Diane Wong Hsia Erik Liu
- Listed as
- authorized agent-others, contractor
- Firm
- Transworld Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2023
138 permits since 2000 (contractor on 137 permits, authorized agent-others on 1 permit): 93 completed, 14 never finaled, 31 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 138.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2023 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | revision to 202201266651. selective exterior demo: new exterior glazing and new millwork.Details
revision to 202201266651. selective exterior demo: new exterior glazing and new millwork. | $20,000 |
| Jul 24, 2023 | Completed final sign-off Oct 2024 | 1520 Stockton St | Transworld Construction | 3rd/fl: partial t.i.- selective finishes dcomo to (e) exam rms, new ceiling, lighting, flooring, wall finishes, millwork & refinishes & update core restroom & adding drinking fountainDetails
3rd/fl: partial t.i.- selective finishes dcomo to (e) exam rms, new ceiling, lighting, flooring, wall finishes, millwork & refinishes & update core restroom & adding drinking fountain | $642,882 |
| Jul 24, 2023 | Never finaled issued Sep 2023, no final | 728 Pacific Av | Transworld Construction | suite 604, selective demolition of non-bearing partitions, doors, finishes and ceiling system. new scope includes partitions, ceiling system, lighting & finishes. mep & public restroom. there is no change of useDetails
suite 604, selective demolition of non-bearing partitions, doors, finishes and ceiling system. new scope includes partitions, ceiling system, lighting & finishes. mep & public restroom. there is no change of use | $311,122 |
| Apr 5, 2023 | Expired or cancelled withdrawn Jun 2023 | 188 Octavia St | commencement of work not started under previously approved permit application# 201906254301 (installation of solar hot heating system to supplement (e) hot water system in apartment building)Details
commencement of work not started under previously approved permit application# 201906254301 (installation of solar hot heating system to supplement (e) hot water system in apartment building) | $38,855 | |
| Feb 17, 2023 | Completed final sign-off Aug 2023 | 188 Octavia St | Transworld Construction | to obtain final inspection for work approved under permit application no(s): 202008141837 & 202010146480.Details
to obtain final inspection for work approved under permit application no(s): 202008141837 & 202010146480. | |
| Feb 17, 2023 | Completed final sign-off Aug 2023 | 188 Octavia St | Transworld Construction | to obtain final inspection for work approved under permit application no(s) 201905170948 & 202002144580. all work is complete.Details
to obtain final inspection for work approved under permit application no(s) 201905170948 & 202002144580. all work is complete. | |
| Aug 23, 2022 | Completed final sign-off Aug 2023 | 188 Octavia St | Transworld Construction | adminitrative permit only - to correct unit count from 27 units to 28 units ref pa# 201610059557 s.Details
adminitrative permit only - to correct unit count from 27 units to 28 units ref pa# 201610059557 s. | |
| Aug 22, 2022 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | revisions to bpa 202201266651. replace (e) rear portion of building due to unsafe structural condition. replace like for like. no design changes.Details
revisions to bpa 202201266651. replace (e) rear portion of building due to unsafe structural condition. replace like for like. no design changes. | $50,000 |
| Apr 1, 2022 | Completed final sign-off Mar 2023 | 1174 Folsom St | Transworld Construction | unit b: revision to pa# 202111162490. revised kitchen/ preparation room equipment layout. relocation of proposed sink, ventless hood, & refrigeration equipment.Details
unit b: revision to pa# 202111162490. revised kitchen/ preparation room equipment layout. relocation of proposed sink, ventless hood, & refrigeration equipment. | |
| Jan 26, 2022 | Completed final sign-off Dec 2023 | 1430 Noriega St | Transworld Construction | full floor interior tenant improvement in a single story building. scope includes demo, new partitions, ceiling, lighting, and finishes, mechanical, elec,plumbing *change of use to optometry officeDetails
full floor interior tenant improvement in a single story building. scope includes demo, new partitions, ceiling, lighting, and finishes, mechanical, elec,plumbing *change of use to optometry office | $188,000 |
| Dec 15, 2021 | Completed final sign-off Nov 2022 | 1798 19th Av | Transworld Construction | 1st floor. partial floor interior ti for a new ambulatory medical facility on g/f. selective demo, partitions, ceilings, lighting, mep, & limited structural limited to new slab infill.Details
