (2), C Green Consulting Dba Anchway Property (2), Caslez Construction Inc (2), Halyard Inc (2), J C Tan Builders (2), M M Bay Area Construction Inc (2), Universal Sign Company Inc (2), Brighter Bay Builders Inc, Build Group Inc., Hon's Construction Inc., K G Builder, Liang's Remodeling Inc., Sassoon Construction, West Coast Premier Construction Inc
- Architects
- Jacob Herczeg
- Engineers
- Joe Win Kon (2), Homy Sikaroudi, Jefferson Chen, Joe Kon, Steve Dejesse
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.