Block 0279, lot 011B
1130 Larkin St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 4
- Units
- 31
- Rooms
- 31 bathrooms
- Building
- 18,302 sq ft
- Lot
- 6,875 sq ft
- Zoning
- POLK
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
42 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2023 | Completed final sign-off Jan 2024 | 1130 Larkin St | Axel8 Construction | unit #5: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #5: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $30,000 |
| Dec 29, 2022 | Completed final sign-off Apr 2023 | 1130 Larkin St | B-Side Inc. | unit #4: install one new clothes washer & dryer. no wall demo.Details
unit #4: install one new clothes washer & dryer. no wall demo. | $4,000 |
| Dec 28, 2022 | Completed final sign-off Jul 2023 | 1130 Larkin St | U S Prime Contractor Inc | concrete repair on rear facade, north and south facade.Details
concrete repair on rear facade, north and south facade. | $20,000 |
| Oct 17, 2022 | Completed final sign-off Feb 2023 | 1130 Larkin St | B-Side Inc. | unit 22 3rd flr: install 1 new clothes washer and elec dryer. no wall demoDetails
unit 22 3rd flr: install 1 new clothes washer and elec dryer. no wall demo | $5,000 |
| Jul 1, 2022 | Completed final sign-off Nov 2022 | 1130 Larkin St | Au Electric Corporation/Aec Alarms | replace existing facu with a new fa system to comply with sffc 1103.7.6.1 by installing new wireless low freq. sounders in all sleeping areas and replace like for like devices for existing smoke detectors, horn/strobes and pull stations in common areas.Details
replace existing facu with a new fa system to comply with sffc 1103.7.6.1 by installing new wireless low freq. sounders in all sleeping areas and replace like for like devices for existing smoke detectors, horn/strobes and pull stations in common areas. | $45,000 |
| Feb 11, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | unit 32: rehab existing kitchen and bathroom. install washer/dryer.Details
unit 32: rehab existing kitchen and bathroom. install washer/dryer. | $25,000 |
| Feb 10, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | unit #35: convert (e) kitchen to bedroom; relocate kitchen; rehabilitate (e) bathroom; install washer/dryerDetails
unit #35: convert (e) kitchen to bedroom; relocate kitchen; rehabilitate (e) bathroom; install washer/dryer | $32,000 |
| Feb 10, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | apt 46. rehab (e) kitchen, rehab (e) bathroom, install washer/dryer.Details
apt 46. rehab (e) kitchen, rehab (e) bathroom, install washer/dryer. | $22,000 |
| Jan 11, 2022 | Completed final sign-off May 2022 | 1130 Larkin St | Axel8 Construction | unit 41 - convert (e) kitchen to bedroom; relocate kitchn; rehabilitate (e) bathroom; install washer/dryerDetails
unit 41 - convert (e) kitchen to bedroom; relocate kitchn; rehabilitate (e) bathroom; install washer/dryer | $33,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | #1 unit convet (e) ktichen to study. relocate kitchen, rehab (e) bathroom. inst washer/dryer.Details
#1 unit convet (e) ktichen to study. relocate kitchen, rehab (e) bathroom. inst washer/dryer. | $32,000 |
| Jan 7, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | unit 34 - convert (e) kitchen to bedroom; relocate kitchen; rehab (e) bathroom; install washer & dryerDetails
unit 34 - convert (e) kitchen to bedroom; relocate kitchen; rehab (e) bathroom; install washer & dryer | $32,000 |
| Jan 7, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | unit 31 - convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom; install washer/dryerDetails
unit 31 - convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom; install washer/dryer | $32,000 |
| Jan 7, 2022 | Completed final sign-off Jul 2022 | 1130 Larkin St | unit 21 - convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom; install washer/dryerDetails
unit 21 - convert (e) kitchen to study, relocate kitchen, rehab (e) bathroom; install washer/dryer | $32,500 | |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | unit 24: convert (e) kitchen into bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryer.Details
unit 24: convert (e) kitchen into bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryer. | $32,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | unit #38: convert (e) kitchen to bedroom. rehab (e) bathroom. relocate kitchen. install washer + dryer.Details
unit #38: convert (e) kitchen to bedroom. rehab (e) bathroom. relocate kitchen. install washer + dryer. | $32,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 1130 Larkin St | Axel8 Construction | #48: convert extg kitchen to bedroom. relocate kitchen. rehab. extg bathroom. install washer and dryer.Details