1st floor. partial floor interior ti for a new ambulatory medical facility on g/f. selective demo, partitions, ceilings, lighting, mep, & limited structural limited to new slab infill. | $256,800 |
| Nov 16, 2021 | Completed final sign-off Mar 2023 | 1174 Folsom St | Transworld Construction | unit b: tenant improvement for 1st time use tenant on g/f of (e) mixed unse building. subdivide exist commercial space for multi. tenants w a cooridor on the ground flrDetails
unit b: tenant improvement for 1st time use tenant on g/f of (e) mixed unse building. subdivide exist commercial space for multi. tenants w a cooridor on the ground flr | $50,000 |
| Oct 18, 2021 | Completed final sign-off Jun 2024 | 2574 San Bruno Av | Transworld Construction | tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520.Details
tenant improvement: upgrade lighting, millwork and finishes. ref. pa 201504012520. | $150,000 |
| Apr 22, 2021 | Never finaled issued Jun 2021, no final | 1174 Folsom St | Transworld Construction | this is fire alarm as-built drawings for f/a permit dbi app # 2015-0826-5383 s6 issued 9/17/2019. sheet fa4.01 new annunciator panel detail.Details
this is fire alarm as-built drawings for f/a permit dbi app # 2015-0826-5383 s6 issued 9/17/2019. sheet fa4.01 new annunciator panel detail. | |
| Nov 5, 2020 | Expired or cancelled withdrawn Dec 2020 | 188 Octavia St | Transworld Construction | revision to the issued s$ (fa) for pa #2016-1005-9557; provide as-built drawings.Details
revision to the issued s$ (fa) for pa #2016-1005-9557; provide as-built drawings. | |
| Feb 14, 2020 | Completed final sign-off Aug 2023 | 188 Octavia St | Transworld Construction | revision 201610059557 s2 (arch/mep) elevator hoistmway access enclosure detailDetails
revision 201610059557 s2 (arch/mep) elevator hoistmway access enclosure detail | |
| Sep 3, 2019 | Expired or cancelled expired Dec 2023 | 1178 Folsom St | Transworld Construction | metal railing fabrication and installation for bld permit 201508265383 s1/r1Details
metal railing fabrication and installation for bld permit 201508265383 s1/r1 | $25,000 |
| Aug 27, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | Transworld Construction | revision to pa 201904087356 minor front facade remodel - remove brick & replace with wood siding to match (e) entry door, garage door & stepsDetails
revision to pa 201904087356 minor front facade remodel - remove brick & replace with wood siding to match (e) entry door, garage door & steps | $12,000 |
| May 22, 2019 | Completed final sign-off Aug 2019 | 3431 Taraval St | Transworld Construction | install plastic sign to wallDetails
install plastic sign to wall | $2,000 |
| May 17, 2019 | Never finaled issued Aug 2019, no final | 188 Octavia St | Transworld Construction | rev to pa# 201610059557-s2 modified floor, ceiling, assembly details at 2-hr exteror walls and 1- hr floorsDetails
rev to pa# 201610059557-s2 modified floor, ceiling, assembly details at 2-hr exteror walls and 1- hr floors | |
| Apr 8, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | Transworld Construction | interior renovation and lightwell infill construction. interior partitions, windows in kind, plumbing,mech, elec. relocate kitchen, living room, dining room, powder rm to ground fl. 3 bdrms, den, 3 baths 2nd fl,Details
interior renovation and lightwell infill construction. interior partitions, windows in kind, plumbing,mech, elec. relocate kitchen, living room, dining room, powder rm to ground fl. 3 bdrms, den, 3 baths 2nd fl, | $250,000 |
| Feb 21, 2019 | Never finaled issued Mar 2019, no final | 1178 Folsom St | Transworld Construction | ref pa# 2015082653833 a proposed janitor room to be converted to a 2-hr protected room to place fire alarm eqipments, eercs,& two way comm. (all under sep permit) to enlarge elevator closet on the roof to become an elevator room per fire dept. suggestionDetails
ref pa# 2015082653833 a proposed janitor room to be converted to a 2-hr protected room to place fire alarm eqipments, eercs,& two way comm. (all under sep permit) to enlarge elevator closet on the roof to become an elevator room per fire dept. suggestion | |
| Feb 15, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | Transworld Construction | demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs.Details
demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs. | $5,000 |
| Oct 18, 2018 | Completed final sign-off Mar 2019 | 75 Ofarrell St | Transworld Construction | tenant improvement to remodel (e) restaurant to install new sink, kitchen sink, refrigerators, & new counters.Details
tenant improvement to remodel (e) restaurant to install new sink, kitchen sink, refrigerators, & new counters. | $10,000 |
