Eddy T Lau
- License
- G506
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Ed2 International
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Feb 2018
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Foundation Soil Stabilization (3), Transworld Construction (3)
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 3431 Taraval St | Transworld Construction, Foundation Soil Stabilization | permeation grouting to provide temp shoring, ref 201609147642 s1Details
permeation grouting to provide temp shoring, ref 201609147642 s1 | $7,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 3425 Taraval St | Transworld Construction, Foundation Soil Stabilization | permeation grouting to fortify (e) foundation of buildingDetails
permeation grouting to fortify (e) foundation of building | $11,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2019 | 3437 Taraval St | Transworld Construction, Foundation Soil Stabilization | permeation grouting to provide temp shoringDetails
permeation grouting to provide temp shoring | $4,000 |