#48: convert extg kitchen to bedroom. relocate kitchen. rehab. extg bathroom. install washer and dryer. | $32,000 |
| Jan 6, 2022 | Completed final sign-off Jul 2022 | 1130 Larkin St | Axel8 Construction | unit 33: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroon, install washer/dryerDetails
unit 33: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroon, install washer/dryer | $32,000 |
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 1130 Larkin St | street space w/mta | ||
| Aug 13, 2019 | Completed final sign-off Jun 2020 | 1130 Larkin St | West Coast Property Mgnt Co | apt# 27; kitchen remodeling: new cabinets, countertop & appliance, bath room remodel: remove & replace tub, vanity cabinet and toilet (no structural work)Details
apt# 27; kitchen remodeling: new cabinets, countertop & appliance, bath room remodel: remove & replace tub, vanity cabinet and toilet (no structural work) | $32,500 |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 1130 Larkin St | street space | ||
| Jan 16, 2019 | Completed final sign-off Jun 2019 | 1130 Larkin St | Bens Roofing Inc | re-roofingDetails
re-roofing | $56,950 |
| Oct 17, 2018 | Completed final sign-off May 2019 | 1130 Larkin St | West Coast Property Mgnt Co | unit 41 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no structural work. bath remodeling - remove and replace tub, shower fixture vanity cabinet. no change on (e) floor planDetails
unit 41 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no structural work. bath remodeling - remove and replace tub, shower fixture vanity cabinet. no change on (e) floor plan | $33,000 |
| Jun 14, 2018 | Never finaled issued Jun 2018, no final | 1130 Larkin St | street space | ||
| May 11, 2018 | Never finaled issued May 2018, no final | 1130 Larkin St | street space permit | ||
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 1130 Larkin St | West Coast Property Mgnt Co | apt 28 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no strutural work. bath remodl - remove & replace tub, shower fixture, vanity & flooringDetails
apt 28 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no strutural work. bath remodl - remove & replace tub, shower fixture, vanity & flooring | $33,000 |
| Dec 11, 2015 | Completed final sign-off Apr 2016 | 1130 Larkin St | West Coast Property Mgnt Co | apt. #31: kitchen remodeling . new cabinets, counter, floor tiles, and appliance. no structural or removal of walls.Details
apt. #31: kitchen remodeling . new cabinets, counter, floor tiles, and appliance. no structural or removal of walls. | $17,500 |
| May 15, 2014 | Never finaled issued May 2014, no final | 1130 Larkin St | West Coast Property Mgnt Co | unit#29 kitchen remodeling. new cabinets, counter top, floor tiles, sink & faucet. install kitchen fluorescent light fixts. no structural work. (e) water & drain line will remain. 50% high eficacy lighting.Details
unit#29 kitchen remodeling. new cabinets, counter top, floor tiles, sink & faucet. install kitchen fluorescent light fixts. no structural work. (e) water & drain line will remain. 50% high eficacy lighting. | $15,000 |
| Jan 3, 2014 | Completed final sign-off Mar 2014 | 1130 Larkin St | West Coast Property Mgnt Co | #37- kitchen remodeling: new cabinet, appliances, counter top, flooring, install fluorescent light fixtures, no structural work, existing drain line will remain. min. 50% total rated wattage of permanently installed lighting in kitchen shall be high efficacy.Details
#37- kitchen remodeling: new cabinet, appliances, counter top, flooring, install fluorescent light fixtures, no structural work, existing drain line will remain. min. 50% total rated wattage of permanently installed lighting in kitchen shall be high efficacy. | $17,000 |
| Nov 15, 2013 | Completed final sign-off Mar 2014 | 1130 Larkin St | West Coast Property Mgnt Co | unit 42 - kitchen remodel ; no structural work; to comply with cec150(k) 8Details
unit 42 - kitchen remodel ; no structural work; to comply with cec150(k) 8 | $12,000 |
| Jan 14, 2013 | Completed final sign-off Mar 2014 | 1130 Larkin St | West Coast Property Mgnt Co | unit #36-kitchen remodelling: new cabinets, countertop & applicances, install fluorescent light fixture to comply with title 24 & cec150(k)8. existing drain line to remain, no structural work, no wall relocation.Details
unit #36-kitchen remodelling: new cabinets, countertop & applicances, install fluorescent light fixture to comply with title 24 & cec150(k)8. existing drain line to remain, no structural work, no wall relocation. | $12,600 |