| Mar 27, 2018 | Completed final sign-off May 2020 | 650 Polk St | Transworld Construction | change of use for new health clinic. demo (e) interior structures & bld systems. refurbish (e) facade. construction of new interior clinic with respective structures and bld systems. grnd & mezz levelsDetails
change of use for new health clinic. demo (e) interior structures & bld systems. refurbish (e) facade. construction of new interior clinic with respective structures and bld systems. grnd & mezz levels | $500,000 |
| Mar 1, 2018 | Completed final sign-off Jul 2021 | 1174 Folsom St | Transworld Construction | revisions to approved addendum (201508265383-s1 & s2), structural, foundation & podium onlyDetails
revisions to approved addendum (201508265383-s1 & s2), structural, foundation & podium only | |
| Feb 21, 2018 | Completed final sign-off Jul 2022 | 939 Eddy St | Transworld Construction | soft story upgrade completed under pa #201503261963 and in response to nv #201715442 per 2016 cebc appendix a-4.Details
soft story upgrade completed under pa #201503261963 and in response to nv #201715442 per 2016 cebc appendix a-4. | |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 3437 Taraval St | Transworld Construction, Foundation Soil Stabilization | permeation grouting to provide temp shoringDetails
permeation grouting to provide temp shoring | $4,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 3425 Taraval St | Transworld Construction, Foundation Soil Stabilization | permeation grouting to fortify (e) foundation of buildingDetails
permeation grouting to fortify (e) foundation of building | $11,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 3431 Taraval St | Transworld Construction, Foundation Soil Stabilization | permeation grouting to provide temp shoring, ref 201609147642 s1Details
permeation grouting to provide temp shoring, ref 201609147642 s1 | $7,000 |
| Jan 24, 2018 | Completed final sign-off Jul 2018 | 1447 37th Av | Transworld Construction | revision to 201708235672 connect (e) 2nd flr bathroom layout. relocate 2 bathrooms at 1st. replace water heater to an outdoor tankless w/hDetails
revision to 201708235672 connect (e) 2nd flr bathroom layout. relocate 2 bathrooms at 1st. replace water heater to an outdoor tankless w/h | $1,000 |
| Aug 23, 2017 | Completed final sign-off Jul 2018 | 1447 37th Av | Transworld Construction | add full bath on 2nd floor. add a media room, 2 bedrooms, 2 bathrooms and a storage room on 1st flDetails
add full bath on 2nd floor. add a media room, 2 bedrooms, 2 bathrooms and a storage room on 1st fl | $70,000 |
| Jun 13, 2017 | Never finaled issued Jun 2017, no final | 477 Ofarrell St | Transworld Construction | common area- replace (e) residential corridor flooring, corridor ceiling system for all floors. (e) basement & g/f flooring at selected areas, (e) g/f ceiling at selected areas, at office, storage, restrooms, dining area, lobby, with no change to the floor plan.Details
common area- replace (e) residential corridor flooring, corridor ceiling system for all floors. (e) basement & g/f flooring at selected areas, (e) g/f ceiling at selected areas, at office, storage, restrooms, dining area, lobby, with no change to the floor plan. | $500,000 |
| Apr 6, 2017 | Completed final sign-off Jan 2018 | 1422 Noriega St | Transworld Construction | remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwallDetails
remove (e) partywall,partitoins,ceiling/suffit, entry dr & back stair & install partiitons, finishes, gym bd ceilings,casework, elec power,lighting,mech air distr, replace window. create reception area, member svcs area & exam areas. relocate & upgrade (e) restrm & 1 (n) restrm. footing, shearwall | $200,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2020 | 1168 Folsom St | Transworld Construction | shoring and tie-back to support excavation and construction of 1174-1178 folsom st pa 2015-0825-5383. maher naDetails
shoring and tie-back to support excavation and construction of 1174-1178 folsom st pa 2015-0825-5383. maher na | $150,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2020 | 1174 Folsom St | Transworld Construction | shoring along folsom and clementina st frontage to support excavation and construction of 1174-1178 folsom under pa 2015-0826-5383Details
shoring along folsom and clementina st frontage to support excavation and construction of 1174-1178 folsom under pa 2015-0826-5383 | $124,000 |
| Oct 14, 2016 | Completed final sign-off Jun 2020 | 1180 Folsom St | Transworld Construction | shoring, tie-back and foundation extension to support excavation and construction of 1174-1178 folsom pa 2015-0826-5383Details
shoring, tie-back and foundation extension to support excavation and construction of 1174-1178 folsom pa 2015-0826-5383 | $136,800 |
| Sep 14, 2016 | Completed final sign-off Aug 2019 | 3431 Taraval St | Transworld Construction | renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrtDetails
renov(e)1st story of a type 5 bldg.upgrade(e)foundation to support 1 new story add above(e)1st story.install a new elevator,an auto.sprinklr sym,(n)stair/intr parti/acoustical ceilings/lighting access.restrms, upgrade(e)pwr distribution/plumb/mech sym(n)roof/roof deck (n)flring,windows,drs&storefrt | $600,000 |
| Jun 22, 2016 | Completed final sign-off Aug 2016 | 728 Pacific Av | Transworld Construction | unit #201: remove interior partitions, doors, finishes, mechanical units, duct work, electrical outlets, conduit. vacant space. maher n/aDetails
unit #201: remove interior partitions, doors, finishes, mechanical units, duct work, electrical outlets, conduit. vacant space. maher n/a | $20,000 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 951 Eddy St | Transworld Construction | this is a revision to pa#201503261957 in order to clarify the full scope of accessibility improvement required by mayor's office on disability in their enforcement of the 2010 ada standards and the california building code.Details
this is a revision to pa#201503261957 in order to clarify the full scope of accessibility improvement required by mayor's office on disability in their enforcement of the 2010 ada standards and the california building code. | |
| Jan 13, 2016 | Completed final sign-off Apr 2017 | 939 Eddy St | Transworld Construction | this is a revision to pa#201503261963 in order to clarify the full scope of accessibility improvement required by mayor's office on disability in their enforcement of the 2010 ada standards and the california building code.Details
this is a revision to pa#201503261963 in order to clarify the full scope of accessibility improvement required by mayor's office on disability in their enforcement of the 2010 ada standards and the california building code. | |
| Nov 30, 2015 | Never finaled issued Dec 2015, no final | 2574 San Bruno Av | Transworld Construction | revision to app# 201504012520. add approx 8 l.f of non-bearing glass partition.Details
revision to app# 201504012520. add approx 8 l.f of non-bearing glass partition. | |
| Sep 11, 2015 | Completed final sign-off Jun 2020 | 1174 Folsom St | Transworld Construction | demolish 2-story, type 5, office & warehouse bldg.Details
demolish 2-story, type 5, office & warehouse bldg. | $42,000 |
| Sep 9, 2015 | Completed final sign-off Sep 2015 | 1450 Noriega St | Transworld Construction | to obtain a final inspection for work approved under #200910159007. all work is complete.Details
to obtain a final inspection for work approved under #200910159007. all work is complete. | |
| Aug 26, 2015 | Completed final sign-off Aug 2021 | 1174 Folsom St | North Star Plumbing & Fire Protection, Transworld Construction | erect 6-story, 1 basement for 42 dwelling units, retail and office building. type 3-a construction. maher ordinance is comply.Details
erect 6-story, 1 basement for 42 dwelling units, retail and office building. type 3-a construction. maher ordinance is comply. | $6,300,000 |
| Jun 1, 2015 | Never finaled issued Dec 2015, no final | 2574 San Bruno Av | Transworld Construction | mechanical system for air electrical and plumbing for new equipmentDetails
mechanical system for air electrical and plumbing for new equipment | $50,000 |
| May 28, 2015 | Expired or cancelled expired Oct 2025 | 728 Pacific Av | Transworld Construction | #201 -revision to app#201409035287 - infill escalator pit with steel angle and metal deck. n/a for the maher.Details
#201 -revision to app#201409035287 - infill escalator pit with steel angle and metal deck. n/a for the maher. | $10,000 |
| Apr 1, 2015 | Completed final sign-off Dec 2015 | 2574 San Bruno Av | Transworld Construction | convert medical exam room to dental clinic. convert storage room to x-ray. 5/29/15 mc slip sheets per mech comments:revised some pg & add 00a e00b/ e0.1/e0.2/e.03/e1.0/e1.1/e2.2/e3.0/e3.1e3.2Details
convert medical exam room to dental clinic. convert storage room to x-ray. 5/29/15 mc slip sheets per mech comments:revised some pg & add 00a e00b/ e0.1/e0.2/e.03/e1.0/e1.1/e2.2/e3.0/e3.1e3.2 | $130,000 |
| Mar 26, 2015 | Completed final sign-off Apr 2017 | 939 Eddy St | Transworld Construction | mohcd rad program submittal. renovation; accessibility upgrades, ufe safety upgrades, soft-story improvement, deferred maintenance, finishes, fixtures, paint, roof, mep included. sprinkler's and fire alarm under seperate permit.Details
mohcd rad program submittal. renovation; accessibility upgrades, ufe safety upgrades, soft-story improvement, deferred maintenance, finishes, fixtures, paint, roof, mep included. sprinkler's and fire alarm under seperate permit. | $3,148,459 |