| Jun 8, 2012 | Completed final sign-off Aug 2012 | 1130 Larkin St | West Coast Property Mgnt Co | unit #6: kitchen remodeling 1) new cabinets, floor tiles, counter & appliances, 2) install new fluorescent light fixture to comply with t-24, reroute gas line and water line, existing drain line will remainDetails
unit #6: kitchen remodeling 1) new cabinets, floor tiles, counter & appliances, 2) install new fluorescent light fixture to comply with t-24, reroute gas line and water line, existing drain line will remain | $15,000 |
| Jun 8, 2012 | Expired or cancelled expired Aug 2012 | 1130 Larkin St | West Coast Property Mgnt Co | #34: kitchen remodeling: new cabinets, floor tiles, counter and appliances, install new fluorescent light fixture to comply with t-24, re-route gas & water line, existing drain line will remainDetails
#34: kitchen remodeling: new cabinets, floor tiles, counter and appliances, install new fluorescent light fixture to comply with t-24, re-route gas & water line, existing drain line will remain | $15,000 |
| Feb 24, 2012 | Completed final sign-off Apr 2012 | 1130 Larkin St | West Coast Property Mgnt Co | #47 - kitchen remodel: new cabinet, floor tiles, counter & appliances, install new fluorescent light fixture to comply with title 24. existing drain line will remain, no structural work.Details
#47 - kitchen remodel: new cabinet, floor tiles, counter & appliances, install new fluorescent light fixture to comply with title 24. existing drain line will remain, no structural work. | $15,000 |
| Feb 6, 2012 | Completed final sign-off Feb 2015 | 1130 Larkin St | to provide temporary shoring for work related to pa #2006.0829.0880. do not final this permit until foundation work is submitted under seperate addendum to site pa# 2006-0829-0880/s-r2Details
to provide temporary shoring for work related to pa #2006.0829.0880. do not final this permit until foundation work is submitted under seperate addendum to site pa# 2006-0829-0880/s-r2 | $18,500 | |
| Feb 7, 2011 | Completed final sign-off Apr 2011 | 1130 Larkin St | West Coast Property Mgnt Co | kitchen remodelling in unit #33: new cabinet, counter, sink & flooring. add new electrical sub panel in unit. install ceiling fluorescent light to comply with title 24. kitchen area approx. 72 sf. no structural work & no wall relocation.Details
kitchen remodelling in unit #33: new cabinet, counter, sink & flooring. add new electrical sub panel in unit. install ceiling fluorescent light to comply with title 24. kitchen area approx. 72 sf. no structural work & no wall relocation. | $16,000 |
| Jan 27, 2011 | Completed final sign-off May 2011 | 1130 Larkin St | West Coast Property Mgnt Co | #22- kitchen remodeling: new cabinet, counter, floor & sink, install fluorescent ceiling light fixture to comply with title 24, add sub panel in unit, existing drain line will remain in same location, no structural work, kitchen area 69.75 sq.ft.Details
#22- kitchen remodeling: new cabinet, counter, floor & sink, install fluorescent ceiling light fixture to comply with title 24, add sub panel in unit, existing drain line will remain in same location, no structural work, kitchen area 69.75 sq.ft. | $15,500 |
| May 19, 2010 | Completed final sign-off Jul 2010 | 1130 Larkin St | West Coast Property Mgnt Co | work on unit#2 only. kitchen remodeling: new kitchen cabinets, counter & sink. min . half of kitchen light wattage shall be of fluorescent lights.Details
work on unit#2 only. kitchen remodeling: new kitchen cabinets, counter & sink. min . half of kitchen light wattage shall be of fluorescent lights. | $10,000 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 1130 Larkin St | street space & sidewalk | ||
| May 24, 2005 | Never finaled issued May 2005, no final | 1130 Larkin St | streetspace | ||
| Apr 1, 2005 | Never finaled issued Apr 2005, no final | 1130 Larkin St | street space | ||
| Oct 31, 2000 | Completed final sign-off Dec 2000 | 1130 Larkin St | On-Site Maintenance | rev to permit 923920-remove partial wall to kitchen-remove door & closed wall to open up roomDetails
rev to permit 923920-remove partial wall to kitchen-remove door & closed wall to open up room | $1,000 |
| Oct 16, 2000 | Completed final sign-off Dec 2000 | 1130 Larkin St | On-Site Maintenance | remodel kitchen & bathroom, new lights,tile,lino, cabientsDetails
remodel kitchen & bathroom, new lights,tile,lino, cabients | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- West Coast Property Mgnt Co (14), Axel8 Construction (12), B-Side Inc. (2), On-Site Maintenance (2), Au Electric Corporation/Aec Alarms, Bens Roofing Inc, U S Prime Contractor Inc
- Engineers
- Joe Win Kon (10), Joe Kon (2), Behruz Vahdani-Sanavi, Ph.D.,P.E, Jo Kon, Joe Win Kon, Phil Whitehead
- Designers
- Au Electric Corporation
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.