| Mar 26, 2015 | Completed final sign-off May 2017 | 951 Eddy St | Transworld Construction | mohcd rad program submittal. renovation; accessibility improvements, deferred maintenance, community space upgrades, finishes, roof, mep included. elevator controller, sprinklers and fire alarm under seperate permit.Details
mohcd rad program submittal. renovation; accessibility improvements, deferred maintenance, community space upgrades, finishes, roof, mep included. elevator controller, sprinklers and fire alarm under seperate permit. | $1,964,496 |
| Oct 14, 2014 | Completed final sign-off Sep 2015 | 1450 Noriega St | Transworld Construction | demolish approx. 16 l.f. non-bearing partition. install approx. 13 l.f. of non-bearing partition. 1 new door, relocate (e) sink associated elec. & plumbing, millwork. approx 9 l.f.Details
demolish approx. 16 l.f. non-bearing partition. install approx. 13 l.f. of non-bearing partition. 1 new door, relocate (e) sink associated elec. & plumbing, millwork. approx 9 l.f. | $40,000 |
| Sep 3, 2014 | Completed final sign-off Feb 2017 | 728 Pacific Av | Transworld Construction | unit #201: renovate 2,210 sf of open office space to member services room. new single use restroom @ existing restroom; mep under separate. maher n/aDetails
unit #201: renovate 2,210 sf of open office space to member services room. new single use restroom @ existing restroom; mep under separate. maher n/a | $200,000 |
| Apr 30, 2014 | Completed final sign-off Aug 2014 | 1520 Stockton St | Transworld Construction | install 3 new i.t. closet on 2nd, 4th, 5th floors. core (2) 5" round holes at each. approx 3'x5' size rooms. 15 l.f. total non bearing rated partition.Details
install 3 new i.t. closet on 2nd, 4th, 5th floors. core (2) 5" round holes at each. approx 3'x5' size rooms. 15 l.f. total non bearing rated partition. | $4,500 |
| Dec 30, 2013 | Completed final sign-off May 2015 | 1520 Stockton St | Transworld Construction | 4th fl. demolish (e) acoustic tile change approx. 800 sq ft. construct approx 190 lf. of non-bearing partition. (n) atc & lights & add one (n) sink.Details
4th fl. demolish (e) acoustic tile change approx. 800 sq ft. construct approx 190 lf. of non-bearing partition. (n) atc & lights & add one (n) sink. | $112,200 |
| Nov 21, 2012 | Completed final sign-off Sep 2015 | 465 Grant Av | Transworld Construction | remodel lobby including new finishes,reception desk. replace (e) storefront windows & tile at ext ground flr w/new in kind. voluntary ada upgrade of two guestrms @ 6th flr, flrs 2-6: cosmetic remodel 70 guestrms including new carpet & paint, new bathrm fixtures & shower stalls, new bathrm tileDetails
remodel lobby including new finishes,reception desk. replace (e) storefront windows & tile at ext ground flr w/new in kind. voluntary ada upgrade of two guestrms @ 6th flr, flrs 2-6: cosmetic remodel 70 guestrms including new carpet & paint, new bathrm fixtures & shower stalls, new bathrm tile | $425,000 |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 1167 Mission St | Transworld Construction | revision to appl #2012.0801.6295: revised portions are shown per delta 1 set - modify entries to opposite sides of corridor (either end). 1 page drawing a2.0Details
revision to appl #2012.0801.6295: revised portions are shown per delta 1 set - modify entries to opposite sides of corridor (either end). 1 page drawing a2.0 | |
| Aug 1, 2012 | Never finaled issued Aug 2012, no final | 1167 Mission St | Transworld Construction | build a fire rated corridor wall at 2nd floor.Details
build a fire rated corridor wall at 2nd floor. | $4,000 |
| Apr 25, 2012 | Completed final sign-off Dec 2012 | 1400 Noriega St | Transworld Construction | change of use from retail/office to medical offices. tenant improvements on 2 flrs. install 9 exam rms, pharmacy, medical/office rm. soiled/clean rm, staff lunch rm, reception & rn stations & associated ancillary spaces. install ceilings/lighting/ power data/mechanical/plumbing. sprinkler sep permitDetails
change of use from retail/office to medical offices. tenant improvements on 2 flrs. install 9 exam rms, pharmacy, medical/office rm. soiled/clean rm, staff lunch rm, reception & rn stations & associated ancillary spaces. install ceilings/lighting/ power data/mechanical/plumbing. sprinkler sep permit | $700,000 |
| Apr 24, 2012 | Completed final sign-off Jun 2012 | 1204 Mason St | Transworld Construction | replace existing double hung wood window to new vinyl dual glazed, low "e" glass stc 26 rating total of 92 windows, no windows will not be replaced on the public visible side (max u factor .4)Details
replace existing double hung wood window to new vinyl dual glazed, low "e" glass stc 26 rating total of 92 windows, no windows will not be replaced on the public visible side (max u factor .4) | $30,000 |
| May 31, 2011 | Completed final sign-off May 2012 | 1168 Folsom St | Transworld Construction | complies w/ nov #200669672, item #1 only. revise appl# 20070125637 & 200803126949. demolish existing wall that separate the 2 ground floor commercial spaces in order to create 1 larger commercial space. install a new platform lift at the entry area for accessibility.Details
complies w/ nov #200669672, item #1 only. revise appl# 20070125637 & 200803126949. demolish existing wall that separate the 2 ground floor commercial spaces in order to create 1 larger commercial space. install a new platform lift at the entry area for accessibility. | $50,000 |
| Feb 11, 2011 | Completed final sign-off Aug 2011 | 1520 Stockton St | Transworld Construction | 1install new plumbing/lighting fixtures, finishes. barrier removal, full compliance.Details
1install new plumbing/lighting fixtures, finishes. barrier removal, full compliance. | $20,000 |
| Dec 3, 2010 | Expired or cancelled cancelled Jun 2014 | 1178 Folsom St | Transworld Construction | change (e) office area to fast food restaurant use. construct new kitchen with counter & food pre equipment per plan at ground floor. modified (e) store front.Details
change (e) office area to fast food restaurant use. construct new kitchen with counter & food pre equipment per plan at ground floor. modified (e) store front. | $20,000 |
| Sep 10, 2010 | Never finaled issued Dec 2010, no final | 1251 Turk St | Transworld Construction | enclosed walkay addition, elevator upgrades, exterior (n) ramp and walkways, lighting and landscaping. note: see pa #2010-0629-5562 for related work on the senior center (1111 buchanan st.) that share the same set of drawings.Details
enclosed walkay addition, elevator upgrades, exterior (n) ramp and walkways, lighting and landscaping. note: see pa #2010-0629-5562 for related work on the senior center (1111 buchanan st.) that share the same set of drawings. | $212,500 |
| Jun 29, 2010 | Never finaled issued Dec 2010, no final | 1111 Buchanan St | Transworld Construction | exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs.Details
exterior paint, replace all windows/doors. (n) site access gate, exterior ramp/walkways, landscape. interior ada upgrades to (e) bathrooms, (n) accessible toilet rooms, interior renovation. see pa #2010-0910-0604 for related work on senior housing (1251 turk st.) that share same set of drwgs. | $1,941,237 |
| Jun 28, 2010 | Completed final sign-off Oct 2010 | 1520 Stockton St | Transworld Construction | remove approx 22 lf non bearing partition; patch/repair install work counter 8 outletsDetails
remove approx 22 lf non bearing partition; patch/repair install work counter 8 outlets | $6,000 |
| Jun 18, 2010 | Completed final sign-off Jan 2012 | 1760 Bush St | Transworld Construction | exterior window and door replacement. replacing (e) single pane non thermally broken alum. frames with (n) dual pane thermally broken frames- includes structural plans-Details
exterior window and door replacement. replacing (e) single pane non thermally broken alum. frames with (n) dual pane thermally broken frames- includes structural plans- | $1,500,000 |
| Jun 18, 2010 | Completed final sign-off Jan 2012 | 1880 Pine St | Transworld Construction | exterior window and door replacement. replace (e) non thermally broken single pane alum. windows w/ new thermally broken dual pane alum. windows.includes structural plansDetails
exterior window and door replacement. replace (e) non thermally broken single pane alum. windows w/ new thermally broken dual pane alum. windows.includes structural plans | $1,100,000 |
| Mar 1, 2010 | Completed final sign-off Aug 2010 | 156 Eddy St | Transworld Construction | minor alterations to ground floor commercial space. partitions & doors, including minor alteration of 1 hour corridor. installation of automatic door opener on entry door. field verify if sprinkler/life safety is required under seperate permitDetails
minor alterations to ground floor commercial space. partitions & doors, including minor alteration of 1 hour corridor. installation of automatic door opener on entry door. field verify if sprinkler/life safety is required under seperate permit | $20,000 |
| Feb 2, 2010 | Completed final sign-off Apr 2015 | 1450 Noriega St | Transworld Construction | installation of surface mounted wall signs on noriega st. & 22nd. ave.Details
installation of surface mounted wall signs on noriega st. & 22nd. ave. | $12,000 |
| Dec 15, 2009 | Completed final sign-off Jun 2012 | 1520 Stockton St | Transworld Construction | interior renovation, install 6 exam rooms @ 5th floor, modify (e) reception desk to be accessible, upgrade (e) men's & women's multi-accommodation toilet 5th floor, provide accessible drinking fountain @ 5th floor.Details
interior renovation, install 6 exam rooms @ 5th floor, modify (e) reception desk to be accessible, upgrade (e) men's & women's multi-accommodation toilet 5th floor, provide accessible drinking fountain @ 5th floor. | $350,000 |
| Dec 11, 2009 | Completed final sign-off Feb 2010 | 1450 Noriega St | Transworld Construction | change medical prep. room & toilet location. revision to appl.#2009/0302/3179.Details
change medical prep. room & toilet location. revision to appl.#2009/0302/3179. | $7,000 |
| Dec 4, 2009 | Completed final sign-off Feb 2010 | 665 Clay St | Transworld Construction | to obtain final inspection for work approved under pa #200505202984, all work is complete, tenant improvements to existing empty restaurant, build out office only.Details
to obtain final inspection for work approved under pa #200505202984, all work is complete, tenant improvements to existing empty restaurant, build out office only. | |
| Oct 15, 2009 | Expired or cancelled expired Mar 2015 | 1450 Noriega St | Transworld Construction | revision to 200903023179: structural work: new infill shearwall at existing openingDetails
revision to 200903023179: structural work: new infill shearwall at existing opening | $3,250 |
| Jun 22, 2009 | Expired or cancelled cancelled Mar 2010 | 2574 San Bruno Av | Transworld Construction | rev.to appl.200707318322 s3/r1.1)add it server room @ bsmt fl.2 modify signage type & location per code. 3-revise room identification signs. 4) add fire damper @ 1 hr fr wall due occupancy separation. 5)mod.stair dimensions at basement per code req. 6) modify glazzing sizes door hardwaresand type.Details
rev.to appl.200707318322 s3/r1.1)add it server room @ bsmt fl.2 modify signage type & location per code. 3-revise room identification signs. 4) add fire damper @ 1 hr fr wall due occupancy separation. 5)mod.stair dimensions at basement per code req. 6) modify glazzing sizes door hardwaresand type. | $20,000 |
| Jun 12, 2009 | Completed final sign-off Nov 2009 | 1520 Stockton St | Transworld Construction | revision to appl #200903254819 - remodel @ westside of the 2nd floor, provide new ceiling at hall, eliminate closet 217a, clarification - dimension of men's toilet room & details, all interior work.Details
revision to appl #200903254819 - remodel @ westside of the 2nd floor, provide new ceiling at hall, eliminate closet 217a, clarification - dimension of men's toilet room & details, all interior work. | $7,000 |
| Mar 25, 2009 | Completed final sign-off Nov 2009 | 1520 Stockton St | Transworld Construction | remodel westside of 2nd floor. interior: install10 exams, office, custodian & closet, upgrade existing men's multi-accomodation toilet to be current accessible compliance. fire sprinkler work under separate permit.Details
remodel westside of 2nd floor. interior: install10 exams, office, custodian & closet, upgrade existing men's multi-accomodation toilet to be current accessible compliance. fire sprinkler work under separate permit. | $390,000 |
| Mar 20, 2009 | Completed final sign-off Jul 2009 | 50 08th St | Transworld Construction | revision to 200806184738, change t24 van parking on ground floorDetails
revision to 200806184738, change t24 van parking on ground floor | |
| Jun 5, 2008 | Completed final sign-off Jun 2008 | 2121 Geary Bl | Transworld Construction | revision to appl #200708038751, 200804250701, 200708038755, 200804250702- to show stair occupant load calculations for clarification required by inspector.Details
revision to appl #200708038751, 200804250701, 200708038755, 200804250702- to show stair occupant load calculations for clarification required by inspector. | |
| May 1, 2008 | Completed final sign-off Mar 2010 | 2574 San Bruno Av | Transworld Construction | shoring and underpinning the street property adjoining a new building site.Details
shoring and underpinning the street property adjoining a new building site. | $30,000 |
| May 1, 2008 | Expired or cancelled expired Mar 2023 | 2598 San Bruno Av | Transworld Construction | shoring and underpinning of a property adjacent to a new building siteDetails
shoring and underpinning of a property adjacent to a new building site | $60,000 |
| May 1, 2008 | Expired or cancelled expired May 2012 | 120 Burrows St | Transworld Construction | underpinning a property adjacent to a new building siteDetails
underpinning a property adjacent to a new building site | $60,000 |
| May 1, 2008 | Completed final sign-off Apr 2010 | 2562 San Bruno Av | Transworld Construction | shoring and underpinning at a property adjacent to a new building siteDetails
shoring and underpinning at a property adjacent to a new building site | $60,000 |
| May 1, 2008 | Never finaled issued Jun 2008, no final | 271 Girard St | Transworld Construction | shoring at a property adjacent to a new building siteDetails
shoring at a property adjacent to a new building site | $3,000 |
| Mar 21, 2008 | Completed final sign-off Mar 2012 | 855 Sacramento St | Transworld Construction, Thompson Builders Corp | add a new 3-story bldg with natatorium at ground level, health/fitness facilities on 2nd & 3rd floors. remodel existing 4-story bldg as locker facilities on ground level, a ymca community center on 1st & 2nd levels & residential on 3rd level.Details
add a new 3-story bldg with natatorium at ground level, health/fitness facilities on 2nd & 3rd floors. remodel existing 4-story bldg as locker facilities on ground level, a ymca community center on 1st & 2nd levels & residential on 3rd level. | $8,000,000 |
| Mar 18, 2008 | Expired or cancelled expired Jul 2008 | 665 Clay St | Transworld Construction | renew pa#200501274099 for final inspection.Details
renew pa#200501274099 for final inspection. | |
| Jan 23, 2008 | Completed final sign-off Jan 2010 | 855 Sacramento St | Transworld Construction | demolition of interior non-structural walls on ground, 1st, 2nd floors. removal tile from swimming pool. 2nd floor remodel under appl #9104539, issued, but not final or final inspection. all new construction will be submitted on new permit.Details
demolition of interior non-structural walls on ground, 1st, 2nd floors. removal tile from swimming pool. 2nd floor remodel under appl #9104539, issued, but not final or final inspection. all new construction will be submitted on new permit. | $25,000 |
| Aug 3, 2007 | Completed final sign-off Jun 2008 | 2141 Geary Bl | Transworld Construction | replacement of exterior stairway in kindDetails
replacement of exterior stairway in kind | $100,000 |
| Aug 3, 2007 | Completed final sign-off Jun 2008 | 2121 Geary Bl | Transworld Construction | replacement of exterior stairway in kind.Details
replacement of exterior stairway in kind. | $100,000 |
| Jul 31, 2007 | Completed final sign-off Apr 2010 | 2574 San Bruno Av | Transworld Construction | erect 2-story, type 5, 1-hr medical clinic building with basement.Details
erect 2-story, type 5, 1-hr medical clinic building with basement. | $4,000,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 2141 Geary Bl | Transworld Construction | remove loose plaster under existing stair landing (explortary).Details
remove loose plaster under existing stair landing (explortary). | $3,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 2040 Ofarrell St | Transworld Construction | remove loose plaster under existing stair landing (explortary).Details
remove loose plaster under existing stair landing (explortary). | $3,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 2121 Geary Bl | Transworld Construction | remove loose plaster under existing stair landing (explortary).Details
remove loose plaster under existing stair landing (explortary). | $3,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 1450 Divisadero St | Transworld Construction | remove loose plaster under existing stair landing (explortary).Details
remove loose plaster under existing stair landing (explortary). | $3,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 2060 Ofarrell St | Transworld Construction | remove loose plaster under existing stair landing (explortary).Details
remove loose plaster under existing stair landing (explortary). | $3,000 |
| Jun 11, 2007 | Expired or cancelled expired Feb 2008 | 1415 Scott St | Transworld Construction | remove loose plaster under existing stair landing (explortary).Details
remove loose plaster under existing stair landing (explortary). | $3,000 |
| Jan 16, 2007 | Completed final sign-off May 2007 | 1167 Mission St | Transworld Construction | oti-1 4th flDetails
oti-1 4th fl | $2,000 |
| Jan 10, 2007 | Completed final sign-off May 2007 | 1167 Mission St | Transworld Construction | renew pa#200110039866 for final inspection.Details
renew pa#200110039866 for final inspection. | |
| Oct 30, 2006 | Completed final sign-off Nov 2006 | 175 17th Av | Transworld Construction | submit as built as per inspection notice for final inspection. appl#200601263115 & 200511289034. all work at ground floor.Details
submit as built as per inspection notice for final inspection. appl#200601263115 & 200511289034. all work at ground floor. | |
| Oct 30, 2006 | Completed final sign-off Nov 2006 | 175 17th Av | Transworld Construction | renew pa# 2006/01/26/3115 for final inspection.Details
renew pa# 2006/01/26/3115 for final inspection. | |
| Nov 22, 2005 | Completed final sign-off Nov 2005 | 1820 Post St | Transworld Construction | renewal for sign off for app #200505132379Details
renewal for sign off for app #200505132379 |